PDCCH monitoring methods, devices, terminals, and network equipment

By negotiating and scheduling the PDCCH listening time interval of the delay enhancement interval in non-terrestrial network communication systems, the problem that network devices cannot determine the timing of terminal uplink transmission is solved, thereby reducing terminal power consumption and maintaining system throughput.

CN115209442BActive Publication Date: 2026-11-17SPREADTRUM SEMICON (NANJING) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202110387288.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-09
Publication Date
2026-11-17
Estimated Expiration
2041-04-09

AI Technical Summary

Technical Problem

In non-terrestrial network communication systems, network devices cannot accurately determine the timing of uplink physical shared channel transmission by terminals, resulting in the inability to accurately monitor the physical downlink control channel. This leads to inconsistencies between the terminal and the network in the PDCCH monitoring position, increasing terminal power consumption.

Method used

By obtaining configuration information, the terminal and network devices negotiate to determine the time interval in the scheduling latency enhancement interval that does not require PDCCH listening, thereby reducing invalid listening and ensuring that the terminal and network reach an agreement on the PDCCH listening position.

Benefits of technology

It enables coordination between the terminal and the network at the PDCCH listening position, reduces terminal power consumption, and maintains the throughput of the NTN communication system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115209442B_ABST
    Figure CN115209442B_ABST
Patent Text Reader

Abstract

This application discloses a PDCCH monitoring method and apparatus, a terminal, and a network device. The method includes: the terminal acquiring configuration information; the terminal determining a first time interval based on the configuration information, wherein the first time interval is a time interval within the scheduling latency enhancement interval where PDCCH monitoring is not required. Therefore, in this application embodiment, the terminal can acquire configuration information and determine the first time interval within the scheduling latency enhancement interval where PDCCH monitoring is not required, ensuring consistency between the terminal and the network at the PDCCH monitoring position, while simultaneously reducing terminal power consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of communication technology, and in particular to a PDCCH monitoring method and apparatus, terminal and network device. Background Technology

[0002] The 3rd Generation Partnership Project (3GPP) has established protocol standards for terrestrial communications (such as cellular mobile communications). In non-terrestrial networks (NTNs), uplink and downlink data transmission timing introduces K_offset on top of existing transmission timing. In NTN communication systems, the timing advance (TA) compensation value of the terminal is determined by the terminal-level TA value and the common TA value broadcast by the network. The network cannot determine the specific value of the terminal's TA compensation. Because the network does not know the specific value of the terminal's TA compensation when scheduling uplink Physical Uplink Shared Channel (PUSCH) transmissions (i.e., it cannot determine the specific location where the terminal sends the PUSCH), it cannot determine the specific timing of the terminal's PUSCH transmission. Consequently, the network cannot accurately determine the time and location at which the terminal can listen to the Physical Downlink Control Channel (PDCCH). According to existing terrestrial network protocols, the terminal and the network cannot agree on the listening location of the PDCCH. Therefore, a new data transmission timing rule needs to be introduced. Summary of the Invention

[0003] This application provides a PDCCH monitoring method and apparatus, a terminal, and a network device to ensure that the terminal and the network reach an agreement on the PDCCH monitoring location, while reducing terminal power consumption.

[0004] In a first aspect, embodiments of this application provide a PDCCH monitoring method, applied to a terminal; the method includes:

[0005] Get configuration information;

[0006] The first time interval is determined based on the configuration information. The first time interval is the time interval in the scheduling latency enhancement interval that does not require listening to PDCCH.

[0007] Secondly, embodiments of this application provide a PDCCH monitoring method, characterized in that it is applied to a network device; the method includes:

[0008] Send configuration information, which is used to determine a first time interval, which is the time interval in the scheduling delay enhancement interval where PDCCH does not need to be listened to.

[0009] Thirdly, embodiments of this application provide a PDCCH monitoring device that obtains configuration information through the communication unit;

[0010] The first time interval is determined based on the configuration information. The first time interval is the time interval in the scheduling latency enhancement interval that does not require listening to PDCCH.

[0011] Fourthly, embodiments of this application provide a PDCCH monitoring device applied to network equipment; the device includes a processing unit and a communication unit, the processing unit being used for:

[0012] Configuration information is sent through the communication unit. The configuration information is used to determine a first time interval, which is the time interval in the scheduling delay enhancement interval where PDCCH does not need to be listened to.

[0013] Fifthly, embodiments of this application provide a terminal, which is a first terminal, including a processor, a memory, a communication interface, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the processor, and the programs include instructions for performing steps in any method of the first aspect of embodiments of this application.

[0014] In a sixth aspect, embodiments of this application provide a network device including a processor, a memory, a communication interface, and one or more programs, wherein the one or more programs are stored in the memory and configured to be executed by the processor, and the programs include instructions for performing steps in any of the methods of the second aspect of embodiments of this application.

[0015] In a seventh aspect, embodiments of this application provide a chip, including: a processor for calling and running a computer program from a memory, causing a device on which the chip is mounted to perform some or all of the steps described in any of the methods of the first or second aspect of embodiments of this application.

[0016] Eighthly, embodiments of this application provide a computer-readable storage medium storing a computer program for electronic data interchange, wherein the computer program causes a computer to perform some or all of the steps described in any of the methods of the first or second aspect of embodiments of this application.

[0017] Ninthly, embodiments of this application provide a computer program operable to cause a computer to perform some or all of the steps described in any of the methods of the first or second aspects of embodiments of this application. The computer program may be a software installation package.

[0018] As can be seen, in this embodiment of the application, the terminal can obtain configuration information and determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH based on the configuration information. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption. Attached Figure Description

[0019] To more clearly illustrate the technical solutions in the embodiments of this application, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a schematic diagram of the architecture of a non-terrestrial network communication system provided in an embodiment of this application;

[0021] Figure 2 This is a schematic diagram of an architecture for a transparent satellite communication system provided in an embodiment of this application;

[0022] Figure 3 This is a flowchart illustrating a PDCCH monitoring method provided in an embodiment of this application;

[0023] Figure 4 This is a schematic diagram illustrating the time relationship in an exemplary application scenario provided by an embodiment of this application;

[0024] Figure 5 This is a schematic diagram illustrating the time relationship in another exemplary application scenario provided by the embodiments of this application;

[0025] Figure 6 This is a schematic diagram illustrating the time relationship in another exemplary application scenario provided in this application embodiment;

[0026] Figure 7 This is a flowchart illustrating another PDCCH monitoring method provided in an embodiment of this application;

[0027] Figure 8 This is a functional unit block diagram of a PDCCH monitoring device provided in an embodiment of this application;

[0028] Figure 9This is a functional unit block diagram of another PDCCH monitoring device provided in the embodiments of this application;

[0029] Figure 10 This is a schematic diagram of the structure of a terminal provided in an embodiment of this application;

[0030] Figure 11 This is a schematic diagram of the structure of a network device provided in an embodiment of this application. Detailed Implementation

[0031] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present application.

[0032] The terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish different objects, not to describe a specific order. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion. For example, a process, method, software, product, or apparatus that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to these processes, methods, products, or apparatuses.

[0033] In this document, the term "embodiment" means that a specific feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments. The embodiments of this application will now be described in detail with reference to the accompanying drawings.

[0034] The technical solutions of this application embodiment can be applied to non-terrestrial network (NTN) communication systems, which generally use satellite communication to provide communication services to ground terminals.

[0035] For example, the non-terrestrial network communication system applied in the embodiments of this application, such as Figure 1As shown. The non-terrestrial network communication system 10 may include a terminal 110, a cell or beam (beam, or beam footprint) 120 where the terminal 110 is located, a satellite 130, a non-terrestrial network gateway (NTN gateway) 140, and network equipment 150. The terminal 110, NTN gateway 140, and network equipment 150 may be located on the Earth's surface, while the satellite 130 is located in Earth orbit. The satellite 130 can provide communication services to the geographical area covered by the signal and can communicate with the terminal 110 located within the signal coverage area. Meanwhile, the terminal 110 is located within a cell or beam 120. Furthermore, the wireless communication link between the terminal 110 and the satellite 130 is called a service link, while the wireless communication link between the satellite 130 and the NTN gateway 140 is called a feeder link. It should be noted that the NTN gateway 140 and network equipment 150 may be integrated into the same device or may be separate devices; there is no specific limitation in this regard.

[0036] This application describes various embodiments in conjunction with terminals, satellites, and network devices. These are described in detail below.

[0037] Specifically, the terminal in the embodiments of this application can be user equipment (terminal), access terminal, user unit, user station, mobile station, mobile station, remote station, remote terminal, mobile device, user terminal, smart terminal, wireless communication device, user agent, or user device. The terminal can also be a cellular phone, cordless phone, session initiation protocol (SIP) phone, wireless local loop (WLL) station, personal digital assistant (PDA), handheld device with wireless communication capabilities, computing device or other processing device connected to a wireless modem, relay device, vehicle-mounted device, wearable device, terminal in next-generation communication systems such as NR networks, or terminal in future evolved public land mobile networks (PLMNs), etc., without specific limitations.

[0038] Furthermore, the terminals can be deployed on land, including indoors or outdoors, handheld, wearable, or vehicle-mounted; they can be deployed on water (such as ships); and they can also be deployed in the air (such as airplanes, balloons, and satellites).

[0039] Furthermore, the terminal can be a mobile phone, tablet computer, computer with wireless transceiver capabilities, virtual reality (VR) terminal device, augmented reality (AR) terminal device, wireless terminal device in industrial control, vehicle-mounted device in self-driving, wireless terminal device in remote medical care, wireless terminal device in smart grid, wireless terminal device in transportation safety, wireless terminal device in smart city, or wireless terminal device in smart home, etc.

[0040] Specifically, the satellite in this application embodiment can be a spacecraft carrying a bent pipe payload or a regenerative payload signal transmitter. It typically operates in a low Earth orbit (LEO) at an altitude between 300 and 1500 km, a medium Earth orbit (MEO) at an altitude between 7000 and 25000 km, a geostationary orbit (GEO) at an altitude of 35786 km, or a highly elliptical orbit (HEO) at an altitude between 400 and 50000 km. In other words, the satellite can be a LEO satellite, a MEO satellite, a GEO satellite, or a HEO satellite, depending on its orbital altitude.

[0041] Furthermore, the signals transmitted by the satellite in this embodiment typically generate one or more beams (or beam footprints) within a given service area bounded by its field of view. Simultaneously, the shape of a beam on the ground can be elliptical, and the satellite's field of view depends on the antenna and minimum elevation angle, etc.

[0042] Specifically, in this embodiment, the non-terrestrial network gateway can be an earth station or gateway located on the Earth's surface, capable of providing sufficient radio frequency (RF) power and RF sensitivity to connect to satellites. Furthermore, the non-terrestrial network gateway can be a transport network layer (TNL) node.

[0043] Specifically, the network device in this application embodiment can be a base station (BTS) in a Global System for Mobile Communication (GSM) or Code Division Multiple Access (CDMA) communication system, a base station (nodeB, NB) in a Wideband Code Division Multiple Access (WCDMA) communication system, an evolved Node B (eNB or eNodeB) in a Long Term Evolution (LTE) communication system, or a base station (gNB) in a New Radio (NR) communication system. The network device can also be an access point (AP) in a Wireless Local Area Network (WLAN), a relay station, a network device in a future evolved PLMN network, or a network device in an NTN communication system, etc.

[0044] It should be noted that in some network deployments, a gNB can include a centralized unit (CU) and a distributed unit (DU), and can also include an active antenna unit (AAU). The CU can implement some of the gNB's functions, and so can the DU. For example, the CU is responsible for handling non-real-time protocols and services, implementing the functions of the radio resource control (RRC) layer and the packet data convergence protocol (PDCP) layer; the DU is responsible for handling physical layer protocols and real-time services, implementing the functions of the radio link control (RLC) layer, the medium access control (MAC) layer, and the physical (PHY) layer. Additionally, the AAU implements some physical layer processing functions, radio frequency processing, and related functions of the active antenna. Since RRC layer information ultimately becomes PHY layer information, or is derived from PHY layer information, higher-layer signaling (such as RRC layer signaling) can be considered to be sent by the DU, or by the DU+AAU. It is understood that network devices can include one or more of the following: CU nodes, DU nodes, and AAU nodes. Furthermore, a CU can be classified as a network device in the radio access network (RAN) or in the core network (CN); there are no specific restrictions on this.

[0045] For example, this application provides a schematic diagram of the architecture of a transparent satellite communication system, such as... Figure 2 As shown in the diagram, the terminal, non-terrestrial network gateway, and gNB are located on the Earth's surface, while the satellite is in Earth orbit. Simultaneously, the satellite, non-terrestrial network gateway, and gNB can function as a 5G radio access network (NG-RAN), and the NG-RAN connects to the 5G core network via the NG interface. It should be noted that the satellite payload implements frequency conversion and RF amplifiers in both the uplink and downlink directions; this satellite corresponds to an analog RF repeater. Furthermore, different transparent satellites can connect to the same gNB on the ground.

[0046] Before providing a detailed description of the PDCCH monitoring method provided in the embodiments of this application, the relevant communication technologies involved in this application will be introduced.

[0047] 1. NTN communication system

[0048] In NTN communication systems, satellites typically generate one or more beams (or beam footprints) or cells on the ground. A cell consists of one or more beams. In NTN communication systems, satellites operate based on specific orbits, and their motion is regular. Therefore, the changes in propagation delay caused by satellite motion are regular and predictable.

[0049] Furthermore, in NTN communication systems, the maximum differential delay value within a cell or beam coverage area refers to the difference between the propagation delay at the farthest point from the satellite and the propagation delay at the closest point to the satellite within a given cell or beam coverage area. Generally speaking, network equipment can calculate the maximum differential delay corresponding to a cell or beam coverage area. Because satellites are relatively far from the ground, the beam / cell coverage area formed by the satellite is relatively large, resulting in a large differential delay within the beam coverage area (twice the maximum differential delay value of a geostationary satellite is 20.6ms).

[0050] 2. The length of the scheduling delay enhancement interval K_offset in the NTN communication system.

[0051] In NTN communication systems, terminals transmit uplink data in advance based on the acquired timing advance (TA) value. For this reason, the uplink and downlink timing in the existing protocol needs to be enhanced by adding an extra time interval (i.e., the length of the scheduling delay enhancement interval) K_offset. For example, in the existing PDCCH scheduling of PUSCH, the DCI in the PDCCH instructs the terminal to a scheduling delay value (referred to as K2 in the protocol). The terminal determines the PUSCH transmission resource location based on the indicated K2 value. However, due to the significant propagation delay in NTN communication systems, if the terminal needs to transmit in advance based on the acquired TA value, it means that there must be a sufficiently large time interval between the PDCCH reception time and the PUSCH transmission time (at least not less than the TA value, which may be the round-trip propagation delay between the satellite and the terminal) to ensure the terminal's advance transmission. Therefore, in the NTN communication system, the scheduling delay of PDCCH to PUSCH is increased to K2 + K_offset. This ensures that there is a sufficiently large time interval between the PDCCH reception time and the PUSCH transmission time, allowing the terminal to send in advance.

[0052] 3. Timing Advance (TA) Maintenance Mechanism in NTN

[0053] In NTN, the terminal can determine the propagation delay between itself and the satellite based on its own location information (determined by GNSS) and ephemeris information. This propagation delay is called the terminal-level timing advance. To define the Common TA (Timing Advance), existing technologies introduce a reference point. The reference point can be a satellite, a ground base station, or any location on the service link or feedback link. The Common TA is the round-trip time (RTT) between the reference point and the satellite. When the terminal performs TA compensation, the TA value needs to be determined based on the terminal's own calculated terminal-level timing advance and the Common TA value broadcast by the network.

[0054] 4. Repeated transmission.

[0055] To ensure coverage, existing NB-IoT / eMTC networks employ repeated transmission technology. The maximum number of repetitions for downlink transmissions is 2048, and for uplink transmissions, it is 128. The actual number of repetitions for PDSCH / PUSCH is dynamically indicated by its corresponding scheduling DCI; that is, the terminal determines the number of repetitions for PDSCH / PUSCH based on specific bit fields in the DCI. The maximum number of repetitions for PDCCH (i.e., Rmax) is semi-statically configured by RRC / SIB.

[0056] 5. Half-frequency division duplexing (FDD)

[0057] Terminals in half-frequency division duplex mode cannot transmit and receive data simultaneously; that is, they cannot receive and send data at the same time.

[0058] In NTN communication systems, uplink and downlink data transmission timing introduces K_offset based on existing transmission timing. In NTN systems, the timing advance (TA) compensation value for a terminal is determined by the terminal-level TA value and the common TA value broadcast by the network. The network cannot determine the specific value of the terminal's TA compensation. Because the network cannot know the specific value of the terminal's TA compensation (i.e., cannot determine the specific location where the terminal sends PUSCH), the network cannot accurately determine when the terminal can listen to PDCCH. Therefore, according to existing terrestrial network protocols, the terminal will continuously perform PUSCH listening during the scheduling delay enhancement interval.

[0059] Based on the above description, this application provides a flowchart illustrating a Physical Downlink Control Channel (PDCCH) monitoring method, which is applied to a terminal. Please refer to [link / reference]. Figure 3 The method includes:

[0060] S310, the terminal obtains configuration information.

[0061] Specifically, the terminal obtains configuration information by receiving Radio Resource Control (RRC) signaling or system broadcast information sent by the network device.

[0062] Specifically, the configuration information includes one of the following: the length of the first time window; the length of the second time window; the length of the third time window; and the target parameter threshold of PUSCH.

[0063] The length of the first time window will be described in detail below.

[0064] The length of the first time window can be at the cell or beam level.

[0065] If the length of the first time window is at the cell level, meaning the network device configures a first time window length for the cell via system broadcast information or RRC signaling, then the length of the first time window is determined by the network device based on the maximum differential latency corresponding to the cell where the terminal is located. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to the same first time window length.

[0066] If the length of the first time window is beam-level, meaning the network device configures a first time window length for each beam in a cell via system broadcast information or RRC signaling, then the length of the first time window is determined by the network device based on the maximum differential latency corresponding to the beam where the terminal is located. If a cell contains multiple beams, then each beam's coverage area within the cell corresponds to a different first time window length.

[0067] The length of the second time window will be described in detail below.

[0068] The length of the second time window can be at the cell or beam level.

[0069] If the length of the second time window is cell-level, meaning the network device configures a second time window length for the cell via system broadcast information or RRC signaling, then the length of the second time window can be determined by the network device based on the maximum differential latency and maximum PUSCH transmission duration corresponding to the cell where the terminal is located. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to the same second time window length.

[0070] If the length of the second time window is beam-level, meaning the network device configures a second time window length value for each beam in a cell via system broadcast information or RRC signaling, then the length of the second time window can be determined by the network device based on the maximum differential delay and maximum PUSCH transmission time corresponding to the beam where the terminal is located. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to a different second time window length value.

[0071] The length of the third time window will be described in detail below.

[0072] The length of the third time window can be at the cell or beam level.

[0073] If the length of the third time window is cell-level, meaning the network device configures a third time window length for the cell via system broadcast information or RRC signaling, then the length of the third time window can be determined by the network device based on the maximum differential latency and PUSCH transmission duration threshold corresponding to the cell where the terminal is located. The PUSCH transmission duration threshold is used to determine whether the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH. When the PUSCH transmission duration scheduled by DCI is less than the PUSCH transmission duration threshold, the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH. When the PUSCH transmission duration scheduled by DCI is greater than or equal to the PUSCH transmission duration threshold, the terminal cannot use the third time window to determine the time interval during which it does not need to listen to the PDCCH. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to the same third time window length.

[0074] If the length of the third time window is at the cell level, meaning the network device configures a third time window length for the cell via system broadcast information or RRC signaling, then the length of the third time window can be determined by the network device based on the maximum differential latency and the PUSCH retransmission count threshold corresponding to the cell where the terminal is located. The PUSCH retransmission count threshold is used to determine whether the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH. When the number of PUSCH retransmissions scheduled by the DCI is less than the PUSCH retransmission count threshold, the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH; when the number of PUSCH retransmissions scheduled by the DCI is greater than or equal to the PUSCH retransmission count threshold, the terminal cannot use the third time window to determine the time interval during which it does not need to listen to the PDCCH. If a cell contains multiple beams, then the length of the same third time window is determined for the coverage area of ​​each beam within the cell.

[0075] If the length of the third time window is beam-level, meaning the network device configures a third time window length for each beam in a cell via system broadcast information or RRC signaling, then the length of the third time window can be determined by the network device based on the maximum differential delay and PUSCH transmission duration threshold corresponding to the beam where the terminal is located. The PUSCH transmission duration threshold is used to determine whether the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH. When the PUSCH transmission duration scheduled by DCI is less than the PUSCH transmission duration threshold, the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH; when the PUSCH transmission duration scheduled by DCI is greater than or equal to the PUSCH transmission duration threshold, the terminal cannot use the third time window to determine the time interval during which it does not need to listen to the PDCCH. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to a different third time window length.

[0076] If the length of the third time window is beam-level, meaning the network device configures a third time window length for each beam in a cell via system broadcast information or RRC signaling, then the length of the third time window can be determined by the network device based on the maximum differential delay and PUSCH or repetition transmission number threshold corresponding to the beam where the terminal is located. The PUSCH repetition transmission number threshold is used to determine whether the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH. When the number of PUSCH repetitions scheduled by DCI is less than the PUSCH repetition transmission number threshold, the terminal can use the third time window to determine the time interval during which it does not need to listen to the PDCCH; when the number of PUSCH repetitions scheduled by DCI is greater than or equal to the PUSCH repetition transmission number threshold, the terminal cannot use the third time window to determine the time interval during which it does not need to listen to the PDCCH. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to a different third time window length.

[0077] The following section introduces the maximum differential delay.

[0078] When the length of the target time window (including the lengths of the first, second, and third time windows) is at the cell level, the maximum differential delay is the difference between the first and second propagation delays; the first propagation delay is the propagation delay between a first location and the location of the target device, where the first location is the closest location to the target device within the cell coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the cell where the terminal is located, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between a second location and the location of the target device, where the second location is the farthest location from the target device within the cell coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the cell where the terminal is located.

[0079] When the length of the target time window (including the lengths of the first, second, and third time windows) is at the beam speed level, the maximum differential delay is the difference between the first and second propagation delays; the first propagation delay is the propagation delay between a first location and the location of the target device, where the first location is the closest location to the target device within the beam speed coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the beam speed of the terminal, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between a second location and the location of the target device, where the second location is the farthest location from the target device within the beam speed coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the beam speed of the terminal.

[0080] S320: The terminal determines the first time interval based on the configuration information. The first time interval is the time interval in the scheduling delay enhancement interval that does not require listening to the PDCCH.

[0081] Since the configuration information includes three different scenarios, the terminal determines the first time interval in the following three ways based on the configuration information.

[0082] Method 1:

[0083] The configuration information includes the length of a first time window. The terminal determines a first time interval based on the configuration information, including: determining a first reference position; determining a first time interval and the physical uplink shared channel (PUSCH) transmission duration scheduled by the downlink control information (DCI) based on the downlink control information (DCI); determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position, the length of the first time window, and the PUSCH transmission duration, wherein the end position is the sum of the start position, the length of the first time window, and the PUSCH transmission duration minus one time unit.

[0084] Specifically, PUSCH transmission includes the transmission of HARQ-ACK information corresponding to uplink data transmission or downlink data transmission.

[0085] Specifically, the PUSCH transmission duration can be obtained by the terminal determining the PUSCH transmission duration based on the PUSCH scheduling information and time slot configuration information in the DCI. That is, the terminal determines the PUSCH transmission duration based on the number of repeated transmissions, resource configuration indication, scheduling TB number indication, etc. indicated by the DCI.

[0086] Specifically, the time unit involved in the embodiments of this application may be, but is not limited to, one of milliseconds (ms), subframes, frames, and slots, and there are no specific limitations on this.

[0087] Method 2:

[0088] The configuration information includes the length value of the second time window. The terminal determines the first time interval based on the configuration information by: determining the first reference position; determining the first time interval based on the downlink control information (DCI); determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position and the length value of the second time window, wherein the end position is the start position and the length value of the second time window minus one time unit.

[0089] Method 3:

[0090] The configuration information includes the length of a third time window and a target parameter threshold for PUSCH. Determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval and the target parameter of the PUSCH scheduled by the downlink control information (DCI) based on the DCI; determining that the target parameter of the PUSCH is less than the target parameter threshold of the PUSCH; determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position and the length of the third time window, wherein the end position is the sum of the start position and the length of the third time window minus one time unit.

[0091] Specifically, the target parameters of the PUSCH include the PUSCH transmission duration or the number of PUSCH retransmissions.

[0092] Specifically, the target parameter thresholds for PUSCH include a PUSCH transmission duration threshold or a PUSCH repeated transmission count threshold.

[0093] It is understandable that when the target parameter of PUSCH is the PUSCH transmission duration, the threshold of the target parameter of PUSCH is the PUSCH transmission duration threshold; when the target parameter of PUSCH is the number of PUSCH retransmissions, the threshold of the target parameter of PUSCH is the number of PUSCH retransmissions.

[0094] The PUSCH transmission duration can be obtained by the terminal determining the PUSCH transmission duration based on the PUSCH scheduling information and time slot configuration information in the DCI. That is, the terminal determines the PUSCH transmission duration based on the number of repeated transmissions, resource configuration indication, scheduling TB number indication, etc. indicated by the DCI.

[0095] The PUSCH retransmission count can be obtained by the terminal determining the PUSCH retransmission count based on the bit fields in the DCI.

[0096] Specifically, in Method 1, Method 2, and Method 3, the correspondence between the first reference position and the first time interval is the same. However, since the first reference position can vary, the correspondence between the first reference position and the first time interval can be categorized into the following two scenarios:

[0097] Scenario 1:

[0098] If the first reference position is the end position of the PDCCH listening time that carries the DCI, then the first time interval is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI corresponding to the PDCCH listening time.

[0099] Scenario 2:

[0100] If the first reference position is the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, then the first time interval is the scheduling delay of the hybrid automatic repeat request-acknowledge (HARQ-ACK) transmission corresponding to the first reference position and the PDSCH transmission.

[0101] In one possible example, after determining the first time interval based on the configuration information, the method further includes: determining the starting position of starting PDCCH listening as the end position of the first time interval plus one time unit.

[0102] As can be seen in this example, the terminal can determine the starting position of PDCCH listening in the scheduling latency enhancement interval based on the configuration information, so as to avoid the terminal performing invalid PDCCH listening in the scheduling latency enhancement interval, thereby reducing the terminal's power consumption.

[0103] In one possible example, after determining that the starting position for initiating PDCCH listening is the end position of the first time interval plus one time unit, the method further includes: determining that the ending position for executing PDCCH listening is the end position of the scheduling latency enhancement interval minus one time unit.

[0104] As can be seen in this example, the terminal can determine the start and end positions of PDCCH monitoring within the scheduling latency enhancement interval based on the configuration information, in order to maintain the throughput of the NTN communication system.

[0105] In one possible example, before determining the first time interval based on configuration information, the method also includes:

[0106] Receive RRC signaling or system broadcast information sent by network devices to obtain the length value K_offset of the scheduling delay enhancement interval.

[0107] K_offset is configured for the network device.

[0108] As can be seen in this example, the terminal is able to obtain the K_offset configured by the network device.

[0109] The term "terminal" in this application includes terminals, and the term "network device" in this application includes network devices.

[0110] The application scenarios of the methods in the embodiments of this application will be described by way of example below.

[0111] Application Scenario Example 1:

[0112] In NTN communication systems, the TA compensation value of a terminal is determined by the terminal-level TA value and the common TA value broadcast by the network. Network devices cannot determine the specific value of the terminal's TA compensation. Because network devices cannot know the specific value of the terminal's TA compensation (i.e., they cannot determine the specific location where the terminal transmits PUSCH), they cannot accurately determine when the terminal can listen to PDCCH. However, network devices can determine the range of the terminal's compensation value based on the cell or beam in which the terminal is currently located. Specifically, they can determine the range of the terminal's TA compensation value based on the round-trip propagation delay between the lowest point (the farthest point from the satellite) and the highest point (the closest point to the satellite) in the terminal's coverage area, and thus determine the time interval for the terminal to transmit PUSCH.

[0113] Therefore, network devices can determine the time range for the terminal to send PUSCH based on the range of the terminal's TA compensation value and the transmission duration of the PUSCH scheduled by DCI (which can be HARQ-ACK information corresponding to uplink or downlink data). The time when the PDCCH sent by the network device arrives at the terminal cannot fall within the time range for the terminal to send PUSCH. In other words, the terminal does not need to listen to the PDCCH within the time range for sending PUSCH determined by the network device.

[0114] Since the range of the terminal's TA compensation value is related to the maximum differential delay of the cell or beam in which the terminal is located, it means that after the terminal sends the PUSCH, it will not be able to listen to the PDCCH for a period of time (in the worst case, twice the terminal's maximum differential delay).

[0115] In NTN communication systems, the uplink and downlink data transmission timing is improved by introducing K_offset based on the existing transmission timing, such as... Figure 4 As shown, the terminal receives the K_offset configured by the network device through Radio Resource Control (RRC) signaling or system broadcast information. The terminal also receives the length T of the first time window configured by the network device through RRC signaling or system broadcast information. The terminal determines the transmission duration N of the PUSCH (including HARQ-ACK information corresponding to uplink or downlink data) based on the PUSCH scheduling information and time slot configuration information in the DCI.

[0116] If the first reference position n is the end position of the PDCCH listening time carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI, then the starting position of the first time window is fixed at n+k. n+k to n+k+K_offset is the scheduling delay enhancement interval. PDCCH listening is not required from n+k to n+k+T+N-1. In specific implementation, the terminal does not perform PDCCH listening from n+k to n+k+T+N-1 to ensure that the terminal and the network reach consensus on the PDCCH listening position, while also reducing terminal power consumption. Further, n+k+T+N is the starting position for starting PDCCH listening after the terminal finishes sending the PUSCH, and n+K_offset+k-1 is the end position of this PDCCH listening. In specific implementation, the terminal performs PDCCH listening from n+k+T+N to n+K_offset+k-1, which can maintain the throughput of the NTN communication system.

[0117] Here, T can be at the cell level, meaning the network device configures a T for the cell via system broadcast information or RRC signaling. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to the same T. Alternatively, T can be at the beam level, meaning the network device configures a T for each beam within a cell via system broadcast information or RRC signaling. If a cell contains multiple beams, then the coverage area of ​​each beam within the cell corresponds to a different T. Specifically, the network device can configure T for the terminal via dedicated RRC signaling or system broadcast information. Furthermore, T is determined by the network device based on the maximum differential latency corresponding to the beam or cell where the terminal is located.

[0118] N represents the PUSCH transmission duration scheduled by the DCI. PUSCH transmission includes the transmission of HARQ-ACK information corresponding to uplink data transmission or downlink data transmission. The terminal can determine N based on the PUSCH scheduling information and time slot configuration information in the DCI, that is, the terminal determines N based on the PUSCH retransmission count, resource configuration indication, and scheduling byte count indication indicated in the DCI.

[0119] The unit of k can be, but is not limited to, milliseconds, subframes, frames, or time slots. If n is a subframe number, then the units of k, K_offset, T, and N are all subframes. If n is a time slot number, then the units of k, K_offset, T, and N are all time slots.

[0120] Specifically, when T is at the cell level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between the first location and the location of the target device, where the first location is the closest location to the target device within the cell coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the cell where the terminal is located, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between the second location and the location of the target device, where the second location is the farthest location from the target device within the cell coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the cell where the terminal is located.

[0121] Specifically, when T is the beam speed level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between a first location and the location of the target device, where the first location is the closest location to the target device within the beam speed coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the beam speed of the terminal, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between a second location and the location of the target device, where the second location is the farthest location from the target device within the beam speed coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the beam speed of the terminal.

[0122] It should be noted that the application principle of the second condition is the same as that of the first condition. The description of the second condition is the same as that of the first condition, and will not be repeated here. The second condition includes n being the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, and k being the scheduling delay of n and the HARQ-ACK transmission corresponding to the PDSCH transmission. The first condition is that the first reference position n is the end position of the PDCCH listening opportunity carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI.

[0123] Application Scenario Example 2:

[0124] In NTN communication systems, the TA compensation value of a terminal is determined by the terminal-level TA value and the common TA value broadcast by the network. Network devices cannot determine the specific value of the terminal's TA compensation. Because network devices cannot know the specific value of the terminal's TA compensation (i.e., they cannot determine the specific location where the terminal transmits PUSCH), they cannot accurately determine when the terminal can listen to PDCCH. However, network devices can determine the range of the terminal's compensation value based on the cell or beam in which the terminal is currently located. Specifically, they can determine the range of the terminal's TA compensation value based on the round-trip propagation delay between the lowest point (the farthest point from the satellite) and the highest point (the closest point to the satellite) in the terminal's coverage area, and thus determine the time interval for the terminal to transmit PUSCH.

[0125] Furthermore, in NTN communication systems, network devices configure the maximum number of PUSCH retransmissions (which can be HARQ-ACK information corresponding to uplink or downlink data) at the cell level (one maximum number of PUSCH retransmissions per cell) or at the beam level (one maximum number of PUSCH retransmissions per beam). Therefore, network devices can determine the time range for terminal PUSCH transmission based on the range of the terminal's TA compensation value and the maximum PUSCH transmission duration corresponding to the cell or beam where the terminal is currently located. The PDCCH sent by the network device cannot arrive at the terminal within this time range. In other words, the terminal does not need to listen to the PDCCH within the time range determined by the network device for PUSCH transmission.

[0126] Since the range of the terminal TA compensation value is related to the maximum differential delay corresponding to the current cell or beam, it means that after the terminal sends uplink data, it will not be able to listen to PDCCH information for a period of time (in the worst case, twice the maximum differential delay).

[0127] In NTN communication systems, the uplink and downlink data transmission timing is improved by introducing K_offset based on the existing transmission timing, such as... Figure 5 As shown, the terminal receives the K_offset configured by the network device via Radio Resource Control (RRC) signaling or system broadcast information. The terminal also receives the length value T1 of the second time window configured by the network device via RRC signaling or system broadcast information.

[0128] If the first reference position n is the end position of the PDCCH listening time carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI, then the starting position of the second time window is fixed at n+k. n+k to n+k+K_offset is the scheduling delay enhancement interval. PDCCH listening is not required from n+k to n+k+T1-1. In specific implementation, the terminal does not perform PDCCH listening from n+k to n+k+T1-1 to ensure that the terminal and the network reach consensus on the PDCCH listening position, while also reducing terminal power consumption. n+k+T1 is the starting position for starting PDCCH listening after the terminal sends the PUSCH, and n+K_offset+k-1 is the ending position of this PDCCH listening. In specific implementation, the terminal performs PDCCH listening in the interval from n+k+T1 to n+K_offset+k-1, which can maintain the throughput of the NTN communication system.

[0129] T1 can be at the cell level, meaning the network device configures a T1 for a cell via system broadcast information or RRC signaling. If a cell contains multiple beams, each beam's coverage area within the cell corresponds to the same T1. Alternatively, T1 can be at the beam level, meaning the network device configures a T1 for each beam within a cell via system broadcast information or RRC signaling. If a cell contains multiple beams, each beam's coverage area within the cell corresponds to a different T1. Specifically, the network device can configure T1 for the terminal via dedicated RRC signaling or system broadcast information. Furthermore, T1 is determined by the network device based on the maximum differential latency corresponding to the cell or beam where the terminal is located and the maximum PUSCH (which can be HARQ-ACK information corresponding to uplink or downlink data) transmission duration corresponding to the cell or beam where the terminal is located.

[0130] It is understandable that if the second time window is at the beam level, the corresponding maximum PUSCH transmission time is also at the beam level; if the second time window is at the cell level, the corresponding maximum PUSCH transmission time is also at the cell level.

[0131] The unit of k can be, but is not limited to, milliseconds, subframes, frames, or time slots. If n is a subframe number, then the units of k, K_offset, and T1 are all subframes. If n is a time slot number, then the units of k, K_offset, and T1 are all time slots.

[0132] Specifically, when T1 is at the cell level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between the first location and the location of the target device, where the first location is the closest location to the target device within the cell coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the cell where the terminal is located, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between the second location and the location of the target device, where the second location is the farthest location from the target device within the cell coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the cell where the terminal is located.

[0133] Specifically, when T1 is at the beam speed level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between the first location and the location of the target device, where the first location is the closest location to the target device within the beam speed coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the beam speed of the terminal, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between the second location and the location of the target device, where the second location is the farthest location from the target device within the beam speed coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the beam speed of the terminal.

[0134] It should be noted that the application principle of the second condition is the same as that of the first condition. The description of the second condition is the same as that of the first condition, and will not be repeated here. The second condition includes n being the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, and k being the scheduling delay of n and the HARQ-ACK transmission corresponding to the PDSCH transmission. The first condition is that the first reference position n is the end position of the PDCCH listening opportunity carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI.

[0135] Application Scenario Example 3:

[0136] In NTN communication systems, the TA compensation value of a terminal is determined by the terminal-level TA value and the common TA value broadcast by the network. Network devices cannot determine the specific value of the terminal's TA compensation. Because network devices cannot know the specific value of the terminal's TA compensation (i.e., they cannot determine the specific location where the terminal transmits PUSCH), they cannot accurately determine when the terminal can listen to PDCCH. However, network devices can determine the range of the terminal's compensation value based on the cell or beam in which the terminal is currently located. Specifically, they can determine the range of the terminal's TA compensation value based on the round-trip propagation delay between the lowest point (the farthest point from the satellite) and the highest point (the closest point to the satellite) in the terminal's coverage area, and thus determine the time interval for the terminal to transmit PUSCH.

[0137] Therefore, network devices can configure the length value T2 of the third time window based on the range of the terminal TA compensation value and the transmission duration (or number of repeated transmissions) threshold of the PUSCH (which can be the HARQ-ACK information corresponding to uplink data or downlink data) scheduled by DCI, so as to ensure that the actual transmission position of uplink data scheduling that meets certain conditions falls within the third time window.

[0138] In NTN communication systems, the uplink and downlink data transmission timing is improved by introducing K_offset based on the existing transmission timing, such as... Figure 6 As shown, the terminal receives the K_offset configured by the network device via Radio Resource Control (RRC) signaling or system broadcast information. The terminal also receives the length value T2 of the third time window and the target parameter threshold for PUSCH configured by the network device via RRC signaling or system broadcast information. The target parameter threshold for PUSCH includes a PUSCH transmission duration threshold or a PUSCH retransmission count threshold.

[0139] If the first reference position n is the end position of the PDCCH listening time carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI, the terminal determines the PUSCH transmission duration based on the PUSCH scheduling information and time slot configuration in the DCI, or the terminal determines the number of PUSCH retransmissions based on the bit fields in the DCI. Further, the starting position of the third time window is fixed at n+k, and the interval from n+k to n+k+K_offset is the scheduling delay enhancement interval. If the terminal determines that the PUSCH transmission duration is less than the PUSCH transmission duration threshold configured by the network device through RRC signaling or system broadcast information, or if the terminal determines that the number of PUSCH retransmissions is less than the PUSCH retransmission number threshold configured by the network device through RRC signaling or system broadcast information, then PDCCH does not need to be listened to from n+k to n+k+T2-1. In the specific implementation, the terminal does not perform PDCCH listening from n+k to n+k+T2 -1 to ensure consistency between the terminal and the network at the PDCCH listening position, while also reducing terminal power consumption. n+k+T2 is the starting position for PDCCH listening after the terminal finishes sending PUSCH, and n+K_offset+k-1 is the ending position for this PDCCH listening. Specifically, the terminal's PDCCH listening within the interval n+k+T2 to n+K_offset+k-1 maintains the throughput of the NTN communication system.

[0140] T2 can be at the cell level, meaning the network device configures a T2 for a cell via system broadcast information or RRC signaling. If a cell contains multiple beams, each beam's coverage area within the cell corresponds to the same T2. Alternatively, T2 can be at the beam level, meaning the network device configures a T2 for each beam within a cell via system broadcast information or RRC signaling. If a cell contains multiple beams, each beam's coverage area within the cell corresponds to a different T2. Specifically, the network device can configure T2 for the terminal via dedicated RRC signaling or system broadcast information. Furthermore, T2 is determined by the network device based on the maximum differential latency corresponding to the cell or beam where the terminal is located and the transmission duration (or number of repetitions) threshold for the PUSCH (which can be HARQ-ACK information corresponding to uplink or downlink data) for the cell or beam where the terminal is located.

[0141] The unit of k can be, but is not limited to, milliseconds, subframes, frames, or time slots. If n is a subframe number, then the units of k, K_offset, and T2 are all subframes. If n is a time slot number, then the units of k, K_offset, and T2 are all time slots.

[0142] Specifically, when T2 is at the cell level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between the first location and the location of the target device, where the first location is the closest location to the target device within the cell coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the cell where the terminal is located, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between the second location and the location of the target device, where the second location is the farthest location from the target device within the cell coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the cell where the terminal is located.

[0143] Specifically, when T2 is at the beam speed level, the maximum differential delay is the difference between the first propagation delay and the second propagation delay; the first propagation delay is the propagation delay between the first location and the location of the target device, where the first location is the closest location to the target device within the beam speed coverage area of ​​the terminal; or, the first location is the closest location to the target device within the beam coverage area of ​​the beam speed of the terminal, where the target device is a satellite or the network device; the second propagation delay is the propagation delay between the second location and the location of the target device, where the second location is the farthest location from the target device within the beam speed coverage area of ​​the terminal; or, the second location is the farthest location from the target device within the beam coverage area of ​​the beam speed of the terminal.

[0144] It should be noted that the application principle of the second condition is the same as that of the first condition. The description of the second condition is the same as that of the first condition, and will not be repeated here. The second condition includes n being the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, and k being the scheduling delay of n and the HARQ-ACK transmission corresponding to the PDSCH transmission. The first condition is that the first reference position n is the end position of the PDCCH listening opportunity carrying the DCI, and the first time interval k is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI.

[0145] Consistent with the above embodiments, this application provides a flowchart illustrating yet another non-terrestrial network communication method. Please refer to [link / reference]. Figure 7 This method is applied to network devices. The method includes:

[0146] S710, the network device sends configuration information, which is used to determine the first time interval. The first time interval is the time interval in the scheduling delay enhancement interval that does not require listening to the PDCCH.

[0147] As can be seen, in this embodiment of the application, the network device obtains configuration information, which is used to determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption.

[0148] In one possible example, the network device sends configuration information, including: the network device sends configuration information via Radio Resource Control (RRC) signaling or system broadcast information.

[0149] In one possible example, the configuration information includes one of the following: the length of the first time window; the length of the second time window; the length of the third time window; and the target parameter threshold.

[0150] In one possible example, the length of the first time window is determined by the network device based on the maximum differential latency corresponding to the beam or cell where the terminal is located.

[0151] In one possible example, the length of the second time window is determined by the network device based on the maximum differential delay and maximum PUSCH transmission duration corresponding to the beam or cell where the terminal is located.

[0152] In one possible example, the length of the third time window is determined by the network device based on the maximum differential delay and the target parameter threshold of PUSCH corresponding to the beam or cell where the terminal is located. The target parameter threshold of PUSCH includes a PUSCH transmission duration threshold or a PUSCH retransmission count threshold.

[0153] In one possible example, the method also includes sending the length value K_offset of the scheduling delay enhancement interval via Radio Resource Control (RRC) signaling or system broadcast information.

[0154] The above mainly describes the solution of the embodiments of this application from the perspective of the interaction between various network elements in the method. It is understood that, in order to achieve the above functions, the terminal includes the corresponding hardware structure and / or software modules for executing each function. Those skilled in the art should readily recognize that, in conjunction with the units and algorithm steps of the various examples described in the embodiments disclosed herein, this application can be implemented in hardware or a combination of hardware and computer software. Whether a certain function is executed in a hardware or computer software-driven hardware manner depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0155] This application embodiment can divide the terminal into functional units according to the above method example. For example, each function can be divided into a separate functional unit, or two or more functions can be integrated into one processing unit. The integrated unit can be implemented in hardware or as a software program module. It should be noted that the unit division in this application embodiment is illustrative and only represents a logical functional division, while other division methods may be used in actual implementation.

[0156] When using integrated units, Figure 8 A functional unit block diagram of a PDCCH monitoring device is provided. The PDCCH monitoring device 800 is applied to a terminal and specifically includes a processing unit 802 and a communication unit 803. The processing unit 802 is used to control and manage the actions of the terminal; for example, the processing unit 802 is used to support the terminal in performing... Figure 3 The steps in the process and other processes used in the technical solutions described in this application. The communication unit 803 is used to support communication between the terminal and other devices in the non-terrestrial network communication system. The PDCCH monitoring device 800 may also include a storage unit 801 for storing the terminal's program code and data.

[0157] The processing unit 802 can be a processor or controller, such as a central processing unit (CPU), a general-purpose processor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processing unit 802 can also be a combination that implements computing functions, such as including one or more microprocessor combinations, a combination of a DSP and a microprocessor, etc. The communication unit 803 can be a communication interface, transceiver, transceiver circuit, etc., and the storage unit 801 can be a memory. When the processing unit 802 is a processor, the communication unit 803 is a communication interface, and the storage unit 801 is a memory, the PDCCH monitoring device 800 involved in the embodiments of this application can be... Figure 7 The terminal shown.

[0158] In specific implementation, the processing unit 802 is used to execute any step performed by the terminal as described in the above method embodiments, and when performing data transmission such as sending, it may selectively call the communication unit 803 to complete the corresponding operation. A detailed description follows.

[0159] The processing unit 802 is used to: obtain configuration information through the communication unit 803; and determine a first time interval based on the configuration information, wherein the first time interval is the time interval in the scheduling delay enhancement interval that does not require listening to the PDCCH.

[0160] As can be seen, in this embodiment of the application, the terminal can obtain configuration information and determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH based on the configuration information. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption.

[0161] In one possible example, regarding the acquisition of configuration information, the processing unit 802 is specifically configured to: receive Radio Resource Control (RRC) signaling or system broadcast information sent by the network device to acquire the configuration information.

[0162] In one possible example, the configuration information includes one of the following: the length value of a first time window; the length value of a second time window; the length value of a third time window; and the target parameter threshold for PUSCH.

[0163] In one possible example, the configuration information includes the length value of a first time window, and in determining the first time interval based on the configuration information, the processing unit 802 is specifically configured to:

[0164] Determine the first reference position;

[0165] The first time interval and the transmission duration of the Physical Uplink Shared Channel (PUSCH) scheduled by the DCI are determined based on the downlink control information (DCI).

[0166] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0167] The end position of the first time interval is determined based on the starting position, the length of the first time window, and the PUSCH transmission duration. The end position is the sum of the starting position, the length of the first time window, and the PUSCH transmission duration minus one time unit.

[0168] In one possible example, the configuration information includes the length value of a second time window, and the processing unit 802 is specifically used for determining the first time interval based on the configuration information:

[0169] Determine the first reference position;

[0170] The first time interval is determined based on the downlink control information (DCI).

[0171] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0172] The end position of the first time interval is determined based on the starting position and the length value of the second time window, wherein the end position is the starting position and the length value of the second time window minus 1 time unit.

[0173] In one possible example, the configuration information includes the length value of the third time window and the target parameter threshold of PUSCH. In the aspect of determining the first time interval based on the configuration information, the processing unit 802 is specifically used to: determine the first reference position;

[0174] The first time interval and the target parameters of the PUSCH scheduled by the DCI are determined based on the downlink control information (DCI).

[0175] It is determined that the target parameter of the PUSCH is less than the target parameter threshold of the PUSCH;

[0176] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0177] The end position of the first time interval is determined based on the starting position and the length value of the third time window. The end position is the sum of the starting position and the length value of the third time window minus one time unit.

[0178] In one possible example, the target parameters for PUSCH include PUSCH transmission duration or the number of PUSCH retransmissions.

[0179] In one possible example, if the first reference position is the end position of the PDCCH listening time carrying the DCI, then the first time interval is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI.

[0180] If the first reference position is the end position of the Physical Downlink Shared Channel (PDSCH) transmission scheduled by the DCI, then the first time interval is the scheduling delay of the Hybrid Automatic Repeat Request / Acknowledge (HARQ-ACK) transmission corresponding to the first reference position and the PDSCH transmission.

[0181] In one possible example, the PUSCH transmission includes the transmission of HARQ-ACK information corresponding to uplink data transmission or downlink data transmission.

[0182] In one possible example, the processing unit 802 is further configured to: after determining the first time interval according to the configuration information, determine the starting position for starting the PDCCH monitoring as the end position of the first time interval plus one time unit.

[0183] In one possible example, the processing unit 802 is further configured to: after determining that the starting position for initiating PDCCH monitoring is the end position of the first time interval plus one time unit, determine that the ending position for executing PDCCH monitoring is the end position of the scheduling delay enhancement interval minus one time unit.

[0184] In one possible example, the processing unit 802 is further configured to: receive Radio Resource Control (RRC) signaling or system broadcast information sent by the network device before determining the first time interval according to the configuration information, so as to obtain the length value K_offset of the scheduling delay enhancement interval.

[0185] When using integrated units, Figure 9 A functional unit block diagram of another PDCCH monitoring device is provided. The PDCCH monitoring device 900 is applied to a network device and specifically includes a processing unit 902 and a communication unit 903. The processing unit 902 is used to control and manage the actions of the network device; for example, the processing unit 902 is used to support the network device in performing... Figure 4 The steps in the process and other processes used in the technical solutions described in this application. The communication unit 903 is used to support communication between the network device and other devices in the non-terrestrial network communication system. The PDCCH monitoring device 900 may also include a storage unit 901 for storing the program code and data of the network device.

[0186] The processing unit 902 can be a processor or controller, such as a CPU, DSP, ASIC, FPGA, or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. The processing unit 902 can also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc. The communication unit 903 can be a communication interface, transceiver, transceiver circuit, etc., and the storage unit 901 can be a memory. When the processing unit 902 is a processor, the communication unit 903 is a communication interface, and the storage unit 901 is a memory, the PDCCH monitoring device 900 involved in the embodiments of this application can be... Figure 8 The network device shown.

[0187] In specific implementation, the processing unit 902 is used to execute any step performed by the network device as described in the above method embodiments, and when performing data transmission such as sending, it may selectively call the communication unit 903 to complete the corresponding operation. A detailed description follows.

[0188] The processing unit 902 is used to send configuration information through the communication unit 903. The configuration information is used to determine a first time interval, which is the time interval in the scheduling delay enhancement interval where PDCCH does not need to be listened to.

[0189] As can be seen, in this embodiment of the application, the network device obtains configuration information, which is used to determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption.

[0190] In one possible example, the configuration information includes one of the following: the length value of a first time window; the length value of a second time window; the length value of a third time window; and the target parameter threshold for PUSCH.

[0191] In one possible example, the length of the first time window is determined by the network device based on the maximum differential latency corresponding to the beam or cell where the terminal is located.

[0192] In one possible example, the length of the second time window is determined by the network device based on the maximum differential delay and maximum PUSCH transmission duration corresponding to the beam or cell where the terminal is located.

[0193] In one possible example, the length of the third time window is determined by the network device based on the maximum differential delay and the target parameter threshold of PUSCH corresponding to the beam or cell where the terminal is located. The target parameter threshold of PUSCH includes a PUSCH transmission duration threshold or a PUSCH retransmission count threshold.

[0194] In one possible example, the processing unit 902 is also configured to: send the length value K_offset of the scheduling delay enhancement interval via Radio Resource Control (RRC) signaling or system broadcast information.

[0195] Please see Figure 10 , Figure 10 This is a schematic diagram of the structure of a terminal provided in an embodiment of this application. The terminal 1000 includes a processor 1010, a memory 1020, a communication interface 1030, and at least one communication bus for connecting the processor 1010, the memory 1020, and the communication interface 1030.

[0196] The memory 1020 includes, but is not limited to, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (PROM), or compact disc read-only memory (CD-ROM), and is used for related instructions and data.

[0197] The communication interface 1030 is used to receive and send data.

[0198] Processor 1010 can be one or more CPUs. When processor 1010 is a CPU, the CPU can be a single-core CPU or a multi-core CPU.

[0199] The processor 1010 in terminal 1000 is used to read one or more programs 1021 stored in memory 1020 to perform the following steps:

[0200] Get configuration information;

[0201] The first time interval is determined based on the configuration information. The first time interval is the time interval within the scheduling latency enhancement interval that does not require listening to the PDCCH.

[0202] It should be noted that the specific implementation details of each operation can be found above. Figure 3 or Figure 6 The descriptions in the method embodiments shown will not be repeated here.

[0203] As can be seen, in this embodiment of the application, the network device obtains configuration information, which is used to determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption.

[0204] In one possible example, in obtaining configuration information, processor 1010 is used to read one or more programs 1021 stored in memory 1020 to specifically perform the following steps: receiving Radio Resource Control (RRC) signaling or system broadcast information sent by network devices to obtain configuration information.

[0205] In one possible example, the configuration information includes the length of a first time window; the length of a second time window; the length of a third time window; and a target parameter threshold.

[0206] In one possible example, the configuration information includes a length value for a first time window, and in determining the first time interval based on the configuration information, the processor 1010 is configured to read one or more programs 1021 stored in the memory 1020 to specifically perform the following steps:

[0207] Determine the first reference position;

[0208] The first time interval and the transmission duration of the Physical Uplink Shared Channel (PUSCH) scheduled by the DCI are determined based on the downlink control information (DCI).

[0209] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0210] The end position of the first time interval is determined based on the starting position, the length of the first time window, and the PUSCH transmission duration. The end position is the sum of the starting position, the length of the first time window, and the PUSCH transmission duration minus one time unit.

[0211] In one possible example, the configuration information includes the length value of a second time window, and regarding the determination of the first time interval based on the configuration information, the processor 1010 is used to read one or more programs 1021 stored in the memory 1020 to specifically perform the following steps:

[0212] Determine the first reference position;

[0213] The first time interval is determined based on the downlink control information (DCI).

[0214] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0215] The end position of the first time interval is determined based on the starting position and the length value of the second time window, wherein the end position is the starting position and the length value of the second time window minus 1 time unit.

[0216] In one possible example, the configuration information includes the length value of a third time window, and regarding the determination of the first time interval based on the configuration information, the processor 1010 is used to read one or more programs 1021 stored in the memory 1020 to specifically perform the following steps:

[0217] Determine the first reference position;

[0218] The first time interval and the target parameters of the PUSCH scheduled by the DCI are determined based on the downlink control information (DCI).

[0219] It is determined that the target parameter of the PUSCH is less than the target parameter threshold of the PUSCH;

[0220] Based on the first reference position and the first time interval, the starting position of the first time interval is determined, wherein the starting position is the sum of the first reference position and the first time interval;

[0221] The end position of the first time interval is determined based on the starting position and the length value of the third time window. The end position is the sum of the starting position and the length value of the third time window minus one time unit.

[0222] In one possible example, the target parameters for PUSCH include PUSCH transmission duration or the number of PUSCH retransmissions.

[0223] In one possible example, if the first reference position is the end position of the PDCCH listening time carrying the DCI, then the first time interval is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI.

[0224] If the first reference position is the end position of the Physical Downlink Shared Channel (PDSCH) transmission scheduled by the DCI, then the first time interval is the scheduling delay of the Hybrid Automatic Repeat Request / Acknowledge (HARQ-ACK) transmission corresponding to the first reference position and the PDSCH transmission.

[0225] In one possible example, the PUSCH transmission includes the transmission of HARQ-ACK information corresponding to uplink data transmission or downlink data transmission.

[0226] In one possible example, processor 1010 is used to read one or more programs 1021 stored in memory 1020 to further perform the following steps: after determining the first time interval according to the configuration information, determining the start position for starting the PDCCH monitoring as the end position of the first time interval plus one time unit.

[0227] In one possible example, processor 1010 is used to read one or more programs 1021 stored in memory 1020 to further perform the following steps: after determining that the start position for initiating PDCCH listening is the end position of the first time interval plus one time unit, determining that the end position for executing PDCCH listening is the end position of the scheduling delay enhancement interval minus one time unit.

[0228] In one possible example, processor 1010 is used to read one or more programs 1021 stored in memory 1020 to further perform the following steps: before determining the first time interval according to the configuration information, receiving Radio Resource Control (RRC) signaling or system broadcast information sent by the network device to obtain the length value K_offset of the scheduling delay enhancement interval.

[0229] Please see Figure 11 , Figure 11 This is a schematic diagram of the structure of a network device provided in an embodiment of this application. The network device 1100 includes a processor 1110, a memory 1120, a communication interface 1130, and at least one communication bus for connecting the processor 1110, the memory 1120, and the communication interface 1130.

[0230] The memory 1120 includes, but is not limited to, RAM, ROM, PROM or CD-ROM, and is used to store relevant instructions and data.

[0231] Communication interface 1130 is used to receive and send data.

[0232] Processor 1110 can be one or more CPUs. When processor 1110 is a CPU, the CPU can be a single-core CPU or a multi-core CPU.

[0233] The processor 1110 in network device 1100 is used to read one or more programs 1121 stored in memory 1120 to perform the following steps: sending configuration information, the configuration information being used to determine a first time interval, the first time interval being a time interval in the scheduling delay enhancement interval where PDCCH does not need to be listened to.

[0234] It should be noted that the specific implementation details of each operation can be found above. Figure 3 or Figure 6 The descriptions in the method embodiments shown will not be repeated here.

[0235] As can be seen, in this embodiment of the application, the network device obtains configuration information, which is used to determine the first time interval in the scheduling latency enhancement interval that does not need to listen to PDCCH. This helps to ensure that the terminal does not listen to PDCCH in the target interval, thereby ensuring that the terminal and the network reach an agreement on the PDCCH listening position. At the same time, it can reduce the terminal's power consumption.

[0236] In one possible example, in sending configuration information, processor 1110 is used to read one or more programs 1121 stored in memory 1120 to specifically perform the following steps:

[0237] Configuration information is sent via Radio Resource Control (RRC) signaling or system broadcast messages.

[0238] In one possible example, the configuration information includes one of the following: the length value of a first time window; the length value of a second time window; the length value of a third time window; and the target parameter threshold for PUSCH.

[0239] In one possible example, the length of the first time window is determined by the network device based on the maximum differential latency corresponding to the beam or cell where the terminal is located.

[0240] In one possible example, the length of the second time window is determined by the network device based on the maximum differential delay and maximum PUSCH transmission duration corresponding to the beam or cell where the terminal is located.

[0241] In one possible example, the length of the third time window is determined by the network device based on the maximum differential delay and the target parameter threshold of PUSCH corresponding to the beam or cell where the terminal is located. The target parameter threshold of PUSCH includes a PUSCH transmission duration threshold or a PUSCH retransmission count threshold.

[0242] In one possible example, processor 1110 is used to read one or more programs 1121 stored in memory 1120 to also perform the following steps: sending the length value K_offset of the scheduling delay enhancement interval via Radio Resource Control (RRC) signaling or system broadcast information.

[0243] This application also provides a chip, which includes a processor for calling and running a computer program from a memory, causing a device with the chip installed to perform some or all of the steps described in the above method embodiments for a terminal or network device.

[0244] This application also provides a computer-readable storage medium storing a computer program for electronic data interchange, wherein the computer program causes a computer to perform some or all of the steps described in the above method embodiments for a terminal or network device.

[0245] This application also provides a computer program product, which includes a computer program operable to cause a computer to perform some or all of the steps described in the above method embodiments for a terminal or network device. This computer program product may be a software installation package.

[0246] The steps of the methods or algorithms described in the embodiments of this application can be implemented in hardware or by a processor executing software instructions. The software instructions can consist of corresponding software modules, which can be stored in RAM, flash memory, ROM, erasable programmable read-only memory (EPROM), electrically erasable programmable read-only memory (EEPROM), registers, hard disks, portable hard disks, read-only optical discs (CD-ROMs), or any other form of storage medium known in the art. An exemplary storage medium is coupled to a processor, enabling the processor to read information from and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and storage medium can reside in an ASIC. Additionally, the ASIC can reside in a terminal or network device. Alternatively, the processor and storage medium can exist as discrete components in the terminal or network device.

[0247] Those skilled in the art will recognize that, in one or more of the examples above, the functions described in the embodiments of this application can be implemented, in whole or in part, by software, hardware, firmware, or any combination thereof. When implemented in software, it can be implemented, in whole or in part, in the form of a computer program product. This computer program product includes one or more computer instructions. When these computer program instructions are loaded and executed on a computer, all or part of the flow or function according to the embodiments of this application is generated. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions can be transmitted from one website, computer, server, or data center to another via wired (e.g., coaxial cable, fiber optic, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) means. The computer-readable storage medium can be any available medium accessible to a computer or a data storage device such as a server or data center that integrates one or more available media. The available media can be magnetic media (e.g., floppy disks, hard disks, magnetic tapes), optical media (e.g., digital video discs (DVDs)), or semiconductor media (e.g., solid-state disks (SSDs)).

[0248] The above detailed embodiments further illustrate the purpose, technical solution, and beneficial effects of the embodiments of this application. It should be understood that the above are merely specific embodiments of the embodiments of this application and are not intended to limit the protection scope of the embodiments of this application. Any modifications, equivalent substitutions, improvements, etc., made on the basis of the technical solutions of the embodiments of this application should be included within the protection scope of the embodiments of this application.

Claims

1. A method for monitoring the Physical Downlink Control Channel (PDCCH), characterized in that, Applied to a terminal; the method includes: Get configuration information; The first time interval is determined based on the configuration information. The first time interval is the time interval within the scheduling delay enhancement interval that does not require PDCCH monitoring. The scheduling delay enhancement interval refers to the time interval for enhancing uplink and downlink timing. The configuration information includes the length of a first time window. Determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval and the physical uplink shared channel (PUSCH) transmission duration scheduled by the DCI based on downlink control information (DCI); if the first reference position is the end position of the PDCCH monitoring opportunity carrying the DCI, then the first time interval is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI; if the first reference position is the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, then the first time interval is the scheduling delay of the hybrid automatic repeat request / acknowledgment (HARQ-ACK) transmission corresponding to the first reference position and the PDSCH transmission; determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position, the length of the first time window, and the PUSCH transmission duration, wherein the end position is the sum of the start position, the length of the first time window, and the PUSCH transmission duration minus one time unit. Alternatively, the configuration information includes the length value of a second time window, and determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval based on downlink control information (DCI); determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position and the length value of the second time window, wherein the end position is the start position and the length value of the second time window minus one time unit. Alternatively, the configuration information includes the length of a third time window and a target parameter threshold for PUSCH. Determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval and the target parameter of the PUSCH scheduled by the DCI based on downlink control information (DCI); determining that the target parameter of the PUSCH is less than the target parameter threshold of the PUSCH; determining the starting position of the first time interval based on the first reference position and the first time interval, wherein the starting position is the sum of the first reference position and the first time interval; and determining the ending position of the first time interval based on the starting position and the length of the third time window, wherein the ending position is the sum of the starting position and the length of the third time window minus one time unit.

2. The method according to claim 1, characterized in that, The acquisition of configuration information includes: Receive Radio Resource Control (RRC) signaling or system broadcast information sent by network devices to obtain the configuration information.

3. The method according to claim 1, characterized in that, The target parameters for PUSCH include PUSCH transmission duration or the number of PUSCH retransmissions.

4. The method according to claim 1 or 3, characterized in that, The PUSCH transmission includes the transmission of HARQ-ACK information corresponding to uplink data transmission or downlink data transmission.

5. The method according to claim 1, characterized in that, After determining the first time interval based on the configuration information, the method further includes: The starting position for initiating the PDCCH monitoring is determined to be the end position of the first time interval plus one time unit.

6. The method according to claim 5, characterized in that, After determining that the starting position for initiating PDCCH monitoring is the end position of the first time interval plus one time unit, the method further includes: The end position of the PDCCH monitoring is determined to be the end position of the scheduling delay enhancement interval minus one time unit.

7. The method according to claim 1, characterized in that, Before determining the first time interval based on the configuration information, the method further includes: Receive Radio Resource Control (RRC) signaling or system broadcast information sent by network devices to obtain the length value K_offset of the scheduling delay enhancement interval.

8. A PDCCH monitoring method, characterized in that, Applied to network devices; the method includes: Send configuration information, which is used to determine a first time interval, which is the time interval within the scheduling delay enhancement interval that does not require listening to the PDCCH; the scheduling delay enhancement interval refers to the time interval for enhancing uplink and downlink timing; The configuration information includes one of the following: The length of the first time window; The length of the second time window; The length of the third time window and the threshold value of the target parameter of PUSCH.

9. The method according to claim 8, characterized in that, The sending configuration information includes: The configuration information is sent via Radio Resource Control (RRC) signaling or system broadcast information.

10. The method according to claim 8, characterized in that, The length of the first time window is determined by the network device based on the maximum differential latency corresponding to the beam or cell where the terminal is located.

11. The method according to claim 8, characterized in that, The length of the second time window is determined by the network device based on the maximum differential delay and maximum PUSCH transmission duration corresponding to the beam or cell where the terminal is located.

12. The method according to claim 8, characterized in that, The length of the third time window is determined by the network device based on the maximum differential delay corresponding to the beam or cell where the terminal is located and the target parameter threshold of the PUSCH. The target parameter threshold of the PUSCH includes a PUSCH transmission duration threshold or a PUSCH repeated transmission count threshold.

13. The method according to claim 8, characterized in that, The method further includes: The length value K_offset of the scheduling delay enhancement interval is sent via Radio Resource Control (RRC) signaling or system broadcast information.

14. A PDCCH monitoring device, characterized in that, Applied to a terminal; the device includes a processing unit and a communication unit, the processing unit being used for: Configuration information is obtained through the communication unit; The first time interval is determined based on the configuration information. The first time interval is the time interval within the scheduling delay enhancement interval that does not require PDCCH monitoring. The scheduling delay enhancement interval refers to the time interval for enhancing uplink and downlink timing. The configuration information includes the length of a first time window. Determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval and the physical uplink shared channel (PUSCH) transmission duration scheduled by the DCI based on downlink control information (DCI); if the first reference position is the end position of the PDCCH monitoring opportunity carrying the DCI, then the first time interval is the scheduling delay corresponding to the PUSCH transmission scheduled by the DCI; if the first reference position is the end position of the physical downlink shared channel (PDSCH) transmission scheduled by the DCI, then the first time interval is the scheduling delay of the hybrid automatic repeat request / acknowledgment (HARQ-ACK) transmission corresponding to the first reference position and the PDSCH transmission; determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position, the length of the first time window, and the PUSCH transmission duration, wherein the end position is the sum of the start position, the length of the first time window, and the PUSCH transmission duration minus one time unit. Alternatively, the configuration information includes the length value of a second time window, and determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval based on downlink control information (DCI); determining the start position of the first time interval based on the first reference position and the first time interval, wherein the start position is the sum of the first reference position and the first time interval; and determining the end position of the first time interval based on the start position and the length value of the second time window, wherein the end position is the start position and the length value of the second time window minus one time unit. Alternatively, the configuration information includes the length of a third time window and a target parameter threshold for PUSCH. Determining the first time interval based on the configuration information includes: determining a first reference position; determining a first time interval and the target parameter of the PUSCH scheduled by the DCI based on downlink control information (DCI); determining that the target parameter of the PUSCH is less than the target parameter threshold of the PUSCH; determining the starting position of the first time interval based on the first reference position and the first time interval, wherein the starting position is the sum of the first reference position and the first time interval; and determining the ending position of the first time interval based on the starting position and the length of the third time window, wherein the ending position is the sum of the starting position and the length of the third time window minus one time unit.

15. A PDCCH monitoring device, characterized in that, Applied to network devices; the device includes a processing unit and a communication unit, the processing unit being used for: Configuration information is sent through the communication unit. The configuration information is used to determine a first time interval, which is a time interval in the scheduling delay enhancement interval that does not require listening to the PDCCH. The scheduling delay enhancement interval refers to the time interval for enhancing uplink and downlink timing. The configuration information includes one of the following: The length of the first time window; The length of the second time window; The length of the third time window and the threshold value of the target parameter of PUSCH.

16. A terminal, characterized in that, The method includes a processor, a memory, a communication interface, and one or more programs, said one or more programs being stored in the memory and configured to be executed by the processor, said programs including instructions for performing the steps of the method as described in any one of claims 1-7.

17. A network device, characterized in that, The method includes a processor, a memory, a communication interface, and one or more programs, said one or more programs being stored in the memory and configured to be executed by the processor, said programs including instructions for performing the steps of the method as described in any one of claims 8-13.

Citation Information

Patent Citations

  • Method for transmitting information, terminal device, and network device

    WO2021016818A1

  • Wireless communication method, terminal device and network device

    WO2021056383A1

  • Random access method, terminal device, network device and storage medium

    WO2021062726A1