A lithology profile division method based on real-time drilling parameters
Through the lithologic profile division method of real-time drilling parameters, the intersection of sand index SI and torque is used to solve the problem of low lithologic profile compliance rate in the new system exploration well, and high accuracy and high efficiency lithologic profile construction is achieved. Improve drilling efficiency and economic benefits.
Patent Information
- Application Number
- CN202210335249.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-31
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-03-31
AI Technical Summary
The low compliance rate of lithologic profiles in the newly developed exploration wells has led to poor quality of well recording data and difficulty in interpreting work, and the demand for intelligent geological well recording is urgent.
The lithologic profile division method based on real-time drilling parameters is adopted, and the intersection of sand index SI and torque is carried out, and the in-depth analysis is carried out in combination with the well recording data to reduce interference factors and improve the profile quality, especially the compliance rate of the main purpose section at the bottom is more than 90%.
It significantly improves the accuracy and timeliness of establishing geological well recording profiles, saves labor costs and time, improves drilling time, and has obvious economic benefits.
Smart Images

Figure CN114741390B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of petroleum exploration, and in particular relates to a lithology profile division method based on real-time drilling parameters. Background Art
[0002] With the rapid development of drilling operations, the drilling operation cycle of Neogene shallow exploration wells is constantly shortened and the pace is constantly accelerating. On-site geological logging operations are compact and important. On the other hand, the Neogene formation gas measurement values are low and the abnormal amplitude is not obvious, and the returned rock cuttings are poorly representative. These are common phenomena in Neogene exploration well logging. As a result, the problem of low logging profile compliance is more prominent, which has caused a lot of troubles to the quality of logging data and subsequent interpretation work. On the other hand, the advancement of science and technology has made intelligent geological logging an unstoppable trend in the future, and the need to establish an automated and rapid logging method is becoming increasingly obvious. Therefore, there is an urgent need for a method that can improve the compliance rate of shallow exploration well logging profiles. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a method for dividing lithologic profiles based on real-time drilling parameters. This method uses the sand index SI and torque for intersection. When the torque intersects on the right side of the sand index SI, the lithology of the formation is sandstone, otherwise it is mudstone. This method is a deep mining and utilization of logging data, which can reduce the influence of interference factors and improve the quality of real-time logging profiles on site. The application effect of this method is good, and the profile obtained by the intersection has a high consistency with the final corrected profile, especially the consistency rate of the profile of the main target layer at the bottom exceeds 90%. This technology can also be applied to the division of thin interbedded lithologic profiles with good results. The technical invention has now achieved semi-intelligent application, combined with the Sino-French logging system, to achieve the intersection of the real-time SI index curve and the real-time torque, and the system quickly constructs a preliminary lithologic profile, and then the on-site supervision combines the cuttings logging, gas logging and other data to perform the final lithologic homing, which greatly improves the accuracy and timeliness of the establishment of geological logging profiles.
[0004] The present invention is achieved through the following technical solutions:
[0005] A lithology profile division method based on real-time drilling parameters is performed in the following steps:
[0006] Step 1: Integrate the collected drilling parameter data into a table. The parameters required for obtaining the stratigraphic profile construction related to lithology judgment are drilling time (min / m), drilling pressure (t) and torque (kN·m);
[0007] Step 2: Construct the real-time parameter sand index SI formula. The formula is as follows: SI = W^(1+a)×T^(1+b)×R^(1+c). Where W is drilling pressure, t; T is torque, KN·m; R is drilling time, min / m; a, b, c are the weights of various parameters, without units;
[0008] Step 3: Calculate the normalization coefficient K, and define the K value adjustment method as the ratio of the median (or average) of SI within the depth range of the lithology division profile to the median (or average) of the torque T, that is,
[0009] Step 4: In shallow formations, under normal circumstances, the K value needs to be adjusted once before and after the formation level changes and the drilling fluid performance transformation.
[0010] Step 5: Adjust the SI index threshold range in the software diagram according to the calculated K value. The torque determination threshold range is 0-X, and the SI index threshold range is 0-K·X.
[0011] Step 6: Put the calculated SI index curve and torque T curve on the same graph in the software, and intersect and fill them into a graph;
[0012] Step 7. When the torque curve intersects with SI in the positive direction, it is filled with yellow, indicating that the lithology of the formation is sandstone. When it intersects with SI in the reverse direction, it is filled with green, indicating that the lithology is mudstone. The curve intersection quality is controlled by adjusting the parameter coefficient K value, and the threshold range of the SI formula is adjusted to achieve rapid curve calibration.
[0013] In the above technical solution, the drilling parameter data is integrated into a table, the data collected by the logging sensor is automatically stored in a database, the drilling parameters are extracted from the database, and the formulas are edited in the logging database to calculate and process the data.
[0014] In the above technical solution, WOB is the bit weight, which indicates the weight of the drill pipe and drill tools applied to the bottom of the well, and the unit is ton (t); TRQ is the torque, which indicates the torque required for the drill bit and drill tools to rotate during drilling, and the unit is kilonewton meter (KN m); ROP is the drilling time, which indicates the time required for drilling 1 meter, and the unit is minute / meter (min / m).
[0015] In the above technical solution, the method is implemented using geological exploration mapping software such as RISExpress or Geofence.
[0016] Compared with the prior art, the advantages of the present invention are:
[0017] The present invention discloses a lithology profile division method based on real-time drilling parameters, which solves the problem of difficulty in constructing lithology profiles of Neogene strata in Bohai Sea and low profile conformity rate. The use of the present invention can quickly and accurately construct lithology profiles, save labor costs and time, save unnecessary logging items and logging time, significantly improve drilling timeliness, and have obvious economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is the DrillingLog chart of the present invention.
[0019] Figure 2 This is a demonstration of the results of the present invention.
[0020] For ordinary technicians in this field, other relevant drawings can be obtained based on the above drawings without any creative work. DETAILED DESCRIPTION
[0021] The technical solution of the present invention is further described below in conjunction with specific embodiments.
[0022] Example
[0023] Step 1: The logging sensor collects the data of various drilling parameters and enters them into the logging database. The required drilling parameters are directly selected from the on-site logging database as needed: drilling time (min / m), drilling pressure (t), and torque (KN·m);
[0024] Step 2: Calculate sand index SI = drilling time * drilling pressure * torque;
[0025] Table 1
[0026] Well Depth Rop Wob Torque SI well name depth Drilling time Drilling pressure Torque Sand Index BZ-1 Well 500.00 1.38 0.40 1.06 0.5851 BZ-1 Well 501.00 0.95 1.20 1.13 1.2882 BZ-1 Well 502.00 1.09 1.40 1.17 1.7854 BZ-1 Well 503.00 3.38 0.90 0.60 1.8252 BZ-1 Well 504.00 0.69 0.40 0.65 0.1794 BZ-1 Well 505.00 0.73 0.80 0.83 0.4847
[0027] Step 3: There are two methods to calculate the normalization coefficient K:
[0028] definition For example, the selected well section is d-Dm, d is the top depth of the well section, and D is the bottom depth of the well section. Therefore, the normalization coefficient K = SI median (or average) / torque T median (or average). Generally, the K value needs to be adjusted once before and after the conversion of drilling fluid performance, and the K value needs to be adjusted once when the formation level changes.
[0029] Table 2
[0030]
[0031] Step 4: Adjust the SI index threshold range in the software diagram according to the calculated K value. The torque determination threshold range is 0-X, and the SI index threshold range is 0-K·X.
[0032] For example Figure 1 The value range of the medium torque T is 0-10KN·m. The final calculation shows that the K value is 3.0, so the value range of the sand index SI is 0-30KN·m. Figure 1 )
[0033] Note: K value adjustment: If there is mud conversion or formation change, the K value needs to be recalculated. The newly calculated K value should be used to adjust the value range of SI index for the newly drilled well section.
[0034] Step 5: Put the SI index and torque T curve in the same graph, and divide the lithology profile according to the intersection of the two parameter curves in the graph. When the torque curve and the SI index curve intersect in the positive direction, the intersection is filled with yellow, and the stratum lithology is represented by sandstone. When they intersect in the reverse direction, the intersection is filled with green, which is mudstone. Combined with the observation samples salvaged on site, fine adjustment of the lithology profile is performed. ( Figure 2 )
[0035] The present invention is described above by way of example. It should be noted that, without departing from the core of the present invention, any simple deformation, modification or other equivalent replacement that can be made by those skilled in the art without inventive effort falls within the protection scope of the present invention.
Claims
1. A lithology profile division method based on real-time drilling parameters, characterized in that: Follow the steps below: Step 1: Integrate the collected drilling parameter data into a table, and the parameters required for obtaining the stratigraphic profile construction related to the lithology judgment are drilling time min / m, drilling pressure t and torque kN·m; Step 2: Construct the real-time parameter sand index SI formula. The formula details are as follows: SI = W^(1+a)×T^(1+b)×R^(1+c), where W is drilling pressure, t; T is torque, KN·m; R is drilling time, min / m; a, b, c are the weights of various parameters, without units; Step 3: Calculate the normalization coefficient K, and define the K value adjustment method as the ratio of the average SI value within the depth range of the lithology division profile to the average torque T value, that is, Step 4: In shallow formations, the K value needs to be adjusted once before and after formation changes and drilling fluid performance transformation; Step 5: Adjust the SI index threshold range in the software diagram according to the calculated K value. The torque determination threshold range is 0-X, and the SI index threshold range is 0-K·X; Step 6: Put the calculated SI index curve and torque T curve on the same graph in the software, and intersect and fill them into a graph; Step 7. When the torque curve intersects with SI in the positive direction, it is filled with yellow, indicating that the lithology of the formation is sandstone. When it intersects with SI in the reverse direction, it is filled with green, indicating that the lithology is mudstone. The curve intersection quality is controlled by adjusting the parameter coefficient K value, and the threshold range of the SI formula is adjusted to achieve rapid curve calibration.
2. The method for lithology profile division based on real-time drilling parameters according to claim 1, characterized in that: The drilling parameter data are integrated in the table, the data collected by the logging sensor is automatically stored in the database, the drilling parameters are extracted from the database, and the formulas are edited in the logging database to calculate and process the data.
3. The method for lithology profile division based on real-time drilling parameters according to claim 1, characterized in that: WOB is the weight on bit, which indicates the weight of the drill pipe and drilling tools applied to the bottom of the well, in tons; TRQ is torque, which indicates the torque required for the drill bit to rotate during drilling, and its unit is kilonewton-meter; ROP is drilling time, which indicates the time required for drilling 1 meter, and its unit is minute / meter.
4. The method for lithology profile division based on real-time drilling parameters according to claim 1, characterized in that: The method is completed using RISExpress or Geofence geological exploration mapping software.
