Methods, devices, and electronic equipment for processing rail transit data.
By monitoring user input and tool execution status information, and identifying and closing data tools that do not conform to the target order, the problem of tool usage errors during data creation is solved, ensuring the accuracy of data creation and the success of engineering projects.
Patent Information
- Application Number
- CN202211469012.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2042-11-22
AI Technical Summary
In the process of creating rail transit data, data creators need to use a variety of tools. However, due to the large number of tools and the complexity of operation, omissions can easily occur, leading to incorrect data entry and causing errors in the debugging process of engineering projects.
By listening to user input, the system determines the most recently used data tool and decides whether to allow the user to use the tool based on the tool's execution status information. If the tool does not conform to the target tool execution order, the tool is closed to ensure that the user uses the data tools correctly in the specified order.
To prevent users from misusing data tools, ensure that the data creation process is carried out in the specified order, reduce the occurrence of data entry errors, and improve the accuracy of engineering projects.
Smart Images

Figure CN115983780B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of rail transit technology, and in particular to a method, apparatus, and electronic device for processing rail transit data. Background Technology
[0002] With the increasing number of engineering projects, the workload of data production personnel has multiplied, and with multiple projects running in parallel, manpower costs are substantial. After the data production for each project is completed, data production personnel still need to use various tools for data generation, checking, and comparison, and are required to operate these tools sequentially. Due to the large number of tools and operations, it is common to overlook the use of a tool, leading to data entry errors and frequent mistakes during project debugging. Ensuring the correct use of various data tools is a pressing issue that the industry needs to address. Summary of the Invention
[0003] To address the problems existing in the prior art, embodiments of the present invention provide a method, apparatus, and electronic device for processing rail transit data.
[0004] In a first aspect, the present invention provides a method for processing rail transit data, comprising:
[0005] By listening to the first input, the user's most recently used first data tool is determined. The first input is the input from the user's operation of any one of the multiple second data tools.
[0006] Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0007] If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool;
[0008] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0009] Optionally, according to the method for processing rail transit data tools provided by the present invention, the tool execution status information includes target identification information, the target identification information is used to identify the third data tool executed according to the target tool execution order, and the next tool after the third data tool is the fourth data tool according to the target tool execution order;
[0010] Based on the tool execution status information, the determination of whether a user is allowed to use the first data tool is made, and the determination result is any one of the following:
[0011] If it is determined that the first data tool is not the third data tool and the first data tool is not the fourth data tool, then a first judgment result is obtained. The first judgment result is used to indicate that the user is not allowed to use the first data tool.
[0012] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unclosed state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0013] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0014] Alternatively, if the first data tool is determined to be the third data tool, a fourth determination result is obtained, which is used to indicate that the user is allowed to use the first data tool;
[0015] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being executed and then closed, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
[0016] Optionally, according to the processing method of a rail transit data tool provided by the present invention, when the judgment result is the fifth judgment result, after obtaining the judgment result, the method further includes:
[0017] The target identification information is updated to the identification information of the first data tool.
[0018] Optionally, according to the processing method of a rail transit data tool provided by the present invention, after updating the target identification information to the identification information of the first data tool, the method further includes:
[0019] If it is determined that the first data tool is in the "executed and closed" state, and the first data tool is the last item in the execution order of the target tool, then the tool operation log data is displayed.
[0020] Optionally, according to the processing method of a rail transit data tool provided by the present invention, closing the first data tool includes:
[0021] The prompt message continues to be displayed until a second input is received, the second input being used to instruct the user to close the first data tool, and the prompt message being used to inform the user that the first data tool is not allowed to be used;
[0022] In response to the second input, the first data tool is closed.
[0023] Optionally, according to the processing method of a rail transit data tool provided by the present invention, before determining the first data tool most recently used by the user by listening to the first input, the method further includes:
[0024] Receive a third input, which is used to determine the execution order of multiple second data tools;
[0025] In response to the third input, the execution order of the target tool is determined.
[0026] Secondly, the present invention also provides a processing apparatus for rail transit data tools, comprising:
[0027] The first determining module is used to determine the first data tool most recently used by the user by listening to the first input, wherein the first input is the input of the user operating any one of a plurality of second data tools;
[0028] The acquisition module is used to determine, based on the tool execution status information, whether a user is allowed to use the first data tool, and to obtain the determination result.
[0029] The shutdown module is used to shut down the first data tool if the judgment result indicates that the user is not allowed to use the first data tool.
[0030] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0031] Thirdly, the present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the program to implement the processing method of any of the above-described rail transit data tools.
[0032] Fourthly, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the processing method of the rail transit data tool as described above.
[0033] Fifthly, the present invention also provides a computer program product, including a computer program that, when executed by a processor, implements the processing method of any of the above-described rail transit data tools.
[0034] The rail transit data tool processing method, apparatus, and electronic device provided by this invention can determine the first data tool most recently used by the user by listening to the first input. The tool execution status information can represent the execution progress of multiple second data tools according to the target tool execution order. Then, based on the execution progress, it can be determined whether the user's operation behavior of using the first data tool conforms to the target tool execution order. If it is determined that the user's current operation behavior of using the first data tool conforms to the target tool execution order, the user is allowed to use the first data tool. If it is determined that the user's current operation behavior of using the first data tool does not conform to the target tool execution order, the user is not allowed to use the first data tool. In the case where the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order. Attached Figure Description
[0035] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0036] Figure 1 This is one of the flowcharts illustrating the processing method of the rail transit data tool provided by the present invention;
[0037] Figure 2 This is the second flowchart illustrating the processing method of the rail transit data tool provided by the present invention;
[0038] Figure 3 This is the third flowchart illustrating the processing method of the rail transit data tool provided by the present invention;
[0039] Figure 4 This is the fourth flowchart illustrating the processing method of the rail transit data tool provided by the present invention;
[0040] Figure 5 This is the fifth flowchart illustrating the processing method of the rail transit data tool provided by the present invention;
[0041] Figure 6 This is the sixth flowchart illustrating the processing method of the rail transit data tool provided by the present invention;
[0042] Figure 7 This is a schematic diagram of the structure of the processing device for the rail transit data tool provided by the present invention;
[0043] Figure 8 This is a schematic diagram of the structure of the electronic device provided by the present invention. Detailed Implementation
[0044] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.
[0045] Figure 1 This is one of the flowcharts illustrating the processing method of the rail transit data tool provided by the present invention, such as... Figure 1 As shown, the entity executing the processing method of the rail transit data tool can be an electronic device, such as a personal computer or a server. The method includes:
[0046] Step 101: By listening to the first input, determine the first data tool most recently used by the user. The first input is the input of the user when operating any one of the multiple second data tools.
[0047] Specifically, in order to ensure that users use each data tool correctly, the first input can be monitored. The first input can be the input of the user when operating any one of the multiple second data tools. By monitoring the first input, the tool operation log data can be obtained. The tool operation log data can characterize the user's historical behavior in operating the data tools. Based on the tool operation log data, the first data tool most recently used by the user can be determined.
[0048] For example, at the first moment, the user operates on data tool A and then closes data tool A. At the second moment, the user operates on data tool B and then closes data tool B. At the third moment, the user operates on data tool C. By listening to the first input, the tool operation log data can be obtained. If the current moment is the third moment, then based on the tool operation log data, it can be determined that the first data tool most recently used by the user is data tool C.
[0049] Step 102: Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0050] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0051] Specifically, the tool execution status information can represent the execution progress of multiple second data tools according to the execution order of the target tool. Based on the execution progress, it can be determined whether the user's operation behavior using the first data tool conforms to the execution order of the target tool. If it is determined that the user's current operation behavior using the first data tool conforms to the execution order of the target tool, the judgment result can indicate that the user is allowed to use the first data tool. If it is determined that the user's current operation behavior using the first data tool does not conform to the execution order of the target tool, the judgment result can indicate that the user is not allowed to use the first data tool.
[0052] Optionally, by listening to the first input, tool operation log data can be obtained, and then the execution progress of multiple second data tools can be estimated based on the tool operation log data and the execution order of the target tool.
[0053] Step 103: If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool;
[0054] Specifically, if the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order.
[0055] The rail transit data tool processing method provided by this invention can determine the first data tool most recently used by the user by listening to the first input. The tool execution status information can represent the execution progress of multiple second data tools according to the target tool execution order. Then, based on the execution progress, it can be determined whether the user's operation behavior of using the first data tool conforms to the target tool execution order. If it is determined that the user's current operation behavior of using the first data tool conforms to the target tool execution order, the user is allowed to use the first data tool. If it is determined that the user's current operation behavior of using the first data tool does not conform to the target tool execution order, the user is not allowed to use the first data tool. In the case where the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order.
[0056] Optionally, according to the method for processing rail transit data tools provided by the present invention, the tool execution status information includes target identification information, the target identification information is used to identify the third data tool executed according to the target tool execution order, and the next tool after the third data tool is the fourth data tool according to the target tool execution order;
[0057] Based on the tool execution status information, the determination of whether a user is allowed to use the first data tool is made, and the determination result is any one of the following:
[0058] If it is determined that the first data tool is not the third data tool and the first data tool is not the fourth data tool, then a first judgment result is obtained. The first judgment result is used to indicate that the user is not allowed to use the first data tool.
[0059] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unclosed state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0060] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0061] Alternatively, if the first data tool is determined to be the third data tool, a fourth determination result is obtained, which is used to indicate that the user is allowed to use the first data tool;
[0062] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being executed and then closed, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
[0063] Specifically, the tool execution status information may include target identification information, which can identify the third data tool (i.e., the tool currently to be used) executed according to the target tool execution order. The target identification information can also determine the next tool after the third data tool, i.e., the fourth data tool, according to the target tool execution order.
[0064] For example, if the execution order of the target tools represents the execution order of three second data tools, namely data tool A, data tool B, and data tool C, and the execution order is: data tool A is executed first, then data tool B is executed, and finally data tool C is executed. The current state of data tool A is the executed and closed state, the current state of data tool B is the open state, and the current state of data tool C is the unexecuted state, then according to the execution order of the target tools, when data tool B (i.e., the third data tool) is executed, the target identification information can be used to identify data tool B, and the next tool after data tool B is data tool C (i.e., the fourth data tool).
[0065] It is understandable that the state of a data tool can be any of the following: not executed, not closed (meaning the data tool has been executed but not closed), or executed and then closed.
[0066] Specifically, the system can analyze the first relationship between the first data tool and the third data tool (whether the first data tool and the third data tool are the same), and analyze the second relationship between the first data tool and the fourth data tool (whether the first data tool and the fourth data tool are the same). Based on the first and second relationships, it can determine whether the user is allowed to use the first data tool and obtain the determination result.
[0067] Optionally, if it is determined that the first data tool is not the third data tool and is not the fourth data tool, then a first judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool.
[0068] Optionally, if it is determined that the first data tool is the fourth data tool and the third data tool is in an open state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool.
[0069] Optionally, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool.
[0070] Optionally, if the first data tool is determined to be the third data tool, a fourth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
[0071] Optionally, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being closed after execution, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
[0072] Optionally, Figure 2 This is a second flowchart illustrating the processing method of the rail transit data tool provided by the present invention, as shown below. Figure 2 As shown, the method includes:
[0073] Step 201: By listening to the first input, determine the first data tool that the user last used;
[0074] Step 202: Analyze the first relationship between the first data tool and the third data tool, and analyze the second relationship between the first data tool and the fourth data tool. Based on the first and second relationships, determine whether the user is allowed to use the first data tool and obtain the determination result.
[0075] Step 203: If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool.
[0076] Therefore, by using the target identification information, the data tool executed in the target tool execution order (the tool that needs to be used now) can be determined. Then, based on the tool that needs to be used now and the next tool that needs to be used now, it can be determined whether the user is allowed to use the first data tool, obtain the judgment result, and then guide the user to operate the data tool correctly based on the judgment result.
[0077] Optionally, according to the processing method of a rail transit data tool provided by the present invention, when the judgment result is the fifth judgment result, after obtaining the judgment result, the method further includes:
[0078] The target identification information is updated to the identification information of the first data tool.
[0079] Specifically, after obtaining the judgment result, if the judgment result is the fifth judgment result, it means that the first data tool currently used by the user is the fourth data tool, that is, the data tool currently used by the user is the next tool after the data tool identified by the target identification information. In this case, the execution progress of multiple second data tools can be updated, that is, the target identification information is updated to the identification information of the first data tool.
[0080] It is understandable that when a user starts using a data tool, the data tool identified by the target identification information can be the first one in the multiple second data tools ordered according to the execution order of the target tool. Then, the first input can be continuously monitored and the judgment result can be obtained. If the judgment result is the fifth judgment result during the above continuous operation, the target identification information can be updated to ensure that the data tool identified by the target identification information is always the data tool executed according to the execution order of the target tool (the tool that needs to be used at the moment).
[0081] Optionally, Figure 3 This is the third flowchart illustrating the processing method of the rail transit data tool provided by this invention, as shown below. Figure 3 As shown, the method includes:
[0082] Step 301: By listening to the first input, determine the first data tool that the user last used;
[0083] Step 302: If it is determined that the first data tool is the fourth data tool and the status of the third data tool is the executed and closed state, then obtain the fifth judgment result. The fifth judgment result is used to indicate that the user is allowed to use the first data tool.
[0084] Step 303: If the judgment result is the fifth judgment result, update the target identification information to the identification information of the first data tool.
[0085] Therefore, by updating the target identification information, it can be ensured that the data tool identified by the target identification information is always the tool that needs to be used at the moment.
[0086] Optionally, according to the processing method of a rail transit data tool provided by the present invention, after updating the target identification information to the identification information of the first data tool, the method further includes:
[0087] If it is determined that the first data tool is in the "executed and closed" state, and the first data tool is the last item in the execution order of the target tool, then the tool operation log data is displayed.
[0088] Specifically, after updating the target identifier information to the identifier information of the first data tool, if a user operation to close the first data tool is detected, the status of the first data tool will be "closed after execution". Then it can be determined whether the first data tool is the last item in the target tool execution order. If the first data tool is the last item in the target tool execution order, it can be determined that the user has completed the operation of all the second data tools in the target tool execution order, and then the tool operation log data can be displayed.
[0089] Optionally, Figure 4 This is the fourth flowchart illustrating the processing method of the rail transit data tool provided by this invention, as shown below. Figure 4 As shown, the method includes:
[0090] Step 401: By listening to the first input, determine the first data tool that the user last used;
[0091] Step 402: If it is determined that the first data tool is the fourth data tool and the status of the third data tool is the executed and closed state, then obtain the fifth judgment result. The fifth judgment result is used to indicate that the user is allowed to use the first data tool.
[0092] Step 403: If the judgment result is the fifth judgment result, update the target identification information to the identification information of the first data tool;
[0093] Step 404: If it is determined that the status of the first data tool is "executed and closed" and the first data tool is the last item in the execution order of the target tool, then display the tool operation log data.
[0094] Therefore, after all the second data tools have been operated in the order of the target tool, the tool operation log data can be displayed so that the user can confirm the correctness of the entire operation process based on the tool operation log data.
[0095] Optionally, according to the processing method of a rail transit data tool provided by the present invention, closing the first data tool includes:
[0096] The prompt message continues to be displayed until a second input is received, the second input being used to instruct the user to close the first data tool, and the prompt message being used to inform the user that the first data tool is not allowed to be used;
[0097] In response to the second input, the first data tool is closed.
[0098] Specifically, if the judgment result indicates that the user is not allowed to use the first data tool, a message can be continuously displayed to remind the user that the first data tool is not allowed to be used. After receiving the second input, the above message can be canceled and the first data tool can be closed.
[0099] Optionally, the prompts can also be used to encourage users to try using third and fourth data tools, in order to guide users to use the data tools correctly.
[0100] Optionally, the above prompt information can be displayed through a prompt window. The prompt window can be equipped with a first control, which is used to receive the user's second input. The prompt window is presented in full-screen, top-down mode. If the user closes the prompt window and no second input is received, a heartbeat mechanism can be used to ensure that the prompt window is presented in full-screen, top-down mode. If the second input is received, the heartbeat mechanism is stopped, the prompt window is closed, and the process of the first data tool is forcibly terminated to close the first data tool.
[0101] Optionally, Figure 5 This is the fifth flowchart illustrating the processing method of the rail transit data tool provided by the present invention, as shown below. Figure 5 As shown, the method includes:
[0102] Step 501: By listening to the first input, determine the first data tool that the user last used;
[0103] Step 502: Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0104] Step 503: If the judgment result indicates that the user is not allowed to use the first data tool, the prompt message continues to be displayed until the second input is received. The second input is used to indicate that the first data tool is closed, and the prompt message is used to inform the user that the first data tool is not allowed to be used.
[0105] Step 504: In response to the second input, close the first data tool.
[0106] Therefore, by continuously displaying prompts, users can be prevented from continuing to use data tools incorrectly, thus guiding them to use data tools correctly.
[0107] Optionally, according to the processing method of a rail transit data tool provided by the present invention, before determining the first data tool most recently used by the user by listening to the first input, the method further includes:
[0108] Receive a third input, which is used to determine the execution order of multiple second data tools;
[0109] In response to the third input, the execution order of the target tool is determined.
[0110] Specifically, before a user operates a data tool, if it is necessary to generate a new tool execution order or update an existing tool execution order, a third input can be received. In response to the third input, the latest execution order of multiple second data tools can be obtained, and then the latest execution order can be determined as the target tool execution order.
[0111] Optionally, the tool execution order can be stored in a configuration file. If it is necessary to update the existing tool execution order, the configuration file can be read to obtain the existing tool execution order and display the relevant information of the existing tool execution order. Then, the user can adjust the existing tool execution order to determine the execution order of multiple second data tools. In response to the third input, the adjusted tool execution order can be obtained and then the adjusted tool execution order can be used as the target tool execution order.
[0112] Optionally, the configuration file can be validated before the user operates the data tool. If the validation passes, the existing tool execution order in the configuration file can be used as the target tool execution order. If the validation fails, the tool execution order can be re-determined by receiving a third input, and then the re-determined tool execution order can be used as the target tool execution order.
[0113] Optionally, Figure 6 This is the sixth flowchart illustrating the processing method of the rail transit data tool provided by this invention, as shown below. Figure 6 As shown, the method includes:
[0114] Step 601: Receive a third input, which is used to determine the execution order of the multiple second data tools;
[0115] Step 602: In response to the third input, determine the execution order of the target tools;
[0116] Step 603: By listening to the first input, determine the first data tool that the user last used;
[0117] Step 604: Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0118] Step 605: If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool.
[0119] Therefore, through human-computer interaction, the execution order of multiple second data tools can be determined, so as to generate new tool execution orders or update existing tool execution orders.
[0120] The rail transit data tool processing method provided by this invention can determine the first data tool most recently used by the user by listening to the first input. The tool execution status information can represent the execution progress of multiple second data tools according to the target tool execution order. Then, based on the execution progress, it can be determined whether the user's operation behavior of using the first data tool conforms to the target tool execution order. If it is determined that the user's current operation behavior of using the first data tool conforms to the target tool execution order, the user is allowed to use the first data tool. If it is determined that the user's current operation behavior of using the first data tool does not conform to the target tool execution order, the user is not allowed to use the first data tool. In the case where the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order.
[0121] The processing apparatus for the rail transit data tool provided by the present invention will be described below. The processing apparatus for the rail transit data tool described below and the processing method for the rail transit data tool described above can be referred to in correspondence with each other.
[0122] Figure 7 This is a schematic diagram of the structure of the processing device for the rail transit data tool provided by the present invention, as shown below. Figure 7 As shown, the device includes: a first determining module 701, an acquiring module 702, and a closing module 703, wherein:
[0123] The first determining module 701 is used to determine the first data tool most recently used by the user by listening to the first input, wherein the first input is the input of the user operating any one of a plurality of second data tools;
[0124] The acquisition module 702 is used to determine whether the user is allowed to use the first data tool based on the tool execution status information, and to obtain the determination result;
[0125] The shutdown module 703 is used to shut down the first data tool if the judgment result indicates that the user is not allowed to use the first data tool.
[0126] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0127] The rail transit data tool processing device provided by this invention can determine the first data tool most recently used by the user by listening to the first input. The tool execution status information can represent the execution progress of multiple second data tools according to the target tool execution order. Then, based on the execution progress, it can determine whether the user's operation behavior of using the first data tool conforms to the target tool execution order. If it is determined that the user's current operation behavior of using the first data tool conforms to the target tool execution order, the user is allowed to use the first data tool. If it is determined that the user's current operation behavior of using the first data tool does not conform to the target tool execution order, the user is not allowed to use the first data tool. In the case where the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order.
[0128] Optionally, the tool execution status information includes target identification information, which is used to identify the third data tool executed according to the target tool execution order. According to the target tool execution order, the next tool after the third data tool is the fourth data tool.
[0129] The acquisition module is specifically used for any of the following:
[0130] If it is determined that the first data tool is not the third data tool and the first data tool is not the fourth data tool, then a first judgment result is obtained. The first judgment result is used to indicate that the user is not allowed to use the first data tool.
[0131] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unclosed state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0132] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool;
[0133] Alternatively, if the first data tool is determined to be the third data tool, a fourth determination result is obtained, which is used to indicate that the user is allowed to use the first data tool;
[0134] Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being executed and then closed, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
[0135] Optionally, the device further includes an update module, wherein, if the judgment result is the fifth judgment result, after obtaining the judgment result, the update module is used to:
[0136] The target identification information is updated to the identification information of the first data tool.
[0137] Optionally, the device further includes a display module, which, after updating the target identification information to the identification information of the first data tool, is configured to:
[0138] If it is determined that the first data tool is in the "executed and closed" state, and the first data tool is the last item in the execution order of the target tool, then the tool operation log data is displayed.
[0139] Optionally, the shut-down module is specifically used for:
[0140] The prompt message continues to be displayed until a second input is received, the second input being used to instruct the user to close the first data tool, and the prompt message being used to inform the user that the first data tool is not allowed to be used;
[0141] In response to the second input, the first data tool is closed.
[0142] Optionally, the device further includes a second determining module, which, before determining the first data tool most recently used by the user by listening to the first input, is configured to:
[0143] Receive a third input, which is used to determine the execution order of multiple second data tools;
[0144] In response to the third input, the execution order of the target tool is determined.
[0145] The rail transit data tool processing device provided by this invention can determine the first data tool most recently used by the user by listening to the first input. The tool execution status information can represent the execution progress of multiple second data tools according to the target tool execution order. Then, based on the execution progress, it can determine whether the user's operation behavior of using the first data tool conforms to the target tool execution order. If it is determined that the user's current operation behavior of using the first data tool conforms to the target tool execution order, the user is allowed to use the first data tool. If it is determined that the user's current operation behavior of using the first data tool does not conform to the target tool execution order, the user is not allowed to use the first data tool. In the case where the user is not allowed to use the first data tool, the first data tool can be turned off to prevent the user from using the data tool incorrectly, and to ensure that the user uses each data production tool correctly in the specified order.
[0146] Figure 8This is a schematic diagram of the structure of the electronic device provided by the present invention, such as... Figure 8 As shown, the electronic device may include: a processor 810, a communication interface 820, a memory 830, and a communication bus 840, wherein the processor 810, the communication interface 820, and the memory 830 communicate with each other via the communication bus 840. The processor 810 can call logical instructions in the memory 830 to execute a processing method for rail transit data tools, such as the method including:
[0147] By listening to the first input, the user's most recently used first data tool is determined. The first input is the input from the user's operation of any one of the multiple second data tools.
[0148] Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0149] If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool;
[0150] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0151] Furthermore, the logical instructions in the aforementioned memory 830 can be implemented as software functional units and, when sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, essentially, or the part that contributes to the prior art, or a part of the technical solution, can be embodied in the form of a software product. This computer software product is stored in a storage medium and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods described in the various embodiments of the present invention. The aforementioned storage medium includes various media capable of storing program code, such as USB flash drives, portable hard drives, read-only memory (ROM), random access memory (RAM), magnetic disks, or optical disks.
[0152] On the other hand, the present invention also provides a computer program product, which includes a computer program that can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer is able to execute the processing method of the rail transit data tool provided by the above methods, for example, the method includes:
[0153] By listening to the first input, the user's most recently used first data tool is determined. The first input is the input from the user's operation of any one of the multiple second data tools.
[0154] Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0155] If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool;
[0156] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0157] In another aspect, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements a method for processing rail transit data tools provided by the methods described above, for example, the method includes:
[0158] By listening to the first input, the user's most recently used first data tool is determined. The first input is the input from the user's operation of any one of the multiple second data tools.
[0159] Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result;
[0160] If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool;
[0161] The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools.
[0162] The device embodiments described above are merely illustrative. The units described as separate components may or may not be physically separate. The components shown as units may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.
[0163] Through the above description of the embodiments, those skilled in the art can clearly understand that each embodiment can be implemented by means of software plus necessary general-purpose hardware platforms, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solutions, in essence or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, magnetic disk, optical disk, etc., and includes several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods described in the various embodiments or some parts of the embodiments.
[0164] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for processing rail transit data, characterized in that, include: By listening to the first input, the user's most recently used first data tool is determined. The first input is the input from the user's operation of any one of the multiple second data tools. Based on the tool execution status information, determine whether the user is allowed to use the first data tool, and obtain the determination result; If the judgment result indicates that the user is not allowed to use the first data tool, close the first data tool; The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools; The tool execution status information includes target identification information, which is used to identify the third data tool executed according to the target tool execution order. According to the target tool execution order, the next tool after the third data tool is the fourth data tool. Based on the tool execution status information, the determination of whether a user is allowed to use the first data tool is made, and the determination result is any one of the following: If it is determined that the first data tool is not the third data tool and the first data tool is not the fourth data tool, then a first judgment result is obtained. The first judgment result is used to indicate that the user is not allowed to use the first data tool. Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unclosed state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool; Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool; Alternatively, if the first data tool is determined to be the third data tool, a fourth determination result is obtained, which is used to indicate that the user is allowed to use the first data tool; Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being executed and then closed, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
2. The processing method of the rail transit data tool according to claim 1, characterized in that, If the judgment result is the fifth judgment result, after obtaining the judgment result, the method further includes: The target identification information is updated to the identification information of the first data tool.
3. The processing method of the rail transit data tool according to claim 2, characterized in that, After updating the target identification information to the identification information of the first data tool, the method further includes: If it is determined that the first data tool is in the "executed and closed" state, and the first data tool is the last item in the execution order of the target tool, then the tool operation log data is displayed.
4. The processing method of the rail transit data tool according to claim 1, characterized in that, The step of shutting down the first data tool includes: The prompt message continues to be displayed until a second input is received, the second input being used to instruct the user to close the first data tool, and the prompt message being used to inform the user that the first data tool is not allowed to be used; In response to the second input, the first data tool is closed.
5. The processing method of the rail transit data tool according to any one of claims 1-4, characterized in that, Prior to determining the first data tool most recently used by the user by listening to the first input, the method further includes: Receive a third input, which is used to determine the execution order of multiple second data tools; In response to the third input, the execution order of the target tool is determined.
6. A processing device for rail transit data tools, characterized in that, include: The first determining module is used to determine the first data tool most recently used by the user by listening to the first input, wherein the first input is the input of the user operating any one of a plurality of second data tools; The acquisition module is used to determine, based on the tool execution status information, whether a user is allowed to use the first data tool, and to obtain the determination result. The shutdown module is used to shut down the first data tool if the judgment result indicates that the user is not allowed to use the first data tool. The tool execution status information is used to indicate the execution progress of the plurality of second data tools according to the execution order of the target tool, and the execution order of the target tool is used to indicate the execution order of the plurality of second data tools; The tool execution status information includes target identification information, which is used to identify the third data tool executed according to the target tool execution order. According to the target tool execution order, the next tool after the third data tool is the fourth data tool. The acquisition module is specifically used to perform any of the following: If it is determined that the first data tool is not the third data tool and the first data tool is not the fourth data tool, then a first judgment result is obtained. The first judgment result is used to indicate that the user is not allowed to use the first data tool. Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unclosed state, then a second judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool; Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in an unexecuted state, then a third judgment result is obtained, which is used to indicate that the user is not allowed to use the first data tool; Alternatively, if the first data tool is determined to be the third data tool, a fourth determination result is obtained, which is used to indicate that the user is allowed to use the first data tool; Alternatively, if it is determined that the first data tool is the fourth data tool and the third data tool is in the state of being executed and then closed, then a fifth judgment result is obtained, which is used to indicate that the user is allowed to use the first data tool.
7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the processing method of the rail transit data tool as described in any one of claims 1 to 5.
8. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by the processor, it implements the processing method of the rail transit data tool as described in any one of claims 1 to 5.
9. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by the processor, it implements the processing method of the rail transit data tool as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Data processing method and device and electronic equipment
CN114780264A
CONTROL SYSTEM FOR AN INDUSTRIAL TOOL BY DEFINING ITS VOLUME OF USE THROUGH LEARNING
FR3010927A1