Sediment dams, tailings dams and centerline tailings damming methods
By designing high-height sand retaining dams and using drainage prisms and drainage layers to reduce the area occupied by tailings dams and the amount of coarse sand, the problems faced by the midline tailings dam construction method in areas with low coarse sand yields and high earthquakes have been solved. Solving the problem of limitation, the cost of tailings dams has been reduced and the scope of application has been expanded.
Patent Information
- Application Number
- CN202210688439.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-17
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-06-17
AI Technical Summary
The midline tailings dam construction method is limited in application in areas with low coarse sand yield and high earthquakes. Moreover, the one-time dam construction method requires a large amount of work and high cost, making it difficult to meet the needs of tailings dams.
Design a sand retaining dam, including a trapezoidal dam body, a drainage prism and a drainage layer. The height of the dam body is increased. The drainage prism and drainage layer are used to reduce the amount of graded coarse tailings, shorten the footprint of the tailings dam, and adopt Use waste rock or local earth and gravel to reduce costs.
It improves the application range of the center-line tailings damming method, reduces the amount of coarse sand, reduces the construction cost of the tailings dam, and expands the application range of the center-line tailings damming method.
Smart Images

Figure CN114892681B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tailings pond construction, in particular to a sand retaining dam, a tailings dam and a center-line tailings dam construction method. Background Art
[0002] Common tailings dam construction methods include upstream tailings dam construction method, midline tailings dam construction method and downstream tailings dam construction method.
[0003] In the related art, the tailings accumulation dam body of the center-line tailings dam method is graded coarse tailings, and there are requirements for the coarse sand yield. When the total tailings particle size is fine, the coarse sand yield is difficult to meet the requirements, thus limiting the application of the center-line tailings dam method. In high-seismic areas, it is not appropriate to use the upstream tailings dam method. The center-line tailings dam method or the one-time dam method is often used. However, the one-time dam method has the defects of large engineering volume and high cost. The center-line tailings dam method has the advantage of low cost. However, the center-line tailings dam method in the related art has a large demand for coarse sand, making it difficult to implement the center-line tailings dam method. Summary of the invention
[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0005] To this end, an embodiment of the present invention provides a sand-blocking dam, which can reduce the amount of coarse sand used and increase the application scope of the center-line tailings damming method.
[0006] An embodiment of the present invention further provides a tailings dam having the above-mentioned sand retaining dam.
[0007] The embodiment of the present invention also provides a center-line tailings damming method.
[0008] The sand retaining dam of the embodiment of the present invention comprises a dam body, a drainage prism and a drainage layer. The cross-sectional shape of the dam body is substantially trapezoidal. The drainage prisms are arranged on both sides of the dam body in the width direction, and the drainage prisms are connected to the bottom edge of the dam body. The drainage layer is arranged at the bottom of the dam body, the top of the dam body and the upstream surface of the dam body. The drainage layer arranged at the bottom of the dam body and the drainage layer arranged on the side of the dam body are both connected to the drainage prisms.
[0009] The sand-blocking dam of the embodiment of the present invention uses the sand-blocking dam in the related art only as its own drainage prism, and uses the dam body to increase the height of the sand-blocking dam, thereby enhancing the sand-blocking effect, so that the distance between the sand-blocking dam and the initial dam can be shortened, reducing the footprint of the tailings dam, thereby reducing the amount of graded coarse tailings, and allowing mines with low coarse sand yields to use the center-line tailings dam construction method, thereby expanding the application scope of the center-line tailings dam construction method.
[0010] In some embodiments, the cross-sectional shape of the drainage prism is generally trapezoidal, and the drainage layer includes a bottom drainage layer and an upstream drainage layer, the bottom drainage layer is arranged at the bottom of the dam body, the bottom drainage layer is connected to the side of the drainage prism, and the upstream drainage layer is arranged on the side and top of the dam body, and the upstream drainage layer is connected to the side and / or top surface of the drainage prism.
[0011] In some embodiments, the dam body is formed by filling waste rock and / or local earth and stone materials;
[0012] The drainage prism and the drainage layer are both formed by filling with fresh stones.
[0013] In some embodiments, the height of the dam body is 5m to 180m, and the total height of the sand retaining dam is 5m to 200m;
[0014] The width of the dam crest of the sand-blocking dam is 2m to 60m, and the width of the portion of the dam crest extending into the coarse tailings is 0 to 50m.
[0015] In some embodiments, the height of the drainage prism is 5m to 20m;
[0016] The thickness of the drainage layer is 1m to 20m.
[0017] In some embodiments, the sand retaining dam further comprises a drainage pipe, wherein the drainage pipe is laid at the bottom of the drainage layer along the width direction of the dam body.
[0018] In some embodiments, the sand-control dam further includes an inverted filter layer, and the inverted filter layer is disposed on a side of the drainage layer adjacent to the dam body.
[0019] The tailings dam of the second aspect embodiment of the present invention includes an initial dam and a sand retaining dam according to any of the above embodiments, wherein the initial dam is located upstream of the sand retaining dam, the distance between the sand retaining dam and the initial dam is greater than or equal to 0m, and a dam body formed by coarse tailings is accumulated between the initial dam and the sand retaining dam.
[0020] In some embodiments, the tailings dam further comprises a drainage pad layer, which is disposed at the bottom of the dam body, one end of the drainage pad layer is connected to the initial dam, and the other end of the drainage pad layer is connected to the drainage prism.
[0021] The centerline tailings damming method of the third aspect of the present invention includes:
[0022] S1. constructing an initial dam and laying a bottom drainage cushion layer downstream of the initial dam;
[0023] S2, constructing a sand retaining dam downstream of the initial dam in a one-time or phased manner, and connecting one end of the drainage cushion layer to the initial dam, and connecting the other end of the drainage cushion layer to the sand retaining dam;
[0024] S3. Gradually discharge graded coarse tailings between the initial dam and the sand retaining dam until the tailings dam is completed.
[0025] In some embodiments, the method for constructing a sand dam in a one-time dam construction manner includes:
[0026] S101, laying drainage pipes;
[0027] S102, filling an upstream drainage prism and a downstream drainage prism, and laying a bottom drainage layer between the upstream drainage prism and the downstream drainage prism;
[0028] S103. Use waste rock or local earth and stone materials to fill the dam body;
[0029] S104: Lay an upstream drainage layer on the top of the dam body and on the side adjacent to the initial dam.
[0030] In some embodiments, the method of constructing a sand dam in stages includes:
[0031] S201, laying a drainage pipe below the preset first-stage drainage prism to the downstream dam foot of the preset first-stage drainage prism;
[0032] S202, filling the first-stage drainage prism;
[0033] S203, extending the drainage pipe to the downstream dam foot of the preset second-phase drainage prism, filling the second-phase drainage prism, laying the second-phase bottom drainage layer between the first-phase drainage prism and the second-phase drainage prism, filling the second-phase dam body with waste rock or local earth and stone materials, laying the second-phase upstream drainage layer on the top of the second-phase dam body and the side adjacent to the initial dam, and the second-phase sand retaining dam is completed;
[0034] S204, repeat step S203 to build the third phase sand retaining dam, the fourth phase sand retaining dam, etc., until the N phase sand retaining dam is completed.
[0035] In some embodiments, the method of constructing a sand dam in stages includes:
[0036] S301, laying drainage pipes;
[0037] S302, filling an upstream drainage prism and a downstream drainage prism, and laying a bottom drainage layer between the upstream drainage prism and the downstream drainage prism;
[0038] S303, using waste rock or local earth and stone materials to fill the first-stage dam body, laying the first-stage upstream drainage layer on the top of the first-stage dam body and the side adjacent to the initial dam, and the first-stage sand retaining dam is completed;
[0039] S304, repeat step S303 to build the second phase sand retaining dam, the third phase sand retaining dam, etc., until the N phase sand retaining dam is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 Schematic diagram of a tailings dam according to an embodiment of the present invention.
[0041] Figure 2 Schematic diagram of a sand retaining dam according to an embodiment of the present invention.
[0042] Figure 3 It is a schematic diagram of a sand retaining dam constructed by a phased dam construction method according to an embodiment of the present invention.
[0043] Figure 4 It is a schematic diagram of another sand retaining dam constructed in stages according to an embodiment of the present invention.
[0044] Figure 5 It is a schematic diagram of a tailings dam in the related art.
[0045] Reference numerals:
[0046] 1. Sediment retaining dam; 11. Dam body; 12. Drainage prism; 13. Bottom drainage layer; 14. Upstream drainage layer; 15. Drainage pipe; 2. Initial dam; 3. Drainage cushion layer; 4. Graded coarse tailings; 5. Fine tailings in the reservoir. DETAILED DESCRIPTION
[0047] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0048] like Figure 1 and Figure 2 As shown, the sand-control dam 1 of the embodiment of the present invention includes a dam body 11, a drainage prism 12 and a drainage layer, wherein the dam body 11 is the main body of the sand-control dam 1, has a relatively high height, and plays a role in blocking and grading coarse tailings 4, and the drainage prism 12 and the drainage layer both play a role in drainage.
[0049] Specifically, the cross-sectional shape of the dam body 11 is generally trapezoidal, the drainage prisms 12 are arranged on both sides of the dam body 11 in the width direction, and the drainage prisms 12 are connected to the bottom edge of the dam body 11, and the drainage layer is arranged at the bottom of the dam body 11, the top of the dam body 11 and the upstream surface of the dam body 11. The drainage layer arranged at the bottom of the dam body 11 and the drainage layer arranged on the side of the dam body 11 are both connected to the drainage prisms 12. The drainage prisms 12 are divided into upstream drainage prisms 12 and downstream drainage prisms 12. The water seeping out of the graded coarse tailings 4 can be discharged to the downstream of the sand retaining dam 1 through the drainage prisms 12 and the drainage layer.
[0050] It should be noted that if Figure 5 As shown, the sand dam in the related art is generally built with fresh stones, with a low dam height and a long distance from the initial dam. It is used to block the tailings carried by rainwater erosion, and it only needs to play a preliminary blocking role. However, this also leads to a large demand for coarse sand. When the total tailings particle size is fine, the coarse sand yield is difficult to meet the requirements.
[0051] The sand-blocking dam 1 of the embodiment of the present invention uses the sand-blocking dam in the related art as only its own drainage prism 12, and uses the dam body 11 to increase the height of the sand-blocking dam 1, thereby enhancing the sand-blocking effect, thereby shortening the distance between the sand-blocking dam 1 and the initial dam 2, reducing the footprint of the tailings dam, thereby reducing the amount of graded coarse tailings 4, and allowing mines with low coarse sand yields to use the center-line tailings dam construction method, thereby expanding the application scope of the center-line tailings dam construction method.
[0052] In some embodiments, the cross-sectional shape of the drainage prism 12 is generally trapezoidal, and the drainage layer includes a bottom drainage layer 13 and an upstream drainage layer 14. The bottom drainage layer 13 is disposed at the bottom of the dam body 11, and the bottom drainage layer 13 is connected to the side of the drainage prism 12. The upstream drainage layer 14 is disposed on the side and top of the dam body 11, and the upstream drainage layer 14 is connected to the side and / or top surface of the drainage prism 12.
[0053] The upstream drainage layer 14 is arranged between the dam body 11 and the graded coarse tailings 4 , and the water seeping out of the graded coarse tailings 4 can be discharged through the upstream drainage layer 14 , the upstream drainage prism 12 , the bottom drainage layer 13 and the downstream drainage prism 12 .
[0054] In some embodiments, the dam body 11 is formed by filling waste rock and / or local earth and stone. It can be understood that the dam body 11 can be filled with only waste rock or local earth and stone, or with waste rock and local earth and stone at the same time. Using waste rock and local earth and stone as materials can reduce the storage pressure of the waste land dump, and compared with fresh stone, the purchase cost and transportation cost of waste rock and local earth and stone are lower, which can greatly reduce the construction cost of the tailings dam.
[0055] The drainage prism 12 and the drainage layer are both formed by filling with fresh stones. It should be noted that waste rocks and local soil and stone materials have low costs, but the drainage effect is poor. Therefore, using fresh stones to form the drainage prism 12 and the drainage layer can effectively improve the drainage effect of the sand dam 1.
[0056] In some embodiments, the height of the dam body 11 is 5m to 180m, the total height of the sand-control dam 1 is 5m to 200m, the slope ratio of the top of the sand-control dam 1 toward the reservoir is 0.01-0.2, the dam top width of the sand-control dam 1 is 2m to 60m, and the width of the part of the dam top of the sand-control dam 1 extending into the coarse tailings is 0 to 50m. The height and other dimensions of the sand-control dam 1 can be determined comprehensively based on factors such as the source of dam construction materials, dam construction costs, and project progress.
[0057] The height of the drainage prism 12 is 5m to 20m, and the thickness of the drainage layer is 1m to 20m. The height of the drainage prism 12 and the thickness of the drainage layer are designed and determined according to the drainage volume of the project.
[0058] In some embodiments, the sand control dam 1 also includes a drainage pipe 15, which is laid at the bottom of the drainage layer along the width direction of the dam body 11. A portion of the water seeping out of the graded coarse tailings 4 can enter the drainage pipe 15 through the drainage layer and be discharged through the drainage pipe 15, further improving the drainage effect of the sand control dam 1.
[0059] Furthermore, the sand retaining dam 1 also includes a filter layer, which is arranged on the side of the drainage layer adjacent to the dam body 11 and between the drainage layer and the dam body 11. The filter layer is composed of natural materials such as crushed stone, gravel, coarse sand and geotechnical materials. The filter layer can prevent the infiltrated water from carrying away the graded coarse tailings 4 in the tailings dam when flowing out, thereby improving the reliability of the tailings dam.
[0060] like Figure 1 As shown, the tailings dam of the second embodiment of the present invention includes an initial dam 2 and the sand retaining dam 1 described in any of the above embodiments, the initial dam 2 is located upstream of the sand retaining dam 1, a dam body formed by coarse tailings is accumulated between the initial dam 2 and the sand retaining dam 1, and fine tailings in the mine are accumulated upstream of the tailings dam.
[0061] The technical advantages of the tailings dam of the second embodiment of the present invention are the same as the technical advantages of the sand retaining dam 1 of the above embodiment, which will not be repeated here.
[0062] In some embodiments, the tailings dam of the second embodiment of the present invention further includes a drainage cushion layer 3, which is also formed by filling with fresh stones. The drainage cushion layer 3 is arranged at the bottom of the dam body, one end of the drainage cushion layer 3 is connected to the initial dam 2, and the other end of the drainage cushion layer 3 is connected to the drainage prism 12. A portion of the seepage water discharged from the graded coarse tailings 4 enters the drainage layer and drainage pipe 15 of the sand retaining dam 1 through the drainage cushion layer 3 and is discharged.
[0063] The centerline tailings damming method of the third aspect embodiment of the present invention comprises the following steps:
[0064] S1, constructing the initial dam 2, using fresh stones to lay the bottom drainage cushion layer 3 downstream of the initial dam 2;
[0065] S2. Constructing a sand-blocking dam 1 downstream of the initial dam 2 in a one-time or phased manner, and connecting one end of the drainage cushion layer 3 to the initial dam 2, and connecting the other end of the drainage cushion layer 3 to the sand-blocking dam 1;
[0066] S3, gradually discharging graded coarse tailings 4 between the initial dam 2 and the sand retaining dam 1 until the tailings dam is completed.
[0067] It should be noted that the sand retaining dam 1 of the embodiment of the present invention is relatively high and involves a large amount of engineering work. In order not to affect production, a tailings dam can be constructed in phases. The number of phases and the height of each phase of the dam are not limited as long as production needs are met.
[0068] Specifically, the method for constructing the sand retaining dam 1 in a one-time dam construction manner comprises the following steps:
[0069] S101, laying bottom drainage pipe 15;
[0070] S102, filling an upstream drainage prism 12 and a downstream drainage prism 12 at a preset position, and laying a bottom drainage layer 13 between the upstream drainage prism 12 and the downstream drainage prism 12;
[0071] S103, using waste rock or local earth and stone materials to fill the dam body 11;
[0072] S104 , laying an upstream drainage layer 14 on the top of the dam body 11 and on the side adjacent to the initial dam 2 , thereby completing the filling of the sand retaining dam 1 .
[0073] like Figure 3 and Figure 4 As shown, there are two methods for constructing the sand retaining dam 1 in stages, and the two methods are introduced below respectively.
[0074] Method 1:
[0075] S201, laying a drainage pipe 15 below the preset first-stage drainage prism 12 to the downstream dam foot of the preset first-stage drainage prism 12;
[0076] S202, filling the first-stage drainage prism 12;
[0077] S203, extending the drainage pipe 15 to the downstream dam foot of the preset second-phase drainage prism 12, filling the second-phase drainage prism 12, laying the second-phase bottom drainage layer 13 between the first-phase drainage prism 12 and the second-phase drainage prism 12, filling the second-phase dam body 11 with waste rock or local earth and stone materials, laying the second-phase upstream drainage layer 14 on the top of the second-phase dam body 11 and the side adjacent to the initial dam 2, and the second-phase sand retaining dam 1 is completed;
[0078] S204, repeat step S203 to fill the third-phase sand-trapping dam 1, the fourth-phase sand-trapping dam 1, and so on, until the N-phase sand-trapping dam 1 is completed.
[0079] In the above-mentioned phased dam construction method, the downstream drainage prism 12 of the second-phase sand retaining dam 1 will be used as the bottom drainage layer 13 of the third-phase sand retaining dam 1, and the downstream drainage prism 12 of the N-1-phase sand retaining dam will be used as the bottom drainage layer 13 of the N-phase sand retaining dam 1.
[0080] Method 2:
[0081] S301, laying bottom drainage pipe 15;
[0082] S302, filling the upstream drainage prism 12 and the downstream drainage prism 12 at the preset position, extending the bottom drainage pipe 15 to the downstream dam foot of the downstream drainage prism 12, and laying the bottom drainage layer 13 between the upstream drainage prism 12 and the downstream drainage prism 12;
[0083] S303, using waste rock or local earth and stone materials to fill the first-stage dam body 11, laying the first-stage upstream drainage layer 14 on the top of the first-stage dam body 11 and the side adjacent to the initial dam 2, and the first-stage sand retaining dam 1 is completed;
[0084] S304, repeat step S303 to fill the second phase sand retaining dam 1, the third phase sand retaining dam 1... until the N phase sand retaining dam 1 is completed.
[0085] It should be noted that in method 2, the second-phase dam body 11 is built on top of the first-phase dam body 11, and the N-phase dam body 11 is built on top of the N-1-phase dam body 11. In actual application, the construction method of the sand retaining dam 1 can be selected according to actual conditions.
[0086] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0087] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0088] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0089] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0090] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0091] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.
Claims
1. A tailings dam, It is characterized in that The invention comprises an initial dam and a sand-blocking dam, wherein the initial dam is located upstream of the sand-blocking dam, the distance between the sand-blocking dam and the initial dam is greater than or equal to 0m, and a dam body formed by coarse tailings is accumulated between the initial dam and the sand-blocking dam; the height of the sand-blocking dam is greater than that of the initial dam, and the slope ratio of the top of the sand-blocking dam to the reservoir is 0.01-0.2, and the sand-blocking dam comprises: A dam body, wherein the cross-sectional shape of the dam body is a trapezoid; Drainage prisms, the drainage prisms are arranged on both sides of the dam body in the width direction, and the drainage prisms are connected to the bottom edge of the dam body; The dam body is formed by filling with waste rock and / or local earth and stone materials; A drainage layer, wherein the drainage layer is arranged at the bottom of the dam body, the top of the dam body and the upstream surface of the dam body, and the drainage layer arranged at the bottom of the dam body and the drainage layer arranged on the side of the dam body are both connected to the drainage prism; the drainage prism and the drainage layer are both formed by filling with fresh stones; The tailings dam further comprises a drainage pad, which is arranged at the bottom of the dam body, one end of which is connected to the initial dam, and the other end of which is connected to the drainage prism, so that a part of the seepage water discharged from the graded coarse tailings can pass through the drainage pad and enter the drainage layer and drainage pipe of the sand retaining dam body for discharge, and the drainage pad is formed by filling with fresh stones; The cross-sectional shape of the drainage prism is a trapezoid, and the drainage layer includes a bottom drainage layer and an upstream drainage layer, wherein the bottom drainage layer is arranged at the bottom of the dam body and connected to the side surface of the drainage prism, and the upstream drainage layer is arranged at the side surface and top of the dam body and connected to the side surface and / or top surface of the drainage prism; The tailings dam further includes an inverted filter layer, which is arranged on a side of the drainage layer adjacent to the dam body.
2. The tailings dam according to claim 1, It is characterized in that The height of the dam body is 5m to 180m, and the total height of the sand retaining dam is 5m to 200m; The width of the dam crest of the sand-blocking dam is 2m to 60m, and the width of the portion of the dam crest extending into the coarse tailings is 0 to 50m.
3. The tailings dam according to claim 1, It is characterized in that The height of the drainage prism is 5m to 20m; The thickness of the drainage layer is 1m to 20m.
4. The tailings dam according to claim 1, It is characterized in that The drainage pipe is laid at the bottom of the drainage layer along the width direction of the dam body.
5. A mid-line tailings damming method, It is characterized in that For constructing a tailings dam as claimed in any one of claims 1 to 4, the centerline tailings dam construction method comprises: S1. constructing an initial dam and laying a bottom drainage cushion layer downstream of the initial dam; S2. constructing a sand-blocking dam downstream of the initial dam in a one-time or phased manner, and making one end of the drainage cushion layer connected to the initial dam, and the other end of the drainage cushion layer connected to the sand-blocking dam, wherein the height of the sand-blocking dam is greater than the height of the initial dam; S3. Gradually discharge graded coarse tailings between the initial dam and the sand retaining dam until the tailings dam is completed.
6. The midline tailings damming method according to claim 5, It is characterized in that The methods of constructing a sand dam in one-step construction include: S101, laying drainage pipes; S102, filling an upstream drainage prism and a downstream drainage prism, and laying a bottom drainage layer between the upstream drainage prism and the downstream drainage prism; S103. Use waste rock or local earth and stone materials to fill the dam body; S104: Lay an upstream drainage layer on the top of the dam body and on the side adjacent to the initial dam.
7. The mid-line tailings damming method according to claim 5, It is characterized in that The methods of constructing a sand dam in stages include: S201, laying a drainage pipe below the preset first-stage drainage prism to the downstream dam foot of the preset first-stage drainage prism; S202, filling the first-stage drainage prism; S203, extending the drainage pipe to the downstream dam foot of the preset second-phase drainage prism, filling the second-phase drainage prism, laying the second-phase bottom drainage layer between the first-phase drainage prism and the second-phase drainage prism, filling the second-phase dam body with waste rock or local earth and stone materials, laying the second-phase upstream drainage layer on the top of the second-phase dam body and the side adjacent to the initial dam, and the second-phase sand retaining dam is completed; S204, repeat step S203 to build the third phase sand retaining dam, the fourth phase sand retaining dam, etc., until the N phase sand retaining dam is completed.
8. The mid-line tailings damming method according to claim 5, It is characterized in that The methods of constructing a sand dam in stages include: S301, laying drainage pipes; S302, filling an upstream drainage prism and a downstream drainage prism, and laying a bottom drainage layer between the upstream drainage prism and the downstream drainage prism; S303, using waste rock or local earth and stone materials to fill the first-stage dam body, laying the first-stage upstream drainage layer on the top of the first-stage dam body and the side adjacent to the initial dam, and the first-stage sand retaining dam is completed; S304, repeat step S303 to build the second phase sand retaining dam, the third phase sand retaining dam, etc., until the N phase sand retaining dam is completed.
