A method and device for obtaining the real performance and spatial distribution of dam concrete
By obtaining large-sized blocks of dam concrete and utilizing precision machining equipment and testing requirements, the problem of not being able to obtain the true performance and spatial distribution of concrete in existing technologies has been solved, enabling accurate evaluation of the performance of dam concrete.
Patent Information
- Application Number
- CN202211708157.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-12-28
AI Technical Summary
Existing technologies cannot obtain the true performance and spatial distribution of dam concrete, especially for the surface concrete of old dams that have been in service for many years and are severely damaged, it is impossible to obtain complete core samples, which makes it impossible to assess the true performance and spatial distribution of the concrete.
By obtaining large-sized concrete blocks, using precision processing equipment and pre-set performance testing requirements, a processing plan is formulated to obtain a set of original concrete samples. Precise testing is then conducted to obtain the true performance and spatial distribution patterns.
This method avoids serious interference from on-site sampling and can accurately obtain the performance and spatial distribution of dam concrete, providing an important basis for assessing aging degree and durability.
Smart Images

Figure CN115931508B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydraulic concrete, and in particular to a method and a device for obtaining the real performance and spatial distribution of dam concrete. Background Art
[0002] The macroscopic properties of concrete need to be tested in the safety inspection, acceptance, and appraisal of concrete dams. The current method for obtaining the performance of dam concrete is the core sample-based test method recommended by the "Testing Procedures for Hydraulic Concrete" (SL352-2020), which uses core drilling equipment to drill core samples of different diameters at different locations on the dam, and then tests their mechanical properties, durability, etc.
[0003] However, the high-speed rotation of the sleeve during the core sampling process will inevitably cause great disturbance to the concrete, and the original concrete sample cannot be obtained. In particular, for the surface concrete of old dams that have been in service for many years and are severely damaged, a complete core sample cannot be obtained. Therefore, the true performance of the dam concrete cannot be evaluated, and the spatial distribution of the dam concrete performance cannot be obtained. Summary of the invention
[0004] In view of this, an embodiment of the present invention provides a method and device for obtaining the true performance and spatial distribution of dam concrete, so as to solve the technical problem that the prior art cannot evaluate the true performance of dam concrete and cannot obtain the spatial distribution of dam concrete performance.
[0005] The technical solution proposed by the present invention is as follows:
[0006] In a first aspect, an embodiment of the present invention provides a method for obtaining the true performance and spatial distribution of dam concrete, and the method for obtaining the true performance and spatial distribution of dam concrete includes: obtaining a large-sized concrete block containing an original sample of dam concrete; based on the large-sized concrete block, determining a processing plan for the original sample of target concrete through a preset processing method and preset performance test requirements; based on preset precision processing equipment, obtaining a target concrete original sample set through the processing plan, the target concrete original sample set includes target concrete original samples at different depths at the same position of the concrete dam, at the same depth at different positions, and meeting the performance test requirements; based on the preset performance test requirements, testing each target concrete original sample in the target concrete original sample set to obtain the true performance of the dam concrete and the performance distribution law at different spatial positions.
[0007] In combination with the first aspect, in a possible implementation of the first aspect, a large-sized concrete block containing an original sample of dam concrete is obtained, including: determining the number of free surfaces of a portion to be sampled in the concrete dam; determining a target cutting method based on the number of free surfaces; and cutting the portion to be sampled using a target cutting method based on a preset large-sized cutting device to obtain the large-sized concrete block containing the original sample of dam concrete.
[0008] In combination with the first aspect, in another possible implementation of the first aspect, based on the large-size concrete blocks, after a preset processing method and preset performance test requirements, a processing plan for the target concrete original sample is determined, including: based on the large-size concrete blocks, after the preset processing method, the spatial positioning coordinates of the target concrete original sample are obtained; based on the spatial positioning coordinates of the target concrete original sample and the preset performance test requirements, the processing plan for the target concrete original sample is determined.
[0009] In combination with the first aspect, in another possible implementation of the first aspect, the concrete dam includes a newly built concrete dam, an old concrete dam, and a dangerous dam.
[0010] In a second aspect, an embodiment of the present invention provides a device for obtaining the true performance and spatial distribution of dam concrete, and the device for obtaining the true performance and spatial distribution of dam concrete includes: an acquisition module, which is used to obtain a large-sized concrete block containing an original sample of dam concrete; a determination module, which is used to determine a processing plan for a target original sample of concrete based on the large-sized concrete block through a preset processing method and preset performance test requirements; a processing module, which is used to obtain a target original sample set of concrete through the processing plan based on preset precision processing equipment, and the target original sample set of concrete includes target original samples of concrete at different depths at the same position of the concrete dam and at the same depth at different positions that meet the performance test requirements; a testing module, which is used to test each target original sample of concrete in the target original sample set based on the preset performance test requirements to obtain the true performance of the dam concrete and the performance distribution law at different spatial positions.
[0011] In combination with the second aspect, in a possible implementation of the second aspect, the acquisition module includes: a first determination submodule, used to determine the number of free surfaces of the part to be sampled in the concrete dam; a second determination submodule, used to determine the target cutting method based on the number of free surfaces; a cutting submodule, used to cut the part to be sampled using the target cutting method based on a preset large-size cutting device to obtain the large-size concrete block containing the original sample of the dam concrete.
[0012] In combination with the second aspect, in another possible implementation of the second aspect, the determination module includes: a processing submodule, which is used to obtain the spatial positioning coordinates of the target concrete original sample based on the large-size concrete cutting and the preset processing method; and a third determination submodule, which is used to determine the processing plan of the target concrete original sample based on the spatial positioning coordinates of the target concrete original sample and the preset performance test requirements.
[0013] In combination with the second aspect, in another possible implementation of the second aspect, the concrete dam includes a newly built concrete dam, an old concrete dam, and a dangerous dam.
[0014] In a third aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the method for obtaining the true performance and spatial distribution of dam concrete as described in the first aspect of the embodiment of the present invention and any one of the first aspects.
[0015] In a fourth aspect, an embodiment of the present invention provides an electronic device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to execute the method for obtaining the true performance and spatial distribution of dam concrete as described in the first aspect and any one of the first aspects of the embodiment of the present invention.
[0016] The technical solution provided by the present invention has the following effects:
[0017] The method for obtaining the real performance and spatial distribution of dam concrete provided by the embodiment of the present invention obtains a large-sized concrete block containing an original sample of dam concrete; based on the large-sized concrete block, after a preset processing method and preset performance test requirements, a processing scheme of the original sample of target concrete is determined; based on a preset precision processing equipment, after the processing scheme, a target concrete original sample set is obtained, the target concrete original sample set includes target concrete original samples at different depths at the same position of the concrete dam, at the same depth at different positions, and meeting the performance test requirements; based on the preset performance test requirements, each target concrete original sample in the original sample set is tested to obtain the real performance of the dam concrete and the performance distribution law at different spatial positions. The present invention adopts precision processing equipment to avoid serious interference of on-site sampling; further, by testing the original sample of the target concrete at different depths at the same position of the processed concrete dam, at the same depth at different positions, and meeting the performance test requirements, the real performance and spatial distribution of the dam concrete can be obtained, which provides an important basis for evaluating the aging degree and durability of the dam concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 is a flow chart of a method for obtaining the real performance and spatial distribution of dam concrete provided according to an embodiment of the present invention;
[0020] Figure 2 It is a schematic diagram of cutting in which a part to be sampled has an open surface provided by an embodiment of the present invention;
[0021] Figure 3 is a schematic diagram of an original state sample of a target concrete provided according to an embodiment of the present invention;
[0022] Figure 4 is a schematic diagram of the distribution of compressive strength along the depth of the dam according to an embodiment of the present invention;
[0023] Figure 5 is a schematic diagram of the distribution of elastic wave velocity along the depth of the dam according to an embodiment of the present invention;
[0024] Figure 6 is a structural block diagram of a device for obtaining the real performance and spatial distribution of dam concrete according to an embodiment of the present invention;
[0025] Figure 7 is a schematic diagram of the structure of a computer-readable storage medium provided according to an embodiment of the present invention;
[0026] Figure 8 It is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present invention. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0029] The embodiment of the present invention provides a method for obtaining the real performance and spatial distribution of dam concrete, such as Figure 1 As shown, the method comprises the following steps:
[0030] Step 101: Obtain a large-sized concrete block containing an original specimen of dam concrete.
[0031] Among them, large-size concrete blocks refer to prismatic blocks, and the shortest side length is at least 50cm, and generally the shortest side length is ≥1m;
[0032] Specifically, before testing the actual performance and spatial distribution of dam concrete, it is first necessary to obtain the corresponding large-sized concrete blocks containing the original samples of dam concrete. Furthermore, by using the original samples of concrete for performance testing, the performance and spatial distribution of dam concrete can be obtained more intuitively and realistically.
[0033] Step 102: Based on the large-sized concrete blocks, a processing plan for the target concrete original sample is determined through a preset processing method and preset performance test requirements.
[0034] The processing plan refers to a processing plan that can make the best use of the original concrete blocks, which is formulated through comprehensive analysis based on the size of the original concrete blocks and the size and number of small specimens required for performance testing.
[0035] Specifically, the preset performance test requirements can be determined based on the performance to be tested, wherein the performance to be tested can be determined based on actual needs, for example, it may include macroscopic properties such as mechanical properties, durability properties, deformation properties, or physical properties such as elastic wave velocity, ultrasonic wave velocity, natural frequency, resistivity, or microstructural feature tests such as pore structure, bubble structure, and microcrack structure, and the embodiments of the present invention do not make specific limitations on this.
[0036] Furthermore, the large-sized concrete blocks are processed using a preset processing method, and according to the preset performance test requirements, a processing plan for the original specimen of the target concrete can be obtained.
[0037] Step 103: Based on the preset precision processing equipment, a target concrete original state sample set is obtained through the processing scheme.
[0038] Among them, the target concrete undisturbed specimen set includes target concrete undisturbed specimens at different depths at the same position of the concrete dam and at the same depth at different positions, which meet the performance test requirements.
[0039] Precision machining equipment may include high-precision precision cutting machines that operate stably and have no or minimal interference with concrete during the cutting process, and may also include core drilling equipment that can accurately control the rotation speed and direction of the drill barrel.
[0040] Specifically, by using precision processing equipment as a processing tool and processing according to the obtained processing plan, it is possible to obtain target concrete original samples at different depths at the same position of the concrete dam or at the same depth at different positions that meet the performance test requirements.
[0041] Step 104: Based on the preset performance test requirements, each of the target concrete original state samples in the target concrete original state sample set is tested to obtain the actual performance of the dam concrete and the performance distribution law at different spatial positions.
[0042] Specifically, the corresponding performance to be tested can be determined according to the performance test requirements described in step 103. Further, each target concrete original sample in the target concrete original sample set is tested according to the performance to be tested, and through comparative analysis, the real performance of the dam concrete and the performance distribution law at different spatial positions can be obtained.
[0043] The method for obtaining the real performance and spatial distribution of dam concrete provided by the embodiment of the present invention obtains a large-sized concrete block containing an original sample of dam concrete; based on the large-sized concrete block, after a preset processing method and preset performance test requirements, a processing scheme of the original sample of target concrete is determined; based on a preset precision processing equipment, after the processing scheme, a target concrete original sample set is obtained, the target concrete original sample set includes target concrete original samples at different depths at the same position of the concrete dam, at the same depth at different positions, and meeting the performance test requirements; based on the preset performance test requirements, each target concrete original sample in the original sample set is tested to obtain the real performance of the dam concrete and the performance distribution law at different spatial positions. The present invention adopts precision processing equipment to avoid serious interference of on-site sampling; further, by testing the original sample of the target concrete at different depths at the same position of the processed concrete dam, at the same depth at different positions, and meeting the performance test requirements, the real performance and spatial distribution of the dam concrete can be obtained, which provides an important basis for evaluating the aging degree and durability of the dam concrete.
[0044] As an optional implementation of an embodiment of the present invention, step 101 includes: determining the number of free surfaces of the part to be sampled in the concrete dam; determining a target cutting method based on the number of free surfaces; cutting the part to be sampled using a target cutting method based on a preset large-size cutting device to obtain the large-size concrete block containing the original sample of the dam concrete.
[0045] The concrete dam may include a newly built concrete dam, or an old concrete dam or a dangerous dam that has been in operation for many years; the location to be sampled indicates the location of the concrete in the concrete dam from which the original sample is to be obtained; the preset large-size cutting equipment may include one or more of a rope saw, a large-scale cutting machine, and the like;
[0046] First, determine the number of free surfaces of the area to be sampled;
[0047] Secondly, when the sampling part has only one free surface, a sacrificial area is set around the sampling area, and cutting is performed after removing the sacrificial area; when the sampling part has more than one free surface, it can be directly obtained by cutting according to the set path. Among them, the cutting can be performed using a preset large-size cutting device.
[0048] Finally, large-sized concrete blocks containing original samples of dam concrete can be obtained by cutting.
[0049] As an optional implementation of the embodiment of the present invention, step 102 includes: based on the large-size concrete blocks, obtaining the spatial positioning coordinates of the target concrete original sample through the preset processing method; based on the spatial positioning coordinates of the target concrete original sample and the preset performance test requirements, determining the processing plan of the target concrete original sample.
[0050] According to the description of the processing scheme in step 102, first, the original dam surface of the large-size concrete block is used as the reference plane xy plane, the origin is selected on it, and the direction perpendicular to the dam surface is used as the z-axis to set the spatial positioning coordinates of the target concrete original sample. Then, the processing scheme of the target concrete original sample is formulated according to the performance test requirements. Among them, the positioning method of the target concrete original sample can be the geometric center of the target concrete original sample or the surface center of the characteristic surface of the target concrete original sample, which can be set as needed.
[0051] In one example, first, large-sized undisturbed concrete blocks of the downstream slope of the dam were obtained, which were prisms with a length of 1.0 m, and transported back to the laboratory.
[0052] like Figure 2 As shown in the figure, if the target area is on the dam slope, that is, there is an open surface, the sampling steps are as follows:
[0053] 1) First, mark the cutting positions on the dam surface, i.e. sides 1 to 4, each side is 1m long. Figure 2 Middle T zone.
[0054] 2) The sacrificial layer S is selected on the right side of edge 4, and its size is 2m long and 1.5m wide. Figure 2 The shaded S area in the figure.
[0055] 3) Use impact drills, electric hammers and other equipment to remove the concrete in area S to form a working area S with a length of 2m, a width of 1.5m and a depth of >1.0m.
[0056] 4) Fix the cutting machine and cut along edges 3, 2, and 1 respectively, with a cutting length of not less than 1.0m.
[0057] 5) Fix the cutting machine at the bottom of the working area S and cut in a direction parallel to the dam surface.
[0058] 6) The target block T is obtained, which is a prism with a side length of 1.0 m, that is, a dam concrete block containing the original sample.
[0059] 7) Transport the intact block back to the laboratory.
[0060] Secondly, concrete compressive strength, splitting tensile strength, carbonation depth, permeability coefficient, and elastic wave velocity are selected as performance test indicators, and a processing plan for small-sized test blocks (original concrete specimens) is developed. Figure 3 As shown, considering the loss during cutting, the side length of each small sample is 15 cm, and a total of 6*6=36 groups of small samples are cut out, with 3 pieces in each group.
[0061] Each test block can be i Y j Z k Then X1Y1Z1 represents the small sample on the dam surface containing the origin; X i Y j Z1~X i Y j Z6 represents small specimens whose cube centers are 7.5cm, 22.5cm, 37.5cm, 52.5cm, 67.5cm and 82.5cm away from the dam surface.
[0062] Then, since the dam concrete discipline focuses on the performance distribution along the depth direction of the dam, the above 36 groups of samples will be X 1~3 Y1Z1 as a group, X 4~6 Y1Z1 as a group, .... Each group can be tested for compressive strength, splitting strength, carbonation, permeability, pore structure, microcracks, etc. The average value of the test results of each group is taken as the true performance of the dam concrete at that location.
[0063] Finally, X 4~6 Y1Z1, X 4~6 Y1Z2, X 4~6 Y1Z3、X 4~6 Y1Z4、X 4~6 Y1Z5、X i Y j The compressive strength test data of Z6 is analyzed, such as Figure 4 As shown in Figure 2. Similarly, the distribution of splitting strength, carbonization depth, and elastic wave velocity along the dam depth can be obtained. Among them, the distribution of elastic wave velocity along the dam depth is shown in Figure 2. Figure 5 shown.
[0064] The embodiment of the present invention also provides a device for obtaining the real performance and spatial distribution of dam concrete, such as Figure 6 As shown, the device comprises:
[0065] The acquisition module 601 is used to obtain a large-sized concrete block containing an original sample of the dam concrete; for details, please refer to the relevant description of step 101 in the above method embodiment.
[0066] The determination module 602 is used to determine the processing plan of the original sample of the target concrete based on the large-size concrete blocks, through a preset processing method and preset performance test requirements; for details, please refer to the relevant description of step 102 in the above method embodiment.
[0067] The processing module 603 is used to obtain a target concrete original sample set based on a preset precision processing equipment and through the processing scheme. The target concrete original sample set includes target concrete original samples at different depths at the same position of the concrete dam and at the same depth at different positions, which meet the performance test requirements. For details, please refer to the relevant description of step 103 in the above method embodiment.
[0068] The testing module 604 is used to test each of the target concrete original sample in the target concrete original sample set based on the preset performance test requirements to obtain the actual performance of the dam concrete and the performance distribution law at different spatial positions; for details, please refer to the relevant description of step 104 in the above method embodiment.
[0069] The device for obtaining the true performance and spatial distribution of dam concrete provided by the embodiment of the present invention adopts precision processing equipment to avoid serious interference of on-site sampling; further, by testing the original target concrete samples at different depths at the same position of the processed concrete dam and at the same depth at different positions that meet the performance test requirements, the true performance and spatial distribution of the dam concrete can be obtained, which provides an important basis for evaluating the aging degree and durability of the dam concrete.
[0070] As an optional implementation manner of an embodiment of the present invention, the acquisition module includes: a first determination submodule, used to determine the number of free surfaces of the part to be sampled in the concrete dam; a second determination submodule, used to determine the target cutting method based on the number of free surfaces; a cutting submodule, used to cut the part to be sampled using the target cutting method based on a preset large-size cutting device to obtain the large-size concrete block containing the original sample of the dam concrete.
[0071] As an optional implementation manner of an embodiment of the present invention, the determination module includes: a processing submodule, which is used to obtain the spatial positioning coordinates of the target concrete original sample based on the large-size concrete cutting and the preset processing method; a third determination submodule, which is used to determine the processing plan of the target concrete original sample based on the spatial positioning coordinates of the target concrete original sample and the preset performance test requirements.
[0072] As an optional implementation manner of the embodiment of the present invention, the concrete dam includes a newly built concrete dam, an old concrete dam and a dangerous dam.
[0073] For a detailed description of the function of the device for obtaining the real performance and spatial distribution of dam concrete provided in an embodiment of the present invention, please refer to the description of the method for obtaining the real performance and spatial distribution of dam concrete in the above embodiment.
[0074] The embodiment of the present invention also provides a storage medium, such as Figure 7 As shown, a computer program 701 is stored thereon, and when the instruction is executed by the processor, the steps of the method for obtaining the real performance and spatial distribution of dam concrete in the above embodiment are implemented. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory (Flash Memory), a hard disk (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above types of memory.
[0075] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the storage medium can be a disk, an optical disk, a read-only memory (ROM), a random access memory (RAM), a flash memory, a hard disk (HDD) or a solid-state drive (SSD), etc.; the storage medium can also include a combination of the above-mentioned types of memory.
[0076] The embodiment of the present invention further provides an electronic device, such as Figure 8 As shown, the electronic device may include a processor 81 and a memory 82, wherein the processor 81 and the memory 82 may be connected via a bus or other means. Figure 8 The example of connecting through bus is taken in the following.
[0077] The processor 81 may be a central processing unit (CPU). The processor 81 may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or a combination of the above chips.
[0078] The memory 82 is a non-transient computer-readable storage medium that can be used to store non-transient software programs, non-transient computer executable programs and modules, such as the corresponding program instructions / modules in the embodiment of the present invention. The processor 81 executes various functional applications and data processing of the processor by running the non-transient software programs, instructions and modules stored in the memory 82, that is, the method for obtaining the real performance and spatial distribution of dam concrete in the above method embodiment is realized.
[0079] The memory 82 may include a program storage area and a data storage area, wherein the program storage area may store the application required for the operating device and at least one function; the data storage area may store data created by the processor 81, etc. In addition, the memory 82 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 82 may optionally include a memory remotely arranged relative to the processor 81, and these remote memories may be connected to the processor 81 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0080] The one or more modules are stored in the memory 82 and when executed by the processor 81, perform the following steps: Figure 1-5 The method for obtaining the real performance and spatial distribution of dam concrete in the illustrated embodiment.
[0081] For details of the above electronic equipment, please refer to Figures 1 to 5 The corresponding related descriptions and effects in the illustrated embodiments can be understood and will not be repeated here.
[0082] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for obtaining the true performance and spatial distribution of dam concrete, It is characterized in that The method comprises: Obtaining large-sized concrete cuts containing undisturbed specimens of dam concrete; Based on the large-sized concrete blocks, a processing scheme for the original concrete sample is determined through a preset processing method and preset performance test requirements. The processing scheme represents a processing and manufacturing scheme that can maximize the use of the original block, which is formulated through comprehensive analysis based on the size of the original concrete blocks and the size and number of the small samples according to the preset performance test requirements. The preset processing method is used to determine the spatial positioning coordinates of the original concrete sample; Based on the preset precision processing equipment, after the processing scheme, a target concrete original state sample set is obtained, wherein the target concrete original state sample set includes target concrete original state samples at different depths at the same position of the concrete dam and at the same depth at different positions, and meeting the performance test requirements; Based on the preset performance test requirements, each of the target concrete original state samples in the target concrete original state sample set is tested to obtain the true performance of the dam concrete and the performance distribution law at different spatial positions.
2. The method according to claim 1, It is characterized in that Obtain large-size concrete cuts containing undisturbed specimens of dam concrete, including: Determining the number of free-surface areas of the concrete dam at the location to be sampled; Determining a target cutting method based on the number of free-surface surfaces; Based on the preset large-size cutting equipment, the portion to be sampled is cut in a targeted cutting manner to obtain the large-size concrete block containing the original sample of the dam concrete.
3. The method according to claim 1, It is characterized in that Based on the large-size concrete blocks, a processing scheme for the original target concrete sample is determined through a preset processing method and preset performance test requirements, including: Based on the large-size concrete cut, the spatial positioning coordinates of the target concrete original sample are obtained through the preset processing method; Based on the spatial positioning coordinates of the target concrete original sample and the preset performance test requirements, a processing plan for the target concrete original sample is determined.
4. The method according to claim 2, It is characterized in that The concrete dams include newly built concrete dams, old concrete dams and dangerous dams.
5. A device for obtaining the real performance and spatial distribution of dam concrete, It is characterized in that The device comprises: An acquisition module, used for acquiring a large-sized concrete cut block including an original concrete sample of the dam; A determination module is used to determine a processing scheme of a target concrete original sample based on the large-sized concrete cut block, through a preset processing method and preset performance test requirements, wherein the processing scheme represents a processing and manufacturing scheme that can maximize the use of the original block, which is formulated through comprehensive analysis based on the size of the original concrete cut block, the size and number of the small samples based on the preset performance test requirements, and the preset processing method is used to determine the spatial positioning coordinates of the target concrete original sample; A processing module, for obtaining a target concrete original state sample set through the processing scheme based on a preset precision processing device, wherein the target concrete original state sample set includes target concrete original state samples at different depths at the same position of the concrete dam and at the same depth at different positions and meeting the performance test requirements; The testing module is used to test each of the target concrete original state samples in the target concrete original state sample set based on the preset performance test requirements to obtain the real performance of the dam concrete and the performance distribution law at different spatial positions.
6. The device according to claim 5, It is characterized in that The acquisition module comprises: The first determination submodule is used to determine the number of free surfaces of the part to be sampled in the concrete dam; A second determination submodule is used to determine a target cutting method based on the number of free surfaces; The cutting submodule is used to cut the sampled portion in a targeted cutting manner based on a preset large-size cutting device to obtain the large-size concrete block containing the original sample of the dam concrete.
7. The device according to claim 5, It is characterized in that The determining module comprises: A processing submodule, for obtaining the spatial positioning coordinates of the target concrete original sample based on the large-size concrete cut blocks and through the preset processing method; The third determination submodule is used to determine the processing plan of the target concrete original state sample based on the spatial positioning coordinates of the target concrete original state sample and the preset performance test requirements.
8. The device according to claim 6, It is characterized in that The concrete dams include newly built concrete dams, old concrete dams and dangerous dams.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the method for obtaining the real performance and spatial distribution of dam concrete as described in any one of claims 1 to 4.
10. An electronic device, It is characterized in that include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for obtaining the real performance and spatial distribution of dam concrete as described in any one of claims 1 to 4 by executing the computer instructions.