Multi-domain and multi-source resource management method for vehicle-road collaboration based on information availability
Through the vehicle-road collaborative multi-domain and multi-source resource management method driven by information availability, data processing resources are dynamically allocated, which solves the problems of resource waste and data loss in the Internet of Vehicles and achieves more efficient data processing and transmission.
Patent Information
- Application Number
- CN202210194126.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-01
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-03-01
AI Technical Summary
In existing Internet of Vehicles technology, data transmission and processing are mostly based on preset sampling frequencies, resulting in outdated or useless sensing information, serious waste of resources, and failure to transmit and process some important data in a timely manner, resulting in the loss of effective data.
This paper proposes a vehicle-road collaborative multi-domain and multi-source resource management method based on information availability. It obtains road environment information through roadside units, divides management sub-areas, calculates static and dynamic environmental complexity, optimizes resource allocation proportions, and realizes data processing resources. Dynamic allocation.
It improves the utilization of data processing resources, ensures the effective operation of Internet of Vehicles applications, and reduces resource waste and data loss.
Smart Images

Figure CN114640944B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of vehicle networking technology, and in particular to a vehicle-road collaborative multi-domain and multi-source resource management method based on information availability, a computer-readable storage medium and a computer device. Background Art
[0002] The rapid development of artificial intelligence and mobile communications has promoted revolutionary progress in Internet of Vehicles technology, giving rise to many emerging Internet of Vehicles applications that require information about the vehicle's surrounding environment (for example, autonomous driving applications, virtual reality applications, or perception applications such as digital twins); these applications require real-time transmission and processing of large amounts of high-dimensional, multimodal distributed perception data.
[0003] In the related technology, when transmitting and processing data for Internet of Vehicles applications, most of the time, simple quantized coded data is obtained based on a pre-set sampling frequency. In this way, much perception information is outdated or useless for vehicle applications, which will lead to serious waste of resources. In addition, due to the limitations of communication bandwidth and computing power, some important perception data cannot be transmitted and processed in a timely manner, resulting in the loss of valid data. Summary of the invention
[0004] The present invention aims to solve at least one of the technical problems in the above-mentioned technologies to a certain extent. To this end, one purpose of the present invention is to propose a vehicle-road collaborative multi-domain and multi-source resource management method based on information availability, which can realize the dynamic allocation of data processing resources, improve the utilization rate of data processing resources, and ensure the effective operation of Internet of Vehicles applications.
[0005] A second object of the present invention is to provide a computer-readable storage medium.
[0006] A third object of the present invention is to provide a computer device.
[0007] To achieve the above-mentioned purpose, an embodiment of the first aspect of the present invention proposes a vehicle-road collaborative multi-domain and multi-source resource management method based on information availability, including the following steps: a roadside unit obtains road environment information of the corresponding management area, and divides the management area according to the road environment information to obtain multiple management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information; the roadside unit obtains the vehicle perception data corresponding to each management sub-area and the position information corresponding to each vehicle in the management area; calculates the dynamic environment complexity corresponding to each management sub-area according to the position information corresponding to each vehicle, and calculates the traffic complexity corresponding to each management sub-area according to the static environment complexity and the dynamic environment complexity; calculates the estimated processing completion time of the vehicle perception data corresponding to each management sub-area according to the traffic complexity, and calculates the information available value corresponding to the management area according to the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data; optimizes the information available value through an optimization algorithm to obtain the optimal information available value, and determines the resource allocation ratio corresponding to each sub-area according to the optimal information available value.
[0008] According to the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability of an embodiment of the present invention, first, the roadside unit obtains the road environment information of the corresponding management area, and divides the management area according to the road environment information to obtain a plurality of management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information; then, the roadside unit obtains the vehicle perception data corresponding to each management sub-area and the position information corresponding to each vehicle in the management area; then, the roadside unit calculates the dynamic environment complexity corresponding to each management sub-area according to the position information corresponding to each vehicle, and calculates the dynamic environment complexity corresponding to each management sub-area according to the static environment complexity and the dynamic environment complexity. The traffic complexity corresponding to each management sub-area is calculated according to the traffic complexity; then, the estimated processing completion time of the vehicle perception data corresponding to each management sub-area is calculated according to the traffic complexity, and the information available value corresponding to the management area is calculated according to the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data; then, the information available value is optimized through the optimization algorithm to obtain the optimal information available value, and the resource allocation ratio corresponding to each sub-area is determined according to the optimal information available value; thereby realizing the dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0009] In addition, the vehicle-road cooperative multi-domain and multi-source resource management method based on information availability proposed in the above embodiment of the present invention may also have the following additional technical features:
[0010] Optionally, the roadside unit obtains vehicle perception data corresponding to each management sub-area, including: the roadside unit obtains the data transmission capability value and the data processing capability value corresponding to each vehicle in the management sub-area, and determines the best processing vehicle corresponding to the management sub-area based on the data transmission capability value and the data processing capability value, and receives the vehicle perception data in the corresponding management sub-area through the best processing vehicle.
[0011] Optionally, the traffic complexity is calculated according to the following formula:
[0012]
[0013] Among them, ε n (t) represents the traffic complexity, represents the complexity of the static environment, Represents the complexity of the dynamic environment.
[0014] Optionally, the estimated processing completion time is calculated according to the following formula:
[0015] R n,RSU (t) = τ n (t)B log(1+ζ n (t))
[0016] Among them, R n,RSU (t) represents the communication transmission rate of the management sub-area, τ n (t) represents the transmission bandwidth ratio of the management sub-area, ζ n (t) represents the transmission signal-to-noise ratio of the management sub-area at time t;
[0017] μ n (t) = γε n (t)
[0018] Among them, μ n (t) represents the computational complexity, γ represents the conversion coefficient, and ε n (t) represents traffic complexity;
[0019]
[0020]
[0021] Among them, b n Indicates the amount of perception data corresponding to the management sub-area, represents the perceived data transmission time, represents the perception data calculation time, C n,t Indicates the computing resource allocation ratio corresponding to the management sub-area;
[0022]
[0023] Where t′ represents the estimated processing completion time, and t represents the current time.
[0024] Optionally, the information availability value is calculated according to the following formula:
[0025]
[0026] Among them, A RSU represents the information availability value, N represents the number of management sub-areas, and U n (t′) represents the time when the latest vehicle perception data corresponding to the management area is obtained.
[0027] To achieve the above-mentioned objectives, the second aspect of the present invention proposes a computer-readable storage medium, on which a vehicle-road collaborative multi-domain multi-source resource management program based on information availability is stored. When the vehicle-road collaborative multi-domain multi-source resource management program based on information availability is executed by a processor, it implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above.
[0028] According to the computer-readable storage medium of an embodiment of the present invention, by storing a vehicle-road collaborative multi-domain multi-source resource management program based on information availability, the processor implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above when executing the vehicle-road collaborative multi-domain multi-source resource management program based on information availability, thereby realizing dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0029] To achieve the above-mentioned objectives, the third aspect of the present invention proposes a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, it implements the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability as described above.
[0030] According to the computer device of an embodiment of the present invention, the vehicle-road collaborative multi-domain multi-source resource management program based on information availability is stored in the memory, so that when the processor executes the vehicle-road collaborative multi-domain multi-source resource management program based on information availability, it implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above, thereby realizing dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a flowchart of a vehicle-road collaborative multi-domain and multi-source resource management method based on information availability according to an embodiment of the present invention. DETAILED DESCRIPTION
[0032] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0033] In the related art, data transmission and processing are performed according to a preset sampling frequency, and much perception information is outdated or useless for vehicle-mounted applications, which will lead to serious waste of resources; in addition, due to the limitations of communication bandwidth and computing power, some important perception data cannot be transmitted and processed in a timely manner, resulting in the loss of valid data; according to the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability of an embodiment of the present invention, first, the roadside unit obtains the road environment information of the corresponding management area, and divides the management area according to the road environment information to obtain a plurality of management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information; then, the roadside unit obtains the vehicle perception data corresponding to each management sub-area and the position information corresponding to each vehicle in the management area; then, based on The dynamic environment complexity corresponding to each management sub-area is calculated according to the position information corresponding to each vehicle, and the traffic complexity corresponding to each management sub-area is calculated according to the static environment complexity and the dynamic environment complexity; then, the estimated processing completion time of the vehicle perception data corresponding to each management sub-area is calculated according to the traffic complexity, and the information available value corresponding to the management area is calculated according to the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data; then, the information available value is optimized through an optimization algorithm to obtain the optimal information available value, and the resource allocation ratio corresponding to each sub-area is determined according to the optimal information available value; thereby realizing the dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0034] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0035] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0036] Figure 1FIG. 1 is a flow chart of a method for managing multi-domain and multi-source resources of vehicle-road collaboration based on information availability according to an embodiment of the present invention. Figure 1 As shown, the vehicle-road cooperative multi-domain multi-source resource management method based on information availability includes the following steps:
[0037] S101, the roadside unit obtains road environment information of the corresponding management area, divides the management area according to the road environment information to obtain multiple management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information.
[0038] That is to say, multiple roadside units are distributed on the road (the roadside units serve as multi-domain and multi-source resource management devices for vehicle-road collaboration), and each roadside unit has a corresponding management area; when performing resource management, the roadside unit obtains the road environment information of its corresponding management area through the sensors it carries, and divides the management area according to the road environment information, so as to divide the management area into multiple management sub-areas; then, the static environment complexity corresponding to each management sub-area is calculated according to the road environment information.
[0039] S102: The roadside unit obtains vehicle perception data corresponding to each management sub-area and location information corresponding to each vehicle in the management area.
[0040] That is to say, the roadside unit acquires the vehicle perception data corresponding to each management sub-area in its management area and the location information corresponding to each vehicle in the management area.
[0041] There are multiple ways for the roadside unit to obtain the vehicle perception data corresponding to each management sub-area.
[0042] As an example, the roadside unit obtains the vehicle perception data corresponding to each management sub-area, including: the roadside unit obtains the data transmission capability value and the data processing capability value corresponding to each vehicle in the management sub-area, and determines the best processing vehicle corresponding to the management sub-area based on the data transmission capability value and the data processing capability value, and receives the vehicle perception data in the corresponding management sub-area through the best processing vehicle.
[0043] That is, when the roadside unit acquires the vehicle perception data corresponding to each management sub-area, it first acquires the data transmission capacity value and data processing capacity value corresponding to each vehicle in the management sub-area; then, the best processing vehicle in the management sub-area is determined according to the data transmission capacity value and data processing capacity value of each vehicle, that is, the vehicle with the best comprehensive data transmission capacity and data processing capacity is selected; then, the best processing vehicle is used as a sink node, so that other vehicles in the management sub-area transmit their acquired perception data to the sink node after acquiring the perception data, and the system only needs to obtain the vehicle perception data of the management sub-area through the sink node.
[0044] S103, calculating the dynamic environment complexity corresponding to each management sub-area according to the position information corresponding to each vehicle, and calculating the traffic complexity corresponding to each management sub-area according to the static environment complexity and the dynamic environment complexity.
[0045] That is, the dynamic environment complexity of the management sub-area is calculated according to the position information corresponding to each vehicle in the management sub-area; then, the traffic complexity corresponding to each management sub-area is calculated according to the static environment complexity calculated from the environment information and the dynamic environment complexity.
[0046] In some embodiments, traffic complexity is calculated according to the following formula:
[0047]
[0048] Among them, ε n (t) represents the traffic complexity, represents the complexity of the static environment, Represents the complexity of the dynamic environment.
[0049] As an example, the position of the vehicles in the management area is monitored by sensors on the roadside unit to obtain the position information of the vehicles, and a vehicle list V = {V1, V2, ..., V m}, where V1, V2, ..., V m is the position coordinate of the vehicle. Then, according to the position coordinate of the vehicle and the division method of the management sub-area in the management area, the vehicle density corresponding to each management sub-area can be calculated; and the vehicle density can be used as the dynamic environment complexity.
[0050] S104, calculating the estimated processing completion time of the vehicle perception data corresponding to each management sub-area according to the traffic complexity, and calculating the information availability value corresponding to the management area according to the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data.
[0051] In some embodiments, the estimated processing completion time is calculated according to the following formula:
[0052] R n,RSU (t) = τ n (t)B log(1+ζ n (t))
[0053] Among them, R n,RSU (t) represents the communication transmission rate of the management sub-area, τ n (t) represents the transmission bandwidth ratio of the management sub-area, ζ n (t) represents the transmission signal-to-noise ratio of the management sub-area at time t; that is, in the sampling process, it is assumed that the amount of data sampled for the same management sub-area at any time is constant, that is, the amount of perception data corresponding to the management sub-area b n is unchanging.
[0054] μ n (t) = γε n (t)
[0055] Among them, μ n (t) represents the computational complexity, γ represents the conversion coefficient, and ε n (t) represents traffic complexity; that is, after the traffic complexity is calculated, the corresponding computational complexity (that is, the CPU cycles required for each bit of data) is calculated based on the traffic complexity.
[0056]
[0057]
[0058] Among them, b n Indicates the amount of perception data corresponding to the management sub-area, represents the perceived data transmission time, represents the perception data calculation time, C n,t Indicates the computing resource allocation ratio corresponding to the management sub-area.
[0059]
[0060] Where t′ represents the estimated processing completion time, and t represents the current time.
[0061] In some embodiments, the information availability value is calculated according to the following formula:
[0062]
[0063] Among them, A RSU represents the information availability value, N represents the number of management sub-areas, and U n(t′) represents the time when the latest vehicle perception data corresponding to the management area is obtained.
[0064] S105, optimizing the information available value through an optimization algorithm to obtain an optimal information available value, and determining the resource allocation ratio corresponding to each sub-region according to the optimal information available value.
[0065] As an example, the roadside unit maximizes A RSU For this purpose, the perception information of each management sub-area is sampled to determine the optimal A RSU value, and according to the optimal A RSU The ratio of the transmission bandwidth of the management sub-area to the value τ n (t) and the computing resource allocation ratio C corresponding to the management sub-area n,t Reallocate to ensure effective use of data transmission resources and data processing resources.
[0066] In summary, according to the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability according to an embodiment of the present invention, first, the roadside unit obtains the road environment information of the corresponding management area, and divides the management area according to the road environment information to obtain multiple management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information; then, the roadside unit obtains the vehicle perception data corresponding to each management sub-area and the position information corresponding to each vehicle in the management area; then, the roadside unit calculates the dynamic environment complexity corresponding to each management sub-area according to the position information corresponding to each vehicle, and calculates the dynamic environment complexity corresponding to each management sub-area according to the static environment complexity and the dynamic environment complexity. The traffic complexity corresponding to each management sub-area is calculated based on the environmental complexity; then, the estimated processing completion time of the vehicle perception data corresponding to each management sub-area is calculated based on the traffic complexity, and the information available value corresponding to the management area is calculated based on the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data; then, the information available value is optimized through the optimization algorithm to obtain the optimal information available value, and the resource allocation ratio corresponding to each sub-area is determined based on the optimal information available value; thereby realizing the dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0067] In order to implement the above-mentioned embodiments, an embodiment of the present invention proposes a computer-readable storage medium, on which a vehicle-road collaborative multi-domain multi-source resource management program based on information availability is stored. When the vehicle-road collaborative multi-domain multi-source resource management program based on information availability is executed by a processor, the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above is implemented.
[0068] According to the computer-readable storage medium of an embodiment of the present invention, by storing a vehicle-road collaborative multi-domain multi-source resource management program based on information availability, the processor implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above when executing the vehicle-road collaborative multi-domain multi-source resource management program based on information availability, thereby realizing dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0069] In order to implement the above-mentioned embodiment, an embodiment of the present invention proposes a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, it implements the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability as described above.
[0070] According to the computer device of an embodiment of the present invention, the vehicle-road collaborative multi-domain multi-source resource management program based on information availability is stored in the memory, so that when the processor executes the vehicle-road collaborative multi-domain multi-source resource management program based on information availability, it implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described above, thereby realizing dynamic allocation of data processing resources, improving the utilization rate of data processing resources, and ensuring the effective operation of Internet of Vehicles applications.
[0071] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0072] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0073] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0074] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0075] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claim. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.
[0076] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0077] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
[0078] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0079] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0080] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0081] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms should not be understood as necessarily referring to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0082] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A vehicle-road cooperative multi-domain and multi-source resource management method based on information availability, characterized in that: The following steps are involved: The roadside unit obtains road environment information of a corresponding management area, divides the management area according to the road environment information to obtain a plurality of management sub-areas, and calculates the static environment complexity corresponding to each management sub-area according to the road environment information; The roadside unit obtains vehicle perception data corresponding to each management sub-area and location information corresponding to each vehicle in the management area; Calculating the dynamic environment complexity corresponding to each management sub-area according to the position information corresponding to each vehicle, and calculating the traffic complexity corresponding to each management sub-area according to the static environment complexity and the dynamic environment complexity; Calculate the estimated processing completion time of the vehicle perception data corresponding to each management sub-area according to the traffic complexity, and calculate the information availability value corresponding to the management area according to the estimated processing completion time of the vehicle perception data corresponding to all management sub-areas and the acquisition time of the latest vehicle perception data; Optimizing the information available value through an optimization algorithm to obtain an optimal information available value, and determining the resource allocation ratio corresponding to each sub-area according to the optimal information available value; The traffic complexity is calculated according to the following formula: Among them, ε n (t) represents the traffic complexity, represents the complexity of the static environment, Indicates the complexity of the dynamic environment; The estimated processing completion time is calculated according to the following formula: R n,RSU (t)=τ n (t)Blog(1+ζ n (t)) Among them, R n,RSU (t) represents the communication transmission rate of the management sub-area, τ n (t) represents the transmission bandwidth ratio of the management sub-area, ζ n (t) represents the transmission signal-to-noise ratio of the management sub-area at time t; m n (t)=yes n (t) Among them, μ n (t) represents the computational complexity, γ represents the conversion coefficient, and ε n (t) represents traffic complexity; Among them, b n Indicates the amount of perception data corresponding to the management sub-area, represents the perceived data transmission time, represents the perception data calculation time, C n,t Indicates the computing resource allocation ratio corresponding to the management sub-area; Among them, t′ represents the estimated processing completion time, and t represents the current time; The information availability value is calculated according to the following formula: Among them, A RSU represents the information availability value, N represents the number of management sub-areas, and U n (′) indicates the time of acquiring the latest vehicle perception data corresponding to the management area.
2. The vehicle-road cooperative multi-domain and multi-source resource management method based on information availability as claimed in claim 1 is characterized in that: The roadside unit obtains vehicle perception data corresponding to each management sub-area, including: The roadside unit obtains the data transmission capacity value and the data processing capacity value corresponding to each vehicle in the management sub-area, and determines the best processing vehicle corresponding to the management sub-area based on the data transmission capacity value and the data processing capacity value, and receives the vehicle perception data in the corresponding management sub-area through the best processing vehicle.
3. A computer-readable storage medium, characterized in that: A vehicle-road collaborative multi-domain multi-source resource management program based on information availability is stored thereon. When the vehicle-road collaborative multi-domain multi-source resource management program based on information availability is executed by a processor, it implements the vehicle-road collaborative multi-domain multi-source resource management method based on information availability as described in any one of claims 1-2.
4. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, it implements the vehicle-road collaborative multi-domain and multi-source resource management method based on information availability as described in any one of claims 1-2.
Citation Information
Patent Citations
Message forwarding method for realizing low-delay communication in Internet of Vehicles V2V communication
CN107360609A
Dynamic self-networking method of Internet of Vehicles
CN108366347A
Vehicle-to-vehicle communication data simplification method and device, equipment and storage medium
CN113709703A
Heterogeneous resource joint management method and system for internet of vehicles beyond visual range perception task
CN113793498A
Low-visibility passing vehicle guiding system and method based on vehicle-road cooperation
CN114049768A