Network planning method and device
By obtaining and analyzing the network element information, optical fiber connection and computer room information of the 5G base station, using the minimum distance method to determine the network element ownership and automatically planning the network structure, the problem of low efficiency and high cost in the transformation of the distributed wireless access network is solved, and the realization of Efficient network transformation and resource utilization.
Patent Information
- Application Number
- CN202210952407.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-08-09
Smart Images

Figure CN115314906B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mobile communication technology, and in particular to a network planning method and device. Background Art
[0002] The construction of 5G base stations is an important measure to implement the national "new infrastructure" strategy. With the gradual advancement of 5G construction, the access layer networking structure is also gradually promoted and deployed synchronously. The traditional DRAN (Distributed Radio Access NetWork) model adopts a distributed networking structure, and the wireless equipment and access equipment are deployed in a dispersed manner, resulting in low equipment utilization. In addition, the 5G base station equipment is expensive, which will inevitably lead to higher construction costs.
[0003] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0004] The embodiments of the present application provide a network planning method and device to at least solve the technical problems in the related art of low efficiency and high construction cost in transforming a distributed wireless access network into a centralized wireless access network.
[0005] According to one aspect of an embodiment of the present application, a network planning method is provided, including: obtaining network element information of target network elements in a target area, optical fiber connection information between target network elements, and computer room information; determining ownership information of each target network element based on the network element information, optical fiber connection information, and computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; and determining a networking structure of each target network element based on the ownership information.
[0006] Optionally, the target network elements include at least: base station network elements, access network elements and aggregation network elements, and network element information of the target network elements in the target area, optical fiber connection information between the target network elements, and computer room information are obtained, including: obtaining base station network element information through a wireless network management system, wherein the base station network element information at least includes: location information of the base station network element, and the number of radio frequency units corresponding to the base station network element; obtaining access network element information and aggregation network element information through a transmission network management system, wherein the access network element information at least includes: the number of ports of the access network element, and the aggregation network element information at least includes: location information and the number of ports of the aggregation network element; obtaining optical fiber connection information through an optical fiber resource management system; obtaining computer room information through a network operation and maintenance management system, wherein the computer room information includes at least one of the following: available scale of external power supply, available scale of computer room space area.
[0007] Optionally, each aggregation network element belongs to a corresponding aggregation computer room, and the ownership information of each target network element is determined based on the network element information, optical fiber connection information and computer room information, including: based on the location information of the base station network element and the location information of the aggregation network element, using the minimum distance method to determine the aggregation network element to which each base station network element belongs, wherein each aggregation network element corresponds to a base station network element group; for each base station network element group, according to the number of radio frequency units corresponding to each base station network element in the base station network element group, the base station network element group is divided into a first network element group and a second network element group, wherein the number of radio frequency units corresponding to the base station network elements in the first network element group is less than the number of radio frequency units corresponding to the base station network elements in the second network element group; determining the ownership information of each base station network element in the first network element group and the second network element group; based on the ownership information of the base station network element, determining the ownership information of the access network element corresponding to the base station network element.
[0008] Optionally, the aggregation network element includes two nodes, and based on the location information of the base station network element and the location information of the aggregation network element, the minimum distance method is used to determine the aggregation network element to which each base station network element belongs, including: for each base station network element, calculating the sum of the distances from the base station network element to the two nodes of each aggregation network element; determining that the aggregation network element corresponding to the minimum distance sum is the aggregation network element to which the base station network element belongs.
[0009] Optionally, the base station network element group is divided into a first network element group and a second network element group based on the number of radio frequency units corresponding to each base station network element in the base station network element group, including: for each base station network element in the base station network element group, if the number of radio frequency units corresponding to the base station network element is less than a preset threshold number, the base station network element is divided into the first network element group; if the number of radio frequency units corresponding to the base station network element is greater than the preset threshold number, the base station network element is divided into the second network element group.
[0010] Optionally, determining the affiliation information of each base station network element in the first network element group and the second network element group includes: affiliating the base station network elements in the first network element group to the aggregation room to which the aggregation network elements belong; if an access room exists, affiliating the base station network elements in the second network element group to the access room; if the access room does not exist, affiliating the base station network elements in the second network element group to the base station room.
[0011] Optionally, determining the ownership information of each base station network element in the first network element group and the second network element group includes: for each first network element group, calculating the first computer room scale required for all base station network elements in the first network element group and the access network elements corresponding to all the base station network elements, wherein the first computer room scale includes at least one of the following: a first external power supply scale, a first computer room space area scale; based on the comparison result of the first computer room scale and the first available computer room scale, determining the ownership information of each base station network element in the first network element group, wherein the first available computer room scale is the available scale of the aggregation computer room to which the aggregation network element corresponding to the first network element group belongs; updating each second network element group based on the ownership information of each base station network element in each first network element group, and determining the ownership information of each base station network element in each updated second network element group.
[0012] Optionally, based on the comparison result of the scale of the first computer room and the scale of the first available computer room, the affiliation information of each base station network element in the first network element group is determined, including: for each first network element group, if the scale of the first computer room is smaller than the scale of the first available computer room, all the base station network elements in the first network element group are affiliated to the aggregation computer room to which the aggregation network elements corresponding to the first network element group belong, and the first number of base station network elements that can be deployed with the remaining available scale of the aggregation computer room is calculated, wherein the remaining available scale can deploy base station network elements with to-be-determined affiliation information in other first network element groups and / or base station network elements in the second network element group; if the scale of the first computer room is larger than the scale of the first available computer room, the second number of base station network elements in the first network element group corresponding to the scale of the first available computer room are affiliated to the aggregation computer room, and the third number of base station network elements with to-be-determined affiliation information in the first network element group is calculated, the third number of base station network elements are affiliated to other aggregation computer rooms with remaining available scale, and / or the third number of base station network elements are divided into the second network element group.
[0013] Optionally, each second network element group is updated based on the affiliation information of each base station network element in each first network element group, including: for each second network element group, if there are base station network elements in the second network element group that are already affiliated to the aggregation room, the base station network elements that are already affiliated to the aggregation room are moved out of the second network element group; if there are base station network elements in the newly divided first network element group in the second network element group, the base station network elements in the newly divided first network element group are added to the second network element group.
[0014] Optionally, determining the affiliation information of each base station network element in each updated second network element group includes: for each updated second network element group, calculating the second computer room scale required for all base station network elements in the second network element group and the access network elements corresponding to all base station network elements, wherein the second computer room scale includes at least one of the following: the second external power supply scale, the second computer room space area scale; traversing each base station network element in the second network element group, taking each base station network element as the focus point in turn, determining the sum of the distances between the base station network element and other base station network elements in the second network element group based on the minimum distance method, and determining the sorting information of the sum of the distances; determining the target base station network element from all base station network elements in the second network element group based on the sorting information, wherein the second available computer room scale of the base station computer room where the target base station network element is located is not less than the second computer room scale; and affiliating all base station network elements in the second network element group to the base station computer room where the target base station network element is located.
[0015] Optionally, the networking structure of each target network element is determined based on the affiliation information, including: based on the affiliation information of each base station network element in the first network element group and the affiliation information of each base station network element in the second network element group, determining the networking structure of each base station network element in the target area, wherein the networking structure at least includes: deploying the radio frequency unit and baseband unit corresponding to the base station network element in a remote manner.
[0016] According to another aspect of an embodiment of the present application, a network planning device is also provided, including: an acquisition module, used to acquire network element information of target network elements in a target area, optical fiber connection information between target network elements, and computer room information; a first determination module, used to determine the ownership information of each target network element based on the network element information, optical fiber connection information and computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; a second determination module, used to determine the networking structure of each target network element based on the ownership information.
[0017] According to another aspect of an embodiment of the present application, there is further provided an electronic device, including: a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to execute the above-mentioned network planning method through the computer program.
[0018] In an embodiment of the present application, the network element information of the target network element in the target area, the optical fiber connection information between the target network elements, and the computer room information are obtained; the ownership information of each target network element is determined based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; and the networking structure of each target network element is determined based on the ownership information. Among them, the network elements are automatically planned according to the optical fiber connection information between each network element; a reasonable estimation of the scale of the computer room demand is added, and an evaluation index for the computer room availability is established; the influencing factor of the number of radio frequency units corresponding to the base station is increased, so that the final networking structure is more feasible, reasonable and fully utilizes existing resources, improves the efficiency of network transformation, and effectively solves the technical problems of low transformation efficiency and high construction cost for the distributed wireless access network to the centralized wireless access network in the related technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0020] Figure 1 is a flowchart of a network planning method according to an embodiment of the present application;
[0021] Figure 2 It is a structural diagram of a network planning device according to an embodiment of the present application. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0024] Example 1
[0025] At present, domestic operators mostly adopt the traditional DRAN model for transmission access layer network planning, especially in areas where optical cable resources are scarce, the access layer networking structure is DRAN. Therefore, the current network transformation is still in its early stages, and the transformation plans proposed by relevant technical personnel have neither considered how to plan the demand scale of the computer room nor how to plan between various network elements when the networking structure changes. At this stage, the planning of DRAN network transformation is mainly completed manually, and the transformation mainly relies on the layers to complete the optical cable routing rules. The lack of digital automatic planning in the entire transformation process leads to low network transformation efficiency.
[0026] In order to solve the above problems, the embodiment of the present application provides a network planning method, which breaks the information island between the network management system and the optical fiber resource management system, intuitively displays the relationship between the logical networking and the physical optical path, and automatically plans the evolution of the access layer networking structure from DRAN to CRAN (Centralized Radio Access NetWork). It can not only automatically plan the network elements according to the optical fiber connection information, but also realize more accurate and reasonable estimation of the scale of computer room requirements when the equipment is centrally deployed, so that the final networking structure is more feasible, reasonable and fully utilizes the existing resources, realizes the smooth evolution from DRAN to CRAN, and improves the efficiency of network transformation.
[0027] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0028] Figure 1 is a flow chart of an optional network planning method according to an embodiment of the present application, such as Figure 1As shown, the method at least includes steps S102-S106, wherein:
[0029] Step S102, obtaining network element information of target network elements in the target area, optical fiber connection information between target network elements, and computer room information.
[0030] The target network elements include at least: base station network elements, access network elements and aggregation network elements.
[0031] Before network planning is performed in the embodiment of the present application, it is necessary to first clarify the topological connection relationship between the base station network elements, access network elements, and aggregation network elements in the target area. In addition, it is also necessary to determine the physical optical path, parameter configuration, etc. between the network elements through the optical fiber connection information between the network elements. By connecting the wireless network management system, the transmission network management system, and the optical fiber resource management system, the relationship between the logical networking and the physical optical path can be intuitively displayed.
[0032] Specifically, the network element information of the target network elements in the target area, the optical fiber connection information between the target network elements, and the computer room information can be obtained in the following ways: obtaining the base station network element information through the wireless network management system, wherein the base station network element information at least includes: the location information of the base station network element, and the number of radio frequency units corresponding to the base station network element; obtaining the access network element information and the aggregation network element information through the transmission network management system, wherein the access network element information at least includes: the number of ports of the access network element, and the aggregation network element information at least includes: the location information and the number of ports of the aggregation network element; obtaining the optical fiber connection information through the optical fiber resource management system; obtaining the computer room information through the network operation and maintenance management system, wherein the computer room information includes at least one of the following: the available scale of the external power supply, and the available scale of the computer room space area.
[0033] Step S104, determining the ownership information of each target network element based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed.
[0034] As an optional implementation mode, each converged network element belongs to a corresponding converged computer room, and the belonging information of the base station network element and the access network element can be determined by the following method:
[0035] Based on the location information of the base station network element and the location information of the aggregation network element, the aggregation network element to which each base station network element belongs is determined using the minimum distance method, wherein each aggregation network element corresponds to a base station network element group; for each base station network element group, the base station network element group is divided into a first network element group and a second network element group according to the number of radio frequency units corresponding to each base station network element in the base station network element group, wherein the number of radio frequency units corresponding to the base station network elements in the first network element group is less than the number of radio frequency units corresponding to the base station network elements in the second network element group; the ownership information of each base station network element in the first network element group and the second network element group is determined; based on the ownership information of the base station network element, the ownership information of the access network element corresponding to the base station network element is determined.
[0036] Optionally, the aggregation network element includes two nodes. For each base station network element, the sum of the distances from the base station network element to the two nodes of each aggregation network element is calculated; and the aggregation network element corresponding to the minimum sum of distances is determined to be the aggregation network element to which the base station network element belongs.
[0037] Among them, the aggregation network element includes two nodes, which are usually aggregation devices deployed at the same site, and a few are deployed at different sites.
[0038] For example, the set of all converged network elements in the target area is (X1-Y1, X2-Y2…X n -Y n ), for each base station network element N, calculate respectively: the sum of the distances from N to the two nodes X1-Y1, L1; the sum of the distances from N to the two nodes X2-Y2, L2… n -Y n The sum of the distances between two nodes is L n , forming a set of distance sums (L1, L2…L n ), take min(L1,L2…L n ) and assign the base station network element N to the aggregation network element, and repeat the above steps to obtain the aggregation network element to which each base station network element belongs.
[0039] Optionally, for each base station network element in the base station network element group, if the number of radio frequency units corresponding to the base station network element is less than a preset threshold number, the base station network element is divided into a first network element group; if the number of radio frequency units corresponding to the base station network element is greater than a preset threshold number, the base station network element is divided into a second network element group.
[0040] For example, in the embodiment of the present application, considering the technical maturity, stability, maintainability, etc. of the passive wavelength splitter, the preset threshold number of radio frequency units can be set to 12 (a typical configuration of a passive wavelength splitter). For each base station network element N in the base station network element group, if the number of radio frequency units corresponding to the base station network element is less than 12, the base station network element is divided into the first network element group; if the number of radio frequency units corresponding to the base station network element is greater than 12, the base station network element is divided into the second network element group. Repeat the above steps to form the first network element group (N1, N2…N i ) and the second network element group (N i+1 ,N i+2 …N n ).
[0041] As an optional implementation, if the scale of the computer room is not considered, the following method can be used to determine the ownership information of each base station network element in the first network element group and the second network element group: the base station network elements in the first network element group are attributed to the aggregation computer room to which the aggregation network elements belong; if an access computer room exists, the base station network elements in the second network element group are attributed to the access computer room; if the access computer room does not exist, the base station network elements in the second network element group are attributed to the base station computer room.
[0042] On the basis of the above implementation, a reasonable estimation of the scale of the demand for the computer room is added, and an evaluation index of the availability of the computer room is established. The embodiment of the present application proposes another optional implementation. Specifically, the ownership information of all base station network elements in the first network element group and the second network element group can be determined through steps S1 to S3, including:
[0043] Step S1, for each first network element group, calculate the first computer room scale required for all base station network elements in the first network element group and the access network elements corresponding to all base station network elements, wherein the first computer room scale includes at least one of the following: the first external power supply scale, the first computer room space area scale.
[0044] Optionally, the total power consumption requirement of the first device = the power consumption requirement of the first wireless device + the power consumption requirement of the first transmission device + the power consumption requirement of the first supporting equipment. The scale of the first external power demand can be calculated based on the total power consumption requirement of the first device, where the scale of the first external power demand = the total power consumption requirement of the first device / 90%; the installed space requirement of the first device = the installed space requirement of the first wireless device + the installed space requirement of the first transmission device + the installed space requirement of the first supporting equipment + the installed space requirement of the first power supply device. The scale of the space area requirement of the first computer room can be calculated based on the installed space requirement of the first equipment, where the scale of the space area requirement of the first computer room = the installed space requirement of the first equipment / 80%.
[0045] Specifically, the demand information of the device can be determined through steps S11 to S16:
[0046] Step S11, calculate the first network element group (N1, N2...Ni ), and determining the first centralized baseband unit equipment demand scale according to the ratio of the first sum to the number of ports typically configured in the centralized baseband unit, where the number of ports typically configured in the centralized baseband unit may be 15;
[0047] Step S12, calculate the first network element group (N1, N2...N i ), and determining the required scale of the first access network element according to the ratio of the second sum to the number of ports typically configured for the access network element, where optionally, the number of ports typically configured for the access network element may be 10;
[0048] Step S13: According to the first network element group (N1, N2...N i ), calculate the optical fiber connection relationship between all base station network elements and access network elements and aggregation network elements in the network, calculate the sum of the third demand of the wiring optical cable termination demand, the access optical cable termination demand and the fiber core termination demand, and determine the port demand of the optical fiber distribution frame; determine the demand scale of the first optical fiber distribution frame according to the ratio of the port demand of the optical fiber distribution frame to the number of typical configuration ports of the optical fiber distribution frame, and optionally, the number of typical configuration ports of the optical fiber distribution frame can be 576;
[0049] Step S14, determining the demand scale of the first integrated cabinet according to the demand scale of the first centralized baseband unit equipment and the demand scale of the first access network element;
[0050] Step S15, calculating the cooling capacity requirement of the first air conditioner, wherein the cooling capacity requirement of the first air conditioner = the power consumption requirement of the first centralized baseband unit + the power consumption requirement of the first access network element device; calculating the construction scale of the first air conditioner, wherein the construction scale of the first air conditioner = the cooling capacity requirement of the first air conditioner / (cooling capacity of each air conditioner*air conditioner load capacity ratio);
[0051] Step S16, calculate the power consumption requirement of the first DC power supply, where the first DC power consumption requirement = the power consumption requirement of the first centralized baseband unit + the power consumption requirement of the first access network element; calculate the demand scale of the first row power supply cabinet, where the demand scale of the first row power supply cabinet = the first DC power consumption requirement / the power consumption capacity provided by each row power supply cabinet.
[0052] Based on the equipment demand information obtained in the above steps, the demand scale of the first computer room can be calculated.
[0053] Specifically, the total power consumption requirement of the first device = the power consumption requirement of the first wireless device + the power consumption requirement of the first transmission device + the power consumption requirement of the first supporting device, wherein the power consumption requirement of the first wireless device includes the power consumption requirement of the first centralized baseband unit, and the power consumption requirement of the first centralized baseband unit = the number of first centralized baseband units * 1500W; the power consumption requirement of the first transmission device includes the power consumption requirement of the first access network element, and the power consumption requirement of the first access network element = the number of first access network elements * 500W; the power consumption requirement of the first supporting device includes the power consumption requirement of the first integrated cabinet and the power consumption requirement of the first air conditioner. The first external power demand scale can be calculated by the total power consumption requirement of the first device, wherein the first external power demand scale = the total power consumption requirement of the first device / 90%.
[0054] Specifically, the installation space requirement of the first equipment = the installation space requirement of the first wireless equipment + the installation space requirement of the first transmission equipment + the installation space requirement of the first supporting equipment + the installation space requirement of the first power supply equipment. Among them, the installation space requirement of the first wireless device includes the installation space requirement of the first centralized baseband unit, and the installation space requirement of the first centralized baseband unit = the number of first centralized baseband units * 3U (U is the typical height unit of the centralized baseband distribution unit); the installation space requirement of the first transmission equipment includes the installation space requirement of the first access network element, and the installation space requirement of the first access network element = the number of first access network elements * 1U; the installation space requirement of the first supporting equipment includes the installation space requirement of the first integrated cabinet and the installation space requirement of the first air conditioner. For example, the installation space of the first integrated cabinet can be 300mm*600mm*2500mm, and the installation space requirement of the first air conditioner can be 300mm*600mm*2500mm; the installation space requirement of the first supporting equipment includes the installation space requirement of the first row power cabinet. For example, the installation space requirement of the first row power cabinet can be 300mm*600mm*2500mm. Therefore, the space area requirement scale of the first computer room can be calculated by the first equipment installation space requirement, wherein the space area requirement scale of the first computer room=the first equipment installation space requirement / 80%.
[0055] Step S2, based on the comparison result of the first machine room scale and the first available machine room scale, determine the ownership information of each base station network element in the first network element group, wherein the first available machine room scale is the available scale of the aggregation machine room to which the aggregation network element corresponding to the first network element group belongs.
[0056] Optionally, for each first network element group, if the scale of the first computer room is smaller than the scale of the first available computer room, all base station network elements in the first network element group are assigned to the aggregation computer room to which the aggregation network elements corresponding to the first network element group belong, and the first number of base station network elements that can be deployed with the remaining available scale of the aggregation computer room is calculated, wherein the remaining available scale can be used to deploy base station network elements with to-be-determined affiliation information in other first network element groups and / or base station network elements in the second network element group; if the scale of the first computer room is larger than the scale of the first available computer room, the second number of base station network elements in the first network element group corresponding to the scale of the first available computer room are assigned to the aggregation computer room, and the third number of base station network elements with to-be-determined affiliation information in the first network element group is calculated, the third number of base station network elements are assigned to other aggregation computer rooms with remaining available scale, and / or the third number of base station network elements are divided into the second network element group.
[0057] Specifically, in the embodiment of the present application, if the scale of the first computer room is smaller than the first network element group (N1, N2...N i ) in the aggregation room to which the aggregation network elements belong, the first network element group (N1, N2…N i ) belongs to the aggregation room to which the aggregation network elements corresponding to the first network element group belong, and a first required number of centralized baseband distribution units and access network elements are newly built in the aggregation room, where the first required number is to meet the requirements of the first network element group (N1, N2…N i ) The radio frequency unit access requirements corresponding to all base station network elements in the aggregation room are calculated. At the same time, the number of access network elements that can be deployed in the remaining available scale of the aggregation room is calculated, and the first number of base station network elements are assigned to the aggregation room. The first number of base station network elements will centrally deploy the access network elements in the aggregation room, that is, the access network elements are networked in a large centralized manner.
[0058] Among them, the first number=the number of access network elements*the typical number of ports of the access network element / the port access requirement of a single centralized baseband unit. Optionally, the typical number of ports configured for the access network element may be 10, and the port access requirement of a single centralized baseband unit is usually 2.
[0059] Optionally, the first number of base station network elements may be base station network elements in other first network element groups whose belonging information is to be determined and / or base station network elements in the second network element group, or may be base station network elements with the smallest sum of distances or average distance to the aggregation network element.
[0060] If the scale of the first computer room is larger than the first network element group (N1, N2…N i ) in the aggregation room to which the aggregation network elements belong, and the first network element group (N1, N2…N i ) and the second number of base station network elements corresponding to the first available machine room scale are assigned to the aggregation machine room, and the first network element group (N1, N2…N i) in which the third number of base station network elements whose belonging information is to be determined, the third number of base station network elements are attributed to other aggregation rooms with remaining available scale, and / or the third number of base station network elements are divided into the second network element group.
[0061] The second number = the number of base station network elements corresponding to the aggregation network element - the number of base station network elements that can be deployed in the first available computer room scale.
[0062] Optionally, the second number of base station network elements may be the sum of the base station network elements whose belonging information is to be determined in other first network element groups, or may be the base station network elements with the smallest sum of distances to the aggregation network element or the smallest average distance.
[0063] It should be noted that the radio frequency unit and baseband unit corresponding to the base station network element are deployed in a remote manner, that is, the first network element group (N1, N2...N i-1 ) is networked in a centralized wireless access network mode.
[0064] Step S3: updating each second network element group according to the ownership information of each base station network element in each first network element group, and determining the ownership information of each base station network element in each updated second network element group.
[0065] Optionally, for each second network element group, if there are base station network elements in the second network element group that have been assigned to the aggregation room, the base station network elements that have been assigned to the aggregation room will be moved out of the second network element group; if there are base station network elements in the newly divided first network element group in the second network element group, the base station network elements in the newly divided first network element group will be added to the second network element group.
[0066] For example, if the second network element group (N i+1 ,N i+2 …N n ) contains base station network elements N that have been assigned to the aggregation room. i+1 , then the base station network element N i+1 Remove the second network element group to obtain an updated second network element group (N i+2 ,N i+3 …N n ); if the second network element group (N i+1 ,N i+2 …N n ) contains a base station network element N in the newly divided first network element group i , get the updated second network element group (N i ,N i+1 ,N i+2 …N n ).
[0067] Optionally, the ownership information of each base station network element in each updated second network element group may be determined through steps S31 to S34:
[0068] Step S31, for each updated second network element group, calculate the second computer room scale required for all base station network elements in the second network element group and the access network elements corresponding to all base station network elements, wherein the second computer room scale includes at least one of the following: the second external power supply scale, the second computer room space area scale.
[0069] Optionally, the total power consumption requirement of the second equipment = the power consumption requirement of the second transmission equipment + the power consumption requirement of the second supporting equipment. The scale of the second external power demand can be calculated based on the total power consumption requirement of the second equipment, where the scale of the second external power demand = the total power consumption requirement of the equipment / 90%; the installed space requirement of the second equipment = the installed space requirement of the second transmission equipment + the installed space requirement of the second supporting equipment + the installed space requirement of the second power supply equipment. The scale of the space area requirement of the second computer room can be calculated based on the installed space requirement of the second equipment, where the scale of the space area requirement of the second computer room = the installed space requirement of the second equipment / 80%.
[0070] Calculate the second network element group (N i+1 ,N i+2 …N n ), and determining the required scale of the second access network element according to the ratio of the fourth number and the number of typical configuration ports of the access network element, wherein the number of typical configuration ports of the access network element may be 10;
[0071] According to the second network element group (N i+1 ,N i+2 …N n ) in the optical fiber connection relationship between all base station network elements and access network elements and aggregation network elements, calculate the sum of the fifth demand of the wiring optical cable termination demand, the access optical cable termination demand and the fiber core termination demand, and determine the optical fiber distribution frame port demand; according to the ratio of the optical fiber distribution frame port demand to the number of ports typically configured in the optical fiber distribution frame, determine the second optical fiber distribution frame demand scale, wherein the number of ports typically configured in the optical fiber distribution frame can be 576;
[0072] According to the construction scale of the second access network element, the demand scale of the second integrated cabinet is determined;
[0073] Calculate the cooling capacity requirement of the second air conditioner, where the cooling capacity requirement of the second air conditioner = the power consumption requirement of the second access network element; calculate the construction scale of the second air conditioner, where the construction scale of the second air conditioner = the cooling capacity requirement of the second air conditioner / (cooling capacity of each air conditioner*air conditioner load capacity ratio).
[0074] Based on the above process, the equipment demand information can be obtained and the demand scale of the second computer room can be calculated.
[0075] Specifically, the total power consumption requirement of the second device = the power consumption requirement of the second transmission device + the power consumption requirement of the second supporting device, where the power consumption requirement of the second transmission device includes the power consumption requirement of the second access network element, and the power consumption requirement of the second access network element = the number of second access network elements * 500W; the power consumption requirement of the second supporting device includes the power consumption requirement of the second integrated cabinet and the power consumption requirement of the second air conditioner. Therefore, the second external power demand scale can be calculated by the total power consumption requirement of the second device, where the second external power demand scale = the total power consumption requirement of the second device / 90%.
[0076] Specifically, the second equipment installation space requirement = the second transmission equipment installation space requirement + the second supporting equipment installation space requirement + the second power supply equipment installation space requirement, wherein the second transmission equipment installation space requirement includes the second access network element installation space requirement, and the second access network element installation space requirement = the number of first access network elements * 1U; the second supporting equipment installation space requirement includes the second comprehensive cabinet installation space requirement and the second air conditioner installation space requirement, for example, the second comprehensive cabinet installation space can be 300mm*600mm*2500mm, and the second air conditioner installation space requirement can be 300mm*600mm*2500mm. Therefore, the second equipment room space area requirement can be calculated by the second equipment installation space requirement, wherein the second equipment room space area requirement = the second equipment installation space requirement / 80%.
[0077] Step S32, traverse each base station network element in the second network element group, take each base station network element as a concentration point in turn, determine the sum of the distances between the base station network element and other base station network elements in the second network element group based on the minimum distance method, and determine the sorting information of the sum of the distances.
[0078] Specifically, in the embodiment of the present application, for the second network element group (N i+1 ,N i+2 …N n ) in each base station network element, in turn with N i+1 , N i+2 …N n As the central point, the sum of the distances between the base station network element and other base station network elements in the second network element group is determined based on the minimum distance method, and the sorting information of the sum of the distances is determined. i+1 When it is the concentration point, calculate N i+1 To N i+2 …N n The sum of the distances G i+1 ; Take base station network element N i+2 When it is the concentration point, calculate N i+2 To N i+1 , N i+3 …N n The sum of the distances G i+2, repeat the above process to obtain a set of distance sums (G i+1 ,G i+2 …G n ), and (G i+1 ,G i+2 …G n ) Sort from small to large to get the first shortest path, the second shortest path and other sorting information.
[0079] Step S33: determining a target base station network element from all base station network elements of the second network element group according to the sorting information, wherein the scale of a second available machine room of the base station machine room where the target base station network element is located is not less than the scale of the second machine room.
[0080] Specifically, the equipment room to which the centralized point base station network element belongs is used as the base station equipment room where the access network element is centrally deployed, and the second available equipment room scale of the base station equipment room where the base station network element is located is compared with the second equipment room demand scale to determine the second network element group (N i+1 ,N i+2 …N n )The ownership information of all base station network elements in ).
[0081] For example, if the size of the second available computer room of the base station computer room where the first shortest path concentration point base station network element is located is larger than the required size of the second computer room, the second network element group (N i+1 ,N i+2 …N n ) belongs to the base station room, and a second required number of access network elements are newly built in the base station room, where the second required number is to meet the second network element group (N i+1 ,N i+2 …N n ) The number of centralized baseband distribution unit port access requirements of all base station network elements;
[0082] If the scale of the second available computer room of the base station computer room where the concentrated point base station network element of the first shortest path is located is smaller than the required scale of the second computer room, then the scale of the second available computer room of the base station computer room where the concentrated point base station network element of the second shortest path is located is compared with the required scale of the second computer room, and this iteration is repeated until a base station computer room that meets the required scale of the second computer room is found, and the final ownership of all base station network elements in the second network element group is determined.
[0083] Step S34: assign all base station network elements in the second network element group to the base station room where the target base station network element is located.
[0084] Specifically, the base station room determined in step S33 is used as the second network element group (N i+1 ,N i+2 …N n) is a room where the access network elements of all base station network elements are centrally deployed. The baseband units of the base station network elements are deployed remotely, that is, the second network element group (N i+1 ,N i+2 …N n ) is networked in a small centralized access network element mode.
[0085] Step S106: determine the networking structure of each target network element based on the belonging information.
[0086] Optionally, based on the affiliation information of each base station network element in the first network element group and the affiliation information of each base station network element in the second network element group, the networking structure of each base station network element in the target area is determined, wherein the networking structure at least includes: the radio frequency unit and baseband unit corresponding to the base station network element are deployed remotely.
[0087] As an optional implementation method, if all the base station network elements in the target area meet the requirements of the first network element group, the networking is performed in a manner of centralized deployment of centralized baseband distribution units and access network elements; if all the base station network elements in the target area meet the requirements of the second network element group, the networking is performed in a manner of centralized deployment of access network elements; if the target area has both network elements that meet the requirements of the first network element group and network elements that meet the requirements of the second network element group, a hybrid networking structure is formed.
[0088] In an embodiment of the present application, the network element information of the target network element in the target area, the optical fiber connection information between the target network elements, and the computer room information are obtained; the ownership information of each target network element is determined based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; and the networking structure of each target network element is determined based on the ownership information. Among them, the network elements are automatically planned according to the optical fiber connection information between each network element; a reasonable estimation of the scale of the computer room demand is added, and an evaluation index for the computer room availability is established; the influencing factor of the number of radio frequency units corresponding to the base station is increased, so that the final networking structure is more feasible, reasonable and fully utilizes existing resources, improves the efficiency of network transformation, and effectively solves the technical problems of low transformation efficiency and high construction cost for the distributed wireless access network to the centralized wireless access network in the related technology.
[0089] Example 2
[0090] According to an embodiment of the present application, a network planning device for implementing the above network planning method is also provided. Figure 2 As shown, the device at least includes an acquisition module 21, a first determination module 22 and a second determination module 23, wherein:
[0091] The acquisition module 21 is used to acquire network element information of target network elements in the target area, optical fiber connection information between target network elements, and computer room information.
[0092] The target network elements include at least: base station network elements, access network elements and aggregation network elements.
[0093] Before network planning is performed in the embodiment of the present application, it is necessary to first clarify the topological connection relationship between the base station network elements, access network elements, and aggregation network elements in the target area. In addition, it is also necessary to determine the physical optical path, parameter configuration, etc. between the network elements through the optical fiber connection information between the network elements. By connecting the wireless network management system, the transmission network management system, and the optical fiber resource management system, the relationship between the logical networking and the physical optical path can be intuitively displayed.
[0094] Specifically, the network element information of the target network elements in the target area, the optical fiber connection information between the target network elements, and the computer room information can be obtained in the following ways: obtaining the base station network element information through the wireless network management system, wherein the base station network element information at least includes: the location information of the base station network element, and the number of radio frequency units corresponding to the base station network element; obtaining the access network element information and the aggregation network element information through the transmission network management system, wherein the access network element information at least includes: the number of ports of the access network element, and the aggregation network element information at least includes: the location information and the number of ports of the aggregation network element; obtaining the optical fiber connection information through the optical fiber resource management system; obtaining the computer room information through the network operation and maintenance management system, wherein the computer room information includes at least one of the following: the available scale of the external power supply, and the available scale of the computer room space area.
[0095] The first determination module 22 is used to determine the ownership information of each target network element based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed.
[0096] As an optional implementation mode, each converged network element belongs to a corresponding converged computer room, and the belonging information of the base station network element and the access network element can be determined by the following method:
[0097] Based on the location information of the base station network element and the location information of the aggregation network element, the aggregation network element to which each base station network element belongs is determined using the minimum distance method, wherein each aggregation network element corresponds to a base station network element group; for each base station network element group, the base station network element group is divided into a first network element group and a second network element group according to the number of radio frequency units corresponding to each base station network element in the base station network element group, wherein the number of radio frequency units corresponding to the base station network elements in the first network element group is less than the number of radio frequency units corresponding to the base station network elements in the second network element group; the ownership information of each base station network element in the first network element group and the second network element group is determined; based on the ownership information of the base station network element, the ownership information of the access network element corresponding to the base station network element is determined.
[0098] Optionally, the aggregation network element includes two nodes. For each base station network element, the sum of the distances from the base station network element to the two nodes of each aggregation network element is calculated; and the aggregation network element corresponding to the minimum sum of distances is determined to be the aggregation network element to which the base station network element belongs.
[0099] Among them, the aggregation network element includes two nodes, which are usually aggregation devices deployed at the same site, and a few are deployed at different sites.
[0100] Optionally, for each base station network element in the base station network element group, if the number of radio frequency units corresponding to the base station network element is less than a preset threshold number, the base station network element is divided into a first network element group; if the number of radio frequency units corresponding to the base station network element is greater than a preset threshold number, the base station network element is divided into a second network element group.
[0101] As an optional implementation, if the scale of the computer room is not considered, the following method can be used to determine the ownership information of each base station network element in the first network element group and the second network element group: the base station network elements in the first network element group are attributed to the aggregation computer room to which the aggregation network elements belong; if an access computer room exists, the base station network elements in the second network element group are attributed to the access computer room; if the access computer room does not exist, the base station network elements in the second network element group are attributed to the base station computer room.
[0102] On the basis of the above implementation, a reasonable estimation of the scale of the demand for the computer room is added, and an evaluation index of the availability of the computer room is established. The embodiment of the present application proposes another optional implementation. Specifically, the ownership information of all base station network elements in the first network element group and the second network element group can be determined through steps S1 to S3, including:
[0103] Step S1, for each first network element group, calculate the first computer room scale required for all base station network elements in the first network element group and the access network elements corresponding to all base station network elements, wherein the first computer room scale includes at least one of the following: the first external power supply scale, the first computer room space area scale.
[0104] Optionally, the total power consumption requirement of the first device = the power consumption requirement of the first wireless device + the power consumption requirement of the first transmission device + the power consumption requirement of the first supporting equipment. The scale of the first external power demand can be calculated based on the total power consumption requirement of the first device, where the scale of the first external power demand = the total power consumption requirement of the first device / 90%; the installed space requirement of the first device = the installed space requirement of the first wireless device + the installed space requirement of the first transmission device + the installed space requirement of the first supporting equipment + the installed space requirement of the first power supply device. The scale of the space area requirement of the first computer room can be calculated based on the installed space requirement of the first equipment, where the scale of the space area requirement of the first computer room = the installed space requirement of the first equipment / 80%.
[0105] Step S2, based on the comparison result of the first machine room scale and the first available machine room scale, determine the ownership information of each base station network element in the first network element group, wherein the first available machine room scale is the available scale of the aggregation machine room to which the aggregation network element corresponding to the first network element group belongs.
[0106] Optionally, for each first network element group, if the scale of the first computer room is smaller than the scale of the first available computer room, all base station network elements in the first network element group are assigned to the aggregation computer room to which the aggregation network elements corresponding to the first network element group belong, and the first number of base station network elements that can be deployed with the remaining available scale of the aggregation computer room is calculated, wherein the remaining available scale can be used to deploy base station network elements with to-be-determined affiliation information in other first network element groups and / or base station network elements in the second network element group; if the scale of the first computer room is larger than the scale of the first available computer room, the second number of base station network elements in the first network element group corresponding to the scale of the first available computer room are assigned to the aggregation computer room, and the third number of base station network elements with to-be-determined affiliation information in the first network element group is calculated, the third number of base station network elements are assigned to other aggregation computer rooms with remaining available scale, and / or the third number of base station network elements are divided into the second network element group.
[0107] Step S3: updating each second network element group according to the ownership information of each base station network element in each first network element group, and determining the ownership information of each base station network element in each updated second network element group.
[0108] Optionally, for each second network element group, if there are base station network elements in the second network element group that have been assigned to the aggregation room, the base station network elements that have been assigned to the aggregation room will be moved out of the second network element group; if there are base station network elements in the newly divided first network element group in the second network element group, the base station network elements in the newly divided first network element group will be added to the second network element group.
[0109] Optionally, the ownership information of each base station network element in each updated second network element group may be determined through steps S31 to S34:
[0110] Step S31, for each updated second network element group, calculate the second computer room scale required for all base station network elements in the second network element group and the access network elements corresponding to all base station network elements, wherein the second computer room scale includes at least one of the following: the second external power supply scale, the second computer room space area scale.
[0111] Optionally, the total power consumption requirement of the second equipment = the power consumption requirement of the second transmission equipment + the power consumption requirement of the second supporting equipment. The scale of the second external power demand can be calculated based on the total power consumption requirement of the second equipment, where the scale of the second external power demand = the total power consumption requirement of the equipment / 90%; the installed space requirement of the second equipment = the installed space requirement of the second transmission equipment + the installed space requirement of the second supporting equipment + the installed space requirement of the second power supply equipment. The scale of the space area requirement of the second computer room can be calculated based on the installed space requirement of the second equipment, where the scale of the space area requirement of the second computer room = the installed space requirement of the second equipment / 80%.
[0112] Step S32, traverse each base station network element in the second network element group, take each base station network element as a concentration point in turn, determine the sum of the distances between the base station network element and other base station network elements in the second network element group based on the minimum distance method, and determine the sorting information of the sum of the distances.
[0113] Specifically, in the embodiment of the present application, for the second network element group (N i+1 ,N i+2 …N n ) in each base station network element, in turn with N i+1 , N i+2 …N n As the central point, the sum of the distances between the base station network element and other base station network elements in the second network element group is determined based on the minimum distance method, and the sorting information of the sum of the distances is determined. i+1 When it is the concentration point, calculate N i+1 To N i+2 …N n The sum of the distances G i+1 ; Take base station network element N i+2 When it is the concentration point, calculate N i+2 To N i+1 , N i+3 …N n The sum of the distances G i+2 , repeat the above process to obtain a set of distance sums (G i+1 ,G i+2 …G n ), and (G i+1 ,G i+2 …G n ) Sort from small to large to get the first shortest path, the second shortest path and other sorting information.
[0114] Step S33: determining a target base station network element from all base station network elements of the second network element group according to the sorting information, wherein the scale of a second available machine room of the base station machine room where the target base station network element is located is not less than the scale of the second machine room.
[0115] Specifically, the equipment room to which the centralized point base station network element belongs is used as the base station equipment room where the access network element is centrally deployed, and the second available equipment room scale of the base station equipment room where the base station network element is located is compared with the second equipment room demand scale to determine the second network element group (N i+1 ,N i+2 …N n )The ownership information of all base station network elements in ).
[0116] If the scale of the second available computer room of the base station computer room where the concentrated point base station network element of the first shortest path is located is smaller than the required scale of the second computer room, then the scale of the second available computer room of the base station computer room where the concentrated point base station network element of the second shortest path is located is compared with the required scale of the second computer room, and this iteration is repeated until a base station computer room that meets the required scale of the second computer room is found, and the final ownership of all base station network elements in the second network element group is determined.
[0117] Step S34: assign all base station network elements in the second network element group to the base station room where the target base station network element is located.
[0118] The second determining module 23 is used to determine the networking structure of each target network element based on the belonging information.
[0119] Optionally, based on the affiliation information of each base station network element in the first network element group and the affiliation information of each base station network element in the second network element group, the networking structure of each base station network element in the target area is determined, wherein the networking structure at least includes: the radio frequency unit and baseband unit corresponding to the base station network element are deployed remotely.
[0120] As an optional implementation method, if all the base station network elements in the target area meet the requirements of the first network element group, the networking is performed in a manner of centralized deployment of centralized baseband distribution units and access network elements; if all the base station network elements in the target area meet the requirements of the second network element group, the networking is performed in a manner of centralized deployment of access network elements; if the target area has both network elements that meet the requirements of the first network element group and network elements that meet the requirements of the second network element group, a hybrid networking structure is formed.
[0121] It should be noted that each module in the network planning device in the embodiment of the present application corresponds one-to-one to each implementation step of the network planning method in Example 1. Since a detailed description has been given in Example 1, some details not reflected in this embodiment can be referred to Example 1 and will not be repeated here.
[0122] Example 3
[0123] According to an embodiment of the present application, a non-volatile storage medium is also provided, which includes a stored program, wherein when the program is running, the device where the non-volatile storage medium is located is controlled to execute the network planning method in Example 1.
[0124] According to an embodiment of the present application, a processor is also provided, which is used to run a program, wherein the network planning method in Example 1 is executed when the program is running.
[0125] According to an embodiment of the present application, an electronic device is also provided, including: a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to execute the network planning method in Example 1 through the computer program.
[0126] Optionally, when the program is running, the device where the non-volatile storage medium is located is controlled to execute the following steps: obtaining network element information of target network elements in the target area, optical fiber connection information between target network elements, and computer room information; determining ownership information of each target network element based on the network element information, optical fiber connection information and computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; and determining the networking structure of each target network element based on the ownership information.
[0127] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0128] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0129] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0130] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed over multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0131] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0132] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of each embodiment method of the present application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk, etc. Various media that can store program codes.
[0133] The above are only preferred implementations of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A network planning method, characterized in that: include: Acquire network element information of target network elements in a target area, optical fiber connection information between the target network elements, and computer room information, wherein the target network elements at least include: base station network elements, access network elements, and aggregation network elements; Determine ownership information of each of the target network elements based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed; Determine a networking structure of each of the target network elements based on the belonging information; Wherein, based on the network element information, the optical fiber connection information and the computer room information, the ownership information of each target network element is determined, including: each aggregation network element belongs to the corresponding aggregation computer room; based on the location information of the base station network element and the location information of the aggregation network element, the aggregation network element to which each base station network element belongs is determined using the minimum distance method, wherein each aggregation network element corresponds to a base station network element group; for each base station network element group, according to the number of radio frequency units corresponding to each base station network element in the base station network element group, the base station network element group is divided into a first network element group and a second network element group, wherein the number of radio frequency units corresponding to the base station network elements in the first network element group is less than the number of radio frequency units corresponding to the base station network elements in the second network element group; the ownership information of each base station network element in the first network element group and the second network element group is determined; based on the ownership information of the base station network element, the ownership information of the access network element corresponding to the base station network element is determined.
2. The method according to claim 1, characterized in that Acquiring network element information of target network elements in a target area, optical fiber connection information between the target network elements, and computer room information, including: Acquire base station network element information through a wireless network management system, wherein the base station network element information at least includes: location information of the base station network element and the number of radio frequency units corresponding to the base station network element; Acquire access network element information and aggregation network element information through the transmission network management system, wherein the access network element information at least includes: the number of ports of the access network element, and the aggregation network element information at least includes: the location information and the number of ports of the aggregation network element; Obtaining the optical fiber connection information through an optical fiber resource management system; The computer room information is obtained through a network operation and maintenance management system, wherein the computer room information includes at least one of the following: available scale of an external power supply and available scale of a computer room space area.
3. The method according to claim 1, characterized in that: The aggregation network element includes two nodes, and based on the location information of the base station network element and the location information of the aggregation network element, the aggregation network element to which each base station network element belongs is determined by using a minimum distance method, including: For each of the base station network elements, calculating the sum of the distances from the base station network element to two nodes of each aggregation network element; It is determined that the aggregation network element corresponding to the sum of the minimum distances is the aggregation network element to which the base station network element belongs.
4. The method according to claim 1, characterized in that: According to the number of radio frequency units corresponding to each base station network element in the base station network element group, the base station network element group is divided into a first network element group and a second network element group, including: For each base station network element in the base station network element group, if the number of radio frequency units corresponding to the base station network element is less than a preset threshold number, the base station network element is divided into the first network element group; if the number of radio frequency units corresponding to the base station network element is greater than the preset threshold number, the base station network element is divided into the second network element group.
5. The method according to claim 1, characterized in that Determining the attribution information of each base station network element in the first network element group and the second network element group includes: Assigning the base station network elements in the first network element group to the aggregation room to which the aggregation network element belongs; If the access room exists, assigning the base station network elements in the second network element group to the access room; If the access room does not exist, the base station network elements in the second network element group are assigned to the base station room.
6. The method according to claim 1, characterized in that Determining the attribution information of each base station network element in the first network element group and the second network element group includes: For each of the first network element groups, calculating the first equipment room scale required for all base station network elements in the first network element group and the access network elements corresponding to all the base station network elements, wherein the first equipment room scale includes at least one of the following: a first external power supply scale, a first equipment room space area scale; Based on the comparison result of the first machine room scale and the first available machine room scale, determine the ownership information of each base station network element in the first network element group, wherein the first available machine room scale is the available scale of the aggregation machine room to which the aggregation network element corresponding to the first network element group belongs; Each of the second network element groups is updated according to the affiliation information of each base station network element in each of the first network element groups, and the affiliation information of each base station network element in each updated second network element group is determined.
7. The method according to claim 6, characterized in that Determining ownership information of each base station network element in the first network element group based on a comparison result of the first machine room scale and the first available machine room scale includes: For each of the first network element groups, if the scale of the first computer room is smaller than the scale of the first available computer room, all base station network elements in the first network element group are assigned to the aggregation computer room to which the aggregation network elements corresponding to the first network element group are assigned, and the first number of base station network elements that can be deployed by the remaining available scale of the aggregation computer room is calculated, wherein the remaining available scale can be used to deploy base station network elements whose affiliation information is to be determined in other first network element groups and / or base station network elements in the second network element group; If the scale of the first computer room is larger than the scale of the first available computer room, the second number of base station network elements in the first network element group corresponding to the scale of the first available computer room shall be assigned to the aggregation computer room, and the third number of base station network elements in the first network element group whose affiliation information is to be determined shall be calculated, and the third number of base station network elements shall be assigned to other aggregation computer rooms with remaining available scale, and / or the third number of base station network elements shall be divided into the second network element group.
8. The method according to claim 7, characterized in that Updating each of the second network element groups according to the ownership information of each base station network element in each of the first network element groups includes: For each of the second network element groups, if there is a base station network element that has been assigned to the convergence room in the second network element group, move the base station network element that has been assigned to the convergence room out of the second network element group; If the second network element group contains base station network elements in the newly divided first network element group, the base station network elements in the newly divided first network element group are added to the second network element group.
9. The method according to claim 8, characterized in that Determining the ownership information of each base station network element in each updated second network element group includes: For each updated second network element group, calculate the second computer room scale required for all base station network elements in the second network element group and the access network elements corresponding to all the base station network elements, wherein the second computer room scale includes at least one of the following: the scale of the second external power supply and the scale of the second computer room space area; Traversing each base station network element in the second network element group, taking each base station network element as a concentration point in turn, determining the sum of distances between the base station network element and other base station network elements in the second network element group based on a minimum distance method, and determining sorting information of the sum of distances; Determine a target base station network element from all base station network elements of the second network element group according to the sorting information, wherein the scale of a second available computer room of a base station computer room where the target base station network element is located is not less than the scale of the second computer room; All base station network elements in the second network element group are assigned to the base station room where the target base station network element is located.
10. The method according to claim 1, characterized in that Determining a networking structure of each of the target network elements based on the attribution information includes: Based on the affiliation information of each base station network element in the first network element group and the affiliation information of each base station network element in the second network element group, the networking structure of each base station network element in the target area is determined, wherein the networking structure at least includes: the radio frequency unit and baseband unit corresponding to the base station network element are deployed remotely.
11. A network planning device, characterized in that: include: An acquisition module, used to acquire network element information of target network elements in a target area, optical fiber connection information between the target network elements, and computer room information, wherein the target network elements at least include: base station network elements, access network elements, and aggregation network elements; A first determination module is used to determine the ownership information of each of the target network elements based on the network element information, the optical fiber connection information and the computer room information, wherein the ownership information is used to determine the computer room where the target network element is deployed, and the determination process of the ownership information includes: each aggregation network element belongs to the corresponding aggregation computer room; based on the location information of the base station network element and the location information of the aggregation network element, the aggregation network element to which each base station network element belongs is determined by using the minimum distance method, wherein each aggregation network element corresponds to a base station network element group; for each of the base station network element groups, the base station network element group is divided into a first network element group and a second network element group according to the number of radio frequency units corresponding to each base station network element in the base station network element group, wherein the number of radio frequency units corresponding to the base station network elements in the first network element group is less than the number of radio frequency units corresponding to the base station network elements in the second network element group; determine the ownership information of each base station network element in the first network element group and the second network element group; based on the ownership information of the base station network element, determine the ownership information of the access network element corresponding to the base station network element; The second determination module is used to determine the networking structure of each of the target network elements based on the belonging information.
12. An electronic device, characterized in that: include: A memory and a processor, wherein the memory stores a computer program, and the processor is configured to execute the network planning method according to any one of claims 1 to 10 through the computer program.
Citation Information
Patent Citations
Transmission access layer planning method and device based on distributed radio access network (DRAN)
CN113572624A
