An intelligent management method, device, electronic device and storage medium for public buildings
By identifying the target system in which the intelligent management of personnel in public buildings does not match the intelligent management of personnel and the intelligent system and formulating training plans, the problem of the mismatch between personnel and the intelligent system is solved, and the benefits of intelligent management are improved.
Patent Information
- Application Number
- CN202211629497.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-19
- Publication Date
- 2025-08-01
- Estimated Expiration
- 2042-12-19
AI Technical Summary
The level of intelligent management of personnel in public buildings does not match the level of intelligent system management, resulting in the inability to maximize the management benefits of intelligent system management.
By determining the intelligence level of public buildings and the intelligent management level of personnel, identifying the mismatched target intelligent systems, and formulating targeted training plans, and feeding them back to the display terminal for display, so as to improve personnel's management level of target intelligent systems.
The benefits of intelligent management of public buildings have been improved and the benefits of intelligent monitoring of smart devices have been maximized.
Smart Images

Figure CN115907682B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent building management, and in particular, to an intelligent management method, device, electronic device and storage medium for public buildings. Background Art
[0002] With the continuous advancement of the construction of smart cities, the level of intelligent building management has also been continuously improved. Nowadays, a multi-level, multi-category and multi-form intelligent management system has been formed in the field of intelligent management of public buildings; the current intelligent management of public buildings is the intelligent management of human-computer interaction in public buildings, that is, the combination of the intelligent management system of public buildings and the intelligent management system of personnel, so as to achieve the purpose of intelligent management of public buildings by personnel and related intelligent devices at the same time.
[0003] However, with the continuous improvement of the degree of intelligence of public buildings, the situation of non-correspondence between the value of personnel intelligent management level and the value of public building intelligent level has become more and more serious; as a result, the intelligent management of some intelligent systems in public buildings fails to be fully combined with personnel intelligent management, that is, personnel fail to fully participate in the intelligent management of this part of intelligent systems; thus, the benefits of the intelligent management of this part of intelligent systems cannot be maximized. Summary of the Invention
[0004] In order to improve the benefits of intelligent management of public buildings, the present application provides an intelligent management method, device, electronic device and storage medium for public buildings.
[0005] In a first aspect, the present application provides an intelligent management method for public buildings, adopting the following technical solutions:
[0006] An intelligent management method for public buildings includes:
[0007] Determine the intelligent level value of the public building and the intelligent management level value of personnel, where the intelligent level value of the public building is the intelligent device monitoring coverage level value in the public building, and the intelligent management level value of personnel is the intelligent operation management level value of personnel for intelligent devices in the public building;
[0008] If the intelligent level value of the public building does not match the intelligent management level value of personnel, determine the target intelligent system and the corresponding historical intelligent management information of personnel for the target intelligent system; the target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of personnel;
[0009] Construct an intelligent management training plan for the target intelligent system according to the target intelligent system and the historical intelligent management information of personnel, and feedback it to the display terminal for display.
[0010] By adopting the above technical solution, the intelligent level of the detection coverage rate of intelligent devices in public buildings, that is, the intelligent level value of public buildings, and the intelligent operation management level of intelligent devices in public buildings, that is, the intelligent management level value of personnel, are determined. Subsequently, it is judged whether the intelligent level value of the public building matches the intelligent management level value of personnel. If the intelligent level value of the public building does not match the intelligent management level value of personnel, it indicates that the current intelligent management level of personnel cannot meet the intelligent monitoring of intelligent devices in public buildings. At this time, the target intelligent system and the corresponding historical intelligent management information of personnel that cause the mismatch between the intelligent level value of the public building and the intelligent management level value of personnel are determined; and a training plan for the target intelligent system and the corresponding historical intelligent management information of personnel is formulated and fed back to the display terminal for display to achieve the goal of training personnel, thereby improving the intelligent management level of personnel for the target intelligent system and further improving the benefit of intelligent management of public buildings.
[0011] In a possible implementation manner, the determination of the intelligent level value of public buildings includes:
[0012] Determine the monitoring coverage rate corresponding to each first sub-intelligent system in the public building and the parameter information corresponding to each first sub-intelligent system;
[0013] According to the monitoring coverage rate corresponding to each first sub-intelligent system and the parameter information corresponding to each first sub-intelligent system, determine the intelligent level value corresponding to each first sub-intelligent system;
[0014] According to the intelligent level value corresponding to each first sub-intelligent system, determine the intelligent level value of the public building.
[0015] By adopting the above technical solution, determine the monitoring coverage rate corresponding to each first sub-intelligent system in the public building and the corresponding parameter information; the monitoring coverage rate reflects the intelligent device monitoring range of the corresponding first sub-intelligent system, and the parameter information reflects the operation and monitoring of the intelligent devices of the corresponding first sub-intelligent system; subsequently, according to the monitoring coverage rate and the parameter information, determine the intelligent level value corresponding to the corresponding first intelligent system, and then determine the intelligent level value of the public building according to the intelligent level values corresponding to all the first intelligent systems, thereby improving the accuracy of determining the intelligent level value.
[0016] In a possible implementation manner, the determination of the intelligent management level value of personnel includes:
[0017] Determine multiple second sub-intelligent systems from all the first sub-intelligent systems, and the second sub-intelligent systems are sub-intelligent systems with personnel adjustment parameters;
[0018] Determine the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system within the first historical time period;
[0019] According to the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system, determine the intelligent management level value corresponding to each second sub-intelligent system;
[0020] According to the intelligent management level value corresponding to each second sub-intelligent system, determine the personnel intelligent management level value.
[0021] By adopting the above technical solution, second sub-intelligent systems with personnel adjustment parameters are determined from all the first sub-intelligent systems, thereby eliminating the sub-intelligent systems that do not involve personnel participation; subsequently, the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system within the first historical time period are determined, and then the intelligent management level value corresponding to each second sub-intelligent system is determined; subsequently, according to all the intelligent management level values, the personnel intelligent management level value is determined; thereby eliminating the first sub-intelligent systems that do not involve personnel participation to ensure the accuracy of the determined personnel intelligent management level value.
[0022] In a possible implementation manner, the determining the target intelligent system if the intelligent level value of the public building does not match the personnel intelligent management level value includes:
[0023] Perform a ratio calculation on the intelligent level value of the public building and the personnel intelligent management level value to determine the intelligent level ratio;
[0024] If the intelligent level ratio exceeds the preset intelligent level ratio range, determine the target intelligent system.
[0025] By adopting the above technical solution, a ratio calculation is performed on the intelligent level value of the public building and the personnel intelligent management level value to obtain the intelligent level ratio; subsequently, the intelligent level ratio is compared with the preset level range. When the intelligent level ratio exceeds the preset intelligent level ratio range, it indicates that the intelligent level of the public building and the personnel intelligent management level do not match at this time, and then the target intelligent system affecting the mismatch is determined; thereby enabling a targeted treatment plan to be determined in the subsequent process.
[0026] In a possible implementation manner, the determining the historical personnel intelligent management information corresponding to the target intelligent system includes:
[0027] Determine a plurality of historical parameter information corresponding to the target intelligent system within the second historical time period;
[0028] Screen out the historical parameter information with personnel adjustment from the plurality of historical parameter information;
[0029] Determine the historical personnel intelligent management information corresponding to the target intelligent system according to the historical parameter information with personnel adjustment.
[0030] By adopting the above technical solution, a plurality of historical parameter information corresponding to the target intelligent system in the second historical time period is determined, and the historical parameter information with personnel adjustment is selected therefrom. The historical parameter information with personnel adjustment can reflect the situation of personnel intelligent management; subsequently, according to the historical parameter information with personnel adjustment, the historical personnel intelligent management information corresponding to the target intelligent system is further determined, so as to eliminate the influence of the parameter information without personnel adjustment on determining the historical personnel intelligent management information corresponding to the target intelligent system.
[0031] In a possible implementation manner, after constructing the intelligent management training plan of the target intelligent system and feeding it back to the display terminal for display, it further includes:
[0032] Judge whether training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained. The training feedback information is the training result information input after personnel learn the training plan of the target intelligent system management;
[0033] Determine the final personnel intelligent management level value based on the training feedback information;
[0034] If the final personnel intelligent management level value matches the intelligent level value of the public building, stop the management training plan of the target intelligent system from being fed back to the display terminal for display again.
[0035] By adopting the above technical solution, first judge whether training feedback information corresponding to the corresponding intelligent management training plan is obtained; if the training feedback information is obtained, it indicates that the staff has carried out technical training on the intelligent management training plan. Subsequently, according to the training feedback information, the final personnel intelligent management level value is further determined. At this time, if the final personnel intelligent management level value matches the intelligent management level value of the public building, it indicates that the intelligent management level of the relevant personnel for the target intelligent system has been made up. Subsequently, stop the management training plan of the target intelligent system from being fed back to the display terminal for display, so as to complete the targeted intelligent management training for personnel.
[0036] In a possible implementation manner, after judging whether training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained, it further includes:
[0037] If the training feedback information corresponding to the intelligent management training plan of the target intelligent system is not obtained, generate a training prompt message at the end of the preset time period;
[0038] Feed the training prompt information and the intelligent management training plan back to the display terminal for display.
[0039] By adopting the above technical solution, when the training feedback information corresponding to the intelligent management training plan of the target intelligent system is not obtained, it indicates that the staff has not received relevant training for this plan. At this time, at the end of the preset time period, a training prompt information is generated and fed back to the display terminal for display together with the intelligent management training plan, so as to notify the staff to participate in the training as soon as possible.
[0040] In a second aspect, the present application provides an intelligent management device for public buildings, adopting the following technical solution:
[0041] An intelligent management device for public buildings includes: a horizontal value determination module, a first determination module, and a first feedback module, where
[0042] The horizontal value determination module is used to determine the intelligent level value of the public building and the intelligent management level value of the personnel. The intelligent level value of the public building is the intelligent device monitoring coverage level value in the public building, and the intelligent management level value of the personnel is the intelligent operation management level value of the personnel for the intelligent devices in the public building;
[0043] The first determination module is used to determine the target intelligent system and the corresponding historical intelligent management information of the personnel if the intelligent level value of the public building does not match the intelligent management level value of the personnel; the target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of the personnel;
[0044] The first feedback module is used to construct an intelligent management training plan for the target intelligent system according to the target intelligent system and the historical intelligent management information of the personnel, and feed it back to the display terminal for display.
[0045] By adopting the above technical solution, the horizontal value determination module determines the intelligent level of the detection coverage rate of intelligent devices in public buildings, that is, the intelligent level value of public buildings, and the intelligent operation management level of intelligent devices in public buildings, that is, the intelligent management level value of personnel; Subsequently, the first determination module determines whether the intelligent level value of the public building matches the intelligent management level value of personnel. If the intelligent level value of the public building does not match the intelligent management level value of personnel, it indicates that the current intelligent management level of personnel cannot meet the intelligent monitoring of intelligent devices in public buildings. At this time, the first determination module determines the target intelligent system and the corresponding historical intelligent management information of personnel that cause the mismatch between the intelligent level value of the public building and the intelligent management level value of personnel; And a training plan for the target intelligent system and the corresponding historical intelligent management information of personnel is formulated through the first feedback module and fed back to the display terminal for display to achieve the goal of training personnel, thereby improving the intelligent management level of personnel for the target intelligent system, and further improving the benefit of intelligent management of public buildings.
[0046] In a possible implementation manner, the horizontal value determination module further includes: an information acquisition unit, a sub-horizontal value determination unit, and a first horizontal value determination unit, where
[0047] The information acquisition unit is configured to acquire the monitoring coverage rate corresponding to each first sub-intelligent system in the public building and the parameter information corresponding to each first sub-intelligent system;
[0048] The sub-horizontal value determination unit is configured to determine the intelligent level value corresponding to each first sub-intelligent system according to the monitoring coverage rate corresponding to each first sub-intelligent system and the parameter information corresponding to each first sub-intelligent system;
[0049] The first horizontal value determination unit is configured to determine the intelligent level value of the public building according to the intelligent level value corresponding to each first sub-intelligent system.
[0050] In a possible implementation manner, the horizontal value determination module further includes: a system determination unit, a first information determination unit, a second information determination unit, and a third information determination unit, where
[0051] The first system determination unit is configured to determine multiple second sub-intelligent systems from all the first sub-intelligent systems, and the second sub-intelligent systems are sub-intelligent systems with personnel adjustment parameters;
[0052] The first information determination unit is configured to determine the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system within the first historical time period;
[0053] A second information determination unit, configured to determine an intelligent management level value corresponding to each second sub-intelligent system according to the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system;
[0054] A second level value determination unit, configured to determine the personnel intelligent management level value according to the intelligent management level value corresponding to each second sub-intelligent system.
[0055] In a possible implementation manner, the first determination module further includes: a level ratio determination unit and a fourth information determination unit, where
[0056] The level ratio determination unit is configured to calculate a ratio of the intelligent level value of the public building to the personnel intelligent management level value to determine an intelligent level ratio;
[0057] The fourth information determination unit is configured to determine a target intelligent system if the intelligent level ratio exceeds a preset level ratio range.
[0058] In a possible implementation manner, the first determination module further includes: a historical information determination unit, an information screening unit, and a fifth information determination unit, where
[0059] The historical information determination unit is configured to determine a plurality of historical parameter information corresponding to the target intelligent system within a second historical time period;
[0060] The information screening unit is configured to screen out historical parameter information with personnel adjustment from the plurality of historical parameter information;
[0061] The fifth information determination unit is configured to determine historical personnel intelligent management information corresponding to the target intelligent system according to the historical parameter information with personnel adjustment.
[0062] In a possible implementation manner, the public building intelligent management further includes: a judgment module, a second determination module, and a scheme stop feedback module, where
[0063] The judgment module is configured to judge whether training feedback information corresponding to the intelligent management training scheme of the target intelligent system is obtained, where the training feedback information is training result information input after personnel learn the training scheme of the target intelligent system management;
[0064] The second determination module is configured to determine a final personnel intelligent management level value based on the training feedback information;
[0065] A solution stop feedback module, configured to stop the management training solution of the target intelligent system from being fed back to the display terminal for display again if the final personnel intelligent management level value matches the intelligent level value of the public building.
[0066] In a possible implementation manner, the intelligent management of the public building further includes: a prompt information generation module and a second feedback module, where
[0067] The prompt information generation module is configured to generate training prompt information at the end of a preset time period if training feedback information corresponding to the intelligent management training solution of the target intelligent system is not obtained;
[0068] The second feedback module is configured to feed back the training prompt information and the intelligent management training solution to the display terminal for display.
[0069] In a third aspect, the present application provides an electronic device, adopting the following technical solution:
[0070] An electronic device, the electronic device includes:
[0071] At least one processor;
[0072] A memory;
[0073] At least one application program, where at least one application program is stored in the memory and is configured to be executed by at least one processor, and the at least one application program is configured to: execute the method for intelligent management of the above-mentioned public building.
[0074] In a fourth aspect, the present application provides a computer-readable storage medium, adopting the following technical solution:
[0075] A computer-readable storage medium, including: a computer program that can be loaded and executed by a processor for the intelligent management of the above-mentioned public building.
[0076] In summary, the present application includes the following beneficial technical effects:
[0077] Determine the intelligent level of the detection coverage rate of intelligent devices in public buildings, that is, the intelligent level value of public buildings, and the intelligent operation management level of intelligent devices in public buildings, that is, the intelligent management level value of personnel; Subsequently, determine whether the intelligent level value of the public building matches the intelligent management level value of personnel. If the intelligent level value of the public building does not match the intelligent management level value of personnel, it indicates that the current intelligent management level of personnel cannot meet the intelligent monitoring of intelligent devices in public buildings. At this time, determine the target intelligent system that causes the mismatch between the intelligent level value of the public building and the intelligent management level value of personnel, and the corresponding historical intelligent management information of personnel; And formulate a training plan for the target intelligent system and the corresponding historical intelligent management information of personnel, and feedback it to the display terminal for display, so as to achieve the goal of training personnel, thereby improving the intelligent management level of personnel for the target intelligent system, and further improving the efficiency of intelligent management of public buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0078] Figure 1 is a schematic flowchart of the public building intelligent management method according to an embodiment of the present application;
[0079] Figure 2 is a block diagram of the public building intelligent management device according to an embodiment of the present application;
[0080] Figure 3 is a schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0081] The following is a further detailed description of the present application in conjunction with the attached Figures 1-3 drawings.
[0082] In order to make the objectives, technical solutions, and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are some, but not all, of the embodiments of the present application. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present application without creative efforts shall fall within the protection scope of the present application.
[0083] An embodiment of the present application provides a public building intelligent management method, which is executed by an electronic device. Among them, the device can be a server or a terminal device. Among them, the server can be an independent physical server, a server cluster or a distributed device composed of multiple physical servers, or a cloud server providing cloud computing services. The terminal device can be a smart phone, a tablet computer, a notebook computer, a desktop computer, etc., but is not limited thereto. The terminal device and the server can be directly or indirectly connected through wired or wireless communication methods, and the embodiments of the present application do not make any restrictions here.
[0084] Referring to Figure 1 , the method includes: step S101, step S102, and step S103, where
[0085] Step S101: Determine the intelligent level value of the public building and the intelligent management level value of the personnel.
[0086] By adopting the above technical solution, the intelligent level value of the public building is the monitoring coverage level value of the intelligent devices in the public building, and the intelligent management level value of the personnel is the intelligent operation management level value of the personnel for the intelligent devices in the public building.
[0087] The installation positions and quantities of the intelligent devices in the public building are determined according to the construction plan of the public building and the actual on-site situation. The installation positions and quantities of the intelligent devices can reflect the intelligent monitoring coverage degree of the public building, that is, the intelligent level of the public building. Further, the intelligent devices send the collected relevant information to the management interface of the electronic device, and the staff analyze and adjust the relevant information to achieve intelligent management of human-computer interaction. And a high intelligent level often requires a high intelligent management level of the staff to give full play to the benefits of the intelligent management of the public building. Therefore, the electronic device determines the intelligent level value of the public building and the intelligent management level value of the personnel by obtaining the relevant information of the intelligent devices in the public building and the adjustment made by the staff for the relevant information, so as to determine whether the intelligent level of the current public building corresponds to the intelligent management of the personnel subsequently.
[0088] Step S102: If the intelligent level value of the public building does not match the intelligent management level value of the personnel, determine the target intelligent system and the historical intelligent management information corresponding to the target intelligent system.
[0089] By adopting the above technical solution, the target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of the personnel. The public building includes multiple sub-intelligent systems, such as a monitoring system, a fire protection system, a heating system, a power supply system, a security system, and a central refrigeration system, etc. Each sub-intelligent system sends the relevant data monitored by multiple intelligent devices to the electronic device installed in the management center. The electronic device analyzes and processes the relevant data corresponding to each received sub-intelligent system and feeds it back to the management interface in the electronic device. The relevant staff conduct real-time monitoring and adjustment management through the management interface in the electronic device, realizing intelligent management of the public building with human-computer interaction.
[0090] When the electronic device determines that the intelligent level value of the public building does not match the intelligent management level value of the personnel, it indicates that the current intelligent management level of the personnel is not sufficient to maximize the benefits of the intelligent monitoring of the intelligent devices included in the current public building. At this time, it is necessary to determine the sub-intelligent system in the public building that causes the mismatch between the intelligent level of the public building and the personnel management level, that is, the target intelligent system and the corresponding historical intelligent management information of the personnel of the target system; the electronic device processes and analyzes the target intelligent system and the corresponding historical intelligent management information of the personnel to determine the reason for the mismatch between the intelligent level value of the public building and the intelligent management level value of the personnel.
[0091] Step S103, construct an intelligent management training plan for the target intelligent system according to the target intelligent system and the historical intelligent management information of the personnel, and feedback it to the display terminal for display.
[0092] By adopting the above technical solution, after the electronic device processes and analyzes the determined target intelligent system and the corresponding historical intelligent management information of the personnel, it determines the relevant monitoring information of the intelligent devices included in the intelligent system and the corresponding historical intelligent management information of the personnel for the relevant monitoring information, further determines the relevant monitoring information with errors or mismatches and the corresponding intelligent management information of the personnel. Subsequently, an intelligent management training plan for the target intelligent system is formulated according to the relevant monitoring information with errors or mismatches and the corresponding intelligent management information of the personnel, and the plan is sent to the display terminal in the management for display, prompting the staff to conduct training on the training plan to improve the intelligent management level of the staff for the target intelligent system, so as to maximize the benefits of the intelligent monitoring of the intelligent devices included in the target intelligent system, and then maximize the benefits of the intelligent management of the public building.
[0093] An embodiment of the present application provides a method for intelligent management of public buildings. An electronic device determines the intelligent level of the detection coverage rate of intelligent devices in a public building, that is, the intelligent level value of the public building, and the intelligent operation management level of the intelligent devices in the public building, that is, the intelligent management level value of personnel. Subsequently, the electronic device determines whether the intelligent level value of the public building matches the intelligent level of personnel. If the electronic device determines that the intelligent level value of the public building does not match the intelligent management level value of personnel, it indicates that the current intelligent management level of personnel cannot meet the intelligent monitoring of intelligent devices in the public building. At this time, the electronic device determines the target intelligent system that causes the mismatch between the intelligent level value of the public building and the intelligent management level value of personnel, as well as the corresponding historical intelligent management information of personnel; and formulates a training plan for the target intelligent system and the corresponding historical intelligent management information of personnel, and feeds it back to the display terminal for display, so as to achieve the goal of training personnel, thereby improving the intelligent management level of personnel for the target intelligent system, and further improving the efficiency of intelligent management of public buildings.
[0094] Specifically, in step S101, determining the intelligent level value of the public building specifically includes: determining the monitoring coverage rate corresponding to each first sub-intelligent system in the public building and the parameter information corresponding to each first sub-intelligent system; determining the intelligent level value corresponding to each first sub-intelligent system according to the monitoring coverage rate corresponding to each first sub-intelligent system and the parameter information corresponding to each first sub-intelligent system; and determining the intelligent level value of the public building according to the intelligent level value corresponding to each first sub-intelligent system.
[0095] By adopting the above technical solution, the first intelligent system is an intelligent system with different applications included in the public building. For example, a monitoring system, a security system, a heating system, etc.; the parameter information is the intelligent device operation information and monitoring and acquisition information included in each first intelligent system.
[0096] The electronic device first obtains the location information corresponding to the intelligent devices included in each first sub-intelligent system and the monitoring range information of each intelligent device; based on the location information corresponding to each intelligent device and the monitoring range information of each intelligent device, it further determines the monitoring range corresponding to each first sub-intelligent system; subsequently, the electronic device obtains the monitoring range corresponding to each first sub-intelligent system that meets the monitoring requirements; and compares the monitoring range that meets the monitoring requirements with the monitoring range corresponding to each sub-intelligent system to determine the monitoring coverage rate corresponding to each first sub-intelligent system in the public building; at the same time, the electronic device obtains the parameter information collected by each intelligent device included in each first sub-intelligent system; after that, the electronic device determines the intelligent level value corresponding to each first sub-intelligent system according to the monitoring coverage rate corresponding to each first sub-intelligent system and the parameter information corresponding to each first intelligent system; subsequently, the electronic device performs an average processing on all sub-intelligent systems to determine the intelligent level value of the public building.
[0097] Specifically, each first sub-intelligent system can be weighted based on its importance, that is, the weight corresponding to each first sub-intelligent system is determined. Subsequently, according to the weight corresponding to each first sub-intelligent system, a product processing is performed on the intelligent level value corresponding to each first sub-intelligent system, and then an average processing is performed on the intelligent level value corresponding to each first sub-intelligent system after the product processing to determine the intelligent level value of the public building.
[0098] Among the multiple intelligent systems included in the public building, there are intelligent systems that only have the function of collecting corresponding information, such as the heating system and the fire protection system, etc.; such intelligent systems will obtain the relevant information on-site in real time and send it to the management center, but the staff located in the management center cannot modify or adjust the parameters of the intelligent devices included in such systems; therefore, such intelligent systems lack the function of personnel intelligent management. So, during the process of determining the personnel intelligent management level value, it is necessary to screen out such intelligent systems to ensure the accuracy of the determined personnel intelligent management level value.
[0099] Specifically, in step S101, determining the personnel intelligent management level value specifically further includes: determining multiple second sub-intelligent systems from all the first sub-intelligent systems, where the second sub-intelligent systems are the sub-intelligent systems with the function of personnel parameter adjustment; determining the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system within the first historical time period; determining the intelligent management level value corresponding to each second sub-intelligent system according to the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system; and determining the personnel intelligent management level value according to the intelligent management level value corresponding to each second sub-intelligent system.
[0100] By adopting the above technical solution, the electronic device screens out the first sub-intelligent systems that do not have personnel participating in parameter adjustment from all the first sub-intelligent systems, and then determines the second sub-intelligent systems with personnel-adjustable parameters; a first historical time period is preset inside the electronic device. Subsequently, the electronic device further determines the corresponding personnel operation information and personnel abnormal operation information of each second sub-intelligent system within the first historical time period; based on the personnel operation information and the personnel abnormal operation information, the corresponding normal operation rate of each second sub-intelligent system can be determined, and then the intelligent management level value corresponding to the corresponding second sub-intelligent system can be determined through the normal operation rate information.
[0101] It should be noted that after obtaining the intelligent management level values corresponding to all the second sub-intelligent systems respectively, the average value of all the intelligent management level values is calculated, and then the intelligent management level value of the personnel is determined; among them, before calculating the average value of all the intelligent management level values, the weights of all the second sub-intelligent systems can be divided based on the importance degree, and according to the corresponding weights of each second sub-intelligent system, the product of all the intelligent management level values is calculated, and then the average value is calculated.
[0102] Specifically, in step S102, if the intelligent level value of the public building does not match the intelligent management level value of the personnel, determining the target intelligent system specifically further includes: calculating the ratio of the intelligent level value of the public building to the intelligent management level value of the personnel to determine the intelligent level ratio; if the intelligent level ratio exceeds the preset intelligent level ratio range, then determine the target intelligent system.
[0103] By adopting the above technical solution, a preset intelligent level ratio range is set inside the electronic device as the judgment basis for determining whether the intelligent level value of the public building matches the intelligent management level value of the personnel; the electronic device calculates the ratio of the determined intelligent level value of the public building to the intelligent management level value of the personnel, and then determines the intelligent level ratio representing the comprehensive intelligent level of the public building; subsequently, the electronic device judges the determined intelligent level ratio with the preset intelligent level ratio range. When the intelligent level ratio exceeds the preset intelligent level ratio range, it indicates that the intelligent level of the public building is not equal to the intelligent management level of the personnel; and then determines the target intelligent system affecting the inequality between the intelligent level of the public building and the intelligent management level of the personnel; and formulates corresponding countermeasures based on the target intelligent system.
[0104] Specifically, in step S102, determining the historical personnel intelligent management information corresponding to the target intelligent system includes: determining a plurality of historical parameter information corresponding to the target intelligent system within the second historical time period; screening out the historical parameter information with personnel adjustment from the plurality of historical parameter information; and determining the historical personnel intelligent management information corresponding to the target intelligent system according to the historical parameter information with personnel adjustment.
[0105] By adopting the above technical solution, the electronic device presets the second historical time period; when the electronic device determines the target intelligent system, it further determines a plurality of historical parameter information corresponding to the target intelligent system within the second historical time period, where the historical parameter information includes the operation information of multiple intelligent devices in the target intelligent system, the configuration information of each intelligent device, and the relevant information collected by each intelligent device; subsequently, the historical parameter information with personnel adjustment is screened out from the plurality of historical parameter information. For example, the parameter information corresponding to the monitoring device includes the configuration information of the monitoring device, the image information collected by the monitoring device, and the operation status information of the monitoring device. Among them, the configuration information of the monitoring device can be manually adjusted remotely, while the operation status information of the monitoring device cannot be adjusted by personnel; furthermore, the electronic device determines the historical personnel intelligent management information corresponding to the intelligent system information according to the historical parameter information with personnel adjustment.
[0106] After determining that the intelligent level of the public building does not match the intelligent management level of the personnel, it is necessary to adjust it back as soon as possible. In order to obtain the adjustment result; after the electronic device determines the intelligent management training plan and feeds it back to the display terminal for display, it needs to further follow up to determine whether to continue to feed back the intelligent management training plan; specifically, in step S103, constructing the intelligent management training plan for the target intelligent system and feeding it back to the display terminal for display, and then further including: determining whether the training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained, where the training feedback information is the training result information entered after the personnel learn the training plan for the management of the target intelligent system; determining the final personnel intelligent management level value based on the training feedback information; if the final personnel intelligent management level value matches the intelligent level value of the public building, stop the management training plan of the target intelligent system from being fed back to the display terminal for display again.
[0107] By adopting the above technical solution, the electronic device determines whether the training feedback information corresponding to the intelligent management training method of the target intelligent system is obtained. If the training feedback information is not obtained, it indicates that the staff has not received relevant training for the intelligent management training program. At this time, the electronic device can generate training prompt information at the end of the unit time period and feedback it to the display terminal for display together with the intelligent management training program; if the training feedback information is obtained, it indicates that the staff has received relevant training for the intelligent management training program. At this time, the electronic device further determines the final personnel intelligent management level value based on the training feedback information, and determines the personnel intelligent management level value and the public building intelligent level value. If the match is matched, the electronic device stops the target intelligent system training program and feeds back the feedback to the display terminal for display again.
[0108] Specifically, it is determined whether the training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained, and then it also includes: if the training feedback information corresponding to the intelligent management training plan of the target intelligent system is not obtained, a training reminder information is generated at the end of the preset time period; the training reminder information and the intelligent management training plan are fed back to the display terminal for display.
[0109] By adopting the above technical solution, if the electronic device determines that the training feedback information corresponding to the intelligent management training plan of the target intelligent system has not been obtained, it indicates that the staff has not received relevant training according to the training plan, that is, the problem of the level of public buildings and the level of intelligent management of personnel has not been solved. At this time, the electronic device generates a training reminder message at the end of the preset time period; and feeds back the training reminder message and the intelligent management training plan to the display terminal for display, thereby reminding the staff to receive training as soon as possible to solve the problem that the benefits of the intelligent management of the target intelligent system cannot be maximized due to the mismatch between the intelligent level of public buildings and the intelligent management level of personnel.
[0110] The above embodiment introduces a method for intelligent management of public buildings from the perspective of method flow. The following embodiment introduces a device for intelligent management of public buildings from the perspective of virtual modules or virtual units. Please refer to the following embodiment for details.
[0111] Reference Figure 2 The public building intelligent management device 20 may specifically include: a level value determination module 201, a first determination module 202 and a first feedback module 203, wherein:
[0112] A horizontal value determination module 201, configured to determine the intelligent level value of a public building and the intelligent management level value of personnel. The intelligent level value of the public building is the monitoring coverage level value of intelligent devices in the public building, and the intelligent management level value of personnel is the intelligent operation management level value of personnel for intelligent devices in the public building;
[0113] A first determination module 202, configured to determine a target intelligent system and the corresponding historical intelligent management information of the target intelligent system if the intelligent level value of the public building does not match the intelligent management level value of personnel; the target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of personnel;
[0114] A first feedback module 203, configured to construct an intelligent management training plan for the target intelligent system according to the target intelligent system and the historical intelligent management information of personnel, and feed it back to a display terminal for display.
[0115] In a possible implementation manner of the embodiment of the present application, the horizontal value determination module 201 further includes: an information acquisition unit, a sub-horizontal value determination unit, and a first horizontal value determination unit, where
[0116] The information acquisition unit is configured to acquire the monitoring coverage rate corresponding to each first sub-intelligent system in the public building and the parameter information corresponding to each first sub-intelligent system;
[0117] The sub-horizontal value determination unit is configured to determine the intelligent level value corresponding to each first sub-intelligent system according to the monitoring coverage rate corresponding to each first sub-intelligent system and the parameter information corresponding to each first sub-intelligent system;
[0118] The first horizontal value determination unit is configured to determine the intelligent level value of the public building according to the intelligent level value corresponding to each first sub-intelligent system.
[0119] In a possible implementation manner of the embodiment of the present application, the horizontal value determination module 201 further includes: a system determination unit, a first information determination unit, a second information determination unit, and a third information determination unit, where
[0120] The first system determination unit is configured to determine a plurality of second sub-intelligent systems from all the first sub-intelligent systems, and the second sub-intelligent systems are sub-intelligent systems with personnel adjustment parameters;
[0121] The first information determination unit is configured to determine the personnel operation information and personnel abnormal operation information corresponding to each second sub-intelligent system within a first historical time period;
[0122] The second information determination unit is configured to determine the intelligent management level value corresponding to each second sub-intelligent system according to the personnel operation information and the personnel abnormal operation information corresponding to each second sub-intelligent system;
[0123] The second level value determination unit is configured to determine the personnel intelligent management level value according to the intelligent management level value corresponding to each second sub-intelligent system.
[0124] In a possible implementation manner of the embodiment of the present application, the first determination module 202 further includes: a level ratio determination unit and a fourth information determination unit, where
[0125] The level ratio determination unit is configured to calculate the ratio of the intelligent level value of the public building to the personnel intelligent management level value to determine the intelligent level ratio;
[0126] The fourth information determination unit is configured to determine the target intelligent system if the intelligent level ratio exceeds the preset intelligent level ratio range.
[0127] In a possible implementation manner of the embodiment of the present application, the first determination module 202 further includes: a historical information determination unit, an information screening unit, and a fifth information determination unit, where
[0128] The historical information determination unit is configured to determine a plurality of historical parameter information corresponding to the target intelligent system within the second historical time period;
[0129] The information screening unit is configured to screen out the historical parameter information with personnel adjustment from the plurality of historical parameter information;
[0130] The fifth information determination unit is configured to determine the historical personnel intelligent management information corresponding to the target intelligent system according to the historical parameter information with personnel adjustment.
[0131] In a possible implementation manner of the embodiment of the present application, the public building intelligent management 20 further includes: a judgment module, a second determination module, and a first feedback module for stopping the plan, where
[0132] The judgment module is configured to judge whether training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained, and the training feedback information is the training result information input after the personnel learn the training plan for the management of the target intelligent system;
[0133] The second determination module is configured to determine the final personnel intelligent management level value based on the training feedback information;
[0134] The first feedback module for stopping the plan is configured to stop the management training plan of the target intelligent system from being fed back to the display terminal for display again if the final personnel intelligent management level value matches the intelligent level value of the public building.
[0135] In a possible implementation manner of the embodiment of the present application, the intelligent management 20 of public buildings further includes: a prompt information generation module and a second feedback module, where
[0136] The prompt information generation module is configured to generate a training prompt information when the preset time period ends if the training feedback information corresponding to the intelligent management training plan of the target intelligent system is not obtained;
[0137] The second feedback module is configured to feedback the training prompt information and the intelligent management training plan to a display terminal for display.
[0138] Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working processes of the above-described systems, devices, and units can refer to the corresponding processes in the foregoing method embodiments, and will not be described herein again.
[0139] The embodiment of the present application also introduces an electronic device from the perspective of an entity device, such as Figure 3 as shown, Figure 3 The electronic device 30 shown includes: a processor 301 and a memory 303. Among them, the processor 301 and the memory 303 are connected, such as connected through a bus 302. Optionally, the electronic device 300 may further include a transceiver 304. It should be noted that in practical applications, the transceiver 304 is not limited to one, and the structure of the electronic device 300 does not constitute a limitation to the embodiment of the present application.
[0140] The processor 301 may be a CPU (Central Processing Unit, central processor), a general-purpose processor, a DSP (Digital Signal Processor, data signal processor), an ASIC (Application Specific Integrated Circuit, application-specific integrated circuit), an FPGA (Field Programmable Gate Array, field programmable gate array), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute various exemplary logical blocks, modules, and circuits described in connection with the disclosure of the present application. The processor 301 may also be a combination that realizes a computing function, such as a combination including one or more microprocessors, a combination of a DSP and a microprocessor, etc.
[0141] The bus 302 may include a path for transmitting information between the above components. The bus 302 can be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The bus 302 can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 3 only a thick line is used to represent it in Figure 3 , but it does not mean that there is only one bus or one type of bus.
[0142] The memory 303 can be a ROM (Read Only Memory) or other types of static storage electronic devices that can store static information and instructions, a RAM (Random Access Memory) or other types of dynamic storage electronic devices that can store information and instructions, or it can also be an EEPROM (Electrically Erasable Programmable Read Only Memory), a CD-ROM (Compact Disc Read Only Memory), or other optical disc storage, optical disc storage (including compact discs, laser discs, optical discs, digital versatile discs, Blu-ray discs, etc.), magnetic disk storage media, or other magnetic storage electronic devices, or any other storage medium that can be used to carry or store the desired program code in the form of instructions or data structures and can be accessed by a computer, but not limited to this.
[0143] The memory 303 is used to store the application program code for executing the solution of this application, and is controlled by the processor 301 for execution. The processor 301 is used to execute the application program code stored in the memory 303 to implement the content shown in the foregoing method embodiments.
[0144] It should be understood that although the steps in the flowchart of the accompanying drawings are sequentially shown according to the indication of the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless there is a clear indication in this article, the execution of these steps has no strict order limitation, and they can be executed in other orders. Moreover, at least a part of the steps in the flowchart of the accompanying drawings may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily sequential, but can be executed alternately or alternately with at least a part of other steps or sub-steps or stages of other steps.
[0145] The above are only some implementation manners of the present application. It should be noted that for those of ordinary skill in the art, without departing from the principle of the present application, several improvements and refinements can be made, and these improvements and refinements should also be regarded as the protection scope of the present application.
Claims
1. An intelligent management method for public buildings, characterized in that, Including: Determine the intelligent level value of a public building and the intelligent management level value of personnel. The intelligent level value of the public building is determined based on the monitoring coverage rate and parameter information of each first sub-intelligent system in the public building. The monitoring coverage rate is determined by the installation locations and quantities of intelligent devices, and the installation locations and quantities are determined based on the planned installation scope and actual installation scope of the intelligent devices. The parameter information includes the operating status of the intelligent devices and the monitored and collected data; The intelligent management level value of personnel is determined based on the normal operation rate of personnel for a second sub-intelligent system with personnel adjustment parameters within a first historical time period. The normal operation rate is determined based on personnel operation information and personnel abnormal operation information; If the ratio of the intelligent level value of the public building to the intelligent management level value of personnel exceeds a preset ratio range, determine a target intelligent system; the target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of personnel; Determine multiple historical parameter information corresponding to the target intelligent system within a second historical time period, screen out the historical parameter information with personnel adjustment from the multiple historical parameter information, and determine the historical intelligent management information of personnel corresponding to the target intelligent system based on the historical parameter information with personnel adjustment; Determine the relevant monitoring information that is incorrect or mismatched from the relevant monitoring information of the intelligent devices included in the target intelligent system, and determine the intelligent management information of personnel corresponding to the incorrect or mismatched relevant monitoring information from the historical intelligent management information of personnel; Based on the incorrect or mismatched relevant monitoring information and the intelligent management information of personnel corresponding to the incorrect or mismatched relevant monitoring information, construct an intelligent management training plan for the target intelligent system, and feedback it to a display terminal for display.
2. The method according to claim 1, wherein After constructing the intelligent management training plan for the target intelligent system and feedbacking it to the display terminal for display, it further includes: Judge whether training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained. The training feedback information is the training result information entered after personnel learn the training plan for the management of the target intelligent system; Based on the training feedback information, determine the final intelligent management level value of personnel; If the final intelligent management level value of personnel matches the intelligent level value of the public building, stop the management training plan of the target intelligent system from being feedbacked to the display terminal for display again.
3. The method according to claim 2, wherein After judging whether training feedback information corresponding to the intelligent management training plan of the target intelligent system is obtained, it further includes: If the training feedback information corresponding to the intelligent management training plan of the target intelligent system is not obtained, generate a training prompt message at the end of a preset time period; Feedback the training prompt message and the intelligent management training plan to the display terminal for display.
4. An intelligent management device for public buildings, characterized in that, Including: A horizontal value determination module for determining the intelligent level value of a public building and the intelligent management level value of personnel. The intelligent level value of the public building is determined based on the monitoring coverage rate and parameter information of each first sub-intelligent system in the public building. The monitoring coverage rate is determined based on the installation location and quantity of intelligent devices, and the installation location and quantity are determined based on the planned installation scope and actual installation scope of the intelligent devices. The parameter information includes the operating status of the intelligent devices and the monitored and collected data. The intelligent management level value of personnel is determined based on the normal operation rate of personnel for a second sub-intelligent system with personnel adjustment parameters within a first historical time period. The normal operation rate is determined based on personnel operation information and personnel abnormal operation information. A first determination module for determining a target intelligent system if the ratio of the intelligent level value of the public building to the intelligent management level value of personnel exceeds a preset ratio range. The target intelligent system is a sub-intelligent system in the public building intelligent system that does not match the intelligent management of personnel. The first determination module is further configured to determine multiple historical parameter information corresponding to the target intelligent system within a second historical time period, screen out the historical parameter information with personnel adjustment from the multiple historical parameter information, and determine the historical intelligent management information of personnel corresponding to the target intelligent system based on the historical parameter information with personnel adjustment. The first determination module is further configured to determine the relevant monitoring information that is incorrect or mismatched from the relevant monitoring information of the intelligent devices included in the target intelligent system, and determine the personnel intelligent management information corresponding to the incorrect or mismatched relevant monitoring information from the historical intelligent management information of personnel. A first feedback module for constructing an intelligent management training plan for the target intelligent system based on the incorrect or mismatched relevant monitoring information and the personnel intelligent management information corresponding to the incorrect or mismatched relevant monitoring information, and feeding it back to the display terminal for display.
5. An electronic device, characterized in that, The electronic device includes: At least one processor; A memory; At least one application program, where at least one application program is stored in the memory and is configured to be executed by at least one processor. The at least one application program is configured to: execute the public building intelligent management method according to any one of claims 1 to 3.
6. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed on a computer, the computer is made to execute the public building intelligent management method according to any one of claims 1 to 3.
Citation Information
Patent Citations
A method for training constructors by using an intelligent terminal
CN109447533A
Method and system for evaluating intelligent operation and maintenance management value of public building group
CN113065672A
Rural residence intelligent control training method
CN114973836A