Device and hoisting method for loading and unloading rods of a drilling rig by hoisting
By designing a lifting device for drilling rigs, the problem of manual operation of drilling rigs loading and unloading drill pipes in the prior art is solved, and the automatic loading and unloading of drill pipes is realized, and efficiency and safety are improved.
Patent Information
- Application Number
- CN202210834284.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-14
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2042-07-14
AI Technical Summary
In the prior art, the loading and unloading of the drill rod requires manual operation, which is time-consuming and labor-intensive, and has large errors, which poses safety hazards.
A device for loading and unloading rods by lifting is designed, including loading and unloading rod support base, loading and unloading rod movable parts and loading and unloading rod hoisting parts, and passive rolling in by gravity to realize automatic loading and unloading of the drill rod.
Through lifting, the drill rods are placed in a fixed position in sequence, which facilitates the automatic loading and unloading drill rod mechanism to grasp, improves loading and unloading efficiency, reduces manpower operations, and reduces safety hazards.
Smart Images

Figure CN115140645B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a device and a hoisting method for loading and unloading drill pipes for a drilling rig by hoisting, belonging to the technical field of drill pipe loading and unloading of a drilling rig. Background Technique
[0002] A horizontal directional drilling rig is a construction machine for laying various underground public facilities (pipelines, cables, etc.) without excavating the ground surface. It is widely used in the laying construction of flexible pipelines such as water supply, electricity, telecommunications, natural gas, coal gas, and petroleum. It is suitable for geological conditions such as sandy soil and clay, and is not suitable for areas with relatively high groundwater levels and pebble formations. Most non-hard rock areas in China can be constructed. The working environment temperature is -15°C to +45°C. The horizontal directional drilling technology is a new construction technology that combines the directional drilling technology in the petroleum industry with the traditional pipeline construction method. It has the advantages of fast construction speed, low construction accuracy, and low cost, and is widely used in pipeline laying construction projects such as water supply, gas, electricity, telecommunications, natural gas, and petroleum. The horizontal directional drilling equipment has also developed rapidly in the past ten years and has become an emerging industry in developed countries. Its development trend is towards large-scale and miniaturization, adapting to hard rock operations, self-provided anchoring systems, automatic stacking and extraction of drill pipes, automatic lubrication of drill pipe connections, automatic operation functions such as anti-electric shock systems, ultra-depth guidance monitoring, and wide application ranges. This type of equipment generally applies to steel pipes and PE pipes with a pipe diameter of φ300 to φ1200mm, and the maximum pipe laying length can reach 1500m, adapting to various soil conditions from soft soil to hard rock, and has broad application prospects.
[0003] The drill pipe is a basic component of the drill string and plays a very important role in the horizontal directional drilling technology.
[0004] During the gradual lengthening process of the drill pipe, it is necessary to continuously load the drill pipe. At present, the drilling rig uses manual replacement of the drill pipe. Manually replacing a drill pipe takes about 10 minutes and requires 3 people to cooperate to complete, which is time-consuming and laborious, with a large error in the installation process and relatively large potential safety hazards.
[0005] In order to improve the loading and unloading efficiency, Chinese invention patent 202023319662.5 discloses an automatic drill pipe loading and unloading mechanism for grasping the drill pipe placed on the ground or the drill pipe standby rack and installing it on the power head of the drilling rig, or disassembling the drill pipe on the power head of the drilling rig and placing it on the ground or the drill pipe standby rack. It can reduce the occupied space of the rod storage bin on the drilling rig, and realizes the automation of drill pipe loading and unloading through the oil cylinder, improves safety, saves a large amount of manual labor workload, flexibly cooperates with various drilling rigs, realizes various state control and adjustment, and is not limited by the drill pipe size at the same time. It is an independent mechanism and does not need to rely on the drilling rig, so it does not increase the design difficulty of the structure of the drilling rig itself.
[0006] However, since the positions of the drill pipes on the ground or on the drill pipe spare rack are different, when the automatic drill pipe loading and unloading mechanism grabs the drill pipes, it is necessary to adjust the distance of grabbing to adapt to the drill pipes at different positions, or the drill pipes on the ground or on the drill pipe spare rack need to be manually placed at the designated position one by one. The power structure is complex and the operation difficulty is great. Summary of the Invention
[0007] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a device for loading and unloading drill pipes for a drilling rig by hoisting, which can sequentially place the drill pipes at fixed positions by hoisting, facilitating the grabbing of the automatic drill pipe loading and unloading mechanism.
[0008] The device for loading and unloading drill pipes for a drilling rig by hoisting according to the present invention includes a drill pipe loading and unloading support base, a drill pipe loading and unloading movable component arranged on the drill pipe loading and unloading support base, and a drill pipe loading and unloading hoisting component.
[0009] The drill pipe unloading support base includes a base main body and a reset pedal, and the reset pedal is installed on a reset control lever for resetting the drill pipe loading and unloading movable component.
[0010] The drill pipe loading and unloading movable component includes a movable main body, a loading and unloading movable beam, and a loading and unloading movable plate. The movable main body is adapted to the base main body. The loading and unloading movable beam is installed on the movable main body through a front ear and a rear ear, and the position of the loading and unloading movable beam on the front ear and the rear ear is adjustable. The front end of the loading and unloading movable beam is connected to two loading and unloading movable plates through a movable shaft column, and the loading and unloading movable plate is connected to the reset control lever.
[0011] The drill pipe loading and unloading hoisting component includes a U-shaped hoisting plate, an I-shaped hoisting structure plate, and a hoisting structure beam. The U-shaped hoisting plates of the hoisting structure beam are located on both sides of the I-shaped hoisting structure plate. The middle part of the hoisting structure beam is integrally connected to the I-shaped hoisting structure plate. A hoisting reinforcement plate is arranged on the upper side of the hoisting structure beam, and a hoisting hook is arranged on the lower side of the hoisting structure beam. Hoisting holes are arranged at both ends of the U-shaped hoisting plate. The hoisting holes of the U-shaped hoisting plate are connected to a front hoisting ear and a rear hoisting ear on the drill pipe loading and unloading movable component, and the hoisting reinforcement plate is connected to a hoisting machine.
[0012] The base body and the movable body are adapted to form the main structure of the device; the loading and unloading movable beam, the front lifting ear and the rear lifting ear are used to adjust the tilting mode of the loading and unloading movable beam and adjust the state of the loading and unloading drill pipe; the loading and unloading movable plate is connected to the reset control lever and is used to convey a single drill pipe; the reset pedal is used to adjust the conveyance of a single drill pipe by the loading and unloading movable plate, and the reset control lever is used to reset the movable components of the loading and unloading rod. The I-shaped lifting structure plate serves as the main body of the lifting component of the loading and unloading rod and is connected to the front lifting ear and the rear lifting ear on the movable component of the loading and unloading rod through the lifting holes of the U-shaped lifting plate to ensure balanced lifting; it is connected to the lifting machinery through the lifting reinforcement plate. Similarly, it ensures balanced lifting of different devices; the lifting hook is used to lift the drill pipe; it can achieve: the loading and unloading actions of the movable components of the loading and unloading rod, the separate balanced lifting of the movable components of the loading and unloading rod, the integrated balanced lifting of the support base of the loading and unloading rod and the movable components of the loading and unloading rod, and the lifting of the drill pipe; it can utilize lifting to adjust the loading and unloading state and move the support base of the loading and unloading rod and the movable components of the loading and unloading rod.
[0013] When loading the rod, a drill pipe is placed on the loading and unloading movable beam. Through the loading and unloading rod lifting component, the tilting mode of the loading and unloading movable beam is adjusted so that the rear end is higher than the front end by adjusting the front lifting ear and the rear lifting ear. Press the reset pedal to drive the loading and unloading movable plate to move, causing it to swing downward near the axis. A single drill pipe rolls downward due to gravity, and the single drill pipe is conveyed to the front end of the loading and unloading movable beam; after the conveyance is completed, the reset pedal is no longer pressed, and the reset control lever executes the reset, causing the loading and unloading movable plate to return. The remaining drill pipes are still sequentially located on the loading and unloading movable beam at the rear end of the loading and unloading movable plate; when loading again, press the reset pedal to continue the conveyance.
[0014] When unloading the rod, through the loading and unloading rod lifting component, the tilting mode of the loading and unloading movable beam is adjusted so that the rear end is lower than the front end by adjusting the front lifting ear and the rear lifting ear. Place the drill pipe at the front end of the loading and unloading movable plate, and the placed drill pipe rolls into the rear of the loading and unloading movable beam due to gravity and is arranged in sequence.
[0015] Preferably, a seventh hole and an eighth hole are vertically distributed on the rear ear, and a ninth hole and a tenth hole are vertically distributed at the rear end of the loading and unloading movable beam; when the seventh hole and the tenth hole are aligned, the rear end of the loading and unloading movable beam is higher than the front end; when the eighth hole and the ninth hole are aligned, the rear end of the loading and unloading movable beam is lower than the front end; the lifting holes provided at both ends of the U-shaped lifting plate include a first lifting hole, a second lifting hole, a third lifting hole, and a fourth lifting hole.
[0016] It is connected to the front lifting ear and the rear lifting ear on the movable device of the loading and unloading rod through the first lifting hole, the second lifting hole, the third lifting hole, and the fourth lifting hole on the U-shaped lifting plate. Connect different holes to ensure balanced lifting of different devices; during lifting, align the tenth hole of the loading and unloading movable beam with the seventh hole of the rear lifting ear and insert a fixing pin, that is, enter the rod loading state; during lifting, align the ninth hole of the loading and unloading movable beam with the eighth hole of the rear lifting ear and insert a fixing pin, that is, enter the rod unloading state.
[0017] Preferably, a first arc and a second arc are provided on the loading and unloading movable plate.
[0018] The first arc is used to divide the loading and unloading movable beam into two parts. One part is for storing drill pipes, and the other part is for conveying drill pipes. When loading the drill pipes, press the reset pedal to drive the loading and unloading movable plate to move, causing its near-axle part to swing downward, that is, the first arc swings downward below the loading and unloading movable beam, and the loading and unloading movable beam is no longer divided into two parts by the first arc. A drill pipe rolls downward due to gravity; the second arc is used to fix the conveyed drill pipes at the front end of the loading and unloading movable beam, that is, when loading the drill pipes, a drill pipe rolls downward due to gravity and is conveyed to the second arc at the front end of the loading and unloading movable beam. When unloading the drill pipes, place the drill pipes on the second arc at the front end of the loading and unloading movable plate.
[0019] Preferably, the reset lever is arranged on the reset spring transmission rod. The reset spring transmission rod fixes the reset axis through the reset connecting plate. A reset spring is connected near the axle of the reset spring transmission rod, and the lower part of the reset spring is connected to the lead screw; a steel chain is arranged on the reset spring transmission rod, and the loading and unloading movable plate is connected to the reset lever through the steel chain and the reset spring transmission rod.
[0020] The loading and unloading rod movable components are reset through the reset spring transmission rod, the reset spring, the reset lever, the reset pedal and the steel chain, and the reset size is adjusted through the lead screw.
[0021] Preferably, the movable main body includes a third bottom structure channel steel, a fourth bottom structure channel steel and a fifth bottom structure channel steel. The third bottom structure channel steel is arranged at one end of two fourth bottom structure channel steels, and the fifth bottom structure channel steel is arranged inside the other end of two fourth bottom structure channel steels; four round steel upper supports are arranged on the third bottom structure channel steel, the fourth bottom structure channel steel and the fifth bottom structure channel steel. The loading and unloading movable beam is connected to the four round steel upper supports through the front ear and the rear ear;
[0022] The base main body includes a first bottom structure channel steel and a second bottom structure channel steel in a frame combination. Four round steel lower supports are arranged on the first bottom structure channel steel and the second bottom structure channel steel. A balance round foot is installed below the round steel lower supports, and the round steel lower supports are detachably connected to the round steel upper supports;
[0023] The hoisting structure beam includes a lower hoisting structure beam and an upper hoisting structure beam. There is a hoisting reinforcement plate on the upper hoisting structure beam and a hoisting hook on the lower hoisting structure beam; the lower side of the hoisting structure beam is hinged to the head of the hoisting hook, and a hanging column adapted to the tail of the hoisting hook is also arranged on the lower side of the hoisting structure beam;
[0024] The movable body is connected to the base body through a connecting operating rod, and the connecting operating rod is installed on a fixed channel steel, and the fixed channel steel is arranged on a lower support of the round steel.
[0025] Four round steel upper supports, the third bottom structural channel steel, the fourth bottom structural channel steel and the fifth bottom structural channel steel form the main structure of the movable body; the round steel lower support, the first bottom structural channel steel and the second bottom structural channel steel form the main structure of the base body, and a balancing round foot is installed under the round steel lower support as a bottom stabilizing device. The round steel lower support and the round steel upper support are detachably connected to form the main structure of the device; the connecting operating rod is used to reinforce the connection between the movable body and the base body, so that the connection between the movable body and the base body is more secure; the lower lifting structure beam and the upper lifting structure beam are respectively located above and below the I-shaped plate of the I-shaped lifting structure plate. While strengthening the structural strength, the lower lifting structure beam is used to lift the drill rod through the lifting hook, and the upper lifting structure beam is used to connect with the lifting machinery through the lifting reinforcement plate; the hinged connection method allows the lifting hook to rotate on the lower side of the lifting structure beam through the head. When the lifting hook is not in use, its tail is hung on the hanging column, and when in use, its tail is taken off the hanging column.
[0026] Preferably, one end of the connecting operating rod is fixed by a movable fixing pin; the rear end of the loading and unloading movable beam is connected to the movable lifting upper fixing plate and the movable lifting lower fixing plate; and two reset pedals are installed on the reset operating rod.
[0027] The movable fixing pin is used to fix the connecting operating rod to prevent it from swinging and shaking when the movable body and the base body are not reinforced by the connecting operating rod; the movable lifting upper fixing plate and the movable lifting lower fixing plate are used for lifting and loading and unloading the movable beam. The lifting hook is installed through the movable lifting upper fixing plate and the movable lifting lower fixing plate. The movable beam is loaded and unloaded by lifting and moving, and the inclination mode of loading and unloading the movable beam is adjusted; the two reset pedals are adapted to the mechanical grip of the automatic loading and unloading drill rod mechanism, which is convenient for pressing and releasing the reset pedals.
[0028] Preferably, it also includes a drill rod lifting claw adapted to the lifting hook, the drill rod lifting claw includes a plurality of core-penetrating lifting claws, and the core-penetrating lifting claws are fixed on a lifting claw fixing plate.
[0029] The drill pipe lifting claw is used to grab the drill pipe through the core lifting claw, and the lifting claw fixing plate is used to connect the core lifting claw and the lifting hook.
[0030] Preferably, it also includes a drill rod placement bracket, which includes a main bracket plate, a drill rod arrangement fixing plate and a bracket lifting beam. The drill rod arrangement fixing plate is located on both sides of the main bracket plate, and the internal shape of the drill rod arrangement fixing plate is adapted to the shape of the drill rod. The main bracket plate is provided with a bracket lifting ear, and the bottom of the bracket lifting beam is adapted to the bracket lifting ear.
[0031] The drill pipe placing bracket is used to place drill pipes. The main bracket plate and the drill pipe arranging and fixing plate form the main structure. The structure strengthening plate serves as a structure strengthening device. The bracket lifting ear and the bracket lifting beam are used for lifting the bracket; the drill pipe arranging and fixing plate can achieve multi-layer close arrangement of several drill pipes. The upper and lower layers of drill pipes are staggered from each other, and the placement is firm and not easy to shift. The drill pipe placement position can cooperate with the drill pipe lifting claws to achieve simultaneous lifting of several drill pipes.
[0032] Preferably, a first bracket lifting hole and a second bracket lifting hole are opened on the bracket lifting beam. The first bracket lifting hole is located at the top of the bracket lifting beam, and the second bracket lifting hole is located at the bottom of the bracket lifting beam and is adapted to the bracket lifting ear.
[0033] By connecting with the bracket lifting beam through a lifting hook, the drill pipe placing bracket can be lifted as a whole.
[0034] The hoisting method for loading and unloading rods for a drilling rig by hoisting according to the present invention uses the above-mentioned hoisting device for loading and unloading rods of a drilling rig, and includes:
[0035] The process of adjusting the state of the rod loading and unloading moving part:
[0036] 1) A hook is installed at the tail of the lifting hook, and the hook extends into the hole on the movable lifting plate in the rod loading and unloading moving part for hook lifting;
[0037] 2) The hoisting machine is connected to the sixth hoisting hole of the upper hoisting structure beam;
[0038] 3) Hoist to align the seventh hole of the loading and unloading movable beam on the rod loading and unloading moving part with the seventh hole of the rear hoisting ear after hoisting, and insert a fixing pin, then enter the state of loading the rod;
[0039] 4) Hoist to align the ninth hole of the loading and unloading movable beam on the rod loading and unloading moving part with the eighth hole of the rear hoisting ear after hoisting, and insert a fixing pin, then enter the state of unloading the rod;
[0040] The process of hoisting the rod loading and unloading moving part alone:
[0041] 1) The hoisting machine is connected to the sixth hoisting hole of the upper hoisting structure beam;
[0042] 2) The first hoisting hole of the U-shaped hoisting plate on the hoisting device is connected to the eleventh hole of the rear hoisting ear on the rod loading and unloading moving part, and the third hoisting hole of the U-shaped hoisting plate is connected to the twelfth hole of the front hoisting ear, and a shaft pin is inserted;
[0043] 3) Pull out the movable fixing pin, and operate the four connecting operating rods on the connecting fixing channel steel to separate them from the protruding columns on the fourth bottom structure channel steel;
[0044] 4) Separate the steel chain from the loading and unloading movable plate in the rod loading and unloading moving part, and unlock the mechanical interlocking device;
[0045] 5) It can achieve the balanced hoisting of the movable parts of the loading and unloading rod separately.
[0046] The process of hoisting the support base of the loading and unloading rod and the movable parts of the loading and unloading rod as a whole:
[0047] 1) The hoisting machinery is connected to the fifth hoisting hole of the upper hoisting structural beam.
[0048] 2) The second hoisting hole of the U-shaped hoisting plate is connected to the eleventh hole of the rear hoisting ear on the movable parts of the loading and unloading rod, and the fourth hoisting hole of the U-shaped hoisting plate is connected to the twelfth hole of the front hoisting ear, and a shaft pin is inserted.
[0049] 3) Operate the four connecting operating rods on the connecting fixed channel steel to make them embed into the protruding columns on the fourth bottom structural channel steel, and insert the movable fixed pins to complete the integrated connection of the support base of the loading and unloading rod and the movable parts of the loading and unloading rod.
[0050] 4) It can achieve the balanced hoisting of the support base of the loading and unloading rod and the movable parts of the loading and unloading rod as a whole.
[0051] The process of hoisting the drill pipe in cooperation with the drill pipe hoisting claw:
[0052] 1) Lower the hoisting hooks, and the two hoisting hooks respectively hook the hoisting holes at the tops of the two drill pipe hoisting claws.
[0053] 2) Insert the 5 core-passing hoisting claws of the two drill pipe hoisting claws into the two ends of the 5 drill pipes in the drill pipe placement bracket respectively.
[0054] 3) Use the boom for hoisting, and it can achieve the simultaneous hoisting of 5 drill pipes.
[0055] The process of hoisting the drill pipe placement bracket as a whole:
[0056] 1) Connect the second support hoisting holes on the two support hoisting beams to the holes on the support hoisting ears on the front and rear sides of the drill pipe placement bracket respectively, and fix them with shaft pins.
[0057] 2) Lower the hoisting hooks on the hoisting component of the loading and unloading rod, and the two hoisting hooks respectively hook the first support hoisting holes at the tops of the two support hoisting beams.
[0058] 3) Use the boom for hoisting, and it can achieve the overall hoisting of the drill pipe placement bracket.
[0059] Compared with the prior art, the present invention has the following beneficial effects:
[0060] The device and hoisting method for loading and unloading the drill rod of the drilling rig by hoisting according to the present invention can sequentially place the drill pipes at fixed positions through hoisting, which is convenient for the automatic drill pipe loading and unloading mechanism to grab, and rely on gravity to passively roll back and forth without power. Brief Description of the Drawings
[0061] Figure 1 is a schematic perspective view of a device for loading and unloading rods for a drill rig by hoisting according to the present invention;
[0062] Figure 2 is a schematic perspective view of a support base for a rod loading and unloading device according to the present invention;
[0063] Figure 3 is a schematic top view of a support base for a rod loading and unloading device according to the present invention;
[0064] Figure 4 is a schematic right view of a support base for a rod loading and unloading device according to the present invention;
[0065] Figure 5 is a schematic front view of a support base for a rod loading and unloading device according to the present invention;
[0066] Figure 6 is a schematic perspective view of a movable component of a rod loading and unloading device according to the present invention;
[0067] Figure 7 is a schematic top view of a movable component of a rod loading and unloading device according to the present invention;
[0068] Figure 8 is a schematic right view of a movable component of a rod loading and unloading device according to the present invention;
[0069] Figure 9 is a schematic front view of a movable component of a rod loading and unloading device according to the present invention;
[0070] Figure 10 is a schematic view of a rear ear according to the present invention;
[0071] Figure 11 is a schematic view of a front ear according to the present invention;
[0072] Figure 12 is a schematic view of a loading and unloading movable beam according to the present invention;
[0073] Figure 13 is a schematic view of a loading and unloading movable plate according to the present invention;
[0074] Figure 14 is a schematic view of a hoisting component for a rod loading and unloading device according to the present invention;
[0075] Figure 15 is a schematic top view of a hoisting component for a rod loading and unloading device according to the present invention;
[0076] Figure 16It is a right - view structural schematic diagram of a hoisting component of a loading and unloading rod according to the present invention;
[0077] Figure 17 It is a front - view structural schematic diagram of a hoisting component of a loading and unloading rod according to the present invention;
[0078] Figure 18 It is a three - dimensional structural schematic diagram of a drill rod hoisting claw according to the present invention;
[0079] Figure 19 It is a top - view structural schematic diagram of a drill rod hoisting claw according to the present invention;
[0080] Figure 20 It is a right - view structural schematic diagram of a drill rod hoisting claw according to the present invention;
[0081] Figure 21 It is a front - view structural schematic diagram of a drill rod hoisting claw according to the present invention;
[0082] Figure 22 It is a three - dimensional structural schematic diagram of a drill rod placement bracket according to the present invention;
[0083] Figure 23 It is a top - view structural schematic diagram of a drill rod placement bracket according to the present invention;
[0084] Figure 24 It is a right - view structural schematic diagram of a drill rod placement bracket according to the present invention;
[0085] Figure 25 It is a front - view structural schematic diagram of a drill rod placement bracket according to the present invention;
[0086] Figure 26 It is a working - state schematic diagram of a drill rod placement bracket according to the present invention;
[0087] Figure 27 It is a structural schematic diagram of a bracket hoisting beam according to the present invention.
[0088] Wherein: 1. Balanced round feet; 2. Lower support of round steel; 3. First bottom structure channel steel; 4. Second bottom structure channel steel; 5. Fixed channel steel; 6. Connecting operating rod; 61. Hook; 7. Movable fixing pin; 8. Reset spring transfer rod; 9. Reset operating lever; 10. Reset pedal; 11. Steel chain; 12. Reset spring; 13. Lead screw; 14. Reset connecting plate; 15. Upper support of round steel; 16. Third bottom structure channel steel; 17. Fourth bottom structure channel steel; 171. Protruding column; 18. Fifth bottom structure channel steel; 19. Loading and unloading movable beam; 199. Ninth hole; 1910. Tenth hole; 20. Rear ear; 207. Seventh hole; 208. Eighth hole; 2011. Eleventh hole; 21. Front ear; 2112. Twelfth hole; 22. Loading and unloading movable plate; 221. First arc; 222. Second arc; 23. Movable shaft column; 24. Movable hoisting upper fixing plate; 25. Movable hoisting lower fixing plate; 26. Movable hoisting plate; 27. U-shaped hoisting plate; 271. First hoisting hole; 272. Second hoisting hole; 273. Third hoisting hole; 274. Fourth hoisting hole; 28. I-shaped hoisting structure plate; 29. Lower hoisting structure beam; 30. Upper hoisting structure beam; 31. Hoisting reinforcement plate; 315. Fifth hoisting hole; 316. Sixth hoisting hole; 32. Hoisting hook; 33. Hanging column; 34. Bracket support; 35. Main body bracket plate; 36. Drill pipe arrangement fixing plate; 37. Bracket hoisting ear; 38. Bracket hoisting beam; 3815. First bracket hoisting hole; 3816. Second bracket hoisting hole; 39. Structure reinforcement plate; 40. Core-piercing hoisting claw; 41. Hoisting claw fixing plate; 4117. Hoisting hole. Detailed implementation mode
[0089] The present invention will be further described below with reference to the accompanying drawings:
[0090] Embodiment 1
[0091] As Figure 1-13 shown, a device for loading and unloading rods for a drilling rig by hoisting according to the present invention includes a rod loading and unloading support base, a rod loading and unloading movable component arranged on the rod loading and unloading support base, and a rod loading and unloading hoisting component.
[0092] The rod unloading support base includes a base main body and a reset pedal 10, and the reset pedal 10 is installed on the reset operating lever 9 for resetting the rod loading and unloading movable component.
[0093] The loading and unloading rod moving part includes a moving body, a loading and unloading moving beam 19 and a loading and unloading moving plate 22. The moving body is adapted to the base body. The loading and unloading moving beam 19 is installed on the moving body through a front ear 21 and a rear ear 20. The position of the loading and unloading moving beam 19 on the front ear 21 and the rear ear 20 is adjustable. The front end of the loading and unloading moving beam 19 is connected to two loading and unloading moving plates 22 through a moving shaft column 23. The loading and unloading moving plate 22 is connected to a reset control lever 9.
[0094] The loading and unloading rod hoisting part includes a U-shaped hoisting plate 27, an I-shaped hoisting structure plate 28 and a hoisting structure beam. The U-shaped hoisting plate 27 of the hoisting structure beam is located on both sides of the I-shaped hoisting structure plate 28. The middle part of the hoisting structure beam is integrally connected to the I-shaped hoisting structure plate 28. A hoisting reinforcement plate 31 is arranged on the upper side of the hoisting structure beam, and a hoisting hook 32 is arranged on the lower side of the hoisting structure beam. Hoisting holes are arranged at both ends of the U-shaped hoisting plate 27. It is connected to the front hoisting ear 21 and the rear hoisting ear 20 on the loading and unloading rod moving part through the hoisting holes of the U-shaped hoisting plate 27, and is connected to the hoisting machinery through the hoisting reinforcement plate 31.
[0095] The base body and the moving body are adapted to form the main structure of the device. The loading and unloading moving beam 19, the front hoisting ear 21 and the rear hoisting ear 20 are used to adjust the tilting mode of the loading and unloading moving beam 19 and adjust the state of the loading and unloading drill pipe. The loading and unloading moving plate 22 is connected to the reset control lever 9 and is used to convey a single drill pipe. The reset pedal 10 is used to adjust the conveying of a single drill pipe by the loading and unloading moving plate 22, and the reset control lever 9 is used to reset the loading and unloading rod moving part. The I-shaped hoisting structure plate 28 serves as the main body of the loading and unloading rod hoisting part. It is connected to the front hoisting ear 21 and the rear hoisting ear 20 on the loading and unloading rod moving part through the hoisting holes of the U-shaped hoisting plate 27 to ensure balanced lifting. It is connected to the hoisting machinery through the hoisting reinforcement plate 31. Similarly, it ensures balanced lifting of different devices. The hoisting hook 32 is used to hoist the drill pipe. It can achieve: the loading and unloading actions of the loading and unloading rod moving part, the separate balanced hoisting of the loading and unloading rod moving part, the integrated balanced hoisting of the loading and unloading rod support base and the loading and unloading rod moving part, and the hoisting of the drill pipe. It can adjust the loading and unloading state by hoisting and move the loading and unloading rod support base and the loading and unloading rod moving part.
[0096] When raising the rod, drill pipes are placed on the loading and unloading movable beam 19. By means of the hoisting component of the loading and unloading rod, the inclination of the loading and unloading movable beam 19 is adjusted with the front lifting ear 21 and the rear lifting ear 20, and the rear end is higher than the front end. Press the reset pedal 10 to drive the loading and unloading movable plate 22 to act, causing it to swing downward near the axis. One drill pipe rolls downward due to gravity, and a single drill pipe is conveyed to the front end of the loading and unloading movable beam 19. After the conveyance is completed, stop pressing the reset pedal 10, and the reset control lever 9 executes the reset, causing the loading and unloading movable plate 22 to return to its original position. The remaining drill pipes are still sequentially located on the loading and unloading movable beam 19 at the rear end of the loading and unloading movable plate 22. When loading again, press the reset pedal 10 to continue the conveyance.
[0097] When unloading the rod, by means of the hoisting component of the loading and unloading rod, the inclination of the loading and unloading movable beam 19 is adjusted with the front lifting ear 21 and the rear lifting ear 20, and the rear end is lower than the front end. Place the drill pipe at the front end of the loading and unloading movable plate 22, and the placed drill pipe rolls into the rear of the loading and unloading movable beam 19 due to gravity and is arranged in sequence.
[0098] The device for the loading and unloading rod of the drilling rig according to the present invention can sequentially place the drill pipes at fixed positions, facilitating the grasping by the automatic drill pipe loading and unloading mechanism. It relies on gravity to passively roll back and forth without power.
[0099] Herein, the adaptation of the movable main body to the base main body means that the movable main body is detachably arranged on the base main body, and specifically, it can be formed by the detachable connection between the lower round steel support 2 and the upper round steel support 15. The detachable connection can specifically be an insertion connection. When connecting, insert the upper round steel support 15 into the lower round steel support 2. When separating, pull out the upper round steel support 15 from the lower round steel support 2.
[0100] Specifically, preferably, two reset pedals 10 are installed on the reset control lever 9.
[0101] The two reset pedals 10 are adapted to the mechanical gripper of the automatic drill pipe loading and unloading mechanism, facilitating the pressing and releasing of the reset pedal 10.
[0102] As Figure 10 and Figure 12 shown, a seventh hole 207 and an eighth hole 208 are vertically distributed on the rear lifting ear 20, and a ninth hole 199 and a tenth hole 1910 are vertically distributed at the rear end of the loading and unloading movable beam 19. When the seventh hole 207 and the tenth hole 1910 are aligned, the rear end of the loading and unloading movable beam 19 is higher than the front end. When the eighth hole 208 and the ninth hole 199 are aligned, the rear end of the loading and unloading movable beam 19 is lower than the front end.
[0103] The tenth hole 1910 of the loading and unloading movable beam 19 is aligned with the seventh hole 207 of the rear lifting ear 20, and a fixing pin is inserted, that is, it enters the upper rod state; the ninth hole 199 of the loading and unloading movable beam 19 is aligned with the eighth hole 208 of the rear lifting ear 20, and a fixing pin is inserted, that is, it enters the rod unloading state.
[0104] Here, the rear end of the loading and unloading movable beam 19 is connected to the movable lifting upper fixing plate 24 and the movable lifting lower fixing plate 25.
[0105] The movable lifting upper fixing plate 24 and the movable lifting lower fixing plate 25 are used for lifting the loading and unloading movable beam 19. A lifting hook is installed through the movable lifting upper fixing plate 24 and the movable lifting lower fixing plate 25, and the loading and unloading movable beam 19 is moved by the lifting, and the tilting mode of the loading and unloading movable beam 19 is adjusted.
[0106] As Figure 13 shown, a first bending arc 221 and a second bending arc 222 are provided on the loading and unloading movable plate 22.
[0107] The first bending arc 221 is used to divide the loading and unloading movable beam 19 into two parts. One part is used for storing drill pipes, and the other part is used for conveying drill pipes. When the rod is being inserted, the reset pedal 10 is pressed to drive the loading and unloading movable plate 22 to move so that its near-axis part swings downward, that is, the first bending arc 221 swings downward below the loading and unloading movable beam 19, and the loading and unloading movable beam 19 is no longer divided into two parts by the first bending arc 221, and a drill pipe rolls downward due to gravity; the second bending arc 222 is used to fix the conveyed drill pipe at the front end of the loading and unloading movable beam 19, that is, when the rod is being inserted, a drill pipe rolls downward due to gravity and is conveyed to the second bending arc 222 at the front end of the loading and unloading movable beam 19, and when the rod is being unloaded, the drill pipe is placed on the second bending arc 222 at the front end of the loading and unloading movable plate 22.
[0108] As Figure 1 and Figure 2 shown, the reset operating lever 9 is arranged on the reset spring transmission rod 8. The reset spring transmission rod 8 fixes the reset axis through the reset connecting plate 14. The near-axis part of the reset spring transmission rod 8 is connected to the reset spring 12, and the lower part of the reset spring 12 is connected to the lead screw 13; a steel chain 11 is arranged on the reset spring transmission rod 8, and the loading and unloading movable plate 22 is connected to the reset operating lever 9 through the steel chain 11 and the reset spring transmission rod 8.
[0109] The loading and unloading rod moving parts are reset through the reset spring transmission rod 8, the reset spring 12, the reset operating lever 9, the reset pedal 10 and the steel chain 11, and the reset size is adjusted through the lead screw 13.
[0110] As Figure 6As shown, the movable body includes a third bottom structural channel steel 16, a fourth bottom structural channel steel 17 and a fifth bottom structural channel steel 18, the third bottom structural channel steel 16 is arranged at one end of the two fourth bottom structural channel steels 17, and the fifth bottom structural channel steel 18 is arranged inside the other end of the two fourth bottom structural channel steels 17; four round steel upper supports 15 are arranged on the third bottom structural channel steel 16, the fourth bottom structural channel steel 17 and the fifth bottom structural channel steel 18, and the loading and unloading movable beam 19 is connected to the four round steel upper supports 15 through the lifting front ear 21 and the lifting rear ear 20.
[0111] Four round steel upper supports 15, a third bottom structural channel steel 16, a fourth bottom structural channel steel 17 and a fifth bottom structural channel steel 18 form the main structure of the movable body.
[0112] like Figure 2 As shown, the base body includes a first bottom structural channel steel 3 and a second bottom structural channel steel 4 of a frame-type combination, four round steel lower supports 2 are arranged on the first bottom structural channel steel 3 and the second bottom structural channel steel 4, and a balancing round foot 1 is installed below the round steel lower support 2, and the round steel lower support 2 is detachably connected to the round steel upper support 15.
[0113] The round steel lower support 2, the first bottom structural channel steel 3 and the second bottom structural channel steel 4 form the main structure of the base body. A balancing round foot 1 is installed under the round steel lower support 2 as a bottom stabilizing device. The round steel lower support 2 and the round steel upper support 15 are detachably connected to form the main structure of the device.
[0114] like Figure 1 As shown, the movable body is connected to the base body via a connecting operating rod 6 , and the connecting operating rod 6 is installed on a fixed channel steel 5 , and the fixed channel steel 5 is arranged on a round steel lower support 2 .
[0115] The connecting operating rod 6 is used to reinforce the connection between the movable body and the base body, so that the connection between the movable body and the base body is more firm.
[0116] Specifically, the other end of the connecting operating rod 6 is hinged to the fixed channel steel 5, and one end is provided with a hook 61, and both ends of the fourth bottom structural channel steel 17 on the movable body are provided with protruding columns 171 adapted to the hook 61.
[0117] Furthermore, one end of the connecting operating rod 6 is fixed by a movable fixing pin 7 .
[0118] The movable fixing pin 7 is used to fix the connecting operating rod 6 to prevent it from swinging and shaking when the movable body and the base body are not connected by the connecting operating rod 6.
[0119] like Figure 14-21As shown, the hoisting structure beam includes a lower hoisting structure beam 29 and an upper hoisting structure beam 30. There is a hoisting reinforcement plate 31 on the upper hoisting structure beam 30, and a hoisting hook 32 on the lower hoisting structure beam 29.
[0120] The lower hoisting structure beam 29 and the upper hoisting structure beam 30 are respectively located above and below the one-word plate of the I-shaped hoisting structure plate 28. While strengthening the structural strength, the lower hoisting structure beam 29 is used to hoist the drill pipe through the hoisting hook 32, and the upper hoisting structure beam 30 is used to connect with the hoisting machinery through the hoisting reinforcement plate 31.
[0121] As Figure 14 shown, the hoisting holes provided at both ends of the U-shaped hoisting plate 27 include a first hoisting hole 271, a second hoisting hole 272, a third hoisting hole 273, and a fourth hoisting hole 274.
[0122] It is connected to the front hoisting ear 21 and the rear hoisting ear 20 on the loading and unloading rod moving device through the first hoisting hole 271, the second hoisting hole 272, the third hoisting hole 273, and the fourth hoisting hole 274 on the U-shaped hoisting plate 27. Different holes are connected to ensure balanced hoisting of different devices.
[0123] Specifically, the lower side of the hoisting structure beam is hinged to the head of the hoisting hook 32, and a hanging column 33 adapted to the tail of the hoisting hook 32 is also provided on the lower side of the hoisting structure beam.
[0124] The hinged connection method enables the hoisting hook 32 to rotate under the lower side of the hoisting structure beam through its head. When the hoisting hook 32 is not in use, its tail is hung on the hanging column 33, and when in use, its tail is taken off the hanging column 33.
[0125] Fifth hoisting hole 315 and sixth hoisting hole 316 are opened on the reinforcement plate 31.
[0126] The fifth hoisting hole 315 and the sixth hoisting hole 316 on the upper hoisting structure beam 30 are connected to the hoisting machinery. Different holes are connected to ensure balanced hoisting of different devices.
[0127] The hoisting device for the loading and unloading rod of the drill rig according to the present invention further includes a drill pipe hoisting claw adapted to the hoisting hook 32. The drill pipe hoisting claw includes a plurality of core-piercing hoisting claws 40, and the core-piercing hoisting claws 40 are fixed on a hoisting claw fixing plate 41.
[0128] The drill pipe hoisting claw is used to grab the drill pipe through the core-piercing hoisting claws 40, and the hoisting claw fixing plate 41 is used to connect the core-piercing hoisting claws 40 and the hoisting hook 32.
[0129] A hoisting hole 4117 is provided at the top of the hoisting claw fixing plate 41 for hook connection with the tail of the hoisting hook 32 for hoisting.
[0130] Here, five core-passing lifting claws 40 can be provided, and the five core-passing lifting claws 40 are adapted to the placement design of the five drill pipes in the drill pipe placement bracket.
[0131] As Figure 22-27 shown, the device for loading and unloading drill pipes for a drilling rig by hoisting according to the present invention further includes a drill pipe placement bracket, and the drill pipe placement bracket includes a main support plate 35, a drill pipe arrangement fixing plate 36, and a support hoisting beam 38. The drill pipe arrangement fixing plate 36 is located on both sides of the main support plate 35, and the inner shape of the drill pipe arrangement fixing plate 36 is adapted to the shape of the drill pipe. A support hoisting ear 37 is provided on the main support plate 35, and the bottom of the support hoisting beam 38 is adapted to the support hoisting ear 37.
[0132] The drill pipe placement bracket is used to place drill pipes. The main support plate 35 and the drill pipe arrangement fixing plate 36 form a main structure, and the structure reinforcing plate 39 serves as a structure reinforcing device. The support hoisting ear 37 and the support hoisting beam 38 are used for hoisting the support; the drill pipe arrangement fixing plate 36 can realize multi-layer close arrangement of several drill pipes, and the upper and lower drill pipes are staggered from each other, and the placement is firm and not easy to shift. The drill pipe placement position can cooperate with the drill pipe lifting claws to realize simultaneous lifting of several drill pipes.
[0133] A first support hoisting hole 3815 and a second support hoisting hole 3816 are opened on the support hoisting beam 38. The first support hoisting hole 3815 is located at the top of the support hoisting beam 38, and the second support hoisting hole 3816 is located at the bottom of the support hoisting beam 38 and is adapted to the support hoisting ear 37.
[0134] By connecting with the support hoisting beam 38 through the hoisting hook 32, the drill pipe placement bracket can be hoisted as a whole.
[0135] The working steps of the device for loading and unloading drill pipes for a drilling rig by hoisting according to the present invention are as follows:
[0136] 1. Place the loading and unloading rod support base at the specified position on the side of the drilling rig, ensure that the mechanical gripper of the drilling rig is aligned with the reset pedal 10, and adjust the heights of the four balance round feet 1 to make the device as a whole horizontal;
[0137] 2. Adjust the loading and unloading rod moving part by hoisting the moving hoisting plate 26 through the loading and unloading rod hoisting part so that the tenth hole 1910 of the loading and unloading moving beam 19 is aligned with the seventh hole 207 of the rear hoisting ear 20 after hoisting, and insert a fixing pin;
[0138] 3. Place 9 drill pipes on the loading and unloading moving beam 19 in the loading and unloading rod moving part, that is, in the full-load state;
[0139] 4. Through the connection of the loading and unloading rod hoisting part with the front hoisting ear 21 and the rear hoisting ear 20, hoist the loading and unloading rod moving part and place it on the loading and unloading rod support base, ensuring that the four lower round steel supports 2 are aligned with the four upper round steel supports 15;
[0140] 5. Operate the four connecting operating rods 6 on the connecting and fixing channel steel 5 so that they are embedded in the hanging posts 33 on the structural channel steel 17, insert the movable fixing pin 7 to complete the integrated connection of the loading and unloading rod support base and the movable part of the loading and unloading rod;
[0141] 6. Connect the steel chain 11 to the loading and unloading movable plate 22 in the movable part of the loading and unloading rod. When the mechanical interlocking device is ready, the drill rod loading operation can start;
[0142] 7. Start the drill, adjust it to the working state, and start the rod loading operation: Lower the mechanical gripper, push the reset pedal 10 downward, through the reset control rod 9 → the reset spring transmission rod 8 → the steel chain 11, drive the loading and unloading movable plate 22 to act, so that its near-axle part swings downward, and a drill rod rolls into the second arc 222 due to gravity;
[0143] 8. Move the mechanical gripper upward, the pressure on the reset pedal 10 becomes smaller, the reset spring 12 returns to its original position due to its elasticity, through the reset spring transmission rod 8, the downward pulling force of the steel chain 11 disappears, the loading and unloading movable plate 22 is not stressed, the drill rod entering the second arc 222 rolls downward, and at the same time presses the loading and unloading movable plate 22, making its far-axle part swing downward and its near-axle part swing upward, so that the next drill rod rolls into the first arc 221, and the edges and corners limit the rolling of the subsequent drill rods, and the next one is ready to be in place;
[0144] 9. The mechanical gripper grabs the drill rod at the second arc 222 upward for drilling operation;
[0145] 10. The subsequent drill rods repeat steps 7, 8, and 9 in sequence for drilling operation.
[0146] 11. When the number of drill rods in the movable part of the loading and unloading rod remains 4 or less, drill rod replenishment is required;
[0147] 12. Use the two lifting hooks 32 on the loading and unloading rod lifting component to respectively pass through the lifting holes 4117 above the two drill rod lifting claws;
[0148] 13. Insert the 5 core rods of the two drill rod lifting claws into both ends of the 5 drill rods in the drill rod placement bracket respectively, and use the boom for lifting;
[0149] 14. After the boom lifts, gently place it on the movable part of the loading and unloading rod and arrange it behind the remaining drill rods. When the placement is complete, pull out the 5 core rods of the two drill rod lifting claws respectively to complete the drill rod replenishment;
[0150] 15. Repeat steps 13 and 14 until the drilling operation is completed.
[0151] 16. After the drilling operation is completed, the drill pipe needs to be placed back on the movable part of the loading and unloading rod;
[0152] 17. Use the lifting part of the loading and unloading rod to lift and adjust the movable part of the loading and unloading rod by the movable lifting plate 26 of the lifting part, so that the ninth hole 199 of the loading and unloading movable beam 19 is aligned with the eighth hole 208 of the rear lifting ear 20, and insert the fixing pin. At this time, the front and rear heights of the loading and unloading movable beam 19 are reversed;
[0153] 18. Lower the mechanical gripper arm and place the drill pipe at the second bending arc 222 of the loading and unloading movable plate 22. The placed drill pipe rolls to the rear of the loading and unloading movable beam 19 due to gravity and is arranged in sequence;
[0154] 19. Repeat step 7 until more than 5 drill pipes are placed. The drill pipes on the movable part of the loading and unloading rod need to be placed into the drill pipe placement bracket;
[0155] 20. Similarly, the two lifting hooks 32 on the lifting part of the loading and unloading rod respectively pass through the lifting holes 4117 above the two drill pipe lifting claws;
[0156] 21. Insert the five core rods of the two drill pipe lifting claws into the two ends of the five drill pipes arranged at the rear on the movable part of the loading and unloading rod respectively, and use the lifting arm for lifting;
[0157] 22. After the lifting arm is lifted, gently place it into the drill pipe placement bracket. When the placement is complete, pull out the five core rods of the two drill pipe lifting claws respectively, and the unloading and placement of the drill pipe are completed.
[0158] Embodiment 2
[0159] The lifting method for loading and unloading the drill rod of the drilling rig by lifting according to the present invention applies the lifting device for the drill rod of the drilling rig described in Embodiment 1, including:
[0160] The process of adjusting the state of the loading and unloading rod of the movable part of the loading and unloading rod:
[0161] 1. A hook is installed at the tail of the lifting hook 32, and the hook extends into the hole on the movable lifting plate 26 in the movable part of the loading and unloading rod for hooking;
[0162] 2. The lifting machine is connected to the sixth lifting hole 316 of the upper lifting structural beam 30;
[0163] 3. Lift to align the tenth hole 1910 of the loading and unloading movable beam 19 on the movable part of the loading and unloading rod with the seventh hole 207 of the rear lifting ear 20, and insert the fixing pin, that is, enter the state of loading the rod;
[0164] 4. Lift to align the ninth hole 199 of the loading and unloading movable beam 19 on the movable part of the loading and unloading rod with the eighth hole 208 of the rear lifting ear 20, and insert the fixing pin, that is, enter the state of unloading the rod;
[0165] Procedure for separately hoisting and loading / unloading the movable part of the loading / unloading rod:
[0166] 1. The hoisting machinery is connected to the sixth hoisting hole 316 of the upper hoisting structural beam 30;
[0167] 2. The first hoisting hole 271 of the U-shaped hoisting plate 27 on the hoisting device is connected to the eleventh hole 2011 of the rear hoisting ear 20 on the movable part of the loading / unloading rod, and the third hoisting hole 273 of the U-shaped hoisting plate 27 is connected to the twelfth hole 2112 of the front hoisting ear 21, and a shaft pin is inserted;
[0168] 3. Pull out the movable fixing pin 7, and operate the four connecting operating rods 6 on the connecting fixing channel steel 5 to separate them from the protruding column 171 on the fourth bottom structural channel steel 17;
[0169] 4. The steel chain 11 is separated from the loading / unloading movable plate 22 in the movable part of the loading / unloading rod, and the mechanical interlocking device is unlocked;
[0170] 5. The separate balanced hoisting of the movable part of the loading / unloading rod can be achieved;
[0171] Procedure for hoisting the support base of the loading / unloading rod and the movable part of the loading / unloading rod as a whole:
[0172] 1. The hoisting machinery is connected to the fifth hoisting hole 315 of the upper hoisting structural beam 30;
[0173] 2. The second hoisting hole 272 of the U-shaped hoisting plate 27 is connected to the eleventh hole 2011 of the rear hoisting ear 20 on the movable part of the loading / unloading rod, and the fourth hoisting hole 274 of the U-shaped hoisting plate 27 is connected to the twelfth hole 2112 of the front hoisting ear 21, and a shaft pin is inserted;
[0174] 3. Operate the four connecting operating rods 6 on the connecting fixing channel steel 5 to embed them into the protruding column 171 on the fourth bottom structural channel steel 17, and insert the movable fixing pin 7 to complete the integrated connection of the support base of the loading / unloading rod and the movable part of the loading / unloading rod;
[0175] 4. The overall balanced hoisting of the support base of the loading / unloading rod and the movable part of the loading / unloading rod can be achieved;
[0176] Procedure for hoisting the drill pipe in cooperation with the drill pipe hoisting claw:
[0177] 1. Lower the hoisting hook 32, and the two hoisting hooks 32 respectively hook the hoisting holes 4117 at the top of the two drill pipe hoisting claws;
[0178] 2. Insert the 5 core-passing hoisting claws 40 of the two drill pipe hoisting claws into the two ends of the 5 drill pipes in the drill pipe placement bracket respectively;
[0179] 3. Use the boom for hoisting, and the simultaneous hoisting of 5 drill pipes can be achieved;
[0180] Procedure for overall hoisting of drill pipe placement bracket:
[0181] 1 Connect the second bracket hoisting holes 3816 on the two bracket hoisting beams 38 respectively with the holes on the bracket hoisting lugs 37 on the front and rear sides of the drill pipe placement bracket, and fix them with axle pins;
[0182] 2 Lower the hoisting hooks 32 on the loading and unloading rod hoisting component, and hook the two hoisting hooks 32 respectively to the first bracket hoisting holes 3815 at the top of the two bracket hoisting beams 38;
[0183] 3 Use the jib for hoisting to achieve the overall hoisting of the drill pipe placement bracket.
[0184] Certainly, the above content is only the preferred embodiment of the present invention and cannot be considered as limiting the scope of the embodiments of the present invention. The present invention is not limited to the above examples either. Equal changes and improvements made by those of ordinary skill in the art within the essence of the present invention shall fall within the scope covered by the patent of the present invention.
Claims
1. A device for loading and unloading rods for a drilling rig by hoisting, characterized in that, It includes a loading and unloading rod support base, a loading and unloading rod movable part arranged on the loading and unloading rod support base, and a loading and unloading rod hoisting part. The loading and unloading rod support base includes a base main body and a reset pedal (10). The reset pedal (10) is installed on a reset control lever (9) and is used to reset the loading and unloading rod movable part. The loading and unloading rod movable part includes a movable main body, a loading and unloading movable beam (19), and a loading and unloading movable plate (22). The movable main body is adapted to the base main body. The loading and unloading movable beam (19) is installed on the movable main body through a front ear (21) and a rear ear (20). The position of the loading and unloading movable beam (19) on the front ear (21) and the rear ear (20) is adjustable. The front end of the loading and unloading movable beam (19) is connected to two loading and unloading movable plates (22) through a movable shaft column (23), and the loading and unloading movable plate (22) is connected to the reset control lever (9). The loading and unloading rod hoisting part includes a U-shaped hoisting plate (27), an I-shaped hoisting structure plate (28), and a hoisting structure beam. The U-shaped hoisting plate (27) of the hoisting structure beam is located on both sides of the I-shaped hoisting structure plate (28). The middle part of the hoisting structure beam is integrally connected to the I-shaped hoisting structure plate (28). A hoisting reinforcement plate (31) is arranged on the upper side of the hoisting structure beam, and a hoisting hook (32) is arranged on the lower side of the hoisting structure beam. Hoisting holes are arranged at both ends of the U-shaped hoisting plate (27). It is connected to the hoisting front ear (21) and the hoisting rear ear (20) on the loading and unloading rod movable part through the hoisting holes of the U-shaped hoisting plate (27), and is connected to the hoisting machinery through the hoisting reinforcement plate (31). A seventh hole (207) and an eighth hole (208) are distributed up and down on the rear ear (20). A ninth hole (199) and a tenth hole (1910) are distributed up and down at the rear end of the loading and unloading movable beam (19). When the seventh hole (207) and the tenth hole (1910) are aligned, the rear end of the loading and unloading movable beam (19) is higher than the front end. When the eighth hole (208) and the ninth hole (199) are aligned, the rear end of the loading and unloading movable beam (19) is lower than the front end.
2. The device for loading and unloading rods for a drilling rig by hoisting according to claim 1, wherein The hoisting holes arranged at both ends of the U-shaped hoisting plate (27) include a first hoisting hole (271), a second hoisting hole (272), a third hoisting hole (273), and a fourth hoisting hole (274).
3. A device for loading and unloading rods for a drilling rig by hoisting, characterized in that, A first arc (221) and a second arc (222) are arranged on the loading and unloading movable plate (22).
4. A device for loading and unloading rods for a drilling rig by hoisting, characterized in that, The reset control lever (9) is arranged on a reset spring transmission rod (8). The reset spring transmission rod (8) fixes a reset axis center through a reset connecting plate (14). A reset spring (12) is connected near the axis center of the reset spring transmission rod (8). The lower part of the reset spring (12) is connected to a lead screw (13). A steel chain (11) is arranged on the reset spring transmission rod (8). The loading and unloading movable plate (22) is connected to the reset control lever (9) through the steel chain (11) and the reset spring transmission rod (8).
5. The device for loading and unloading rods for a drilling rig by hoisting according to claim 1, characterized in that, The movable body includes a third bottom structural channel steel (16), a fourth bottom structural channel steel (17) and a fifth bottom structural channel steel (18). The third bottom structural channel steel (16) is arranged at one end of two fourth bottom structural channel steels (17), and the fifth bottom structural channel steel (18) is arranged inside the other end of the two fourth bottom structural channel steels (17); Four round steel upper supports (15) are arranged on the third bottom structural channel steel (16), the fourth bottom structural channel steel (17) and the fifth bottom structural channel steel (18). The loading and unloading movable beam (19) is connected to the four round steel upper supports (15) through a front ear (21) and a rear ear (20); The base body includes a first bottom structural channel steel (3) and a second bottom structural channel steel (4) which are combined in a frame shape. Four round steel lower supports (2) are arranged on the first bottom structural channel steel (3) and the second bottom structural channel steel (4). A balance round foot (1) is installed below the round steel lower support (2). The round steel lower support (2) is detachably connected to the round steel upper support (15); The hoisting structure beam includes a lower hoisting structure beam (29) and an upper hoisting structure beam (30). There is a hoisting reinforcement plate (31) on the upper hoisting structure beam (30), and a hoisting hook (32) on the lower hoisting structure beam (29); The lower side of the hoisting structure beam is hinged to the head of the hoisting hook (32), and a hanging column (33) adapted to the tail of the hoisting hook (32) is also arranged on the lower side of the hoisting structure beam; The movable body is connected to the base body through a connecting operating rod (6). The connecting operating rod (6) is installed on a fixed channel steel (5), and the fixed channel steel (5) is arranged on the round steel lower support (2).
6. The device for loading and unloading rods for a drill rig by hoisting according to claim 5, characterized in that, One end of the connecting operating rod (6) is fixed by a movable fixing pin (7); The rear end of the loading and unloading movable beam (19) is connected to a movable hoisting upper fixing plate (24) and a movable hoisting lower fixing plate (25); Two reset pedals (10) are installed on the reset operating rod (9).
7. The device for loading and unloading rods for a drilling rig by hoisting according to claim 1, wherein, It also includes a drill pipe hoisting claw adapted to the hoisting hook (32). The drill pipe hoisting claw includes a plurality of core-piercing hoisting claws (40), and the core-piercing hoisting claws (40) are fixed on a hoisting claw fixing plate (41).
8. The device for loading and unloading rods for a drilling rig by hoisting according to claim 1, characterized in that, It also includes a drill pipe placement bracket. The drill pipe placement bracket includes a main bracket plate (35), a drill pipe arrangement fixing plate (36) and a bracket hoisting beam (38). The drill pipe arrangement fixing plate (36) is located on both sides of the main bracket plate (35). The internal shape of the drill pipe arrangement fixing plate (36) is adapted to the shape of the drill pipe. A bracket hoisting ear (37) is arranged on the main bracket plate (35), and the bottom of the bracket hoisting beam (38) is adapted to the bracket hoisting ear (37).
9. The device for loading and unloading rods for a drilling rig by hoisting according to claim 8, characterized in that, A first bracket hoisting hole (3815) and a second bracket hoisting hole (3816) are formed on the bracket hoisting beam (38). The first bracket hoisting hole (3815) is located at the top of the bracket hoisting beam (38), and the second bracket hoisting hole (3816) is located at the bottom of the bracket hoisting beam (38) and is adapted to the bracket hoisting ear (37).
Citation Information
Patent Citations
Automatic drill rod loading and unloading mechanism
CN214221123U
Device for assembling and disassembling rod for drilling machine
CN217538628U
Hoisting device for loading and unloading rod of drilling machine
CN217650693U