Method, system, device and storage medium for calculating DC carrying capacity of receiving power grid
By obtaining the initial data of the receiving end power grid and the configuration of the landing area, the power grid frequency and safety and stability analysis algorithms are used to calculate the DC carrying capacity, which solves the problem of inaccurate DC carrying capacity assessment in the existing technology and improves the calculation of the UHV DC power grid. Accuracy and safety.
Patent Information
- Application Number
- CN202210458529.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-28
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-04-28
AI Technical Summary
The existing receiving-end power grid planning mainly relies on engineering experience and cannot accurately assess the carrying capacity of DC power, making it difficult to guarantee the stability and security of the UHV DC power grid.
By obtaining the initial power grid data and landing point area configuration of the target global receiving end power grid, using the preset power grid frequency algorithm and power system security and stability analysis algorithm, calculate the frequency characteristics of the power grid when it returns to stable operation under a fault state, and determine the global DC carrying capacity , and calculate the comprehensive DC carrying capacity based on this capacity.
It improves the calculation accuracy of the DC carrying capacity of the receiving end power grid, achieves accurate calculation of power flow and voltage stability in each landing point area, and ensures the safe and stable operation of the UHV DC power grid.
Smart Images

Figure CN114741660B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of DC carrying capacity analysis, and in particular to a method, system, device and storage medium for calculating the DC carrying capacity of a receiving-end power grid. Background Art
[0002] In recent years, with the accelerated development of clean energy in my country's power industry, ultra-high voltage direct current transmission technology, with its large transmission capacity and long transmission distance, has been widely used in long-distance transmission of clean energy.
[0003] The transmission stability of UHV DC transmission depends on the structure of the receiving power grid. Therefore, the planning and evaluation of the receiving power grid structure is of great significance to the safe operation of the power grid after it is put into operation. The existing receiving power grid planning is mainly determined by engineering personnel based on engineering experience and from the perspective of power supply and demand balance. However, relying on engineering experience, it is impossible to accurately evaluate the carrying capacity of the receiving power grid for the fed DC power during operation. Therefore, how to improve the calculation accuracy of the DC carrying capacity of the receiving power grid and then realize the accurate planning of the UHV DC power grid has become an urgent problem to be solved. Summary of the invention
[0004] The purpose of the embodiments of the present invention is to provide a method, system, device and storage medium for calculating the DC carrying capacity of a receiving-end power grid, so as to improve the calculation accuracy of the DC carrying capacity of the receiving-end power grid. The specific technical solution is as follows:
[0005] A method for calculating the DC carrying capacity of a receiving-end power grid, the method comprising:
[0006] Obtain an initial grid data group and a landing area configuration group of the target global receiving grid, wherein the landing area configuration group includes an initial configuration parameter group for at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving grid includes at least one of the landing areas.
[0007] According to a preset input sequence, the DC feed-in capacities in a preset DC feed-in capacity group are determined as current DC feed-in capacities in sequence, wherein the preset DC feed-in capacity group includes at least two of the DC feed-in capacities.
[0008] Based on a preset grid frequency algorithm, according to the grid initial data group and the current DC feed-in capacity, the current grid frequency group of the target global receiving grid in a first preset operating state is obtained, wherein the first preset operating state is the process of the target global receiving grid recovering from a preset fault state to a stable operating state.
[0009] Determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition. If so, determine the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group as the global DC carrying capacity of the target global receiving-end power grid.
[0010] Based on a preset power system safety and stability analysis algorithm, according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, the power system safety and stability calculation and analysis is performed on each landing area to obtain the DC carrying capacity group of each landing area.
[0011] Based on a preset receiving node DC carrying capacity algorithm, the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid is determined according to the global DC carrying capacity and the DC carrying groups of each landing area.
[0012] Optionally, when the current power grid frequency group satisfies any one of the first constraint condition and the second constraint condition, the method further includes:
[0013] According to the preset order of investment, the DC feed-in capacity invested after the current DC feed-in capacity in the preset DC feed-in capacity group is updated to the current DC feed-in capacity, and the step of returning to execute the preset grid frequency algorithm to obtain the current grid frequency group of the target global receiving-end grid in the first preset operating state according to the grid frequency modulation data group and the current DC feed-in capacity.
[0014] Optionally, the obtaining, based on a preset grid frequency algorithm and according to the grid initial data group and the current DC feed-in capacity, a current grid frequency group of the target global receiving-end grid in a first preset operating state includes:
[0015] After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in the preset fault state, and according to the preset collection interval, the power grid real-time data group and the system maximum equipment power loss of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes power grid real-time data matching each preset collection interval, and the types of the power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L .
[0016] For each preset collection interval: according to the grid initial data group, the grid real-time data group and the system maximum equipment power loss amount P Loss , through the formula:
[0017]
[0018] Calculate the real-time grid frequency f that matches the preset acquisition interval, where the ∑ΔP G is the primary frequency modulation amount of the generator of the target global receiving power grid during the preset acquisition interval, and the ΔP G is the difference between the real-time data of the power grid and the initial data of the power grid, the ∑ΔP DC is the DC automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔP DC is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, and the ∑ΔP L is the load automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid; J is the inertia in the initial data group of the system power grid; The preset acquisition interval is characterized.
[0019] The current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f that match each preset acquisition interval.
[0020] Optionally, the determining whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, if so, determining the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group as the global DC carrying capacity of the target global receiving-end power grid, including:
[0021] Determine the real-time grid frequency f with the smallest value in the current grid frequency group min , is it not less than the first round frequency of low-frequency load shedding of the system? If not, it is determined that the current grid frequency group does not meet the first constraint condition.
[0022] Determine the stable grid frequency f in the current grid frequency group AVG , whether it is within the system steady-state limit frequency range, if not, it is determined that the current power grid frequency group does not meet the second constraint condition.
[0023] When the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0024] Optionally, based on a preset receiving node DC carrying capacity algorithm, according to the global DC carrying capacity and the DC carrying groups of each landing area, determining the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid includes:
[0025] For each drop zone:
[0026] According to the global DC carrying capacity P Df And the DC carrying capacity P of the landing area i Dvi , through the formula:
[0027] P Di =min(P Df , P Dvi ),
[0028] Get the DC carrying capacity P of the landing area i Di , and the DC carrying capacity P Di The value of is determined as the comprehensive DC carrying capacity of the receiving node in the landing area i.
[0029] A system for calculating the DC carrying capacity of a receiving-end power grid, the system comprising:
[0030] A data acquisition module is used to obtain the initial data group of the power grid of the target global receiving end power grid, and the landing area configuration group, wherein the landing area configuration group includes an initial configuration parameter group of at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving end power grid includes at least one of the landing areas.
[0031] The feed-in capacity determination module is used to determine the DC feed-in capacity in a preset DC feed-in capacity group as the current DC feed-in capacity in sequence according to a preset input order, wherein the preset DC feed-in capacity group includes at least two of the DC feed-in capacities.
[0032] The grid frequency acquisition module obtains the current grid frequency group of the target global receiving grid in a first preset operating state based on a preset grid frequency algorithm and according to the grid initial data group and the current DC feed-in capacity, wherein the first preset operating state is the process of the target global receiving grid recovering from a preset fault state to a stable operating state.
[0033] The first parameter acquisition module is used to determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition. If so, the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0034] The second parameter acquisition module, based on a preset power system safety and stability analysis algorithm, performs power system safety and stability calculation and analysis on each landing area according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, to obtain the DC carrying capacity group of each landing area.
[0035] The DC carrying capacity acquisition module determines the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid based on a preset receiving node DC carrying capacity algorithm and according to the global DC carrying capacity and the DC carrying groups of each landing area.
[0036] Optionally, the system further includes:
[0037] The feed-in capacity updating module is used to update the DC feed-in capacity put into operation after the current DC feed-in capacity in the preset DC feed-in capacity group to the current DC feed-in capacity in accordance with the preset order of input, and return to execute the step of obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm according to the grid frequency modulation data group and the current DC feed-in capacity.
[0038] Optionally, the power grid frequency acquisition module is configured to:
[0039] After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in the preset fault state, and according to the preset collection interval, the power grid real-time data group and the system maximum equipment power loss of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes power grid real-time data matching each preset collection interval, and the types of the power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L .
[0040] For each preset collection interval: according to the grid initial data group, the grid real-time data group and the system maximum equipment power loss amount P Loss , through the formula:
[0041]
[0042] Calculate the real-time grid frequency f that matches the preset acquisition interval, where the ∑ΔP G is the primary frequency modulation amount of the generator of the target global receiving power grid during the preset acquisition interval, and the ΔP G is the difference between the real-time data of the power grid and the initial data of the power grid, the ∑ΔP DCis the DC automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔP DC is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, and the ∑ΔP L is the load automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid; J is the inertia in the initial data group of the system power grid; The preset acquisition interval is characterized.
[0043] The current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f that match each preset acquisition interval.
[0044] Optionally, the first parameter acquisition module is set to:
[0045] Determine the real-time grid frequency f with the smallest value in the current grid frequency group min , is it not less than the first round frequency of low-frequency load shedding of the system? If not, it is determined that the current grid frequency group does not meet the first constraint condition.
[0046] Determine the stable grid frequency f in the current grid frequency group AVG , whether it is within the system steady-state limit frequency range, if not, it is determined that the current power grid frequency group does not meet the second constraint condition.
[0047] When the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0048] Optionally, the DC carrying capacity acquisition module is configured to:
[0049] For each drop zone:
[0050] According to the global DC carrying capacity P Df And the DC carrying capacity P of the landing area i Dvi , through the formula:
[0051] P Di =min(P Df , P Dvi ),
[0052] Get the DC carrying capacity P of the landing area i Di , and the DC carrying capacity P DiThe value of is determined as the comprehensive DC carrying capacity of the receiving node in the landing area i.
[0053] A device for calculating the DC carrying capacity of a receiving-end power grid, the device comprising:
[0054] processor;
[0055] A memory for storing instructions executable by the processor.
[0056] The processor is configured to execute the instructions to implement the method for calculating the DC carrying capacity of the receiving-end power grid as described in any one of the above items.
[0057] A computer-readable storage medium. When instructions in the computer-readable storage medium are executed by a processor of a receiving-end power grid DC carrying capacity calculation device, the receiving-end power grid DC carrying capacity calculation device is able to execute any of the above-mentioned receiving-end power grid DC carrying capacity calculation methods.
[0058] The DC carrying capacity calculation method, system, device and storage medium of the receiving-end power grid provided in the embodiment of the present invention obtains the target global receiving-end power grid, and the power grid frequency during the process of recovering from the fault state to the stable operation state, calculates the global DC carrying capacity according to the frequency stability characteristics, and calculates the comprehensive DC carrying capacity based on the global DC carrying capacity, thereby improving the calculation accuracy of the comprehensive DC carrying capacity. At the same time, the present invention comprehensively calculates the DC carrying capacity of the target global receiving-end power grid by obtaining the above-mentioned initial power grid data group of the global receiving-end power grid and the above-mentioned landing area configuration group. Compared with the prior art, the present invention adds the DC carrying capacity group of each landing area on the basis of calculating the global DC capacity, realizes the accurate evaluation of the flow calculation and voltage stability of each landing area, thereby improving the calculation accuracy of the comprehensive DC carrying capacity. It can be seen that the present invention improves the calculation accuracy of the DC carrying capacity of the global receiving-end power grid. Of course, any product or method implementing the present invention does not necessarily need to achieve all the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0060] Figure 1 A flow chart of a method for calculating the DC carrying capacity of a receiving-end power grid provided in an embodiment of the present invention;
[0061] Figure 2A block diagram of a receiving-end power grid DC carrying capacity calculation system provided for an optional embodiment of the present invention;
[0062] Figure 3 A block diagram of a receiving-end power grid DC carrying capacity calculation device provided for another optional embodiment of the present invention. DETAILED DESCRIPTION
[0063] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0064] The embodiment of the present invention provides a method for calculating the DC carrying capacity of a receiving-end power grid, such as Figure 1 As shown, the method for calculating the DC carrying capacity of the receiving-end power grid includes:
[0065] S101. Obtain an initial grid data group and a landing area configuration group of a target global receiving grid, wherein the landing area configuration group includes an initial configuration parameter group of at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving grid includes at least one landing area.
[0066] The above-mentioned grid initial data group may be a data group of power system operation parameters including the target global receiving grid. The above-mentioned landing area configuration group may be a data group of power system operation parameters in each landing area in the target global receiving grid.
[0067] Optionally, in an optional embodiment of the present invention, the above-mentioned landing area may be an area that relies on the feeding of direct current for power supply. In actual application scenarios, a global receiving-end power grid may be composed of multiple landing areas, and the power of the fed direct current connected to each landing area may be the same or different. This results in that when the target global receiving-end power grid is connected to the external fed direct current, the flow evacuation and voltage of some landing areas will be different. However, when the prior art evaluates and calculates the DC carrying capacity, the object is only the global receiving-end power grid. Therefore, the present invention obtains the initial grid data group of the above-mentioned global receiving-end power grid, and the above-mentioned landing area configuration group, to comprehensively calculate the DC carrying capacity of the target global receiving-end power grid, thereby improving the calculation accuracy of the DC carrying capacity.
[0068] S102. According to a preset input sequence, the DC feed-in capacities in a preset DC feed-in capacity group are determined as current DC feed-in capacities in sequence, wherein the preset DC feed-in capacity group includes at least two DC feed-in capacities.
[0069] Optionally, in an optional embodiment of the present invention, the above-mentioned preset order of operation can be set according to the design requirements of the target global receiving power grid. For example, if the design feed-in capacities of the target global receiving power grid are 8000MW, 4000MW and 6000MW respectively, the preset order of operation can be 8000MW, 6000MW and 4000MW.
[0070] It should be noted that the data quantity and specific parameters in the above-mentioned preset DC feed-in capacity group can be set according to historical design parameters or actual design requirements, and the present invention does not impose too many restrictions on this.
[0071] S103. Based on a preset grid frequency algorithm, according to the grid initial data group and the current DC feed-in capacity, obtain the current grid frequency group of the target global receiving grid in a first preset operating state, wherein the first preset operating state is the process of the target global receiving grid recovering from a preset fault state to a stable operating state.
[0072] Among them, since the grid frequency is volatile, and when the power system is impacted and the fluctuation of the grid frequency exceeds the preset range, the power system will actively interfere with the grid frequency to restore the grid frequency to the above preset range. Therefore, the above-obtained current grid frequency group can include multiple grid frequencies that change over time in the first preset operating state of the above-mentioned target global receiving end grid.
[0073] Optionally, in an optional embodiment of the present invention, the setting of the above-mentioned fault state can be set according to the N-1 principle of the power system. The above-mentioned N-1 principle of the power system means that when any component in the power system is disconnected in a fault-free state or disconnected due to a fault, the power system should be able to ensure stable operation and normal power supply. And other components are in compliance, and the voltage and grid frequency are within the allowable range. The types of the above-mentioned components include but are not limited to: lines, generators, transformers, etc. There are many types of the above-mentioned faults, for example, phase short circuit, generator steady-state voltage adjustment frequency instability, etc.
[0074] S104. Determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition. If so, determine the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group as the global DC carrying capacity of the target global receiving-end power grid.
[0075] Optionally, in an optional embodiment of the present invention, the above-mentioned first constraint condition and second constraint condition may be conditions for determining whether each grid frequency in a grid frequency group meets the design requirements of the power system.
[0076] The present invention obtains the target global receiving-end power grid, the power grid frequency during the process of recovering from a fault state to a stable operating state, calculates the global DC carrying capacity according to the frequency stability characteristics, and calculates the comprehensive DC carrying capacity based on the global DC carrying capacity, thereby improving the calculation accuracy of the comprehensive DC carrying capacity.
[0077] S105. Based on a preset power system safety and stability analysis algorithm, according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, the power system safety and stability calculation and analysis are performed on each landing area to obtain the DC carrying capacity group of each landing area.
[0078] Optionally, in an optional embodiment of the present invention, the above-mentioned preset power system safety and stability analysis algorithm can be an algorithm for analyzing the static stability, transient stability and dynamic stability of the power system based on the existing power system analysis software (PSD-BPA). The present invention solves the DC carrying capacity of each landing area through the above-mentioned preset power safety and stability analysis algorithm, realizes the accurate evaluation of the power flow calculation and voltage stability of each landing area, and improves the final calculation of the comprehensive DC carrying capacity.
[0079] Optionally, in another optional embodiment of the present invention, the preset power equipment fault set may be a data set including fault parameters of each component in the power system under various types of transient fault conditions. The types of the fault parameters include, but are not limited to: site voltage fault parameters, generator power angle fault parameters, branch power flow fault parameters, and transformer power flow fault parameters.
[0080] It should be noted that the above Figure 1 In step S105 shown, the specific implementation method of performing safety and stability calculation and analysis on each landing area of the power system is a technology well known to those skilled in the art, and the present invention will not be elaborated in detail here.
[0081] S106. Based on a preset receiving node DC carrying capacity algorithm, according to the global DC carrying capacity and the DC carrying groups of each landing area, determine the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid.
[0082] Optionally, in an optional embodiment of the present invention, the above Figure 1 The step S105 shown in FIG. 1 can be performed simultaneously with the above steps S103 and S104. Figure 1 The step S104 shown needs to be executed after the step S103.
[0083] The present invention obtains the grid frequency of the target global receiving-end power grid during the process of recovering from a fault state to a stable operating state, calculates the global DC carrying capacity according to the frequency stability characteristics, and calculates the comprehensive DC carrying capacity based on the global DC carrying capacity, thereby improving the calculation accuracy of the comprehensive DC carrying capacity. At the same time, the present invention comprehensively calculates the DC carrying capacity of the target global receiving-end power grid by obtaining the grid initial data group of the above-mentioned global receiving-end power grid and the above-mentioned landing area configuration group. Compared with the prior art, the present invention adds the DC carrying capacity group of each landing area on the basis of calculating the global DC capacity, realizes the accurate evaluation of the flow calculation and voltage stability of each landing area, thereby improving the calculation accuracy of the comprehensive DC carrying capacity. It can be seen that the present invention improves the calculation accuracy of the DC carrying capacity of the target global receiving-end power grid.
[0084] Optionally, when the current power grid frequency group satisfies any one of the first constraint condition and the second constraint condition, the above-mentioned method for calculating the DC carrying capacity of the receiving-end power grid further includes:
[0085] According to the preset order of input, the DC feed-in capacity in the preset DC feed-in capacity group that is put into use after the current DC feed-in capacity is updated to the current DC feed-in capacity, and the step of returning to execute the step of obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm, the grid frequency modulation data group and the current DC feed-in capacity. Optionally, obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm, the grid initial data group and the current DC feed-in capacity includes:
[0086] After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in a preset fault state, and according to the preset collection interval, the power grid real-time data group and the maximum power loss of the system equipment of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes the power grid real-time data matching each preset collection interval, and the types of power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L .
[0087] For each preset collection interval: according to the initial data group of the power grid, the real-time data group of the power grid and the maximum power loss of the system equipment P Loss , through the formula:
[0088]
[0089] Calculate the real-time grid frequency f that matches the preset acquisition interval, where ∑ΔP Gis the primary frequency regulation of the target global receiving power grid at the preset acquisition interval, ΔP G It is the difference between the real-time data of the power grid and the initial data of the power grid, ∑ΔP DC is the DC automatic frequency regulation amount of the target global receiving power grid during the preset acquisition interval, ΔP DC It is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, ∑ΔP L is the load automatic frequency regulation amount of the target global receiving power grid during the preset acquisition interval, ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid. J is the inertia in the initial data group of the system power grid. The preset acquisition interval is characterized.
[0090] A current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f matching each preset acquisition interval.
[0091] Optionally, it is determined whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition. If so, the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid, including:
[0092] Determine the real-time grid frequency f with the smallest value in the current grid frequency group min , is it not less than the first round frequency of low-frequency load shedding of the system? If not, it is determined that the current grid frequency group does not meet the first constraint condition.
[0093] Determine the stable grid frequency f in the current grid frequency group AVG , whether it is within the system steady-state limit frequency range, if not, it is determined that the current power grid frequency group does not meet the second constraint condition.
[0094] When the current grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0095] Optionally, in an optional embodiment of the present invention, the above-mentioned stable grid frequency f AVG The way to obtain it can be:
[0096] In the above-mentioned current power grid frequency group, two adjacent real-time power grid frequencies are determined as a comparison group. It is judged whether each comparison group meets the preset judgment condition. Among them, the above-mentioned preset judgment condition can be whether the difference between the values of the two adjacent real-time power grid frequencies in the comparison group meets the preset difference range. If so, it is judged that the comparison group meets the preset judgment condition.
[0097] When the number of continuous comparison groups that meet the preset judgment conditions is not less than the preset number, the real-time grid frequency in the continuous comparison groups is removed after the overlapped values are removed, and the average value is determined as the stable grid frequency f AVG .
[0098] For example, assuming that the real-time grid frequency values in the current grid frequency group are 49.94 Hz, 49.97 Hz, 49.99 Hz, 49.98 Hz and 49.99 Hz, the preset difference interval is set to plus or minus 0.02 Hz.
[0099] The above comparison groups are: the first comparison group (49.94Hz, 49.97Hz), the second comparison group (49.97Hz, 49.99Hz), the third comparison group (49.99Hz, 49.98Hz), and the fourth comparison group (49.98Hz, 49.99Hz).
[0100] According to the above preset difference interval, it is determined that except for the first comparison group (49.94Hz, 49.97Hz), all comparison groups are continuous and meet the preset difference interval. Then, the second to fourth comparison groups are removed from the overlapped values, and the average value is taken to obtain the stable grid frequency f AVG It is 49.98Hz.
[0101] In order to facilitate the understanding of the determination of the global DC carrying capacity, an optional embodiment of the present invention is specifically explained here:
[0102] For the convenience of description, the initial DC feed-in capacity of the target global receiving power grid is set to 2000MW. The preset DC feed-in capacity group is set to include the first DC feed-in capacity, the second DC feed-in capacity and the third DC feed-in capacity. Among them, the first DC feed-in capacity is 8000MW, the second DC feed-in capacity is 6000MW, and the third DC feed-in capacity is 4000MW. The current power grid frequency group corresponding to the first DC feed-in capacity and the second DC feed-in capacity is set to satisfy the above-mentioned first constraint condition and the second constraint condition.
[0103] Before the third DC feed-in capacity is put into use, the total amount of DC feed-in capacity in the target global receiving-end power grid is the sum of the initial DC feed-in capacity, the first DC feed-in capacity and the second DC feed-in capacity, that is, 16,000 MW.
[0104] After the third DC feed-in capacity is put into use, the current grid frequency groups obtained do not meet the first constraint and the second constraint. The total amount of the DC feed-in capacity is determined as the global DC carrying capacity of the target global receiving-end grid, that is, 16,000 MW.
[0105] Optionally, based on a preset receiving node DC carrying capacity algorithm, according to the global DC carrying capacity and the DC carrying groups of each landing area, the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid is determined, including:
[0106] For each drop zone:
[0107] According to the global DC carrying capacity P Df And the DC carrying capacity P of the landing area i Dvi , through the formula:
[0108] P Di =min(P Df , P Dvi ),
[0109] Get the DC carrying capacity P of the landing area i Di , and the DC carrying capacity P Di The value of is determined as the comprehensive DC carrying capacity of the receiving node in the landing area i.
[0110] Corresponding to the above method embodiment, the embodiment of the present invention further provides a receiving-end power grid DC carrying capacity calculation system, such as Figure 2 As shown, the receiving-end power grid DC carrying capacity calculation system includes:
[0111] The data acquisition module 201 is used to obtain the initial data group of the target global receiving power grid and the landing area configuration group, wherein the landing area configuration group includes an initial configuration parameter group of at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving power grid includes at least one landing area.
[0112] The feed-in capacity determination module 202 is used to determine the DC feed-in capacity in the preset DC feed-in capacity group as the current DC feed-in capacity in sequence according to the preset input order, wherein the preset DC feed-in capacity group includes at least two DC feed-in capacities.
[0113] The grid frequency acquisition module 203 obtains the current grid frequency group of the target global receiving grid in the first preset operating state based on the preset grid frequency algorithm, according to the grid initial data group and the current DC feed-in capacity, wherein the first preset operating state is the process of the target global receiving grid recovering from a preset fault state to a stable operating state.
[0114] The first parameter acquisition module 204 is used to determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition. If so, the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0115] The second parameter acquisition module 205 performs power system safety and stability calculation and analysis on each landing area based on a preset power system safety and stability analysis algorithm, according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, and obtains the DC carrying capacity group of each landing area.
[0116] The DC carrying capacity acquisition module 206 determines the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid based on a preset receiving node DC carrying capacity algorithm, according to the global DC carrying capacity and the DC carrying groups of each landing area.
[0117] Optionally, the receiving-end power grid DC carrying capacity calculation system further includes:
[0118] The feed-in capacity update module is used to update the DC feed-in capacity put into use after the current DC feed-in capacity in the preset DC feed-in capacity group to the current DC feed-in capacity in accordance with the preset order of put-in-use, and return to execute the step of obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm according to the grid frequency modulation data group and the current DC feed-in capacity.
[0119] Optionally, the power grid frequency acquisition module 203 is configured as follows:
[0120] After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in a preset fault state, and according to the preset collection interval, the power grid real-time data group and the maximum power loss of the system equipment of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes the power grid real-time data matching each preset collection interval, and the types of power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L .
[0121] For each preset collection interval: according to the initial data group of the power grid, the real-time data group of the power grid and the maximum power loss of the system equipment P Loss , through the formula:
[0122]
[0123] Calculate the real-time grid frequency f that matches the preset acquisition interval, where ∑ΔP G is the primary frequency regulation of the target global receiving power grid at the preset acquisition interval, ΔP G It is the difference between the real-time data of the power grid and the initial data of the power grid, ∑ΔP DC is the DC automatic frequency regulation amount of the target global receiving power grid during the preset acquisition interval, ΔP DC It is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, ∑ΔP L is the load automatic frequency regulation amount of the target global receiving power grid during the preset acquisition interval, ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid. J is the inertia in the initial data group of the system power grid. The preset acquisition interval is characterized.
[0124] A current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f matching each preset acquisition interval.
[0125] Optionally, the first parameter acquisition module 204 is configured as follows:
[0126] Determine the real-time grid frequency f with the smallest value in the current grid frequency group min , is it not less than the first round frequency of low-frequency load shedding of the system? If not, it is determined that the current grid frequency group does not meet the first constraint condition.
[0127] Determine the stable grid frequency f in the current grid frequency group AVG , whether it is within the system steady-state limit frequency range, if not, it is determined that the current power grid frequency group does not meet the second constraint condition.
[0128] When the current grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
[0129] Optionally, the DC carrying capacity acquisition module 206 is configured to:
[0130] For each drop zone:
[0131] According to the global DC carrying capacity P Df And the DC carrying capacity P of the landing area i Dvi , through the formula:
[0132] P Di =min(P Df , P Dvi ),
[0133] Get the DC carrying capacity P of the landing area i Di , and the DC carrying capacity P Di The value of is determined as the comprehensive DC carrying capacity of the receiving node in the landing area i.
[0134] The embodiment of the present invention also provides a receiving-end power grid DC carrying capacity calculation device, such as Figure 3 As shown, the device includes:
[0135] Processor 301;
[0136] The memory 302 is used to store instructions executable by the processor 301 .
[0137] The processor 301 is configured to execute instructions to implement any of the above methods for calculating the DC carrying capacity of the receiving-end power grid.
[0138] An embodiment of the present invention also provides a computer-readable storage medium. When the instructions in the computer-readable storage medium are executed by a processor of a receiving-end power grid DC carrying capacity calculation device, the receiving-end power grid DC carrying capacity calculation device can execute any of the receiving-end power grid DC carrying capacity calculation methods described above.
[0139] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip. The memory is an example of a computer-readable medium.
[0140] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0141] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0142] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. It should also be noted that the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0143] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0144] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for calculating the DC carrying capacity of a receiving-end power grid, characterized in that: The method comprises: Obtaining a power grid initial data group and a landing area configuration group of a target global receiving power grid, wherein the landing area configuration group includes an initial configuration parameter group of at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving power grid includes at least one of the landing areas; According to a preset input sequence, the DC feed-in capacities in the preset DC feed-in capacity group are sequentially determined as the current DC feed-in capacity, wherein the preset DC feed-in capacity group includes at least two of the DC feed-in capacities; Based on a preset grid frequency algorithm, according to the grid initial data group and the current DC feed-in capacity, a current grid frequency group of the target global receiving-end grid in a first preset operating state is obtained, wherein the first preset operating state is a process in which the target global receiving-end grid recovers from a preset fault state to a stable operating state; Determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition; if so, determine the sum of the DC feed-in capacities previously invested in the preset DC feed-in capacity group as the global DC carrying capacity of the target global receiving-end power grid; Based on a preset power system safety and stability analysis algorithm, according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, a power system safety and stability calculation and analysis is performed on each landing area to obtain a DC carrying capacity group for each landing area; Based on a preset receiving node DC carrying capacity algorithm, the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid is determined according to the global DC carrying capacity and the DC carrying groups of each landing area.
2. The method according to claim 1, characterized in that: In a case where the current power grid frequency group satisfies any one of the first constraint condition and the second constraint condition, the method further includes: According to the preset order of investment, the DC feed-in capacity invested after the current DC feed-in capacity in the preset DC feed-in capacity group is updated to the current DC feed-in capacity, and the step of returning to execute the preset grid frequency algorithm to obtain the current grid frequency group of the target global receiving-end grid in the first preset operating state according to the grid frequency modulation data group and the current DC feed-in capacity.
3. The method according to claim 1, characterized in that The method of obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm and according to the grid initial data group and the current DC feed-in capacity includes: After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in the preset fault state, and according to the preset collection interval, the power grid real-time data group and the system maximum equipment power loss of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes power grid real-time data matching each preset collection interval, and the types of the power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L ; For each preset collection interval: according to the initial data group of the power grid, the real-time data group of the power grid and the maximum power loss of the system equipment P Loss , through the formula: Calculate the real-time grid frequency f that matches the preset acquisition interval, where the ∑ΔP G is the primary frequency modulation amount of the generator of the target global receiving power grid during the preset acquisition interval, and the ΔP G is the difference between the generator frequency modulation amount in the real-time data of the power grid and the initial data of the power grid, and the ∑ΔPD c is the DC automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔPD C is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, and the ∑ΔP L is the load automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid; J is the inertia in the initial data group of the system power grid; The preset acquisition interval is characterized; The current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f that match each preset acquisition interval.
4. The method according to claim 3, characterized in that The determining whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, and if so, determining the sum of each DC feed-in capacity invested before the current DC feed-in capacity in the preset DC feed-in capacity group as the global DC carrying capacity of the target global receiving-end power grid, includes: Determine the real-time grid frequency f with the smallest value in the current grid frequency group min , whether it is not less than the first round frequency of low-frequency load shedding of the system, if not, it is determined that the current power grid frequency group does not meet the first constraint condition; Determine the stable grid frequency f in the current grid frequency group AVG , whether it is within the system steady-state limit frequency interval, if not, it is determined that the current power grid frequency group does not meet the second constraint condition; When the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, the sum of the DC feed capacities invested before the current DC feed capacity in the preset DC feed capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid.
5. The method according to claim 3, characterized in that: Based on a preset receiving node DC carrying capacity algorithm, according to the global DC carrying capacity and the DC carrying groups of each landing area, the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid is determined, including: For each drop zone: According to the global DC carrying capacity P Df And the DC carrying capacity P of the landing area i Dvi , through the formula: P Di =min(P Df ,P Dvi ), Get the DC carrying capacity PD of the landing area i i , and the DC carrying capacity PD i The value of is determined as the comprehensive DC carrying capacity of the receiving node in the landing area i.
6. A receiving-end power grid DC carrying capacity calculation system, characterized in that: The system comprises: A data acquisition module, used to obtain a power grid initial data group and a landing area configuration group of a target global receiving power grid, wherein the landing area configuration group includes an initial configuration parameter group of at least one landing area, and the initial configuration parameter group includes multiple types of initial configuration parameters in the landing area, and the target global receiving power grid includes at least one of the landing areas; A feed-in capacity determination module, configured to determine the DC feed-in capacities in a preset DC feed-in capacity group as the current DC feed-in capacity in sequence according to a preset input sequence, wherein the preset DC feed-in capacity group includes at least two of the DC feed-in capacities; A power grid frequency acquisition module, based on a preset power grid frequency algorithm, obtains a current power grid frequency group of the target global receiving-end power grid in a first preset operating state according to the power grid initial data group and the current DC feed-in capacity, wherein the first preset operating state is a process in which the target global receiving-end power grid recovers from a preset fault state to a stable operating state; A first parameter acquisition module is used to determine whether the current power grid frequency group does not satisfy at least one of the first constraint condition and the second constraint condition, and if so, the sum of the DC feed-in capacities invested before the current DC feed-in capacity in the preset DC feed-in capacity group is determined as the global DC carrying capacity of the target global receiving-end power grid; The second parameter acquisition module performs power system safety and stability calculation and analysis on each landing area based on a preset power system safety and stability analysis algorithm, according to the landing area configuration group, the current DC feed-in capacity and the preset power equipment fault set, to obtain a DC carrying capacity group for each landing area; The DC carrying capacity acquisition module determines the comprehensive DC carrying capacity of each receiving node of the target global receiving power grid based on a preset receiving node DC carrying capacity algorithm and according to the global DC carrying capacity and the DC carrying groups of each landing area.
7. The system according to claim 6, characterized in that The system further comprises: The feed-in capacity updating module is used to update the DC feed-in capacity put into operation after the current DC feed-in capacity in the preset DC feed-in capacity group to the current DC feed-in capacity according to the preset order of input, and return to execute the step of obtaining the current grid frequency group of the target global receiving-end grid in the first preset operating state based on the preset grid frequency algorithm according to the grid frequency modulation data group and the current DC feed-in capacity.
8. The system according to claim 6, characterized in that The power grid frequency acquisition module is configured as follows: After the current DC feed-in capacity is put into the preset target global receiving-end power grid, the target global receiving-end power grid is set to be in the preset fault state, and according to the preset collection interval, the power grid real-time data group and the system maximum equipment power loss of the target global receiving-end power grid in the first preset operating state are collected, wherein the power grid real-time data group includes power grid real-time data matching each preset collection interval, and the types of the power grid real-time data include: generator frequency modulation amount P G , DC automatic frequency regulation amount P DC and load automatic frequency regulation P L ; For each preset collection interval: according to the initial data group of the power grid, the real-time data group of the power grid and the maximum power loss of the system equipment P Loss , through the formula: Calculate the real-time grid frequency f that matches the preset acquisition interval, where the ∑ΔP G is the primary frequency modulation amount of the generator of the target global receiving power grid during the preset acquisition interval, and the ΔP G is the difference between the generator frequency modulation amount in the real-time data of the power grid and the initial data of the power grid, and the ∑ΔPD c is the DC automatic frequency regulation amount of the target global receiving-end power grid during the preset acquisition interval, and the ΔPD C is the difference between the DC automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid, the ∑ΔPL is the load automatic frequency regulation amount of the target global receiving end power grid at the preset collection interval, the ΔP L is the difference between the load automatic frequency regulation amount in the real-time data of the power grid and the initial data of the power grid; J is the inertia in the initial data group of the system power grid; Characterizing the preset acquisition interval; The current power grid frequency group is obtained, wherein the current power grid frequency group includes real-time power grid frequencies f that match each preset acquisition interval.
9. A receiving-end power grid DC carrying capacity calculation device, characterized in that: The device comprises: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the method for calculating the DC carrying capacity of the receiving-end power grid according to any one of claims 1 to 5.
10. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by a processor of a receiving-end power grid DC carrying capacity calculation device, the receiving-end power grid DC carrying capacity calculation device is enabled to execute the receiving-end power grid DC carrying capacity calculation method according to any one of claims 1 to 5.
