Fault warning method, device, battery, vehicle and storage medium
By preprocessing and feature extraction of the original parameter data, combined with moving average and differential operations, the inaccuracy problem of existing fault detection methods due to missing data and external environment interference is solved, and the accuracy and versatility of fault early warning are improved. .
Patent Information
- Application Number
- CN202211427155.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-11-14
AI Technical Summary
Existing fault detection methods lead to inaccurate detection results and low versatility in the case of missing data and external environment interference.
By preprocessing the original parameter data, we eliminate outliers and missing data, extract fault assessment features under target operating conditions, determine the fault warning time based on the relationship between features and thresholds, and improve the accuracy of the warning time through moving average and differential operations. .
It improves the accuracy and reliability of fault warning, reduces false positives and false negatives caused by external environmental interference, and enhances the versatility of the method.
Smart Images

Figure CN115817178B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of fault detection, and specifically to a fault warning method, device, battery, vehicle and storage medium. Background Art
[0002] The current fault detection method is to collect multi-source fault growth data, describe the trend of characteristic points of the acquired data, select detection points that effectively track the fault growth process, and remove detection points with no trend or decreasing fault growth trend. This will lead to large system errors and inaccurate detection results. In addition, the above detection method is limited to working conditions where the data is collected accurately and has low versatility. Summary of the invention
[0003] In view of the above problems, the present application provides a fault warning method, which processes the original parameter data to obtain parameter data of the fault assessment characteristics under the target working conditions, and determines whether there is a fault in the target object based on the relationship between the fault assessment parameters and their corresponding fault thresholds, thereby avoiding the situation where the target object fault warning judgment is inaccurate due to the interference of the parameter data by the external environment.
[0004] In a first aspect, the present application provides a fault warning method, comprising: collecting original parameter data of a target object within a first time window, wherein the original parameter data includes operating parameters related to a fault assessment feature under at least one operating condition; determining parameter data of a fault assessment feature of the target object within a second time window based on the original parameter data of a warning risk range, wherein the fault assessment feature is determined based on a target operating condition, the warning risk range is at least one target object within a set range, the second time window is the same length as the first time window, and the amount of data within the first time window is greater than the amount of data within the second time window; determining the fault warning time of the target object under the target operating condition based on the parameter data of the fault assessment feature and a corresponding parameter fault threshold.
[0005] In the technical solution of the embodiment of the present application, data collection is performed on the operating parameters of the target object at the same time interval within the first time window, as the original parameter data, the original parameter data includes the operating parameters of the target object under different working conditions. Since the amount of data is relatively large, the data will be compressed, and the time before and after compression is the same, the difference is that the amount of data after compression is reduced. In addition, in order to avoid the data being disturbed by variables such as communication and external environment, which makes the data unstable and easy to be missing, thereby reducing the accuracy of fault warning, the original parameter data is first pre-processed, and the sampling time without data corresponding to a certain time period is eliminated, or the abnormal value in the parameter data is eliminated, and then the original parameter data within the warning risk range is obtained, for example, the operating data of the same batch of objects. Based on data statistics and other methods, the parameter data that best reflects the fault assessment characteristics of the target object under the target working condition is extracted from the original parameter data within the warning risk range. Then, according to the relationship between the fault assessment parameter and its corresponding fault threshold, it is determined whether the target object has a fault, so as to avoid the situation where the fault warning judgment of the target object is inaccurate due to the interference of the parameter data by the external environment. For example, the first time window includes the original parameter data from October 1st to October 31st. The target operating condition is high-speed driving, and the corresponding fault assessment feature is the battery insulation value. The battery insulation value of the high-speed driving condition is compressed every day, that is, feature extraction, and the parameter data related to the battery insulation value is extracted every day. The compressed time length is the same, that is, the second time window is still October 1st to October 31st. Thousands of frames of original data in each day from October 1st to October 31st are compressed into one frame of feature data, and the data of each day is analyzed. If the battery insulation feature of a certain day, such as October 12th, triggers the set battery insulation value feature threshold, it is preliminarily determined that the fault warning time is October 12th, and then further confirmed whether October 12th is a real fault according to the present invention.
[0006] In some embodiments, the second time window includes multiple identical time segments, and the fault warning time of the target object under the target operating condition is determined based on the parameter data of the fault assessment feature and the corresponding parameter fault threshold, including: obtaining the parameter data statistics of the fault assessment feature in each time segment in the second time window; and taking the time segment corresponding to when the parameter data statistics triggers the parameter fault threshold of the fault assessment feature as the fault warning time.
[0007] By reducing the dimension of the original data, removing abnormal data, etc., more accurate parameter data of the fault assessment feature can be obtained even when the data is affected by communication and the external environment and is unstable or easily missing. All parameter data of the fault assessment feature in the second time window are obtained, and the statistics of the parameter data in each time segment in the second time window are calculated. The corresponding time segment when the statistics of the parameter data trigger the parameter fault threshold corresponding to the fault assessment feature is found, and the time segment is considered to be the fault warning time. For example, still taking the second time window as October 1-October 31, if the statistics of the parameter data of the fault assessment on October 12 triggers the parameter fault threshold corresponding to the fault assessment feature, October 12 is considered to be the fault warning time.
[0008] In some embodiments, the above-mentioned fault warning method also includes: obtaining the parameter data change trend of the fault assessment feature within the second time window; when the parameter data change trend of the fault assessment feature is less than a first set threshold, determining that the fault warning time is valid.
[0009] In order to further improve the accuracy of the fault warning time, the fault warning time is also secondary judged. For example, by obtaining the parameter data change trend of the fault assessment feature within the second time window, whether the fault warning time is valid is determined according to the change trend. When the change trend can characterize that the fault is continuing to occur, it is considered that a fault has occurred in the target object, that is, the fault warning time is considered to be valid.
[0010] In some embodiments, obtaining the parameter data change trend of the fault assessment feature within the second time window includes: performing a sliding average operation and a differential operation on the parameter data of the fault assessment feature within the second time window to obtain the parameter data change trend.
[0011] That is to say, by performing sliding average processing on the parameter data of the fault assessment characteristics within the second time window, non-stationary data can be processed quickly and conveniently in real time, and by performing differential operations on the data after sliding average processing, the trend of parameter data changes can be well determined.
[0012] In some embodiments, performing sliding average operation and differential operation on the parameter data of the fault assessment feature in the second time window includes: performing sliding average operation on the parameter data of the fault assessment feature in the second time window according to the set window size to obtain a sliding average operation result; performing differential operation on the sliding average operation result to obtain a differential operation result; performing secondary sliding average operation on the differential operation result to obtain a secondary sliding average operation result; performing average operation on the secondary sliding average operation result to obtain the parameter data change trend. Thus, the parameter data change trend of the fault assessment feature can be accurately determined through sliding average operation and differential operation, thereby improving the accuracy of fault warning.
[0013] In some embodiments, the above-mentioned fault warning method also includes: obtaining the data frame length of the fault assessment feature for determining the fault warning time located in the original parameter data; when the data frame length is greater than a second set threshold, determining that the fault warning time is valid.
[0014] Not only can the fault warning time be re-determined based on the changing trend of the parameter data of the fault assessment feature, but also whether the fault warning time is valid can be determined based on the data frame length of the fault assessment feature in the original parameter data. For example, when the data frame length is only a few frames, it is considered that the fault assessment feature value is extracted based on a very small amount of data, so the credibility is low; when the data frame length is large, it is considered that the credibility is high, that is, the fault warning time is valid.
[0015] In some embodiments, obtaining the data frame length of the fault assessment feature for determining the fault warning time in the original parameter data includes: performing data backtracking on the parameter data of the fault assessment feature to determine the data frame length of the parameter data of the fault assessment feature within the first time window.
[0016] In some embodiments, the above-mentioned fault warning method also includes: obtaining a first characteristic statistic of parameter data of fault assessment characteristics within a third time window, wherein the third time window is contained in the second time window and is at the end of the second time window; obtaining a second characteristic statistic of parameter data of fault assessment characteristics within a preset time range in which the warning time is located, wherein the preset time range is the warning time and its adjacent previous preset time segments; obtaining a change between the first characteristic statistic and the second characteristic statistic; and when the change is less than a third set threshold, determining that the fault warning time is valid.
[0017] Not only can the fault warning time be secondary determined according to the change trend of the parameter data of the fault assessment feature, and / or, the fault warning time can be secondary determined according to the data frame length of the fault assessment feature in the original parameter data, but also the fault warning time can be determined whether it is valid by the difference between the statistical average value of the parameter data of the fault assessment feature in the end window of the second time window and the statistical average value of the parameter data of the fault assessment feature within the preset time range. For example, the fault warning time is October 12, the preset time range is October 10 to October 12, and the third time window is October 31. The fault warning time is determined whether it is valid according to the difference between the statistical average value of the parameter data of the fault assessment feature on October 31 and the statistical average value of the parameter data of the fault assessment feature within the preset time range. When the difference is larger, it is considered that the fault has been restored and the fault warning time is invalid. If the difference is smaller, it is considered that the fault still exists and the fault warning time is valid. Therefore, using the latest data (end time window data) will improve the accuracy of the warning judgment.
[0018] In some embodiments, after determining that the fault warning time is valid, the fault warning information including the fault warning time is output. That is, after determining that the fault warning time is valid, the fault warning information is also output so that corresponding processing measures can be taken according to the fault warning information.
[0019] In some embodiments, based on the original parameter data of the warning risk range, the parameter data of the fault assessment characteristics of the target object within the second time window is determined, including: compressing the original parameter data and eliminating abnormal values in the original parameter data; obtaining fault assessment characteristics under different working conditions based on the original parameter data after elimination, wherein the fault assessment characteristics include at least one; and obtaining the parameter data of the fault assessment characteristics in the original parameter data after elimination based on the fault assessment characteristics under the target working condition.
[0020] In some embodiments, when there are multiple fault assessment features, the method further includes: obtaining statistics of parameter data of each fault assessment feature; determining the fault warning time according to the statistics of each fault assessment feature and its corresponding weight coefficient and the set parameter fault threshold. When there are multiple fault assessment features under the target working condition, the fault warning time is determined according to the weight coefficient of each fault assessment feature, so that the fault warning time can be judged more accurately.
[0021] In a second aspect, the present application provides a fault warning device, comprising: a data acquisition module, used to collect original parameter data of a target object within a first time window, wherein the original parameter data includes operating parameters related to a fault assessment feature under at least one working condition; a data determination module, used to determine parameter data of a fault assessment feature of the target object within a second time window based on the original parameter data of a warning risk range, wherein the fault assessment feature is determined based on a target working condition, the warning risk range is at least one target object within a set range, the second time window is the same length as the first time window, and the amount of data in the first time window is greater than the amount of data in the second time window; a determination module, used to determine the fault warning time of the target object under the target working condition based on the parameter data of the fault assessment feature and a corresponding parameter fault threshold.
[0022] In the technical solution of the embodiment of the present application, data collection is performed on the operating parameters of the target object at the same time interval within the first time window, as the original parameter data, the original parameter data includes the operating parameters of the target object under different working conditions. Since the amount of data is relatively large, the data will be compressed, and the time before and after compression is the same, the difference is that the amount of data after compression is reduced. In addition, in order to avoid the data being disturbed by variables such as communication and external environment, which makes the data unstable and easy to be missing, thereby reducing the accuracy of fault warning, the original parameter data is first pre-processed, and the sampling time without data corresponding to a certain time period is eliminated, or the abnormal value in the parameter data is eliminated, and then the original parameter data within the warning risk range is obtained, for example, the operating data of the same batch of objects. Based on data statistics and other methods, the parameter data that best reflects the fault assessment characteristics of the target object under the target working condition is extracted from the original parameter data within the warning risk range. Then, according to the relationship between the fault assessment parameter and its corresponding fault threshold, it is determined whether the target object has a fault, so as to avoid the situation where the fault warning judgment of the target object is inaccurate due to the interference of the parameter data by the external environment. For example, the first time window includes the original parameter data from October 1st to October 31st. The target operating condition is high-speed driving, and the corresponding fault assessment feature is the battery insulation value. The battery insulation value of the high-speed driving condition is compressed every day, that is, feature extraction, and the parameter data related to the battery insulation value is extracted every day. The compressed time length is the same, that is, the second time window is still October 1st to October 31st. Thousands of frames of original data in each day from October 1st to October 31st are compressed into one frame of data, and the data of each day is analyzed. If the battery insulation feature of a certain day, such as October 12th, triggers the set battery insulation value feature threshold, it is preliminarily determined that the fault warning time is October 12th, and then further confirmed whether October 12th is a real fault according to the present invention.
[0023] In a third aspect, the present application provides a computer-readable storage medium having a fault warning program stored thereon, which, when executed by a processor, implements the fault warning method of the first aspect.
[0024] In a fourth aspect, the present application provides a battery, comprising a memory, a processor, and a fault warning program stored in the memory and executable on the processor, wherein when the processor executes the fault warning program, the fault warning method according to the first aspect is implemented.
[0025] In a fifth aspect, the present application provides a vehicle comprising a memory, a processor, and a fault warning program stored in the memory and executable on the processor, wherein when the processor executes the fault warning program, the fault warning method according to the first aspect is implemented.
[0026] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Moreover, the same reference numerals are used throughout the drawings to represent the same components. In the drawings:
[0028] Figure 1 A flowchart of a fault warning method according to some embodiments of the present application;
[0029] Figure 2 A flowchart of a fault warning method according to some embodiments of the present application;
[0030] Figure 3 A block diagram of a fault warning device according to some embodiments of the present application;
[0031] Figure 4 A schematic block diagram of a battery according to some embodiments of the present application;
[0032] Figure 5 A block diagram of a vehicle according to some embodiments of the present application. DETAILED DESCRIPTION
[0033] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0034] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.
[0035] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.
[0036] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
[0037] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0038] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).
[0039] The current fault detection method is: multi-source fault growth data collection, pre-processing of raw data, determination of fault prediction time nodes, fault growth trend construction, fault growth trend information fusion, and fault growth trend prediction. By analyzing the fault growth trend characteristics described by different measuring points, it is possible to select measuring points that effectively track the fault growth process, reduce the impact of measuring point data with insignificant trend characteristics and large random interference on the fault prediction results, and improve the accuracy of fault prediction; by analyzing the correlation of each fault growth trend, it is possible to remove the impact of redundant measuring points with similar trend characteristics on fault prediction efficiency and reduce prediction time; by fusing the fault growth trends described by multiple effective measuring points, it is possible to avoid the limitations of relying on trend information from a single measuring point and improve the accuracy of fault prediction.
[0040] However, the above method is not suitable for scenarios with large / serious data missing, and removing measurement points with no trend characteristics and decreasing fault growth trend will cause system errors. When the data is disturbed by variables such as communication and external environment, the data will be unstable and easy to be missing. If the above method is still used, the accuracy of fault warning will be reduced.
[0041] In order to solve the above problems, the applicant has found that the original parameter data can be preprocessed first, the sampling time with no data corresponding to a certain time period can be eliminated, or the abnormal values in the parameter data can be eliminated, and then the original parameter data within the warning risk range can be obtained, for example, the operating data of the objects in the same batch. Based on data statistics and other methods, the parameter data that best reflects the fault assessment characteristics of the target object in the second time window under the target working conditions is extracted from the original parameter data within the warning risk range. Then, based on the relationship between the fault assessment parameters and their corresponding fault thresholds, it is determined whether the target object has a fault, so as to avoid the situation where the fault warning judgment of the target object is inaccurate due to the interference of the parameter data by the external environment.
[0042] The fault warning method of the embodiment of the present application can be applied to a battery, and the battery can be a battery on a vehicle.
[0043] For the convenience of explanation, the following embodiments are combined Figure 1 The fault warning method of the present application is described.
[0044] like Figure 1 As shown, the fault warning method in this application may include the following steps:
[0045] S1, collecting original parameter data of a target object within a first time window, wherein the original parameter data includes operating parameters related to fault assessment characteristics under at least one working condition.
[0046] S2. Determine the parameter data of the fault assessment feature of the target object within the second time window based on the original parameter data of the warning risk range, wherein the fault assessment feature is determined based on the target operating condition, the warning risk range is at least one target object within the set range, the second time window has the same time length as the first time window, and the amount of data in the first time window is greater than the amount of data in the second time window.
[0047] S3, determining the fault warning time of the target object under the target working condition according to the parameter data of the fault assessment feature and the corresponding parameter fault threshold.
[0048] Specifically, data is collected for the operating parameters of the target object at the same time interval within the first time window as the original parameter data, which includes the operating parameters of the target object under different working conditions. Since the amount of data is relatively large, the data will be compressed. The time before and after compression is the same, and the difference is that the amount of data after compression is reduced. In addition, in order to avoid the data being disturbed by variables such as communication and external environment, which makes the data unstable and easy to be missing, thereby reducing the accuracy of fault warning, the original parameter data is first pre-processed, and the sampling time without data corresponding to a certain time period is eliminated, or the abnormal values in the parameter data are eliminated, and then the original parameter data within the warning risk range is obtained, for example, the operating data of the same batch of objects. Based on data statistics and other methods, the parameter data that best reflects the fault assessment characteristics of the target object in the second time window under the target working condition is extracted from the original parameter data within the warning risk range. Then, according to the relationship between the fault assessment parameter and its corresponding fault threshold, it is determined whether the target object has a fault, so as to avoid the situation where the fault warning judgment of the target object is inaccurate due to the interference of the parameter data by the external environment.
[0049] For example, the fault warning method is applied to the battery on the vehicle, and the original parameter data within the first time window (such as October 1st to October 31st) is collected. When the target working condition is high-speed driving and the corresponding fault assessment feature is the battery insulation value, the battery insulation value of the vehicle under high-speed driving conditions is compressed every day, and the parameter data related to the battery insulation value is extracted every day. The compressed time length is the same, that is, the second time window is still October 1st to October 31st. Thousands of frames of original data in each day from October 1st to October 31st are compressed into one frame of data, and the data of each day are analyzed. If the battery insulation feature of a certain day, such as October 12th, triggers the set battery insulation value feature threshold, the fault warning time is preliminarily determined to be October 12th, and October 12th is used as the second time window. For example, the average value of all battery insulation values under high-speed driving conditions on October 12th is obtained. When the average value is less than the set battery insulation threshold, it is determined that the battery is abnormal, and October 12th is considered to be the fault warning time. -It should be noted that when the parameter data statistics in multiple time segments trigger the parameter fault threshold of the fault assessment feature, the last time segment (close to the end of the second time window) is used as the fault warning time. For example, if it is determined that the parameter data on October 12, October 14, and October 15 all meet the fault conditions, October 15 will be used as the final fault warning time.
[0050] According to some embodiments of the present application, the second time window includes multiple identical time segments, and the fault warning time of the target object under the target operating conditions is determined based on the parameter data of the fault assessment feature and the corresponding parameter fault threshold, including: obtaining the parameter data statistics of the fault assessment feature in each time segment in the second time window; and using the time segment corresponding to the time when the parameter data statistics triggers the parameter fault threshold of the fault assessment feature as the fault warning time.
[0051] Specifically, by reducing the dimension of the original data and removing abnormal data, even if the data is unstable or easily missing due to the influence of communication and external environment, more accurate parameter data of the fault assessment feature can be obtained, all parameter data of the fault assessment feature in the second time window are obtained, and the statistics of all parameter data are obtained. When the statistics trigger the parameter fault threshold corresponding to the fault assessment feature, the time segment corresponding to the parameter data of the fault assessment feature is considered to be the fault warning time. The target working condition is high-speed driving, and the fault assessment feature is the insulation value under this working condition. The corresponding battery insulation values under all high-speed driving working conditions in each time segment in the second time window are obtained, and the average value of the battery insulation value in each time segment is obtained respectively. When the insulation average value is less than the preset current threshold, it is considered that the insulation data under the high-speed driving working condition in the time segment corresponding to the insulation average value is abnormal, which means that the time segment is the fault warning time.
[0052] According to some embodiments of the present application, the above-mentioned fault warning method further includes: obtaining a parameter data change trend of the fault assessment feature within a second time window; when the parameter data change trend of the fault assessment feature is less than a first set threshold, determining that the fault warning time is valid. The first set threshold can be calibrated according to actual conditions, and the corresponding first set threshold can be determined specifically according to the fault assessment feature.
[0053] Specifically, in order to further improve the accuracy of the fault warning time, the fault warning time is also secondary judged. For example, by obtaining the parameter data change trend of the fault assessment feature within the second time window, whether the fault warning time is valid is determined according to the change trend. When the change trend can characterize that the fault is continuing to occur, it is considered that a fault has occurred in the target object, that is, the fault warning time is considered to be valid.
[0054] According to some embodiments of the present application, obtaining a parameter data variation trend of a fault assessment feature within a second time window includes: performing a sliding average operation and a differential operation on the parameter data of the fault assessment feature within the second time window to obtain the parameter data variation trend.
[0055] By performing sliding average processing on the parameter data of the fault assessment characteristics within the second time window, non-stationary data can be processed quickly and conveniently in real time, and by performing differential operations on the data after sliding average processing, the changing trend of the parameter data can be well determined.
[0056] According to some embodiments of the present application, sliding average operation and differential operation are performed on the parameter data of the fault assessment feature within the second time window, including: performing a sliding average operation on the parameter data of the fault assessment feature within the second time window according to a set window size to obtain a sliding average operation result; performing a differential operation on the sliding average operation result to obtain a differential operation result; performing a secondary sliding average operation on the differential operation result to obtain a secondary sliding average operation result; and performing an averaging operation on the secondary sliding average operation result to obtain a parameter data change trend.
[0057] Specifically, within a period of time, the parameter data of the fault assessment feature is subjected to a sliding average operation based on the second time window according to the set window size to obtain multiple sliding average values, and then the multiple sliding average values are subjected to a differential operation to obtain multiple differential values, and then the multiple differential values are subjected to a sliding average operation to obtain multiple sliding average values, and finally the multiple sliding average values are averaged, and the change trend of the parameter data is determined according to the average value. For example, taking the battery insulation fault warning as an example, when the average value obtained is the insulation value, an abnormally small insulation value is a direct manifestation of the insulation fault. When quantifying the change trend, the smaller the insulation value, the more obvious the downward trend. If the insulation value is a negative number, it means that there is a risk of failure in the battery insulation, and the fault warning time is determined to be effective.
[0058] For example, still taking the second time window of October 1 to October 31 as an example, a sliding average is performed according to four days (the set window size), that is, the average value of the parameter data of the fault assessment characteristics from October 1 to October 4 is obtained, the average value of the parameter data of the fault assessment characteristics from October 2 to October 5 is obtained, ..., the average value of the parameter data of the fault average characteristics from October 27 to October 31, and the average value of the parameter data of the fault average characteristics can be obtained. Then, the average value of the parameter data of the 27 groups of fault average characteristics is differentially calculated to obtain 27 groups of differential data. Then, the 27 groups of differential calculation results are slidingly averaged again, and the window size is still four days, so 24 groups of results can be obtained. The average value of the 24 groups of results is calculated to obtain the final average value. The parameter change trend can be determined according to the size of the average value. For example, the fault assessment parameter is the battery insulation value. The smaller the final average value (insulation value) is, the more obvious the downward trend is. If the insulation value is negative, it means that there is a risk of failure in the battery insulation.
[0059] The length of the second time window depends on the prediction cycle. For example, if the business scenario requires the output of a risk list every 30 days, the length of the second time window is 30 days. The sliding window size of the second time window depends on the data quality. If the parameter data is seriously missing, the sliding window of the second time window can be appropriately reduced, for example, 2 to 3 times the feature extraction cycle; if the data is complete and coherent, the sliding window of the second time window can be appropriately increased. Therefore, the parameter data change trend of the fault assessment feature can be accurately determined through the sliding average operation and the differential operation, thereby improving the accuracy of the fault warning.
[0060] It should be noted that, in some embodiments of the present application, the average value of the result of a sliding average operation can be directly taken, and the trend of parameter data changes can be determined based on the average value.
[0061] According to some embodiments of the present application, the above-mentioned fault warning method also includes: obtaining the data frame length of the fault assessment feature for determining the fault warning time located in the original parameter data; when the data frame length is greater than a second set threshold, determining that the fault warning time is valid.
[0062] Not only can the fault warning time be re-determined based on the changing trend of the parameter data of the fault assessment feature, but also whether the fault warning time is valid can be determined based on the data frame length of the fault assessment feature in the original parameter data. For example, when the data frame length is only a few frames, it is considered that the fault assessment feature value is extracted based on a very small amount of data, so the credibility is low; when the data frame length is large, it is considered that the credibility is high, that is, the fault warning time is valid.
[0063] According to some embodiments of the present application, obtaining the data frame length of the fault assessment feature for determining the fault warning time in the original parameter data includes: performing data backtracking on the parameter data of the fault assessment feature to determine the data frame length of the parameter data of the fault assessment feature within the first time window.
[0064] Specifically, not only can the fault warning time be re-determined based on the parameter data change trend of the fault assessment feature, but also the validity of the fault warning time can be determined based on the data frame length of the fault assessment feature in the original parameter data. For example, when the data frame length is only a few frames, it is considered that the fault assessment feature value is extracted based on a very small amount of data, so the credibility is low; when the data frame length is large, it is considered that the credibility is high, that is, the fault warning time is valid. For example, when the current working condition is high-speed driving, high-speed driving for half an hour, 2 frames / min, and 60 frames of data are abnormal, corresponding to the above data length; if there is only one frame alarm, it is a false alarm.
[0065] It should be noted that the fault warning time can also be considered valid when both of the above two conditions (the parameter data change trend of the fault assessment feature meets the fault condition, and the data frame length of the fault assessment feature in the original parameter data meets the fault condition) are met.
[0066] According to some embodiments of the present application, the above-mentioned fault warning method also includes: obtaining a first characteristic statistic of parameter data of fault assessment characteristics within a third time window, wherein the third time window is contained in the second time window and is at the end of the second time window; obtaining a second characteristic statistic of parameter data of fault assessment characteristics within a preset time range in which the warning time is located, wherein the preset time range is the warning time and its adjacent previous preset time segments; obtaining a change between the first characteristic statistic and the second characteristic statistic; when the change is less than a third set threshold value, determining that the fault warning time is valid.
[0067] Specifically, not only can the fault warning time be secondary determined according to the change trend of the parameter data of the fault assessment feature, and / or, the fault warning time can be secondary determined according to the data frame length of the fault assessment feature in the original parameter data, but also the fault warning time can be determined whether it is valid by the difference between the average value of the statistics of the parameter data of the fault assessment feature in the end window of the second time window and the average value of the statistics of the parameter data of the fault assessment feature within the preset time range. For example, the fault warning time is October 12, the preset time range is October 10 to October 12, and the third time window is October 31. The fault warning time is determined whether it is valid according to the difference between the average value of the statistics of the parameter data of the fault assessment feature on October 31 and the average value of the statistics of the parameter data of the fault assessment feature within the preset time range. When the difference is larger, it is considered that the fault has been restored and the fault warning time is invalid. If the difference is smaller, it is considered that the fault still exists and the fault warning time is valid. Therefore, using the latest data (end time window data) will improve the accuracy of the warning judgment.
[0068] For example, taking the battery insulation fault warning as an example, the battery insulation fault may be caused by the failure of the seal to enter the water vapor. When the external environment returns to a warm and dry state, the water vapor evaporates and the fault is automatically resolved. Therefore, the warning of the fault warning time may be a false warning, and the change is used to observe whether the fault has been restored. For example, when the change is a large positive number, it means that the fault has been restored, and the fault warning time is not the real warning point.
[0069] It should be noted that the fault warning time can be considered valid under the above two conditions if at least one of the above three conditions (the parameter data change trend of the fault assessment feature meets the fault condition, the data frame length of the fault assessment feature in the original parameter data meets the fault condition, and the change between the first feature statistic and the second feature statistic meets the fault condition) is met, or if all three conditions are met.
[0070] According to some embodiments of the present application, after determining that the fault warning time is valid, fault warning information including the fault warning time is output. That is, after determining that the fault warning time is valid, the fault warning information is also output so that corresponding processing measures can be taken according to the fault warning information.
[0071] According to some embodiments of the present application, parameter data of fault assessment characteristics of a target object within a second time window are determined based on original parameter data of a warning risk range, including: compressing the original parameter data and eliminating abnormal values in the original parameter data; obtaining fault assessment characteristics under different working conditions based on the eliminated original parameter data, wherein the fault assessment characteristics include at least one; and obtaining parameter data of the fault assessment characteristics in the eliminated original parameter data based on the fault assessment characteristics under the target working condition.
[0072] Specifically, the original data is preprocessed. For example, if there is no sampling data within a sampling time point, missing value processing is required. For another example, if the sampling data does not meet the requirements, outlier processing is required. The main reason for the need for missing value processing is that no data is returned due to communication failure. Then the fault assessment features under different working conditions are obtained. For example, the working conditions include: working condition A, working condition B and working condition C, and then the fault assessment features under each working condition are determined. For example, the fault assessment feature corresponding to working condition A is a, the fault assessment feature corresponding to working condition B is b, and the fault assessment feature corresponding to working condition C is c. Then, according to the target working condition being B, the corresponding fault assessment feature is b, and the parameter data of the preprocessed fault assessment feature b is obtained.
[0073] It should be noted that in some embodiments of the present application, the corresponding fault assessment features under different working conditions can be obtained based on a large amount of test data, or the existing optimization algorithm can be used to compare the results of different fault assessment features under the same working condition to determine the appropriate fault assessment features under the working condition.
[0074] According to some embodiments of the present application, when there are multiple fault assessment features, the method also includes: obtaining statistics of parameter data of each fault assessment feature; determining the fault warning time based on the statistics of each fault assessment feature and its corresponding weight coefficient and the set parameter fault threshold.
[0075] Specifically, when a working condition corresponds to multiple fault assessment features, for example, the fault assessment features corresponding to working condition A are a1 and a2, the weight coefficients of the fault assessment features a1 and a2 are obtained, the statistic b1 of the parameter data of the fault assessment feature a1 is obtained, and the statistic b2 of the parameter data of the fault assessment feature a2 is obtained, and the statistic of the sum of a1*b1 and a1*b2 is compared with the set parameter fault threshold, and when the statistic triggers the set parameter fault threshold, the second time window is determined as the fault warning time. When there are multiple fault assessment features under the target working condition, the fault warning time is determined according to the weight coefficient of each fault assessment feature, so that the fault warning time can be judged more accurately.
[0076] In summary, in the technical solution of the embodiment of the present application, data is collected for the operating parameters of the target object at the same time interval within the first time window, as the original parameter data, the original parameter data includes the operating parameters of the target object under different working conditions. Since the amount of data is relatively large, the data will be compressed, and the time before and after compression is the same, the difference is that the amount of data after compression is reduced. In addition, in order to avoid the data being disturbed by variables such as communication and external environment, which makes the data unstable and easy to be missing, thereby reducing the accuracy of fault warning, the original parameter data is first pre-processed, and the sampling time corresponding to no data in a certain time period is eliminated, or the abnormal values in the parameter data are eliminated, and then the original parameter data within the warning risk range is obtained, for example, the operating data of the same batch of objects. Based on data statistics and other methods, the parameter data that best reflects the fault assessment characteristics of the target object under the target working condition is extracted from the original parameter data within the warning risk range. Then, according to the relationship between the fault assessment parameter and its corresponding fault threshold, it is determined whether the target object has a fault, so as to avoid the situation where the fault warning judgment of the target object is inaccurate due to the interference of the parameter data by the external environment.
[0077] As a specific example of this application, Figure 2 As shown, the fault warning method of the present application includes the following steps:
[0078] S101, obtaining original parameter data of a target object.
[0079] S102, preprocessing the original data, wherein the preprocessing includes data compression, missing value processing, abnormal value processing, etc.
[0080] S103, performing feature extraction on the preprocessed data according to the target object and the warning risk range to obtain parameter data of the fault assessment feature of the target object.
[0081] S104, when the parameter data statistics of the fault assessment feature trigger the corresponding parameter fault threshold, the time segment is used as the fault warning time, and then steps S105, S107 and S109 are respectively executed.
[0082] S105 , obtaining a change trend of parameter data of the fault assessment feature as indicator 1 .
[0083] S106, when the parameter data change trend of the fault assessment feature is less than the first set threshold, determine that the fault warning time is valid, and execute step S111.
[0084] S107 , obtaining the data frame length of the fault assessment feature for determining the fault warning time in the original parameter data as indicator 2.
[0085] S108, when the data frame length is greater than the second set threshold, determine that the fault warning time is valid, and execute step S111.
[0086] S109, respectively obtaining characteristic statistical changes of parameter data of fault assessment characteristics near the quantitative observation point and near the fault warning time as index 3. The near the quantitative observation point refers to the end time period of collecting original data.
[0087] S110, when the change amount is less than a third set threshold, determining that the fault warning time is valid.
[0088] S111, when it is determined that the fault warning time is valid, outputting fault warning information including the fault warning time.
[0089] It should be noted that Figure 3 The dotted lines in the figure indicate that the indicator 1, the indicator 2 and the indicator 3 can be used to determine whether the fault warning time is effective alone, or the indicator 1 and the indicator 2 can be used in combination to determine whether the fault warning time is effective, or the indicator 2 and the indicator 3 can be used in combination to determine whether the fault warning time is effective, or the indicator 1, the indicator 2 and the indicator 3 can be used in combination to determine whether the fault warning time is effective. The above embodiment is only a specific example and cannot be a limitation to the present application.
[0090] Corresponding to the above embodiment, the present application also proposes a fault warning device.
[0091] like Figure 3 As shown, the fault warning device 100 of the present application may include: a data acquisition module 110 , a data determination module 120 and a determination module 130 .
[0092] Among them, the data acquisition module 110 is used to collect the original parameter data of the target object in the first time window, wherein the original parameter data includes the operating parameters related to the fault assessment characteristics under at least one working condition. The data determination module 120 is used to determine the parameter data of the fault assessment characteristics of the target object in the second time window according to the original parameter data of the warning risk range, wherein the fault assessment characteristics are determined based on the target working condition, the warning risk range is at least one target object within the set range, the second time window has the same time length as the first time window, and the amount of data in the first time window is greater than the amount of data in the second time window. The determination module 130 is used to determine the fault warning time of the target object under the target working condition according to the parameter data of the fault assessment characteristics and the corresponding parameter fault threshold.
[0093] According to some embodiments of the present application, the second time window includes multiple identical time segments, and the determination module 130 determines the fault warning time of the target object under the target operating conditions based on the parameter data of the fault assessment feature and the corresponding parameter fault threshold, and is specifically used to: obtain the parameter data statistics of the fault assessment feature in each time segment in the second time window; and use the time segment corresponding to the time when the parameter data statistics trigger the parameter fault threshold of the fault assessment feature as the fault warning time.
[0094] According to some embodiments of the present application, the determination module 130 is also used to: obtain the parameter data change trend of the fault assessment feature within the second time window; when the parameter data change trend of the fault assessment feature is less than the first set threshold, determine that the fault warning time is valid.
[0095] According to some embodiments of the present application, the determination module 130 obtains the parameter data change trend of the fault assessment feature within the second time window, and is specifically used to: perform sliding average operation and differential operation on the parameter data of the fault assessment feature within the second time window to obtain the parameter data change trend.
[0096] According to some embodiments of the present application, the determination module 130 performs sliding average operation and differential operation on the parameter data of the fault assessment feature within the second time window, and is specifically used for: performing a sliding average operation on the parameter data of the fault assessment feature within the second time window according to a set window size to obtain a sliding average operation result; performing a differential operation on the sliding average operation result to obtain a differential operation result; performing a secondary sliding average operation on the differential operation result to obtain a secondary sliding average operation result; and performing an averaging operation on the secondary sliding average operation result to obtain a parameter data change trend.
[0097] According to some embodiments of the present application, the determination module 130 is further used to: obtain the data frame length of the fault assessment feature for determining the fault warning time in the original parameter data; when the data frame length is greater than a second set threshold, determine that the fault warning time is valid.
[0098] According to some embodiments of the present application, the determination module 130 obtains the data frame length of the fault assessment feature for determining the fault warning time in the original parameter data, and is specifically used to: perform data backtracking on the parameter data of the fault assessment feature to determine the data frame length of the parameter data of the fault assessment feature within the first time window.
[0099] According to some embodiments of the present application, the determination module 130 is also used to: obtain a first characteristic statistic of parameter data of a fault assessment feature within a third time window, wherein the third time window is contained in the second time window and is at the end of the second time window; obtain a second characteristic statistic of parameter data of a fault assessment feature within a preset time range in which the warning time is located, wherein the preset time range is the warning time and its adjacent previous preset time segments; obtain a change between the first characteristic statistic and the second characteristic statistic; and when the change is less than a third set threshold, determine that the fault warning time is valid.
[0100] According to some embodiments of the present application, the determination module 130 is further configured to, after determining that the fault warning time is valid, output fault warning information including the fault warning time.
[0101] According to some embodiments of the present application, the data determination module 120 determines the parameter data of the fault assessment characteristics of the target object within the second time window based on the original parameter data of the warning risk range, and is specifically used for: compressing the original parameter data and eliminating abnormal values in the original parameter data; obtaining fault assessment characteristics under different working conditions based on the eliminated original parameter data, wherein the fault assessment characteristics include at least one; obtaining the parameter data of the fault assessment characteristics in the eliminated original parameter data based on the fault assessment characteristics under the target working condition.
[0102] According to some embodiments of the present application, the determination module 130 is also used to obtain the statistics of the parameter data of each fault assessment feature when there are multiple fault assessment features; and determine the fault warning time according to the statistics of each fault assessment feature and its corresponding weight coefficient and the set parameter fault threshold.
[0103] It should be noted that for details not disclosed in the fault warning device of the embodiment of the present application, please refer to the details disclosed in the fault warning method of the embodiment of the present application, and the details will not be repeated here.
[0104] Corresponding to the above embodiments, the present application also proposes a computer-readable storage medium.
[0105] The computer-readable storage medium of the present application stores a fault warning program thereon, and the fault warning program implements the above-mentioned fault warning method when executed by a processor.
[0106] Corresponding to the above embodiments, the present application also proposes a battery.
[0107] like Figure 4 As shown, the battery 200 of the present application includes a memory 210, a processor 220, and a fault warning program stored in the memory 210 and executable on the processor 220. When the processor executes the fault warning program, the fault warning method in the above embodiment is implemented.
[0108] Corresponding to the above embodiments, the present application also proposes a vehicle.
[0109] like Figure 5 As shown, the vehicle 300 of the present application includes a memory 310, a processor 320, and a fault warning program stored in the memory 310 and executable on the processor 320. When the processor executes the fault warning program, the fault warning method in the above embodiment is implemented.
[0110] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the claims and specification of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
Claims
1. A fault early warning method, It is characterized in that include: Collecting original parameter data of the target object within a first time window, wherein the original parameter data includes operating parameters related to fault assessment characteristics under at least one working condition; Determining parameter data of a fault assessment feature of the target object within a second time window according to the original parameter data of the early warning risk range, wherein the fault assessment feature is determined based on a target operating condition, the early warning risk range is at least one target object within a set range, the second time window has the same time length as the first time window, and the amount of data in the first time window is greater than the amount of data in the second time window; Determining a fault warning time of the target object under the target working condition according to the parameter data of the fault assessment feature and the corresponding parameter fault threshold; Acquire a first characteristic statistic of parameter data of a fault assessment feature in a third time window, wherein the third time window is contained in the second time window and is at the end of the second time window; Obtaining a second characteristic statistic of parameter data of a fault assessment characteristic within a preset time range in which the warning time is located, wherein the preset time range is the warning time and a preset number of time segments adjacent thereto; Obtaining a change between the first feature statistic and the second feature statistic; When the change amount is less than a third set threshold, it is determined that the fault warning time is valid.
2. The fault warning method according to claim 1, It is characterized in that The second time window includes a plurality of identical time segments, and determining the fault warning time of the target object under the target working condition according to the parameter data of the fault assessment feature and the corresponding parameter fault threshold, including: Obtaining parameter data statistics of fault assessment features in each time segment within the second time window; The time segment corresponding to when the parameter data statistic triggers the parameter fault threshold of the fault assessment feature is used as the fault warning time.
3. The fault warning method according to claim 1, It is characterized in that The method further comprises: Obtaining a parameter data change trend of the fault assessment feature within the second time window; When the parameter data variation trend of the fault assessment feature is less than a first set threshold, it is determined that the fault warning time is valid.
4. The fault warning method according to claim 3, It is characterized in that Obtaining a parameter data change trend of the fault assessment feature within the second time window includes: A sliding average operation and a differential operation are performed on the parameter data of the fault assessment feature within the second time window to obtain a change trend of the parameter data.
5. The fault warning method according to claim 4, It is characterized in that Performing a sliding average operation and a differential operation on the parameter data of the fault assessment feature within the second time window includes: Performing a sliding average operation on the parameter data of the fault assessment feature within the second time window according to a set window size to obtain a sliding average operation result; Performing a differential operation on the sliding average operation result to obtain a differential operation result; Performing a secondary sliding average operation on the differential operation result to obtain a secondary sliding average operation result; The secondary sliding average calculation results are averaged to obtain the parameter data change trend.
6. The fault warning method according to claim 1, It is characterized in that The method further comprises: Obtaining the data frame length of the fault assessment feature for determining the fault warning time located in the original parameter data; When the data frame length is greater than a second set threshold, it is determined that the fault warning time is valid.
7. The fault warning method according to claim 6, It is characterized in that Obtaining the data frame length of the fault assessment feature for determining the fault warning time located in the original parameter data, comprising: Perform data backtracking on the parameter data of the fault assessment feature to determine a data frame length of the parameter data of the fault assessment feature within the first time window.
8. The fault warning method according to any one of claims 1 to 7, It is characterized in that After determining that the fault warning time is valid, outputting fault warning information including the fault warning time.
9. The fault warning method according to claim 1, It is characterized in that Determining parameter data of fault assessment features of the target object within a second time window according to the original parameter data of the warning risk range includes: Compressing the original parameter data and removing abnormal values in the original parameter data; Obtaining fault assessment features under different working conditions according to the original parameter data after elimination, wherein the fault assessment features include at least one; According to the fault assessment feature under the target working condition, parameter data of the fault assessment feature in the original parameter data after elimination is obtained.
10. The fault warning method according to claim 9, It is characterized in that When there are multiple fault assessment features, the method further includes: Obtaining statistics of parameter data of each of the fault assessment features; The fault warning time is determined according to the statistics of each fault assessment feature and its corresponding weight coefficient and the set parameter fault threshold.
11. A fault warning device, It is characterized in that include: A data acquisition module, used to acquire original parameter data of the target object within the first time window, wherein the original parameter data includes operating parameters related to the fault assessment characteristics under at least one working condition; a data determination module, configured to determine parameter data of a fault assessment feature of the target object within a second time window according to the original parameter data of the early warning risk range, wherein the fault assessment feature is determined based on a target operating condition, the early warning risk range is at least one target object within a set range, the second time window has the same time length as the first time window, and the amount of data within the first time window is greater than the amount of data within the second time window; A determination module, configured to determine a fault warning time of the target object under the target working condition according to the parameter data of the fault assessment feature and a corresponding parameter fault threshold; The determination module is further configured to obtain a first characteristic statistic of parameter data of a fault assessment characteristic within a third time window, wherein the third time window is included in the second time window and is at the end of the second time window; Obtaining a second characteristic statistic of parameter data of a fault assessment characteristic within a preset time range in which the warning time is located, wherein the preset time range is the warning time and a preset number of time segments adjacent thereto; Obtaining a change between the first feature statistic and the second feature statistic; When the change amount is less than a third set threshold, it is determined that the fault warning time is valid.
12. A computer-readable storage medium, It is characterized in that A fault warning program is stored thereon, and when the fault warning program is executed by the processor, the fault warning method according to any one of claims 1-10 is implemented.
13. A battery, It is characterized in that The method comprises a memory, a processor and a fault warning program stored in the memory and running on the processor. When the processor executes the fault warning program, the fault warning method according to any one of claims 1 to 10 is implemented.
14. A vehicle, It is characterized in that The method comprises a memory, a processor and a fault warning program stored in the memory and running on the processor. When the processor executes the fault warning program, the fault warning method according to any one of claims 1 to 10 is implemented.
