Time-sensitive network testing method, test bed, and storage medium
By using time-sensitive network testing methods in power communication networks to evaluate the adaptability of TSN switches in power control business scenarios, the problems of high networking costs and poor reliability in power communication access networks are solved, and low latency is achieved. and highly reliable power business transmission.
Patent Information
- Application Number
- CN202211436019.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-16
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-11-16
AI Technical Summary
In power communication access networks, when using passive Ethernet optical networks or industrial Ethernet, different networking equipment have different communication methods, resulting in time-sensitive control signals needing to be wired separately during transmission, which increases the cost of networking and When the network is congested, packets are easily lost and reliability is poor.
A time-sensitive network testing method is proposed. Through the power information collection terminal, TSN switch and power information processing terminal, combined with the network test device, the power business flow and background traffic are simulated to test the business adaptation degree of the TSN switch in the power control business scenario. , configure the data upload triggering method and terminal remote control instructions, analyze fault recording information, and evaluate network performance and adaptability.
By verifying the adaptability of TSN technology, it improves power grid dispatching communication delay, increases network transmission reliability, reduces networking costs, improves the flexibility of distributed intelligent networking, avoids packet loss, and improves the transmission capacity of multi-service load traffic.
Smart Images

Figure CN115834430B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technology, and in particular to a time-sensitive network testing method, a test bed, and a storage medium. Background Art
[0002] Time-Sensitive Networking (TSN) technology is a new generation of Ethernet technology. It complies with the standard Ethernet architecture, has precise traffic scheduling capabilities, and can ensure high-quality transmission of multiple business traffic on the same network. It has technical and cost advantages. It is considered to be one of the evolution directions of the next generation of network bearer technology in many fields such as audio and video transmission, mobile bearer, and in-vehicle network.
[0003] TSN achieves zero congestion packet loss transmission through a series of protocol standards (IEEE 802.1Qbv, IEEE 802.1Qci, IEEE 802.1Qbu, etc.), provides low latency and jitter with upper bound guarantees, and provides deterministic transmission guarantees for latency-sensitive traffic. At present, the time-sensitive network protocol cluster is basically complete, the technology is becoming mature, and mainstream chip manufacturers, communication equipment manufacturers, and automation manufacturers have released time-sensitive network related products.
[0004] In the process of implementing this application, the inventor found that in the related technology, passive Ethernet optical network or industrial Ethernet is commonly used in the power communication access network, and different networking devices use different communication methods. For time-sensitive control signal information, it can only be connected separately during transmission, resulting in high networking costs and serious waste of resources. At the same time, communication based on industrial Ethernet is prone to packet loss when the network is congested, and the reliability is poor.
[0005] It should be noted that the information disclosed in this background technology section is only for understanding the background technology of the present application concept, and therefore, it may contain information that does not constitute the prior art. Summary of the invention
[0006] The first purpose of this application is to propose a time-sensitive network testing method to verify the application of TSN technology in the power industry, verify the adaptability of power services with time synchronization, low latency and jitter to TSN technology, and test the real-time and synchronization of power communication networks based on TSN technology.
[0007] A second object of the present application is to provide a computer-readable storage medium.
[0008] The third objective of the present application is to provide a time-sensitive network test bed.
[0009] To achieve the above-mentioned purpose, the first aspect embodiment of the present application proposes a time-sensitive network testing method, which is applied to a time-sensitive network test bed, wherein the time-sensitive network test bed includes: a power information acquisition end, a TSN switch, a power information processing end and a network testing device, wherein the power information acquisition end, the TSN switch and the power information processing end are connected in sequence, and the network testing device is connected to the TSN switch. The method includes: sending power service traffic to the TSN switch through the power information acquisition end, so that the TSN switch uploads the power service traffic to the power information processing end; sending background traffic to the TSN switch through the network testing device, so that the background traffic generates network congestion on the transmission link of the TSN switch; and determining the service adaptation degree of the TSN switch in the power control service scenario based on the power service traffic received by the power information processing end.
[0010] According to the time-sensitive network testing method proposed in the embodiment of the present application, by configuring time-sensitive power business scenarios and TSN networks, and combining special test instruments and test configuration terminals, it is possible to verify the compatibility between TSN equipment, TSN networks, and TSN technology and power applications for power control business scenarios with strict time synchronization, delay requirements, and high reliability, and obtain the compatibility of time-synchronized, low-latency and jitter power services with TSN technology, and test the real-time and synchronization of power communication networks based on TSN technology, so that when the test results are good, the power grid dispatching communication delay can be improved through TSN technology, packet loss can be avoided during transmission, the reliability of network transmission can be increased, the dispatching capability can be improved, the networking cost can be reduced, and hardware resources can be saved, and the flexibility of distributed intelligent networking can be improved while TSN carries multiple business load flows.
[0011] According to one embodiment of the present application, before determining the service adaptation degree of the TSN switch in the power control service scenario based on the power service flow received by the power information processing end, the method also includes: sending configuration information to the TSN switch through the power information processing end, so that the TSN switch sends the configuration information to the power information collection end to configure the power information collection end.
[0012] According to one embodiment of the present application, the service adaptation degree of the TSN switch in the power control service scenario is determined based on the power service traffic received by the power information processing end, including: determining the transmission result of the configuration information based on the power service traffic received by the power information processing end, and determining the service adaptation degree based on the transmission result.
[0013] According to an embodiment of the present application, the configuration information includes configuration information of a data upload triggering method, and the transmission result of the configuration information includes: a transmission success rate and a transmission time.
[0014] According to an embodiment of the present application, the data upload triggering method includes: data value change, data quality change, data update, and general call.
[0015] According to one embodiment of the present application, sending power business traffic to the TSN switch through the power information acquisition terminal includes: making corresponding changes to the data of the power information acquisition terminal according to the configuration information of the data upload trigger method to trigger the power information acquisition terminal to upload the power business traffic.
[0016] According to an embodiment of the present application, the configuration information includes a terminal remote control instruction, wherein the terminal remote control instruction includes: a terminal control command and an instruction execution mode; and the transmission result of the terminal remote control instruction includes: a transmission success rate and a transmission time.
[0017] According to one embodiment of the present application, the method also includes: sending fault recording information to the TSN switch through the power information acquisition end, so that the TSN switch uploads the fault recording information to the power information processing end; analyzing the received fault recording information through the power information processing end, and generating the terminal remote control instruction based on the analysis result, so as to trigger the issuance of the terminal remote control instruction.
[0018] According to one embodiment of the present application, before determining the service adaptation degree of the TSN switch in the power control service scenario based on the power service flow received by the power information processing end, the method also includes: determining the transmission result of the fault recording information based on the fault recording information received by the power information processing end, so that when determining the service adaptation degree, the service adaptation degree is also determined based on the transmission result of the fault recording information.
[0019] According to an embodiment of the present application, the power information collection end and the power information processing end communicate with each other via the GOOSE protocol.
[0020] According to an embodiment of the present application, sending background traffic to the TSN switch through the network testing device includes: sending the background traffic to the TSN switch through a first port of the network testing device, and receiving the background traffic through a second port of the network testing device.
[0021] According to one embodiment of the present application, before determining the service adaptation degree of the TSN switch in the power control service scenario based on the power service traffic received by the power information processing end, the method also includes: comparing the background traffic sent by the first port and the background traffic received by the second port to obtain the network test result of the TSN switch, so that when determining the service adaptation degree, the service adaptation degree is also determined based on the network test result.
[0022] To achieve the above objectives, the second aspect of the present application proposes a computer-readable storage medium, on which a time-sensitive network test program is stored. When the time-sensitive network test program is executed by a processor, the time-sensitive network test method in the above embodiment is implemented.
[0023] To achieve the above-mentioned purpose, the third aspect embodiment of the present application proposes a time-sensitive network test bed, including a power information acquisition end, a TSN switch, a power information processing end and a network testing device, wherein the power information acquisition end, the TSN switch and the power information processing end are connected in sequence, and the network testing device is connected to the TSN switch; wherein the power information acquisition end is used to send power service traffic to the TSN switch so that the TSN switch uploads the power service traffic to the power information processing end; the network testing device is used to send background traffic to the TSN switch so that the background traffic generates network congestion on the transmission link of the TSN switch; the power information processing end determines the service adaptability of the TSN switch in the power control service scenario based on the received power service traffic.
[0024] According to one embodiment of the present application, the test bed includes at least two TSN switches, the at least two TSN switches include a first TSN switch and a second TSN switch, the power information acquisition end, the first TSN switch, the second TSN switch and the power information processing end are connected in sequence, and the network testing device is respectively connected to the first TSN switch and the second TSN switch.
[0025] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a flowchart of a time-sensitive network testing method according to an embodiment of the present application.
[0027] Figure 2 This is a schematic diagram of the network architecture of a time-sensitive network test bed according to an embodiment of the present application.
[0028] Figure 3 This is a schematic diagram of the network architecture of a time-sensitive network test bed according to another embodiment of the present application.
[0029] Figure 4 This is a schematic diagram of the network architecture of a time-sensitive network test bed according to yet another embodiment of the present application. DETAILED DESCRIPTION
[0030] The embodiments of the present application are described in detail below. Examples of the embodiments described below are shown in the accompanying drawings, wherein the same or similar reference numerals represent the same or similar elements or elements having the same or similar functions from beginning to end. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present application, and should not be construed as limiting the present application.
[0031] The following describes the time-sensitive network testing method, test bed, and storage medium of the embodiments of the present application with reference to the accompanying drawings.
[0032] See also Figure 1 The time-sensitive network testing method in the embodiment of the present application includes the following steps 100 to 300.
[0033] S100, sending power business traffic to the TSN switch through the power information collection end, so that the TSN switch uploads the power business traffic to the power information processing end.
[0034] The time-sensitive network testing method of this embodiment is applied to a time-sensitive network test bed. For a schematic diagram of the network architecture of the test bed, please refer to Figure 2 The time-sensitive network test bed includes: a power information collection terminal 11, a TSN switch A, a power information processing terminal 12 and a network test device 13, wherein the power information collection terminal 11, the TSN switch A and the power information processing terminal 12 are connected in sequence, and the network test device 13 is connected to the TSN switch A.
[0035] After the test bed is built, all devices are powered on and turned on. The computer can be connected to TSN switch A through the serial port and control TSN switch A to enable test-related functions and protocols. The power information collection terminal 11 and the power information processing terminal 12 are both terminal devices, where the power information collection terminal 11 will collect power business data, form power business traffic based on the collected information and send it to TSN switch A, and then upload it to the power information processing terminal 12 through TSN switch A.
[0036] Since the existing Ethernet transmission information adopts a best-effort method and forwards in the order of arrival, when the background traffic reaches the line speed, the traffic that arrives later cannot be transmitted in time. The network's per-hop delay can be divided into three parts: link propagation delay, switch processing delay, and port queuing delay, while the end-to-end delay is the sum of hop-by-hop delays. Link delay and processing delay are basically fixed values, so reducing delay requires reducing queuing delay, that is, the essence of delay-sensitive networks is no queuing: TSN networks first separate delay-sensitive flows from best-effort flows through priority queues, and then separate the same delay-sensitive flows in time (dividing time slots) or space (planning routes). After achieving low latency, the data packet stays in the switch for a very short time, and the accumulation of data packets will not exceed the queue buffer size, thereby achieving zero packet loss rate; at the same time, jitter refers to the difference in delay variation. Low latency reduces the worst latency, making the upper bound of latency close to the lower bound of latency, reducing the latency variation range, and thus achieving low jitter.
[0037] After receiving the power business flow, the power information processing terminal 12 processes and responds to the data content in the power business flow. For example, if the data content is the reading information of the electric meter, the power information processing terminal 12 records the reading information, or if the data content is the device status information, the power information processing terminal 12 generates the corresponding power distribution control instructions after analyzing the device status information, forms power business flow based on the power distribution control instructions and sends it to the TSN switch A, and then sends it to the power information collection terminal 11 through the TSN switch A. It can be understood that the power business flow is the data generated in the power business scenario.
[0038] S200, sending background traffic to the TSN switch through a network testing device, so that the background traffic generates network congestion on a transmission link of the TSN switch.
[0039] Since the power control business scenario in the power industry has high requirements for the time synchronization, latency, reliability and stability of data transmission, in order to test whether the transmission of power business traffic can meet the requirements when network congestion occurs during the transmission of current business traffic, a network testing device 13 is set in the test bed to simulate the network congestion scenario.
[0040] Specifically, in the process of uploading power business traffic from the power information collection terminal 11 to the power information processing terminal 12, the network test device 13 will send background traffic (shown by the dotted line in the figure) to the TSN switch A. On the link of the TSN switch A, the power business traffic and the background traffic together form a mixed traffic to simulate the state of network congestion on the transmission link. Among them, the background traffic is a large-flow data packet, which is used to fill the bandwidth of the transmission link of the TSN switch A. The background traffic can be set to the port line speed of a 64-byte data packet. The network test device 13 can be to continuously send background traffic to the TSN switch A within a set time (for example, one minute).
[0041] S300, determining the service adaptability of the TSN switch in the power control service scenario according to the power service traffic received by the power information processing terminal.
[0042] The degree of business adaptability refers to the degree to which the TSN switch meets the scenario requirements when operating in the power control business scenario, such as whether the execution of the data transmission function, interface function and forwarding function of the TSN switch in the power control business scenario meets the scenario requirements. The power business adaptability test mainly combines the power business with the TSN network to carry out business transmission tests, including business information transmission function, performance, reliability and other tests. The business mainly includes telemetry, telesignaling, remote control business, distribution automation business, video surveillance business, security system and other related businesses.
[0043] The degree of business adaptation can be obtained by analyzing the power business traffic received by the power information processing terminal 12. For example, the received power business traffic is analyzed to obtain indicators such as data accuracy, data integrity, and data transmission rate. If, in the case of network congestion, all data packets sent by the power information acquisition terminal 11 are received by the power information processing terminal 12, and the content of the data packets has not changed, and the transmission process takes a very short time, it means that the TSN switch has a high degree of business adaptation in the current power control business scenario. Therefore, the test results show that the TSN switch can meet the current power control business scenario for data accuracy, data integrity, data transmission rate and other requirements; if, in the case of network congestion, only a part of the data packets sent by the power information acquisition terminal 11 are received by the power information processing terminal 12, the content of the data packets has changed due to transmission, and the transmission process takes too long, it means that the TSN switch has a low degree of business adaptation in the current power control business scenario. Therefore, the test results show that the TSN switch cannot meet the current power control business scenario for data accuracy, data integrity, data transmission rate and other requirements.
[0044] It is understandable that for different network architectures and functional requirements, the power business scenarios are also different, so time-sensitive network testing can be re-performed, for example Figure 1 The test results in the power business scenario are adapted, while for Figure 1 In other scenarios with more complex working conditions and architectures, it is necessary to rebuild the TSN network and retest it to determine whether TSN equipment can meet the needs of new power business scenarios. Figure 1 The fact that the test result in the power business scenario is adapted does not mean that the test results in all power business scenarios are adapted.
[0045] According to the time-sensitive network testing method proposed in the embodiment of the present application, by configuring time-sensitive power business scenarios and TSN networks, and combining special test instruments and test configuration terminals, it is possible to verify the compatibility between TSN equipment, TSN networks, and TSN technology and power applications for power control business scenarios with stringent requirements on time synchronization, latency, and high reliability, and to obtain the compatibility of power services with time synchronization, low latency, and jitter with TSN technology. It is also possible to test the real-time and synchronization of power communication networks based on TSN technology, so as to improve the communication delay of power grid dispatching and improve the dispatching capability through TSN technology, and enable TSN to improve the flexibility of distributed intelligent networking while carrying multiple business load flows.
[0046] In some embodiments, the method of determining the service adaptation degree in step 300 may include: comparing the power service flow uploaded by the power information collection terminal with the power service flow received by the power information processing terminal, determining the test result of the preset indicator based on the comparison result, and determining the service adaptation degree based on the test result of the preset indicator. The preset indicator may include packet loss rate, delay and jitter.
[0047] Specifically, when conducting a test, the power information acquisition terminal 11 can be configured in advance so that the power information acquisition terminal 11 periodically uploads the telemetry data or telesignaling data collected by the power information acquisition terminal 11 to the power information processing terminal 12 within a certain period of time, such as the real-time level signal of a certain device collected, and the level signal forms the power business flow. Then, the power business flow sent by the power information acquisition terminal 11 received by the power information processing terminal 12 is recorded and analyzed, and the level signal data uploaded by the power information acquisition terminal 11 is identified, and these data are analyzed to obtain the value, quantity, receiving time, receiving order, etc. of the level signal data, and then compared with the signal value, quantity, sending time, sending order, etc. of the real-time level signal uploaded by the power information acquisition terminal 11, to obtain preset indicators such as packet loss rate, delay, and jitter. Since these indicators can reflect the data accuracy, data integrity, data transmission rate, etc. of the power business flow transmission, the degree of business adaptation can be determined based on indicators such as packet loss rate, delay, and jitter.
[0048] The specific process of determining the test results of the preset indicators can be: calculating the specific values of each preset indicator, and then comparing these specific values with the corresponding preset thresholds. If they are not lower than the preset thresholds, the preset indicator is determined to be a qualified indicator, otherwise the preset indicator is determined to be a non-qualified indicator. The specific process of determining the degree of business adaptability at this time can be: only when all the preset indicators are qualified indicators, the business adaptability is determined to be "adaptive", that is, the TSN switch can meet the business needs in the current power control business scenario; if one or more of the preset indicators are non-qualified indicators, the business adaptability is determined to be "unsuitable", that is, the TSN switch cannot meet the business needs in the current power control business scenario.
[0049] In some embodiments, before determining the service adaptability of TSN switch A in the power control service scenario based on the power service flow received by the power information processing terminal 12, configuration information can be sent to TSN switch A through the power information processing terminal 12 so that the TSN switch can send the configuration information to the power information collection terminal 11 to configure the power information collection terminal 11.
[0050] The configuration information can be used to configure the working mode of the power information collection terminal 11, and can also be used to configure the functions of the power information collection terminal 11. For example, the power information collection terminal 11 is configured to collect data according to a set period, and the data collected within the period is uploaded according to the set period regardless of whether the collected data changes; or the power information collection terminal 11 is configured to compare the collected data with the last collected data each time, and the collected data will be uploaded only when the collected data is different from the last collected data.
[0051] The configuration information may include: the source of telemetering changes, the configuration mode of telemetering change threshold, the type of telemetering change threshold judgment criterion, the telemetering change threshold value, the telemetering change sending strategy, the telestep change sending strategy, the COS sending strategy, the SOE sending strategy, the telemetering change message organization scanning strategy, the telestep change message organization scanning strategy, the COS message organization scanning strategy, the SOE message organization scanning strategy, the source of telesignaling data, the remote control process timeout, the remote control associated telesignaling interlocking configuration strategy, the remote control associated interlocking unified configuration telesignaling status, the gear remote adjustment command execution mode, the gear remote adjustment process timeout, the remote adjustment command execution mode, the remote control closing mode strategy, the process reset operation strategy, etc.
[0052] The power information collection terminal 11 is configured in advance by the power information processing terminal 12, so that when the time-sensitive network test is performed, the power information collection terminal 11 uploads the power service traffic in the same way as required by the power information processing terminal 12, so as to facilitate the smooth progress of the test. At the same time, the power information processing terminal 12 can simulate different power control service sub-scenarios by sending different configuration information in sequence, so as to conduct more comprehensive tests, obtain index test results under multiple different sub-scenarios, and conduct a comprehensive evaluation of the obtained multiple index test results, so as to obtain the degree of service adaptation. It can be understood that the power information collection terminal 11 and the power information processing terminal 12 are both interfered by background traffic during the transmission of configuration information and service traffic.
[0053] The comprehensive evaluation method can be: in the indicator test results under multiple different sub-scenarios, when all the preset indicators of each indicator test result are up-to-standard indicators, the business adaptation degree is determined to be "adaptive"; if one or more preset indicators in the indicator test results under one or more sub-scenarios are not up-to-standard indicators, the business adaptation degree is determined to be "unsuitable".
[0054] The comprehensive evaluation method can also be: classify the power control business sub-scenarios corresponding to the various configuration information according to the scenario requirements. Different sub-scenarios have different emphases on data transmission. The scenario requirements can be accurate data transmission, efficient data transmission, etc., and then divide the preset indicators in the same type of sub-scenarios according to the scenario requirements of this type of sub-scenarios, and obtain indicators directly related to the scenario requirements of this type of sub-scenarios and indicators indirectly related to the scenario requirements of this type of sub-scenarios. At this time, if each indicator directly related to the scenario requirements is a qualified indicator, then regardless of whether the indicators indirectly related to the scenario requirements are met, the business adaptation degree is determined to be "adaptive"; if one or more indicators directly related to the scenario requirements are unmet indicators, then regardless of whether the indicators indirectly related to the scenario requirements are met, the business adaptation degree is determined to be "unfit". Specifically, it is assumed that five different sub-scenarios of power control services are configured through five types of configuration information, wherein the scenario requirement X1 of four sub-scenarios is accurate data transmission, and the scenario requirement X2 of one sub-scenario is efficient data transmission. The preset indicators of each sub-scenario are packet loss rate, delay and jitter. For the four sub-scenarios of requirement X1, packet loss rate and jitter are indicators directly related to requirement X1, and for the one sub-scenario of requirement X2, delay is an indicator directly related to requirement X2. Then, the indicator test results of five different sub-scenarios of power control services are obtained by sending these five types of configuration information in sequence. If the packet loss rate and jitter in the indicator test results of requirement X1 meet the standards and the delay in the indicator test results of requirement X2 meet the standards, then it is determined that TSN switch A is "adapted" in the full scenario of power control services, otherwise it is determined that TSN switch A is "unsuitable" in the full scenario of power control services.
[0055] In some embodiments, step 300 may specifically include: determining the transmission result of the configuration information according to the power service flow received by the power information processing terminal 12, and determining the service adaptation degree according to the transmission result.
[0056] The configuration information sent by the power information processing terminal 12 can also be used to test the transmission of the configuration information, and the transmission result of the configuration information itself can be used as a basis for determining the degree of service adaptation. In other words, in addition to determining the degree of service adaptation based on whether the power information processing terminal 12 receives the power service flow uploaded by the power information collection terminal 11 as expected as described above, the degree of service adaptation can also be determined based on whether the power information collection terminal 11 receives the configuration information sent by the power information processing terminal 12 as expected.
[0057] Specifically, the method for determining whether the power information collection terminal 11 receives the configuration information as expected can be determined by the power business flow fed back by the power information collection terminal 11. There are many configurable items of the configuration information. For example, the configuration information CFG1 sent by the power information processing terminal 12 includes an instruction to double the feedback cycle of the telemetry data fed back by the power information collection terminal 11. After receiving the configuration CFG1, the power information collection terminal 11 will configure itself and upload the flow according to the doubled feedback cycle. If the frequency of the power business flow received by the power information processing terminal 12 is halved thereafter, it means that the power information collection terminal 11 has correctly received the CFG1 sent by the power information processing terminal 12. When the power information acquisition terminal 11 uploads for the first time according to the modified feedback cycle, the uploaded power business flow may include the time T2 when the power information acquisition terminal 11 receives the configuration CFG1. At this time, the time T2 can also be obtained by analyzing the power business flow received by the power information processing terminal 12. By comparing the time T1 and T2 when the power information processing terminal 12 sends the configuration information, the transmission rate of the configuration information on the TSN link can be obtained. Whether the power information acquisition terminal 11 correctly receives CFG1 and the transmission rate are used as transmission results to participate in the determination of the business adaptation degree. For example, only when the power information acquisition terminal 11 correctly receives the configuration information and all the preset indicators (packet loss rate, delay and jitter) of the power business flow uploaded after the configuration according to the configuration information are up-to-standard indicators, the business adaptation degree is determined to be "adaptive", otherwise the business adaptation degree is determined to be "unsuitable".
[0058] In some embodiments, the configuration information may include configuration information of a data upload triggering method, and the transmission result of the configuration information includes: a transmission success rate and a transmission time.
[0059] The configuration information CFG2 sent by the power information processing terminal 12 to the TSN switch A can be a data upload trigger method. The data upload trigger method refers to the trigger condition for the power information collection terminal 11 to upload the power business traffic. When the trigger condition is met, the power information collection terminal 11 uploads the power business traffic, otherwise the traffic is not uploaded.
[0060] The transmission result is obtained through the transmission success rate and the transmission time. After the power information processing terminal 12 sends the configuration CFG2 to modify the data upload trigger method of the power information acquisition terminal 11, the power information processing terminal 12 analyzes the traffic uploaded by the received power information acquisition terminal 11. If it is analyzed that the traffic is still triggered and uploaded according to the data upload trigger method before the modification, the transmission success rate is 0. If it is analyzed that the traffic is triggered and uploaded according to the modified data upload trigger method, the transmission success rate is 1. At this time, the transmission time is obtained by comparing the time T1 when the power information processing terminal 12 sends the configuration CFG2 and the time T2 when the power information acquisition terminal 11 contained in the power business traffic receives the configuration FG2. The transmission success rate and the transmission time are used as transmission results to determine the degree of business adaptation. For example, only when the transmission success rate of the data upload trigger method is 1 and all preset indicators (packet loss rate, delay and jitter) of the uploaded power business traffic after configuration according to CFG2 are up-to-standard indicators, the business adaptation degree is determined to be "adaptive", otherwise the business adaptation degree is determined to be "unsuitable".
[0061] In some embodiments, data upload triggering methods include: data value change, data quality change, data update, and general call.
[0062] Specifically, data value change means that the value of the data item collected by the power information collection terminal 11 this time is different from the value collected last time, and the power information collection terminal 11 is triggered to upload data at different times; data quality change means that the data quality of the data item collected this time is different from the data quality of the data item collected last time, and the power information collection terminal 11 is triggered to upload data at different times; data update means that every time the value of a data item is collected, it is equivalent to an update of the data item, and the power information collection terminal 11 is triggered to upload data after the update; total call means that all the data items to be collected by the power information collection terminal 11 have completed one collection, and the power information collection terminal 11 is triggered to upload data. The above data upload triggering methods can be selectively incorporated into the configuration information, and only one data upload triggering method can be incorporated or multiple data upload triggering methods can be incorporated at the same time to configure the power information collection terminal 11.
[0063] In some embodiments, in step 100, power business traffic is sent to TSN switch A through the power information acquisition terminal 11, which can be specifically: the data of the power information acquisition terminal 11 is changed accordingly according to the configuration information of the data upload trigger method to trigger the power information acquisition terminal 11 to upload the power business traffic.
[0064] When testing, the power information acquisition terminal 11 can be connected to a real lower-level device and tested by collecting real telemetry and telesignaling data, or it can be tested more conveniently by simulating telemetry and telesignaling data, that is, by generating simulated data changes on the power information acquisition terminal 11, the current data upload trigger mode is artificially satisfied, thereby causing the power business flow of the power information acquisition terminal 11 to be uploaded. The power information acquisition terminal 11 itself can generate simulated data changes, or it can be another device connected to the power information acquisition terminal 11.
[0065] Specifically, the power information processing terminal 12 of the power business first sends configuration information to the TSN switch A, so that the TSN switch A sends the configuration information to the power information collection terminal 11 of the power business. After receiving the configuration information, the power information collection terminal 11 changes its own data upload trigger mode according to the configuration information, and can automatically trigger the simulated data change corresponding to the new data upload trigger mode, so that after the change, the power information collection terminal 11 can be triggered at the fastest speed to upload the changed data as power business traffic according to the changed mode. In the above process, the transmission results can be determined, and the test results of the preset indicators can be determined, so as to realize the determination of the business adaptation degree based on the configuration information and remote control telemetry data.
[0066] In some embodiments, the configuration information includes a terminal remote control instruction, and the transmission result of the terminal remote control instruction includes: a transmission success rate and a transmission time.
[0067] The configuration information CFG3 sent by the power information processing terminal 12 to the TSN switch A can be a terminal remote control instruction, which includes a terminal control command and an instruction execution mode. The terminal control command is used to remotely control and monitor the controlled object. For example, the power information processing terminal 12 sends the terminal remote control instruction to the power information collection terminal 11, so that the power information collection terminal 11 closes a connected controllable switch. The instruction execution mode can be set to a direct execution mode or a selective execution mode, that is, the terminal control command can be directly executed or selectively executed.
[0068] The power information processing terminal 12 sends a terminal remote control instruction to the TSN switch A, so that the TSN switch A sends the terminal remote control instruction to the power information collection terminal 11, and the power information collection terminal 11 performs a write operation according to the terminal remote control instruction, and makes the terminal remote control instruction effective after saving.
[0069] The transmission result of the terminal remote control command is also obtained by the transmission success rate and the transmission time. After the power information processing terminal 12 issues the configuration CFG3 to execute the terminal remote control command of the power information collection terminal 11, the power information processing terminal 12 analyzes the traffic uploaded by the power information collection terminal 11. If it is analyzed that the traffic is carried out according to the instructions in the configuration CFG3, the transmission success rate is 1, otherwise the transmission success rate is 0; at this time, the transmission time is obtained by comparing the time T3 when the power information processing terminal 12 issues the configuration CFG3 and the time T4 when the power information collection terminal 11 receives the configuration CFG3 contained in the power service traffic. The transmission success rate and the transmission time are used as the transmission results to participate in the determination of the service adaptation degree. For example, only when the transmission success rate is 1 and all the preset indicators (packet loss rate, delay and jitter) of the power service traffic uploaded after the configuration according to the configuration CFG3 are all qualified indicators, the service adaptation degree is determined to be "adaptive", otherwise the service adaptation degree is determined to be "unsuitable".
[0070] It can be understood that, for remote control services, the configuration information may also include preset configuration or non-preset configuration, wherein the preset configuration is pre-configured for dual-machine supervision. When the remote control preset operation is successfully completed and the permission is obtained, an "execute" command can be sent to the remote terminal unit (RTU) to perform the remote control execution operation; and the non-preset configuration refers to configuration when remote control operation is required, rather than pre-configuration.
[0071] The remote control preset message may include the following fields: application layer function code (03 represents preset), number of remote control operations (0001 represents 1), remote control number (0001 represents remote control number 1), control code (41 represents control-on operation, 81 represents control-off operation), counting code (the number of times the remote control operation is executed continuously, 01 represents 1 time), on time, off time, etc.
[0072] The remote control preset response message may include the following fields: application layer function code, number of remote control operations, remote control number, control code, property status bit, etc.
[0073] In some embodiments, the time-sensitive network testing method may further include the following steps B1 and B2.
[0074] Step B1, sending fault recording information to the TSN switch A through the power information collection terminal 11, so that the TSN switch A uploads the fault recording information to the power information processing terminal 12.
[0075] The fault recording information is the waveform and data recorded before, during and after the fault occurs. The fault recorder can be used to start recording when a fault or oscillation occurs. It can record the voltage, current, power changes and relay protection actions within a few hundred milliseconds before and a few thousand milliseconds after the fault. The power information processing terminal 12 can serve as the main station for power system dispatching to select and download the recording file sent by the power information collection terminal.
[0076] Step B2: Analyze the received fault recording information through the power information processing terminal 12, and generate a terminal remote control instruction according to the analysis result to trigger the issuance of the terminal remote control instruction.
[0077] When the power information collection terminal 11 encounters a fault, it is necessary to transmit the fault recording information to the power information processing terminal 12 through the TSN switch A in a very short time. After receiving the fault recording information, the power information processing terminal 12 analyzes and processes the information to make corresponding decisions, and then generates a remote control command and sends it to the power information collection terminal 11 to handle the fault.
[0078] In some embodiments, before determining the service adaptability of TSN switch A in the power control service scenario based on the power service flow received by the power information processing terminal 12, the transmission result of the fault recording information can also be determined based on the fault recording information received by the power information processing terminal 12, so that when determining the service adaptability, the service adaptability can also be determined based on the transmission result of the fault recording information.
[0079] Specifically, the transmission result of the fault recording information may also include: transmission success rate and transmission time. After the power information acquisition terminal 11 sends the fault recording information to the TSN switch A so that the TSN switch A uploads the fault recording information to the power information processing terminal 12, the time when the power information processing terminal 12 receives the fault recording information is T6, and the fault recording information may include the time T5 when the power information acquisition terminal 11 sends the information. The power information processing terminal 12 obtains the transmission time of the fault recording information by comparing T5 and T6. The transmission success rate and the transmission time are used as the transmission results to participate in the determination of the service adaptation degree. For example, only when the transmission success rates of the fault recording information and the terminal remote control command are both 1, and all the preset indicators (packet loss rate, delay and jitter) of the uploaded power service flow after configuration according to the configuration CFG3 are all qualified indicators, the service adaptation degree is determined to be "adaptive", otherwise the service adaptation degree is determined to be "unsuitable".
[0080] In some embodiments, the power information collection terminal 11 and the power information processing terminal 12 communicate via the GOOSE protocol. GOOSE (Generic Object Oriented Substation Event) refers to a generic object-oriented substation event. It is a fast message transmission mechanism in IEC61850, used to transmit important real-time signals in a substation.
[0081] In some embodiments, see Figure 3 In step 200, background traffic is sent to the TSN switch A through the network test device 13, which can be specifically: background traffic is sent to the TSN switch A through the first port P1 of the network test device 13, and the background traffic is received through the second port P2 of the network test device 13.
[0082] The network test device 13 is usually provided with multiple ports, each port is equivalent to a terminal, that is, the network test device 13 sends the background traffic (shown by the dotted line in the figure) to itself, but specifically sends it through the link of the TSN switch.
[0083] In some embodiments, before determining the service adaptability of TSN switch A in the power control service scenario based on the power service flow received by the power information processing terminal 12, the background flow sent by the first port P1 and the background flow received by the second port P2 can also be compared to obtain the network test result of TSN switch A, so that the service adaptability can be determined based on the network test result when determining the service adaptability.
[0084] When determining the compatibility between the TSN switch and the power control business scenario, in addition to using the transmission effect of the TSN switch as the transmission medium for power business information as the basis for whether it is compatible, the performance test of the TSN switch itself and the test results of the network test can also be used as the basis for whether the TSN switch and the power control business scenario are compatible. Specifically, the network test device 13 is made to send background traffic for at least a period of time, and the background traffic sent by the network test device 13 is compared with the returned background traffic. If the two are the same, it means that the network test result meets the standard.
[0085] It is understandable that the testing of TSN switches can also include: functional testing, performance testing, protocol consistency testing, clock synchronization testing, interoperability testing, network reliability testing, etc. Among them, functional testing refers to testing of interface functions, forwarding functions, business functions, management protocols, traffic scheduling, MAC address tables, VLANs, port aggregation, port mirroring, etc.; performance testing refers to testing of throughput, forwarding rate, latency, jitter, packet loss, etc.; protocol consistency testing refers to testing of IEEE 802.1AS protocol consistency, IEEE 802.1Qbv protocol consistency, IEEE802.1Qbu protocol consistency, etc.; clock synchronization testing refers to testing of clock source selection, synchronization mechanism, time synchronization accuracy, scheduling accuracy, etc.; interoperability testing refers to interoperability testing between devices from different manufacturers; network reliability testing refers to testing of continuous working time, fault repair time, etc. of the TSN network. The results of the above tests can be used selectively or in full to comprehensively evaluate the business adaptability of TSN switches in power control business scenarios.
[0086] In addition, an embodiment of the present application further provides a computer-readable storage medium, on which a time-sensitive network test program is stored. When the time-sensitive network test program is executed by a processor, the time-sensitive network test method in the above embodiment is implemented.
[0087] According to the computer-readable storage medium proposed in the embodiment of the present application, a processor executes a time-sensitive network test program stored on the storage medium, configures a time-sensitive power business scenario and a TSN network, and combines a dedicated test instrument and a test configuration terminal. It is possible to verify the compatibility between TSN equipment, TSN networks, and TSN technology and power applications for power control business scenarios with strict time synchronization, delay requirements, and high reliability, and obtain the compatibility of power services with time synchronization, low latency, and jitter with TSN technology. The real-time and synchronization of the power communication network based on TSN technology are tested, so that when the test results are good, the power grid dispatching communication delay can be improved through TSN technology, packet loss can be avoided during transmission, the reliability of network transmission can be increased, the dispatching capability can be improved, the networking cost can be reduced, and hardware resources can be saved. In addition, TSN can improve the flexibility of distributed intelligent networking while carrying multiple business load flows.
[0088] Also, see Figure 2 The embodiment of the present application also proposes a time-sensitive network test bed, including a power information acquisition terminal 11, a TSN switch A, a power information processing terminal 12 and a network test device 13. The power information acquisition terminal, the TSN switch and the power information processing terminal are connected in sequence, and the network test device is connected to the TSN switch.
[0089] Among them, the power information collection terminal 11 is used to send power business traffic to the TSN switch A, so that the TSN switch A uploads the power business traffic to the power information processing terminal 12. The network testing device 13 is used to send background traffic to the TSN switch A, so that the background traffic generates network congestion on the transmission link of the TSN switch A. The power information processing terminal 12 determines the service adaptation degree of the TSN switch A in the power control service scenario based on the received power business traffic.
[0090] According to the time-sensitive network test bed proposed in the embodiment of the present application, by configuring time-sensitive power business scenarios and TSN networks, and combining special test instruments and test configuration terminals, it is possible to verify the compatibility between TSN equipment, TSN networks, and TSN technology and power applications for power control business scenarios with stringent requirements on time synchronization, latency, and high reliability, and to derive the compatibility between power services with time synchronization, low latency, and jitter and TSN technology. It is also possible to test the real-time and synchronization of power communication networks based on TSN technology, so as to improve the communication delay of power grid dispatching and improve the dispatching capability through TSN technology, and enable TSN to improve the flexibility of distributed intelligent networking while carrying multiple business load flows.
[0091] In some embodiments, the method by which the power information processing terminal 12 determines the degree of service adaptation may include: comparing the power service flow uploaded by the power information acquisition terminal 11 with the power service flow received by the power information processing terminal 12, determining the test result of the preset indicator based on the comparison result, and determining the degree of service adaptation based on the test result of the preset indicator. The preset indicator may include packet loss rate, delay, and jitter.
[0092] In some embodiments, before the power information processing terminal 12 determines the service adaptability of the TSN switch A in the power control service scenario based on the received power service traffic, the power information processing terminal 12 sends configuration information to the TSN switch A through the power information processing terminal 12, so that the TSN switch A sends the configuration information to the power information collection terminal 11 to configure the power information collection terminal 11.
[0093] In some embodiments, the way in which the power information processing end 12 determines the service adaptability of the TSN switch A in the power control service scenario may specifically include: the power information processing end 12 determines the transmission result of the configuration information based on the received power service flow, and determines the service adaptability based on the transmission result.
[0094] In some embodiments, the configuration information includes configuration information of a data upload triggering method, and the transmission result of the configuration information includes: a transmission success rate and a transmission time.
[0095] In some embodiments, data upload triggering methods include: data value change, data quality change, data update, and general call.
[0096] In some embodiments, the power information collection terminal 11 can send power business traffic to the TSN switch A in the following manner: according to the configuration information of the data upload trigger method, the data of the power information collection terminal 11 is changed accordingly to trigger the power information collection terminal 11 to upload the power business traffic.
[0097] In some embodiments, the configuration information includes terminal remote control instructions, wherein the terminal remote control instructions include: terminal control commands and instruction execution modes; and the transmission results of the terminal remote control instructions include: transmission success rate and transmission time.
[0098] In some embodiments, the power information collection terminal 11 is also used to send fault recording information to the TSN switch A, so that the TSN switch A uploads the fault recording information to the power information processing terminal 12. The power information processing terminal 12 is also used to analyze the received fault recording information and generate a terminal remote control instruction based on the analysis results to trigger the issuance of the terminal remote control instruction.
[0099] In some embodiments, before the power information processing terminal 12 determines the service adaptability of the TSN switch A in the power control service scenario based on the received power service flow, the power information processing terminal 12 also determines the transmission result of the fault recording information based on the received fault recording information, so that when determining the service adaptability, the service adaptability is also determined based on the transmission result of the fault recording information.
[0100] In some embodiments, the power information collection terminal 11 and the power information processing terminal 12 communicate with each other via the GOOSE protocol.
[0101] In some embodiments, see Figure 3 The network test device 13 sends background traffic to the TSN switch A in the following manner: the background traffic is sent to the TSN switch A through the first port P1 of the network test device 13 , and the background traffic is received through the second port P2 of the network test device 13 .
[0102] In some embodiments, before the power information processing terminal 12 determines the service adaptation degree of the TSN switch A in the power control service scenario based on the received power service traffic, the network testing device 13 first compares the background traffic sent by the first port P1 and the background traffic received by the second port P2 to obtain the network test result of the TSN switch A, so that when determining the service adaptation degree, the service adaptation degree is also determined based on the network test result.
[0103] In some embodiments, see Figure 4 The test bed may include at least two TSN switches, for example, a first TSN switch (TSN switch A) and a second TSN switch (TSN switch B). The power information acquisition terminal 11, the TSN switch A, the TSN switch B and the power information processing terminal 12 are connected in sequence, and the TSN switch A and the TSN switch B jointly form a transmission link between the power information acquisition terminal 11 and the power information processing terminal 12.
[0104] The network testing device may include a network tester 41 and a tester controller 42. The network tester 41 is connected to TSN switch A and TSN switch B respectively, and the tester controller 42 is connected to the network tester 41 for configuring the simulated background traffic for the network tester 41 and for issuing configuration commands to the network tester 41 to control the network tester 41 to send the simulated background traffic at the port line speed.
[0105] The test bed may also include a video monitoring terminal 31 and a video monitor 32. The video monitoring terminal 31, TSN switch A, TSN switch B and video monitor 32 are connected in sequence to realize the sending and receiving of video traffic. Video traffic is also a type of power business traffic. When the power information acquisition terminal 11 and the video monitoring terminal 31 send power business traffic to the TSN switch A, the network tester 41 also sends background traffic to the TSN switch A (shown by the dotted line in the figure). The power business traffic and the background traffic form a mixed traffic at the TSN switch A (shown by the dotted line in the figure). The TSN switch A forwards the mixed traffic to the TSN switch B, and the TSN switch B sends the background traffic therein to the network tester 41, because the background traffic is sent by the network tester 41 to itself, but it only passes through the transmission link between the TSN switches. At the same time, the TSN switch B sends the power business traffic therein to the power information processing terminal 12, and the video traffic therein is sent to the video monitor 32, completing the traffic transmission under network congestion.
[0106] It should be noted that the logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as a sequenced list of executable instructions for implementing logical functions, and can be specifically implemented in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection portion with one or more wirings (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.
[0107] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.
[0108] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0109] In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Thus, the features defined as "first" and "second" can expressly or implicitly include at least one of the features. In the description of the present application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. Relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or equipment including a series of elements includes not only those elements, but also includes other elements that are not clearly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of more restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or equipment including the elements.
[0110] Each embodiment in this specification is described in a related manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device, electronic device, and computer-readable storage medium embodiments, since they are basically similar to the method embodiments, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiments.
[0111] The above description is only a preferred embodiment of the present application and is not intended to limit the protection scope of the present application. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application are included in the protection scope of the present application.
Claims
1. A time-sensitive network testing method, It is characterized in that Applied to a time-sensitive network test bed, the time-sensitive network test bed includes: a power information acquisition end, a TSN switch, a power information processing end and a network test device, the power information acquisition end, the TSN switch and the power information processing end are connected in sequence, the network test device is connected to the TSN switch, and the method includes: Sending power service traffic to the TSN switch through the power information acquisition end, so that the TSN switch uploads the power service traffic to the power information processing end; Sending background traffic to the TSN switch through the network testing device, so that the background traffic generates network congestion on the transmission link of the TSN switch; wherein the background traffic is a large-flow data packet used to fill the bandwidth of the TSN switch transmission link; The service adaptability of the TSN switch in the power control service scenario is determined according to the power service traffic received by the power information processing end.
2. The method according to claim 1, It is characterized in that Before determining the service adaptation degree of the TSN switch in the power control service scenario according to the power service flow received by the power information processing terminal, the method further includes: The configuration information is sent to the TSN switch through the power information processing end, so that the TSN switch sends the configuration information to the power information collection end to configure the power information collection end.
3. The method according to claim 2, It is characterized in that Determining the service adaptability of the TSN switch in the power control service scenario according to the power service flow received by the power information processing terminal includes: The transmission result of the configuration information is determined according to the power service flow received by the power information processing terminal, and the service adaptation degree is determined according to the transmission result.
4. The method according to claim 3, It is characterized in that The configuration information includes configuration information of a data upload triggering method, and the transmission result of the configuration information includes: a transmission success rate and a transmission time.
5. The method according to claim 4, It is characterized in that The data upload triggering method includes: one or more of data value change, data quality change, data update and general call.
6. The method according to claim 4 or 5, It is characterized in that Sending power service traffic to the TSN switch through the power information collection terminal includes: According to the configuration information of the data upload triggering mode, the data of the power information collection terminal is changed accordingly to trigger the power information collection terminal to upload the power service flow.
7. The method according to claim 3, It is characterized in that The configuration information includes terminal remote control instructions, wherein the terminal remote control instructions include: terminal control commands and instruction execution modes; and the transmission results of the terminal remote control instructions include: transmission success rate and transmission time.
8. The method according to claim 7, It is characterized in that The method further comprises: Sending fault recording information to the TSN switch through the power information acquisition end, so that the TSN switch uploads the fault recording information to the power information processing end; The received fault recording information is analyzed by the power information processing terminal, and the terminal remote control instruction is generated according to the analysis result, so as to trigger the sending of the terminal remote control instruction.
9. The method according to claim 8, It is characterized in that Before determining the service adaptation degree of the TSN switch in the power control service scenario according to the power service flow received by the power information processing terminal, the method further includes: The transmission result of the fault recording information is determined according to the fault recording information received by the power information processing terminal, so that when determining the service adaptation degree, the service adaptation degree is also determined according to the transmission result of the fault recording information.
10. The method according to claim 1, It is characterized in that The power information collection end and the power information processing end communicate with each other via the GOOSE protocol.
11. The method according to claim 1, It is characterized in that Sending background traffic to the TSN switch through the network testing device includes: The background traffic is sent to the TSN switch through the first port of the network test device, and the background traffic is received through the second port of the network test device.
12. The method according to claim 11, It is characterized in that Before determining the service adaptation degree of the TSN switch in the power control service scenario according to the power service flow received by the power information processing terminal, the method further includes: The background traffic sent by the first port and the background traffic received by the second port are compared to obtain a network test result of the TSN switch, so that when determining the service adaptation degree, the service adaptation degree is also determined according to the network test result.
13. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a time-sensitive network testing program, which, when executed by a processor, implements the time-sensitive network testing method according to any one of claims 1 to 12.
14. A time-sensitive network test bed, It is characterized in that It includes a power information acquisition terminal, a TSN switch, a power information processing terminal and a network testing device, wherein the power information acquisition terminal, the TSN switch and the power information processing terminal are connected in sequence, and the network testing device is connected to the TSN switch; wherein, The power information acquisition end is used to send power service traffic to the TSN switch, so that the TSN switch uploads the power service traffic to the power information processing end; The network testing device is used to send background traffic to the TSN switch, so that the background traffic generates network congestion on the transmission link of the TSN switch; wherein the background traffic is a large-flow data packet, which is used to fill the bandwidth of the transmission link of the TSN switch; The power information processing end determines the service adaptability of the TSN switch in the power control service scenario based on the received power service traffic.
15. The time-sensitive network test bed according to claim 14, It is characterized in that The test bed includes at least two TSN switches, and the at least two TSN switches include a first TSN switch and a second TSN switch. The power information acquisition end, the first TSN switch, the second TSN switch and the power information processing end are connected in sequence, and the network testing device is connected to the first TSN switch and the second TSN switch respectively.
Citation Information
Patent Citations
Test bed and test method for time-sensitive network equipment
CN112804124A
Traffic scheduling test device and method in time-sensitive network
CN113347065A