A method and device for verifying equipment cost based on LCC model
The LCC model is used to evaluate the life cycle cost of power equipment, which solves the problem that existing technology cannot evaluate the cost of power equipment, provides simple and reliable decision support, and helps select equipment with cost advantages.
Patent Information
- Application Number
- CN202210493837.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-04-28
AI Technical Summary
The existing technology cannot evaluate the life cycle cost of power equipment, which affects the overall planning and lean management of power equipment.
The equipment cost verification method based on the LCC model is adopted. By obtaining the initial investment, operation and maintenance, maintenance and failure cost data of the substation equipment, the preset annual cost calculation model is used to conduct sequential sub-item calculations and the timing of the full life cycle LCC model. Summary, divide it into the first and second total cost sequences, and conduct a quality test.
It realizes the assessment of the advantages and disadvantages of the whole life cycle cost of substation equipment, provides a simple, reliable and applicable decision-making basis, and helps to select equipment with cost advantages or eliminate equipment with cost disadvantages.
Smart Images

Figure CN114881471B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power equipment, and in particular to an equipment cost verification method and device based on an LCC model. Background Art
[0002] The entire life cycle usually refers to the entire life stage of a project or product from design to scrapping. The life cycle cost usually refers to the total cost required to consume the project or product during its entire life cycle. The LCC model usually refers to a mathematical model used to calculate the life cycle cost.
[0003] In the field of power equipment, cost management methods generally calculate the life cycle cost of power equipment by constructing and using the corresponding LCC model, which can not only improve the efficiency of power equipment cost control, but also provide certain decision-making support for the overall planning and lean management of power equipment. Some power equipment differs in equipment type, geographical environment, deployment and maintenance methods, which will lead to advantages and disadvantages in the life cycle cost of some power equipment, which can provide a reference for the rational deployment of power equipment in the future.
[0004] However, the existing cost management methods are unable to evaluate the pros and cons of the full life cycle cost of power equipment, which is detrimental to better overall planning and lean management of power equipment. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects and problems existing in the prior art that the full life cycle cost of power equipment cannot be evaluated, and to provide an equipment cost verification method and device based on the LCC model that can evaluate the full life cycle cost of substation equipment.
[0006] To achieve the above objectives, the technical solution of the present invention is: an equipment cost verification method based on the LCC model, the method comprising the following steps:
[0007] S1. Obtain N source cost data sets of N substation equipment in the same life cycle, each source cost data set includes initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment;
[0008] S2. Perform time-series item-by-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over their entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence;
[0009] S3, by using the preset full life cycle LCC model, N equal-year cost sets are summarized in time series to obtain N total cost sequences of N substation equipment in the full life cycle;
[0010] S4, dividing the N total cost sequences into N1 first total cost sequences and N2 second total cost sequences;
[0011] S5. Perform a superiority test on the N2 second total cost sequences based on the N1 first total cost sequences.
[0012] In step S1, the initial investment data and failure cost data of the substation equipment are retrieved from the ERP system to designated folders, respectively; the operation and maintenance cost data of the substation equipment are retrieved from the operation and maintenance records of the PMS system to designated folders; the inspection and repair cost data of the substation equipment are retrieved from the work order of the PMS system to designated folders; and the designated folder containing the initial investment data, operation and maintenance cost data, inspection and repair cost data and failure cost data of the substation equipment is set as the source cost data set of the substation equipment.
[0013] In step S2, the calculation model of initial investment and other annual costs is:
[0014] A CI =P CI ×CRF(γ,T)
[0015]
[0016] F CI =CI1+CI2+CI3
[0017] In the formula, A CI is the equal annual value of the i-th year in the initial investment equal annual fee sequence, P CI is the present value of initial investment, F CI is the final value of the initial investment, CI1 is the purchase cost, CI2 is the installation and commissioning cost, and CI3 is other costs; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding electrical equipment, 1≤i≤T.
[0018] In step S2, the annual cost calculation model for operation and maintenance is:
[0019] A CO =P CO ×CRF(γ,T)
[0020]
[0021]
[0022] In the formula, A COis the equal annual value of the i-th year in the operation and maintenance equal annual fee sequence, P CO is the present value of the operation and maintenance cost of the transformer equipment in the i-th year, CO i is the final value of the operation and maintenance cost of the transformer equipment in the i-th year, To correspond to the energy consumption of the transformer equipment in year i, is the maintenance cost of the corresponding switching equipment in the i-th year; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding switching equipment, 1≤i≤T.
[0023] In step S2, the annual cost calculation model for maintenance and other expenses is:
[0024] A CM =P CM ×CRF(γ,T)
[0025]
[0026] CM i =x i ×p1+y i ×p2
[0027] In the formula, A CM is the equal annual value of the i-th year in the maintenance equal annual fee sequence, P CM is the present value of maintenance cost of transformer equipment in year i, CM i is the final value of the maintenance cost of the transformer equipment in the i-th year, x i is the frequency of calibration and maintenance of the transformer equipment in the i-th year, p1 is the single calibration and maintenance fee, y i is the preventive maintenance frequency of the corresponding switching equipment in the i-th year, p2 is the single preventive maintenance fee; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding switching equipment, 1≤i≤T.
[0028] In step S2, the annual cost calculation model for failures is:
[0029] A CF =P CF ×CRF(γ,T)
[0030]
[0031]
[0032] In the formula, A CF is the equal annual value of the i-th year in the fault equal annual cost sequence, P CF is the present value of the failure cost of the transformer equipment in the i-th year, CF i is the final value of the failure fee of the corresponding transformer equipment in the i-th year, S is the maximum distribution transformer capacity of the corresponding transformer equipment, K dis the electricity price conversion multiple, t i is the power outage time of the transformer equipment in the i-th year, ψ i is the load rate of the corresponding transformer equipment in the i-th year, p k To correspond to the load loss of the transformer equipment in the i-th year, is the power factor, ε i is the accident rate of the corresponding strain-switch equipment in the i-th year, μ is the fault repair rate of the corresponding strain-switch equipment, and CI1 is the purchase cost; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding strain-switch equipment, 1≤i≤T.
[0033] In step S2, the annual cost calculation model for scrapping is:
[0034] A CD =α×A CI
[0035] In the formula, A CD is the equal annual value of the i-th year in the scrap equal annual cost sequence, α is the scrap investment cost ratio, A CI is the equal annual value of the i-th year in the initial investment equal annual fee sequence.
[0036] Step S5 specifically includes the following steps:
[0037] S51, performing univariate nonlinear regression on N1 first total cost sequences respectively to obtain N1 total cost curve models of N1 substation equipment in the whole life cycle;
[0038] S52, calculating the maximum cost difference between each total cost curve model and each second total cost sequence, and grouping N1 maximum cost differences corresponding to each second total cost sequence into a corresponding cost difference set;
[0039] S53, traversing each cost difference set, when any maximum cost difference in the corresponding cost difference set is less than or equal to the first preset threshold, accumulating and counting once, until the traversal is completed, and obtaining the corresponding accumulated number of times;
[0040] S54, determining whether each accumulated number is greater than or equal to a second preset threshold value, if so, determining that the corresponding second total cost sequence is dominant; if not, determining that the corresponding second total cost sequence is inferior.
[0041] An equipment cost verification device based on an LCC model, comprising:
[0042] A data acquisition module is used to respectively acquire N source cost data sets of N substation equipment in the same full life cycle, each source cost data set including initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment;
[0043] The sub-item calculation module is used to perform time-series sub-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over the entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence;
[0044] The time series summary module is used to perform time series summary on N equal-year cost sets respectively through a preset full life cycle LCC model to obtain N total cost sequences of N substation equipment in the full life cycle;
[0045] The cost analysis module is used to divide the N total cost sequences into N1 first total cost sequences and N2 second total cost sequences, and perform a superiority test on the N2 second total cost sequences according to the N1 first total cost sequences.
[0046] Compared with the prior art, the present invention has the following beneficial effects:
[0047] In an equipment cost verification method and device based on an LCC model of the present invention, a preset equal-annual cost calculation model and a preset full life cycle LCC model are combined to convert the source cost data sets of multiple substation equipment in the same full life cycle into equal-annual cost sets expressed in the form of equal-annual values, which is more conducive to comparing the pros and cons of costs. By means of grouping a plurality of total cost sequences corresponding to a plurality of substation equipment one by one, the purpose of verifying the pros and cons of the full life cycle cost of the substation equipment is achieved. The method and device have simplicity, reliability and applicability, and provide a decision-making basis for continuing to deploy substation equipment with full life cycle cost advantages or eliminating substation equipment with full life cycle cost disadvantages in the future. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 The present invention is a flow chart of an equipment cost verification method based on an LCC model.
[0049] Figure 2 It is a schematic diagram of an initial investment and equivalent annual fee sequence in an embodiment of the present invention.
[0050] Figure 3 It is a schematic diagram of the annual fee sequence for operation and maintenance etc. in an embodiment of the present invention.
[0051] Figure 4 It is a schematic diagram of the annual fee sequence for maintenance etc. in an embodiment of the present invention.
[0052] Figure 5 It is a schematic diagram of the failure equal annual fee sequence in the embodiment of the present invention.
[0053] Figure 6 It is a schematic diagram of the scrapping equal annual fee sequence in an embodiment of the present invention.
[0054] Figure 7 Schematic diagram of the total cost sequence in an embodiment of the present invention.
[0055] Figure 8 It is a structural schematic diagram of an equipment cost verification device based on an LCC model of the present invention. DETAILED DESCRIPTION
[0056] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0057] See also Figure 1 , an equipment cost verification method based on the LCC model, the method comprising the following steps:
[0058] S1. Obtain N source cost data sets of N substation equipment in the same life cycle, each source cost data set includes initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment, N≥2;
[0059] If there are two substations, the two substations can be divided into one substation located indoors and one substation located outdoors; if there are four substations, the four substations can be divided into two substations located indoors and two substations located outdoors;
[0060] The initial investment data and failure cost data of the substation equipment are retrieved from the ERP system to the designated folders, the operation and maintenance cost data of the substation equipment are retrieved from the operation and maintenance records of the PMS system to the designated folders, and the inspection and repair cost data of the substation equipment are retrieved from the work order of the PMS system to the designated folders. The designated folders containing the initial investment data, operation and maintenance cost data, inspection and repair cost data, and failure cost data of the substation equipment are set as the source cost data set of the substation equipment.
[0061] S2. Perform time-series item-by-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over their entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence;
[0062] The representation of the initial investment and other annual fee series can be the same as the representation of the operation and maintenance and other annual fee series, the maintenance and other annual fee series, the failure and other annual fee series, and the scrapping and other annual fee series. Taking the initial investment and other annual fee series as an example, it can be expressed as
[0063] The calculation model for initial investment and other annual costs is:
[0064] A CI =P CI ×CRF(γ,T)
[0065]
[0066] F CI =CI1+CI2+CI3
[0067] In the formula, A CI is the equal annual value of the i-th year in the initial investment equal annual fee sequence, P CI is the present value of initial investment, F CI is the final value of the initial investment, CI1 is the purchase cost, CI2 is the installation and commissioning cost, and CI3 is other costs; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding electrical equipment, 1≤i≤T;
[0068] The purchase cost CI1 may include equipment costs, professional tools and initial spare parts costs, and supplier freight costs. The installation and commissioning costs CI2 may include the owner's transportation costs, equipment construction and installation costs, and commissioning costs before the equipment is put into operation. Other costs CI3 may include acceptance costs, special test costs, and the costs of possible condition monitoring devices to be purchased. The social discount rate γ may be 8%, and the life cycle T may be 40 years.
[0069] The annual cost calculation model for operation and maintenance is:
[0070] A CO =PC O ×CRF(γ,T)
[0071]
[0072]
[0073] In the formula, A CO is the equal annual value of the i-th year in the operation and maintenance equal annual fee sequence, P CO is the present value of the operation and maintenance cost of the corresponding power equipment in the i-th year, COi is the final value of the operation and maintenance cost of the corresponding power equipment in the i-th year, To correspond to the energy consumption of the transformer equipment in year i, is the maintenance cost of the corresponding transformer equipment in the i-th year; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding transformer equipment, 1≤i≤T;
[0074] Energy consumption Can be a fixed value, maintenance fee Specifically, it can be expressed as:
[0075]
[0076]
[0077]
[0078] In the formula, Cost of loss of power substation equipment itself; Auxiliary loss fee, auxiliary loss fee Can be a fixed value; ΔP max is the power loss at maximum load, t max is the maximum load loss time, η is the main operating power, M is the average transmission and distribution price, P max is the active power at maximum load, Q max is the reactive power at maximum load, R is the resistance, U is the rated voltage, is the power factor;
[0079] The annual cost calculation model for maintenance and other expenses is:
[0080] A CM =P CM ×CRF(γ,T)
[0081]
[0082] CM i =x i ×p1+y i ×p2
[0083] In the formula, A CM is the equal annual value of the i-th year in the maintenance equal annual fee sequence, P CM is the present value of maintenance cost of transformer equipment in year i, CM i is the final value of the maintenance cost of the transformer equipment in the i-th year, x i is the frequency of calibration and maintenance of the transformer equipment in the i-th year, p1 is the single calibration and maintenance fee, y i is the preventive maintenance frequency of the corresponding electrical equipment in the i-th year, p2 is the single preventive maintenance fee; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding electrical equipment, 1≤i≤T;
[0084] The annual cost calculation model for failures is:
[0085] A CF =P CF ×CRF(γ,T)
[0086]
[0087]
[0088] In the formula, A CF is the equal annual value of the i-th year in the fault equal annual cost sequence, P CF is the present value of the failure cost of the transformer equipment in the i-th year, CF i is the final value of the failure fee of the corresponding transformer equipment in the i-th year, S is the maximum distribution transformer capacity of the corresponding transformer equipment, K d is the electricity price conversion multiple, t i is the power outage time of the transformer equipment in the i-th year, ψ i is the load rate of the corresponding transformer equipment in the i-th year, p k To correspond to the load loss of the transformer equipment in the i-th year, is the power factor, ε i is the accident rate of the corresponding transformer equipment in the i-th year, μ is the fault repair rate of the corresponding transformer equipment, and CI1 is the purchase cost; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding transformer equipment, 1≤i≤T;
[0089] The calculation model of scrapping and other annual costs is:
[0090] A CD =α×A CI
[0091] In the formula, A CD is the equal annual value of the i-th year in the scrap equal annual cost sequence; α is the scrap investment cost ratio, which can be 5%; A CI is the equal annual value of the i-th year in the equal annual fee sequence of the initial investment;
[0092] S3, by using the preset full life cycle LCC model, N equal-year cost sets are summarized in time series to obtain N total cost sequences of N substation equipment in the full life cycle;
[0093] For each equal-annual cost set, the initial investment equal-annual cost sequence, the operation and maintenance equal-annual cost sequence, the overhaul equal-annual cost sequence, the failure equal-annual cost sequence, and the scrap equal-annual cost sequence are added up in column order to obtain the corresponding total cost sequence. This can be used as a time series summary method. For example, a total cost sequence can be expressed as [LCC 1 , LCC 2 , ..., LCCT ];
[0094] Five different equal-year values are calculated by presetting the equal-year cost calculation model, which can take into account the simplicity, accuracy and practicality of the sub-item calculation;
[0095] The default life cycle LCC model is:
[0096] LCC=(A CI +A CO +A CM +A CF +A CD )
[0097] Where LCC is the total cost of the i-th year in the total cost sequence of the corresponding electrical equipment;
[0098] S4, dividing the N total cost sequences into N1 first total cost sequences and N2 second total cost sequences, N1≥1, N2≥1, N1+N2=N;
[0099] For example, the four total cost sequences are different from each other, two of them are named as the first total cost sequence, and the other two are named as the second total cost sequence; or, three of them are named as the first total cost sequence, and the remaining one is named as the second total cost sequence;
[0100] S5, performing a superiority test on the N2 second total cost sequences according to the N1 first total cost sequences; specifically comprising the following steps:
[0101] S51, performing univariate nonlinear regression on N1 first total cost sequences respectively to obtain N1 total cost curve models of N1 substation equipment in the whole life cycle;
[0102] The univariate nonlinear regression can adopt the Monte Carlo algorithm, and each total cost curve model can be expressed as a univariate curve in a two-dimensional coordinate system, where time is the independent variable, the total cost LCC is the dependent variable, and the unit time can be years;
[0103] S52, calculating the maximum cost difference between each total cost curve model and each second total cost sequence, and grouping N1 maximum cost differences corresponding to each second total cost sequence into a corresponding cost difference set;
[0104] According to the year, the corresponding total cost curve model and each total cost LCC in the second total cost sequence are subtracted column-wise to obtain the cost difference until the last year. All cost differences corresponding to the total cost curve model are sorted, and the cost difference with the largest data is selected from all the sorted cost differences, which is the corresponding maximum cost difference;
[0105] S53, traversing each cost difference set, when any maximum cost difference in the corresponding cost difference set is less than or equal to the first preset threshold, accumulating and counting once, until the traversal is completed, and obtaining the corresponding accumulated number of times;
[0106] The first preset threshold value may be 5, 10, or 20, for example, when the maximum cost difference is greater than 10, the cumulative counting operation is skipped, and when the maximum cost difference is less than or equal to 10, the cumulative counting operation is performed, and the cumulative counting operation may be n=n+1, and the initial value of n is 0;
[0107] S54, determining whether each accumulated number is greater than or equal to a second preset threshold, if so, determining that the corresponding second total cost sequence is dominant; if not, determining that the corresponding second total cost sequence is inferior;
[0108] The first preset threshold may be 1. If the second total cost sequence is advantageous, it means that the corresponding substation equipment has a cost advantage. If the second total cost sequence is inferior, it means that the corresponding substation equipment has a cost advantage.
[0109] With the help of curve form, the first total cost series is used as a reference object and the second total cost series is used as a verification object, which helps to improve the reliability and accuracy of substation equipment cost verification.
[0110] In an embodiment of the present invention, the staff can interact with terminal devices such as desktop computers, iPads, or notebooks to input various required data into the terminal devices, and the terminal devices send the various required data to the central server, or / and the central server retrieves various required data from a third-party server through an API interface, and then the central server performs data analysis.
[0111] In the embodiment of the present invention, for the case of an outdoor substation and an indoor substation, the initial investment and annual fee sequence can be as follows: Figure 2 As shown, the first-year equivalent values of the two substations are 13.37 million and 14.99 million respectively, with a difference of 1.62 million. With the increase of life cycle, the equivalent values of the two substations are declining. The reason is that the cost allocated to each year will become less. The sixth-year equivalent values of the two substations are 2.8921 million and 3.2426 million respectively, and the difference is reduced to 350,500. The 40th-year equivalent values of the two substations are 1.1212 million and 1.2571 million respectively, and the difference is reduced to 135,900, which is the smallest difference.
[0112] In the embodiment of the present invention, the annual fee sequence for operation and maintenance can be as follows: Figure 3As shown, the first-year equivalent values of the two substations are 76,798 and 40,900 respectively, with a difference of 72,708. As the life cycle increases, the equivalent annual values of the two substations show an upward trend. This is because the energy consumption is gradually increasing. Compared with indoor substations, the equivalent annual value of outdoor substations has been higher. The 40th-year equivalent annual values of the two substations are 238,529 and 14,865 respectively, with a difference of 223,664 yuan.
[0113] In the embodiment of the present invention, the annual fee sequence for maintenance etc. can be as follows: Figure 4 As shown in the figure, the first-year equivalent values of the two substations are 173,200 and 64,670 respectively, with a difference of 108,530. As the life cycle increases, the equivalent annual values of the two substations show an upward trend. Compared with the outdoor substation, the equivalent annual value of the indoor substation has been higher. The 40th-year equivalent annual values of the two substations are 537,905 and 240,910 respectively, with a difference of 297,040.
[0114] In the embodiment of the present invention, the annual fee sequence for failures etc. can be as follows: Figure 5 As shown, in the 31st year, the equivalent annual values of the two substations were both 95,530, and from the 32nd to the 35th year, the two substations were overhauled once a year respectively; for the indoor substation, the equivalent annual values of the above three years were 15,748, 26,290 and 28,430 respectively, showing an increasing trend; for the outdoor substation, the equivalent annual values of the above three years were 21,232, 26,399 and 32,632 respectively, also showing an increasing trend.
[0115] In the embodiment of the present invention, the scrapping and other annual fee sequences can be as follows: Figure 6 As shown in the figure, the equivalent annual values of the two substations show a downward trend with the increase of their life cycle. The equivalent annual values in the first year are 749,500 and 668,500 respectively, the equivalent annual values in the sixth year are 162,128 and 144,607 respectively, and the equivalent annual values in the 40th year are 62,853 and 56,061 respectively.
[0116] In the embodiment of the present invention, the total cost sequence can be as follows: Figure 7As shown, during the period from the 1st to the 26th year, the total cost of indoor substations was always higher than that of outdoor substations. In the 26th year, the total costs of the two substations were 1.37344 million and 1.369376 million respectively, with a difference of 0.4064. In the 27th year, the total costs of the two substations were 1.359849 million and 1.361342 million respectively, with a difference of 0.1493 million. The total cost of outdoor substations was higher than that of indoor substations. After 27 years, the total cost of outdoor substations was always higher than that of indoor substations.
[0117] See also Figure 8 , an equipment cost verification device based on an LCC model, comprising:
[0118] The data acquisition module is used to respectively acquire N source cost data sets of N substation equipment in the same life cycle, each source cost data set includes initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment, N≥2;
[0119] The sub-item calculation module is used to perform time-series sub-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over the entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence;
[0120] The time series summary module is used to perform time series summary on N equal-year cost sets respectively through a preset full life cycle LCC model to obtain N total cost sequences of N substation equipment in the full life cycle;
[0121] The cost analysis module is used to divide N total cost sequences into N1 first total cost sequences and N2 second total cost sequences, N1≥1, N2≥1, N1+N2=N; and perform a superiority test on the N2 second total cost sequences according to the N1 first total cost sequences.
[0122] A computing device according to another embodiment of the present invention includes a memory, a processor, and a computer program stored in the memory and executable on the processor, and when the processor executes the computer program, the above-mentioned method for verifying the equipment cost based on the LCC model is implemented. It can be understood that the computing device of the present invention can be a server or a terminal substation, wherein the processor can be connected to the memory via a universal serial bus.
[0123] A non-transitory computer-readable storage medium according to another embodiment of the present invention stores a computer program, and when the computer program is executed by a processor, the above-mentioned equipment cost verification method based on the LCC model is implemented.
[0124] Generally speaking, the computer instructions for implementing the method of the present invention may be carried in any combination of one or more computer-readable storage media. Non-transitory computer-readable storage media may include any computer-readable media, except for the signal itself that is temporarily propagating.
[0125] Computer readable storage media can be, for example, but not limited to, electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or components, or any combination thereof. More specific examples (non-exhaustive list) of computer readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAn), a read-only memory (Ron), an erasable programmable read-only memory (EKR0n or flash memory), an optical fiber, a portable compact disk read-only memory (CD-R0n), an optical storage device, a magnetic storage device, or any suitable combination thereof. In this document, a computer readable storage medium can be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device.
[0126] Computer program code for performing the operation of the present invention can be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Snalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages, in particular, Kython language suitable for neural network computing and platform frameworks based on TensorFlow, KyTorch, etc. can be used. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or connected to an external computer (for example, using an Internet service provider to connect through the Internet).
[0127] The above-mentioned computing device and non-temporary computer-readable storage medium can refer to the detailed description of the equipment cost verification method based on the LCC model and its beneficial effects, which will not be repeated here.
[0128] Although the embodiments of the present invention have been shown and described above, it should be understood that the above embodiments are exemplary and should not be construed as limitations on the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for verifying equipment cost based on LCC model, characterized in that: The method comprises the following steps: S1. Obtain N source cost data sets of N substation equipment in the same life cycle, each source cost data set includes initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment; S2. Perform time-series item-by-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over their entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence; The calculation model for initial investment and other annual costs is: A CI =P CI ×CRF(γ,T) F CI =CI1+CI2+CI3 In the formula, A CI is the equal annual value of the i-th year in the initial investment equal annual fee sequence, P CI is the present value of initial investment, F CI is the final value of the initial investment, CI1 is the purchase cost, CI2 is the installation and commissioning cost, and CI3 is other costs; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding electrical equipment, 1≤i≤T; The annual cost calculation model for operation and maintenance is: A CO =P CO ×CRF(γ,T) In the formula, A CO is the equal annual value of the i-th year in the operation and maintenance equal annual fee sequence, P CO is the present value of the operation and maintenance cost of the transformer equipment in the i-th year, CO i is the final value of the operation and maintenance cost of the transformer equipment in the i-th year, To correspond to the energy consumption of the transformer equipment in year i, is the maintenance cost of the corresponding transformer equipment in the i-th year; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding transformer equipment, 1≤i≤T; The annual cost calculation model for maintenance and other expenses is: A CM =P CM ×CRF(γ,T) CM i =x i ×p1+y i ×p2 In the formula, A CM is the equal annual value of the i-th year in the maintenance equal annual fee sequence, P CM is the present value of maintenance cost of transformer equipment in year i, CM i is the final value of the maintenance fee for the transformer equipment in the i-th year, x i is the frequency of calibration and maintenance of the electrical equipment in the i-th year, p1 is the single calibration and maintenance fee, y i is the preventive maintenance frequency of the corresponding electrical equipment in the i-th year, p2 is the single preventive maintenance fee; CRF(γ, T) is the annuity present value coefficient, γ is the social discount rate, T is the life cycle of the corresponding electrical equipment, 1≤i≤T; The annual cost calculation model for failures is: A CF =P CF ×CRF(γ,T) In the formula, A CF is the equal annual value of the i-th year in the fault equal annual cost sequence, P CF is the present value of the failure cost of the transformer equipment in the i-th year, CF i is the final value of the failure fee of the corresponding transformer equipment in the i-th year, S is the maximum distribution transformer capacity of the corresponding transformer equipment, K d is the electricity price conversion multiple, t i is the power outage time of the transformer equipment in the i-th year, ψ i is the load rate of the corresponding transformer equipment in the i-th year, p k To correspond to the load loss of the transformer equipment in the i-th year, is the power factor, ε i is the accident rate of the corresponding transformer equipment in the i-th year, μ is the fault inspection and repair cost rate of the corresponding transformer equipment, CI1 is the purchase cost; CRF(γ, T) is the annuity present value coefficient, Y is the social discount rate, T is the life cycle of the corresponding transformer equipment, 1≤i≤T; The calculation model of scrapping and other annual costs is: A CD =α×A CI In the formula, A CD is the equal annual value of the i-th year in the scrap equal annual cost sequence, α is the scrap investment cost ratio, A CI is the equal annual value of the i-th year in the equal annual fee sequence of the initial investment; S3, by using the preset full life cycle LCC model, N equal-year cost sets are summarized in time series to obtain N total cost sequences of N substation equipment in the full life cycle; S4, dividing the N total cost sequences into N1 first total cost sequences and N2 second total cost sequences; S5, performing a superiority test on the N2 second total cost sequences according to the N1 first total cost sequences; specifically comprising the following steps: S51, performing univariate nonlinear regression on N1 first total cost sequences respectively to obtain N1 total cost curve models of N1 substation equipment in the whole life cycle; S52, calculating the maximum cost difference between each total cost curve model and each second total cost sequence, and grouping N1 maximum cost differences corresponding to each second total cost sequence into a corresponding cost difference set; S53, traversing each cost difference set, when any maximum cost difference in the corresponding cost difference set is less than or equal to the first preset threshold, accumulating and counting once, until the traversal is completed, and obtaining the corresponding accumulated number of times; S54, determining whether each accumulated number is greater than or equal to a second preset threshold value, if so, determining that the corresponding second total cost sequence is dominant; if not, determining that the corresponding second total cost sequence is inferior.
2. The equipment cost verification method based on the LCC model according to claim 1 is characterized in that: In step S1, the initial investment data and failure cost data of the substation equipment are retrieved from the ERP system to designated folders, respectively; the operation and maintenance cost data of the substation equipment are retrieved from the operation and maintenance records of the PMS system to designated folders; the inspection and repair cost data of the substation equipment are retrieved from the work order of the PMS system to designated folders; and the designated folder containing the initial investment data, operation and maintenance cost data, inspection and repair cost data and failure cost data of the substation equipment is set as the source cost data set of the substation equipment.
3. An equipment cost verification device based on the LCC model, characterized in that: The device is applied to the method described in claim 1 or 2, and the device comprises: A data acquisition module is used to respectively acquire N source cost data sets of N substation equipment in the same full life cycle, each source cost data set including initial investment data, operation and maintenance cost data, repair cost data and failure cost data of the corresponding substation equipment; The sub-item calculation module is used to perform time-series sub-item calculations on N source cost data sets respectively through a preset equal-annual cost calculation model to obtain N equal-annual cost sets of N substation equipment over the entire life cycle, each equal-annual cost set including an initial investment equal-annual cost sequence corresponding to the initial investment data, an operation and maintenance equal-annual cost sequence corresponding to the operation and maintenance cost data, an overhaul equal-annual cost sequence corresponding to the overhaul cost data, a failure equal-annual cost sequence corresponding to the failure cost data, and a scrapping equal-annual cost sequence adapted to the initial investment equal-annual cost sequence; The time series summary module is used to perform time series summary on N equal-year cost sets respectively through a preset full life cycle LCC model to obtain N total cost sequences of N substation equipment in the full life cycle; The cost analysis module is used to divide the N total cost sequences into N1 first total cost sequences and N2 second total cost sequences, and perform a superiority test on the N2 second total cost sequences according to the N1 first total cost sequences.
Citation Information
Patent Citations
Expense estimation method of oil immersed transformer based on whole life cycle cost model
CN101799889A
Full life-cycle cost evaluation method based on power cable heat transfer model
CN105243520A