Coal mining machine electric control system replacement method and coal mining machine electric control system based on Internet
A technology of electronic control system and replacement method, applied in general control system, control/regulation system, computer control and other directions, can solve the problems of easy error, cumbersome process, increase time cost and economic cost, etc., achieve efficient switching and improve safety the effect of reducing time cost and economic cost
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2022-08-05
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to a rapid replacement method for a local electric control system of a coal shearer and a coal shearer control system based on the Internet. Background technique
[0002] Due to the different conditions of coal seam and coal quality in the coal mining face, different coal mines have different requirements for productivity, safety, production, etc., different coal mining related supporting equipment, various models of shearers, and large functional differences between each other. The electric control system of the coal machine generally provides different functional versions for different models. When the shearer leaves the factory, different versions of the electric control system will be installed according to the needs, so that the different models of the shearer can work normally under different industrial control conditions. Production.
[0003] When the industrial control conditions or production requirements of the shearer ...
Examples
Embodiment Construction
[0028] like figure 1 As shown, the present invention discloses a method for replacing a control system of a coal mining machine (which may be referred to as a method for replacing an electronic control system), comprising the following steps:
[0029] Step 1, generate a new electronic control system configuration file through the remote update device;
[0030] Step 2, the shearer is powered on;
[0031] Step 3, establishing a connection between the remote update device and the local original electric control system of the shearer through the Internet;
[0032] Step 4, the remote update device sends the new electric control system configuration file to the local original electric control system of the shearer;
[0033] Step 5, the shearer is powered on again, enters the working mode of updating the electric control system, and updates the local original electric control system according to the new electric control system configuration file.
[0034] Steps 1 and 2 are not req...