Base station commissioning system and base station commissioning method
Through the coordinated work of the unified orchestration collaboration module and the provincial orchestration module, activation instructions are generated and issued to control the equipment to open the bearer circuit, solving the problem of low efficiency of 5G base station opening and realizing the automated site opening of the base station.
Patent Information
- Application Number
- CN202111491233.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-08
- Publication Date
- 2025-07-11
- Estimated Expiration
- 2041-12-08
AI Technical Summary
In the prior art, 5G base station opening efficiency is low, the manual configuration error rate is high, and it takes a long time to achieve automated configuration.
The unified orchestration collaboration module and the provincial orchestration collaboration module are used to arrange the planning resource information, generate messages and issue them to the controller, and the controller generates an activation command. The equipment activates the bearer circuit according to the instructions, and plans the station opening module to perform base station opening operations to realize automated processes.
Improve the efficiency of base station opening, reduce manual configuration time, reduce error rate, and realize the automatic station opening of base stations.
Smart Images

Figure CN116249133B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of communication technologies, and in particular, to a base station commissioning system and a base station commissioning method. Background Art
[0002] The advent of the 5G era has brought great convenience to users. In order to further improve the network experience of users, a large number of 5G base stations need to be commissioned. After the 5G base stations are commissioned, the bearer network can be configured so that users can use 5G network services.
[0003] In the prior art, when configuring 5G base station services, the wireless base station professional needs to determine the 5G base station service parameters, then perform construction according to the determined 5G base station service parameters, and after the construction is completed, transfer the service parameters to the data bearer professional, and configure the bearer services of the 5G bearer network through the data bearer professional to open the bearer circuit between the 5G base station commissioning system - 5G core network - 5G base station, so as to complete the commissioning of the 5G base station.
[0004] However, in the prior art, the determination of 5G base station service parameters is a combination of electronic work orders and manual configuration, and the configuration of the bearer services of the 5G bearer network is also through manual configuration, which takes a lot of time and has a high error rate in manual configuration, resulting in low efficiency of base station commissioning. Summary of the Invention
[0005] The present application provides a base station commissioning system and a base station commissioning method, which can realize automatic issuance of messages to open the bearer circuit, effectively improving the efficiency of base station commissioning.
[0006] In a first aspect, an embodiment of the present application provides a base station commissioning system, including: an orchestration and coordination system, a controller, a planning and commissioning module, and devices.
[0007] The orchestration and coordination system includes a unified orchestration and coordination module and a provincial orchestration and coordination module.
[0008] The unified orchestration and coordination module is configured to, when receiving an opening application for opening a bearer circuit of a target base station sent by a service system, orchestrate the planning resource information required for opening the bearer circuit of the target base station, and send the orchestrated target planning resource information to the provincial orchestration and coordination module.
[0009] The provincial orchestration and coordination module is configured to generate a message corresponding to the target planning resource information, and send the message to the controller.
[0010] The controller is configured to generate an opening instruction corresponding to the bearer circuit of the target base station according to the message, and send the opening instruction to the devices, and the opening instruction includes the target planning resource information.
[0011] The device is used to activate the bearer circuit of the target base station according to the target planned resource information, and send the result of successful or failed activation of the bearer circuit of the target base station to the controller; so that the controller sends the result of successful activation of the bearer circuit of the target base station to the provincial arrangement coordination module, so that the provincial arrangement coordination module forwards it to the unified arrangement coordination module.
[0012] The planned base station activation module is used to perform base station activation operations when receiving the result of successful activation of the bearer circuit of the target base station.
[0013] Optionally, the base station activation system further includes a service system, which is used to store the activation information of the base station bearer circuit, and send the query result of whether the bearer circuit of the target base station is occupied to the planned base station activation module when receiving the query instruction for the activation information of the bearer circuit of the target base station sent by the planned base station activation module.
[0014] The planned base station activation module is further used to send an activation application for activating the bearer circuit of the target base station to the unified arrangement coordination module in the arrangement coordination system when receiving the query result that the bearer circuit of the target base station is not occupied.
[0015] Optionally, the base station activation system further includes a resource planning module.
[0016] The resource planning module is used to perform preliminary planning on multiple resource information, and send the planned resource information to the unified arrangement coordination module.
[0017] The unified arrangement coordination module is further used to synchronize the planned resource information to the provincial arrangement coordination module and the controller according to the provincial information.
[0018] Optionally, the service system is further used to store the status information of the base station bearer circuit, and perform real-time update on the stored status information of the base station bearer circuit.
[0019] The service system is further used to send the corresponding status information of the base station bearer circuit to the planned base station activation module when receiving the query instruction for the status information of the base station bearer circuit sent by the planned base station activation module after the base station activation is completed.
[0020] Optionally, the controller is further used to send the target planned resource information and the result of failed activation of the bearer circuit of the target base station to the service system when receiving the result of failed activation of the bearer circuit of the target base station sent by the device.
[0021] In a second aspect, an embodiment of the present application provides a base station activation method, and the base station activation method includes:
[0022] When the unified orchestration and coordination module receives an activation application sent by the service system for activating the bearer circuit of the target base station, it orchestrates the planning resource information required for activating the bearer circuit of the target base station, and sends the orchestrated target planning resource information to the provincial orchestration and coordination module.
[0023] The provincial orchestration and coordination module configures the target planning resource information into a JSON message according to the YANG model, and sends the JSON message to the controller.
[0024] The controller generates an activation instruction corresponding to the bearer circuit of the target base station according to the message, and sends the activation instruction to the device, and the activation instruction includes the target planning resource information.
[0025] The device activates the bearer circuit of the target base station according to the target planning resource information, and sends the result of successful or failed activation of the bearer circuit of the target base station to the controller.
[0026] If the planning base station activation module receives the result of successful activation of the bearer circuit of the target base station, it performs the base station activation operation.
[0027] Optionally, the method further includes:
[0028] When the service system receives an activation information query instruction for the bearer circuit of the target base station sent by the planning base station activation module, it determines the target activation information corresponding to the bearer circuit of the target base station in the stored activation information of the base station bearer circuit, and the target activation information includes occupied or unoccupied.
[0029] The service system determines whether the bearer circuit of the target base station is occupied according to the target activation information, and sends the query result of whether it is occupied to the planning base station activation module.
[0030] If the query result is unoccupied, the planning base station activation module sends an activation application for activating the bearer circuit of the target base station to the unified orchestration and coordination module.
[0031] Optionally, the base station activation system further includes a resource planning module; before the unified orchestration and coordination module receives an activation application sent by the service system for activating the bearer circuit of the target base station, the method further includes:
[0032] The resource planning module makes a preliminary plan for the multiple resource information according to the service types of the multiple resource information, and sends the planned planning resource information to the unified orchestration and coordination module.
[0033] The unified orchestration and coordination module synchronizes the planning resource information to the provincial orchestration and coordination module and the controller according to the provincial information.
[0034] Optionally, the method further includes:
[0035] The service system updates the status information of the base station bearer circuit stored in real time.
[0036] After the base station opening is completed, when the service system receives a query instruction for the status information of the base station bearer circuit sent by the planned opening module, it sends the corresponding status information of the base station bearer circuit to the planned opening module, and the status information includes at least one of port status, optical attenuation, and error code.
[0037] Optionally, the method further includes:
[0038] When the controller receives the result that the opening of the target base station bearer circuit fails sent by the device, it sends the target planning resource information and the result that the opening of the target base station bearer circuit fails to the provincial arrangement and coordination module.
[0039] The unified arrangement and coordination module forwards the target planning resource information and the result that the opening of the target base station bearer circuit fails received by the provincial arrangement and coordination module to the service system.
[0040] The service system records the target planning resource information and the result that the opening of the target base station bearer circuit fails.
[0041] Optionally, the resource information includes at least two of device identifier, port, virtual local area network (VLAN), routing target (RT), routing discriminator (RD), and IP address.
[0042] As can be seen, the present application provides a base station commissioning system and a base station commissioning method, including an orchestration and coordination system, a controller, a planning and commissioning module, and devices; the orchestration and coordination system includes a unified orchestration and coordination module and a provincial orchestration and coordination module; the unified orchestration and coordination module is configured to, when receiving a commissioning application for opening a bearer circuit of a target base station sent by a service system, orchestrate the planning resource information required for opening the bearer circuit of the target base station, and send the orchestrated target planning resource information to the provincial orchestration and coordination module; the provincial orchestration and coordination module is configured to generate a message corresponding to the target planning resource information, and send the message to the controller; the controller is configured to generate a commissioning instruction corresponding to the bearer circuit of the target base station according to the message, and send the commissioning instruction to the devices, where the commissioning instruction includes the target planning resource information; the devices are configured to open the bearer circuit of the target base station according to the target planning resource information, and send the result of successful or failed commissioning of the bearer circuit of the target base station to the controller; so that the controller sends the result of successful commissioning of the bearer circuit of the target base station to the provincial orchestration and coordination module, so that the provincial orchestration and coordination module forwards it to the unified orchestration and coordination module; the planning and commissioning module is configured to perform base station commissioning operations when receiving the result of successful commissioning of the bearer circuit of the target base station. The technical solution provided by the embodiments of the present application can, through the coordinated cooperation of the unified orchestration and coordination module, the provincial orchestration and coordination module, the controller, the planning and commissioning module, and the devices, achieve the orchestration of resource planning information and automatically send the configuration, that is, send the message, to control the devices to open the bearer circuit, without the need for technicians to manually perform orchestration and send the configuration, saving a large amount of time, thereby improving the efficiency of base station commissioning. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 FIG. is a schematic structural diagram of a base station commissioning system provided by an embodiment of the present application;
[0044] Figure 2 FIG. is a schematic flow diagram of a base station commissioning method provided by an embodiment of the present application;
[0045] Figure 3 FIG. is a schematic flow diagram of a method for planning and synchronizing resource information provided by an embodiment of the present application;
[0046] Figure 4 FIG. is a schematic flow diagram of a method for opening a base station bearer circuit provided by an embodiment of the present application.
[0047] Through the above-mentioned drawings, specific embodiments of the present disclosure have been shown, and there will be more detailed descriptions hereinafter. These drawings and text descriptions are not intended to limit the scope of the concept of the present disclosure in any way, but to illustrate the concept of the present disclosure to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0048] Exemplary embodiments will be described in detail herein, and examples thereof are shown in the accompanying drawings. When the following description refers to the accompanying drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present disclosure. On the contrary, they are merely examples of apparatuses and methods consistent with some aspects of the present disclosure as detailed in the appended claims.
[0049] In the embodiments of the present application, "at least one" means one or more, and "a plurality" means two or more. "And / or" describes the association relationship of associated objects and indicates that three relationships may exist. For example, A and / or B may represent three situations: A exists alone, A and B exist simultaneously, and B exists alone. Here, A and B may be singular or plural. In the written description of the present application, the character " / " generally represents an "or" relationship between the associated objects before and after.
[0050] The technical solutions provided in the embodiments of the present application can be applied to the scenario of opening a 5G base station. The 5G bearer network uses Segment Routing (SR) technology for forwarding, and a centralized SDN controller is set up to uniformly distribute 5G bearer services.
[0051] Currently, when opening a 5G base station, it is necessary for the wireless base station professional to determine the 5G base station service parameters, then perform construction according to the determined 5G base station service parameters, and after the construction is completed, transfer the service parameters to the data bearer professional, and configure the bearer services of the 5G bearer network through the data bearer professional to open the bearer circuit, thereby completing the opening of the 5G base station. When configuring the bearer network, it is necessary to configure the service access related configurations for the access layer of the bearer network, and also configure the 5G base station service opening related configurations on the wireless side. Configuration verification and service testing need to be performed at different service layers.
[0052] However, the current method for opening a 5G base station requires manual cooperation to complete. For example, it is necessary for technicians to manually distribute service configurations to configure the bearer network, which takes a lot of time, and the error rate of manually distributing configurations is relatively high, and automatic configuration for opening the station cannot be achieved, resulting in low efficiency of opening the 5G base station.
[0053] To solve the problem of low opening efficiency of 5G base stations caused by configuration, the planning resource information required for opening the bearer circuit of the target base station can be orchestrated by the unified orchestration and coordination module, and the orchestrated target planning resource information can be sent to the provincial orchestration and coordination module, so that the provincial orchestration and coordination module sends a message to the controller, and the controller converts the message into an opening instruction to control the device to open the base station bearer circuit according to the opening instruction, and the planning opening module notifies the execution of the base station opening operation. Through the cooperation of the unified orchestration and coordination module, the provincial orchestration and coordination module, the controller, the planning opening module and the device, the orchestration of the planning resource information can be realized, the process of opening the base station is simplified, manual configuration is not required, a large amount of time is saved, and thus the opening efficiency of the base station is improved, realizing automatic opening of the base station.
[0054] Figure 1 This is a schematic structural diagram of a base station opening system provided by an embodiment of the present application. According to Figure 1 As shown, the base station opening system includes an orchestration and coordination system 101, a controller 102, a planning opening module 103 and a device 104. Among them, the orchestration and coordination system 101 includes a unified orchestration and coordination module 1011 and a provincial orchestration and coordination module 1012.
[0055] For example, the unified orchestration and coordination module 1011 is used to orchestrate the planning resource information required for opening the bearer circuit of the target base station when receiving an opening application sent by the service system for opening the bearer circuit of the target base station, and send the orchestrated target planning resource information to the provincial orchestration and coordination module 1012. The provincial orchestration and coordination module 1012 is used to generate a message corresponding to the target planning resource information and send the message to the controller 102. The controller 102 is used to generate an opening instruction corresponding to the bearer circuit of the target base station according to the message and send the opening instruction to the device 104. The opening instruction includes the target planning resource information. The device 104 is used to open the bearer circuit of the target base station according to the target planning resource information and send the result of successful or failed opening of the bearer circuit of the target base station to the controller 102; so that the controller 102 sends the result of successful opening of the bearer circuit of the target base station to the provincial orchestration and coordination module 1012, so that the provincial orchestration and coordination module 1012 forwards it to the unified orchestration and coordination module 1011. The planning opening module 103 is used to perform a base station opening operation when receiving the result of successful opening of the bearer circuit of the target base station.
[0056] In the embodiment of the present application, through the collaborative operation of the unified orchestration and coordination module, the provincial orchestration and coordination module, the controller, the planned site opening module, and the equipment, the unified orchestration and coordination module orchestrates the planned resource information required for opening the bearer circuit of the target base station, and through the provincial collaborative orchestration module and the controller, the equipment is controlled to open the bearer circuit of the target base station according to the arranged target planned resource information. After the bearer circuit of the target base station is successfully opened, the site opening operation of the base station is carried out. The whole process does not require technicians to configure manually, realizing the automation of the base station site opening, saving a lot of time, thus improving the efficiency of the base station site opening, and being able to contribute to the efficient deployment of 5G new infrastructure, achieving the construction goals of unified planning, unified standards, and unified deployment of 5G base stations.
[0057] The base station site opening system provided by the embodiment of the present application may further include a service system and a resource planning module. By way of example, the service system is used to store the opening information of the base station bearer circuit, and when receiving the query instruction for the opening information of the target base station bearer circuit sent by the planned site opening module 103, it sends the query result of whether the target base station bearer circuit is occupied to the planned site opening module 103. Therefore, the planned site opening module 103 is further used to send an opening application for opening the target base station bearer circuit to the unified orchestration and coordination module 1011 in the orchestration and coordination system when receiving the query result that the target base station bearer circuit is not occupied.
[0058] In the embodiment of the present application, the service system can provide a query function for the planned site opening module to query whether the target base station bearer circuit is occupied, which can avoid the problem that the target bearer circuit cannot be opened due to the planned target base station bearer circuit, and can effectively improve the efficiency of the base station site opening.
[0059] The resource planning module is used to initially plan multiple resource information and send the planned planned resource information to the unified orchestration and coordination module 1011. Therefore, the unified orchestration and coordination module 1011 is further used to synchronize the planned resource information to the provincial orchestration and coordination module 1012 and the controller 102 according to the provincial information.
[0060] In the embodiment of the present application, through the initial planning of multiple resource information by the resource planning module, it can avoid technicians wasting a lot of time on manual planning, thereby further improving the efficiency of the base station site opening.
[0061] By way of example, the service system is further used to store the status information of the base station bearer circuit and update the stored status information of the base station bearer circuit in real time; the service system is further used to send the corresponding status information of the base station bearer circuit to the planned site opening module 103 when receiving the query instruction for the status information of the base station bearer circuit sent by the planned site opening module 103 after the base station site opening is completed.
[0062] In an embodiment of the present application, the service system can store the status information of the base station bearer circuit and update it in real time, enabling users to query the situation of the base station bearer circuit in real time through the service system, so as to facilitate operations such as maintaining or updating the base station bearer circuit.
[0063] Exemplarily, when opening the target base station bearer circuit, due to problems such as incorrect parameters, the opening of the target base station bearer circuit may fail. When the opening of the target base station bearer circuit fails, the controller 102 is further configured to, when receiving the result of the failure of opening the target base station bearer circuit sent by the device 104, send the target planning resource information and the result of the failure of opening the target base station bearer circuit to the service system.
[0064] Exemplarily, when the controller 102 sends the target planning resource information and the result of the failure of opening the target base station bearer circuit to the service system, it may first send the target planning resource information and the result of the failure of opening the target base station bearer circuit to the provincial arrangement and coordination system, and send them to the unified arrangement and coordination module 1011 through the provincial arrangement and coordination module 1012, so as to send them to the service system through the unified arrangement and coordination module 1011.
[0065] It can be understood that the target planning resource information is pre-stored by the controller 102, and the unified arrangement and coordination module 1011 synchronizes the planning resource information to the provincial arrangement and coordination module 1012 and the controller 102 according to the provincial information.
[0066] In an embodiment of the present application, the controller sends the target planning resource information and the result of the failure of opening the target base station bearer circuit to the provincial arrangement and coordination module, so that when the target base station bearer circuit is opened, the service system can timely know the target planning resource information of the target base station bearer circuit that fails to open, so as to facilitate the service system to record.
[0067] Next, the base station opening method provided by the present application will be described in detail through specific embodiments. It can be understood that these specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.
[0068] Figure 2 It is a schematic flowchart of a base station opening method provided by an embodiment of the present application. This base station opening method can be executed by software and / or a hardware device. For example, this hardware device can be a base station opening system, and this base station opening system can be a terminal or a processing chip in the terminal. Exemplarily, please refer to Figure 2 As shown, this base station opening method may include:
[0069] S201. When the unified orchestration and collaboration module receives a service system's request for activating the bearer circuit of a target base station, it orchestrates the planning resource information required for activating the bearer circuit of the target base station and sends the orchestrated target planning resource information to the provincial orchestration and collaboration module.
[0070] For example, when the unified orchestration and collaboration module receives a service system's request for activating the bearer circuit of a target base station, the request can be an electronic application form, which may be based on user input or automatically generated based on the basic information of the target base station's bearer circuit. The basic information of the target base station's bearer circuit may include information such as the bearer circuit identifier and the bearer circuit type. The embodiments of this application do not make any limitations on the specific manner of the activation request.
[0071] For example, the planning resource information required for the target base station's bearer circuit is obtained by the unified orchestration and collaboration module from the resource planning module and may include information such as equipment planning, port planning, and Virtual Local Area Network (VLAN) planning. Moreover, after orchestrating the obtained planning resource information, the orchestrated target planning resource information is sent to the corresponding provincial orchestration and collaboration module, enabling the provincial orchestration and collaboration module to which the target base station's bearer circuit belongs to carry out activation operations in a targeted manner.
[0072] S202. The provincial orchestration and collaboration module configures the target planning resource information into a JSON message according to the YANG model and sends the JSON message to the controller.
[0073] For example, the provincial orchestration and collaboration module can generate the access ID of the target base station's bearer circuit channel based on the target planning resource information in combination with the YANG model. For example, it generates the access ID based on the device IP, port information, and VLAN identifier, and generates Quality of Service (QoS) information based on the port bandwidth, etc., and configures a JSON message in the standard format of L3VPN, that is, the configuration and distribution message, and sends the JSON message to the controller.
[0074] S203. The controller generates an activation instruction corresponding to the target base station's bearer circuit according to the message and sends the activation instruction to the device. The activation instruction includes the target planning resource information.
[0075] Exemplarily, when the controller generates an activation instruction corresponding to the target base station bearer circuit based on the message, the controller receives the JSON message information sent by the province orchestration coordination module, and can adapt device scenario commands according to templates for different service scenarios, different manufacturers, and different models of the controller, that is, the activation instruction corresponding to the target base station bearer circuit, and perform cli / netconf sending. After the sending is completed, the status of the service application form is returned. It can be understood that the status of the service application form can be successful sending or failed sending. This application embodiment is only described by the above example, but it does not mean that this application embodiment is only limited to this.
[0076] S204. The device activates the target base station bearer circuit according to the target planned resource information, and sends the result of successful or failed activation of the target base station bearer circuit to the controller.
[0077] Exemplarily, when the device activates the target base station bearer circuit according to the target planned resource information, it can activate the target base station bearer circuit according to the port, vlan, route target RT (Route Target), route distinguisher RD (Route Distinguisher), and IP address. This application embodiment does not make any limitation on this.
[0078] S205. If the planned site opening module receives the result of successful activation of the target base station bearer circuit, it performs the base station site opening operation.
[0079] Exemplarily, the base station site opening operation may include constructing and establishing a 5G base station according to the activated target base station bearer circuit and configuring the parameters of the 5G base station. This application embodiment does not make specific limitations on the base station site opening operation.
[0080] It can be seen that in the base station commissioning method provided by the embodiments of the present application, when the unified orchestration and coordination module receives a commissioning application for commissioning the bearer circuit of the target base station sent by the service system, it orchestrates the planned resource information required for commissioning the bearer circuit of the target base station, and sends the orchestrated target planned resource information to the provincial orchestration and coordination module; the provincial orchestration and coordination module configures the target planned resource information into a JSON message according to the YANG model, and sends the JSON message to the controller; the controller generates a commissioning instruction corresponding to the bearer circuit of the target base station according to the message, and sends the commissioning instruction to the device, and the commissioning instruction includes the target planned resource information; the device commissions the bearer circuit of the target base station according to the target planned resource information, and sends the result of successful or failed commissioning of the bearer circuit of the target base station to the controller; if the planned commissioning module receives the result of successful commissioning of the bearer circuit of the target base station, it performs the base station commissioning operation. The technical solution provided by the embodiments of the present application can, through the collaborative operations among the unified orchestration and coordination module, the service system, the provincial orchestration and coordination module, the controller, the device, and the planned commissioning module, eliminate the need for technicians to manually configure and send instructions, and the planned resource information is orchestrated within the system, thereby improving the efficiency of base station commissioning.
[0081] For example, before the unified orchestration and coordination module receives the commissioning application for commissioning the bearer circuit of the target base station sent by the service system, when the service system receives the commissioning information query instruction of the bearer circuit of the target base station sent by the planned commissioning module, it determines the target commissioning information corresponding to the bearer circuit of the target base station from the stored commissioning information of the bearer circuit of the base station, and the target commissioning information includes occupied or unoccupied; the service system determines whether the bearer circuit of the target base station is occupied according to the target commissioning information, and sends the query result of whether it is occupied to the planned commissioning module; if the query result is unoccupied, the planned commissioning module sends a commissioning application for commissioning the bearer circuit of the target base station to the unified orchestration and coordination module.
[0082] In the embodiments of the present application, by storing the commissioning information of the bearer circuit of the base station in the service system, the planned commissioning module can query at any time through the service system whether the bearer circuit of the target base station is occupied, which can avoid the problem of commissioning failure caused by commissioning an already occupied bearer circuit, reduce incorrect operations, and thus improve the efficiency of base station commissioning.
[0083] For example, in order to further improve the efficiency of base station commissioning, the base station commissioning system further includes a resource planning module. Before the unified orchestration and collaboration module receives a commissioning application from the service system for commissioning the bearer circuit of the target base station, the resource planning module can preliminarily plan multiple resource information according to the service types of the multiple resource information, and send the planned resource information to the unified orchestration and collaboration module. The unified orchestration and collaboration module synchronizes the planned resource information to the provincial orchestration and collaboration module and the controller according to the province information.
[0084] For example, when the resource planning module preliminarily plans multiple resource information, the resource information comes from the acquisition and analysis system. The base station commissioning system obtains all resource lists through the acquisition and analysis system, and the operation and maintenance personnel maintain the basic attributes of the equipment and the special attributes required by the service. There are two ways of resource synchronization between systems, full update and incremental update, which can ensure the uniqueness and timeliness of devices and ports. The resource system automatically obtains the incremental file of device attribute changes from the acquisition and analysis system every two hours, and at the same time synchronizes the corresponding information to the unified orchestration and collaboration module, and automatically synchronizes it to the sub-provincial orchestration and collaboration modules and sub-provincial controllers.
[0085] It can be understood that the resource planning module supports querying device resource information by province, device model, and device manufacturer. The target device can be queried more efficiently through filtering conditions. By default, it displays the list of all device information in the domain to which the currently logged-in user belongs, and supports paging and export functions for convenient offline viewing and processing.
[0086] For example, the resource planning module can preliminarily plan multiple resource information according to the service types of the multiple resource information, which can include RT planning, RD planning, VLAN planning, etc. For example, when performing RT planning and RD planning, according to different service types such as mobile services, home broadband services, and dedicated line services, the RT information and RD information of the 5G services to be planned and commissioned can be determined. Different services can plan different RD, RT1, and RT2 values, flexibly supporting different RD and RT allocation rules. For example, the service can also be subdivided. For example, mobile services can be subdivided into 5G services and 4G services, and further subdivided into radio access network RAN and operation and maintenance management OAM, etc., and different plans can be made for different provincial cities.
[0087] For example, when conducting VLAN planning, the VLAN identifiers of different 5G services in the cities where 5G services are launched can be flexibly planned and flexibly modified after planning. The VLAN identifiers of different virtual private networks (VPNs) for the same service can be planned and modified, such as for 5G radio access network (5G_RAN), 5G operation and maintenance management (5G_OAM), 4G radio access network (4G_RAN), and 4G operation and maintenance management (4G_OAM). For a specific VPN, such as 5G_RAN, there are different access types, which can be specifically divided into base station access, connection to the 5G core network (5GC), direct connection between MCRs, connection to the B network, etc. For different access levels, access devices can distinguish different users through VLANs, and core devices can distinguish different networks and autonomous system (AS) domains through VLANs, which can improve the manageability of different services and flexibly support different services to use different VLAN identifiers.
[0088] The embodiments of this application are only illustrated by taking the above RT planning, RD planning, and VLAN planning as examples, but it does not mean that the embodiments of this application are only limited to this.
[0089] For example, when the unified orchestration and coordination module synchronizes the planned resource information to the provincial orchestration and coordination module and the controller according to the provincial information, there can be a corresponding relationship between the provincial orchestration and coordination module domain control, that is, the provincial orchestration and coordination modules of different provinces correspond to different controllers. The planned RT, RD, and VLAN identifiers are passed to the unified orchestration and coordination module for synchronization.
[0090] In the embodiments of this application, the resource planning module preliminarily plans multiple resource information, eliminating the need for technicians to perform manual planning, saving a large amount of time, and improving the accuracy and efficiency of the planned resource information. In addition, the unified orchestration and coordination module synchronizes the planned resource information to the provincial orchestration and coordination module and the controller according to the provincial information, enabling the provincial orchestration and coordination module and the controller to pre-store the planned resource information, which is beneficial to the subsequent activation of the base station bearer circuit.
[0091] For example, after the base station is set up, the service system updates the status information of the base station bearer circuit stored in real time; after the base station is set up, when the service system receives a query instruction for the status information of the base station bearer circuit sent by the planned base station setup module, it sends the corresponding status information of the base station bearer circuit to the planned base station setup module, and the status information includes at least one of port status, optical attenuation, and error code. The planned information is passed to the unified orchestration and coordination for synchronization, and different service VLANID values are matched when configuring and sending messages.
[0092] For example, when querying the status information of the base station bearer circuit, the specific status information of the base station bearer circuit can be queried in the service system according to the identifier of the base station bearer circuit.
[0093] In the embodiment of the present application, the service system can provide the status information of the base station bearer circuit for the planning and development module, and determine whether the base station bearer circuit needs to be maintained according to the status information of the bearer circuit, that is, it can solve the problems that occur in the base station bearer in a timely manner.
[0094] For example, when the device fails to open the target base station bearer circuit during the opening process, when the controller receives the result of the failure to open the target base station bearer circuit sent by the device, it sends the target planning resource information and the result of the failure to open the target base station bearer circuit to the provincial arrangement and coordination module; the unified arrangement and coordination module forwards the target planning resource information and the result of the failure to open the target base station bearer circuit received by the provincial arrangement and coordination module to the service system, and the service system records the target planning resource information and the result of the failure to open the target base station bearer circuit.
[0095] In the embodiment of the present application, when the controller sends the result of the failure to open the target base station bearer circuit, it also sends the target planning resource information to the provincial arrangement and coordination module, so that both the target planning resource information and the result of the failure to open the target base station bearer circuit are sent to the service system, enabling the service system to analyze the reason for the failure to open the target base station bearer circuit and facilitating the re-opening of the target base station bearer circuit.
[0096] To facilitate the understanding of the base station opening system provided by the embodiment of the present application, the following will be described in detail by taking the interaction between the modules in the system as an example. Figure 3 It is a schematic flowchart of a method for planning and synchronizing resource information provided by an embodiment of the present application.
[0097] According to Figure 3 As shown, when planning and synchronizing resource information, the following steps may be included:
[0098] S301. The planning and opening module queries the 5G base station bearer circuit plan from the resource planning module.
[0099] S302. The resource planning module performs device planning, port planning, IP planning, and virtual local area network planning, and feeds back the device planning, port planning, IP planning, and virtual local area network planning to the planning and opening module.
[0100] For example, the specific methods for the resource planning module to perform device planning, port planning, IP planning, and virtual local area network planning can be referred to the above embodiments, and will not be elaborated herein in the embodiments of the present application.
[0101] S303. The resource planning module sends the device planning, port planning, IP planning, and local area network planning to the unified arrangement and coordination module for synchronization.
[0102] S304. The unified orchestration and coordination module sends the planned resource information to the provincial orchestration and coordination modules of each province.
[0103] It can be understood that the planned resource information may include device planning, port planning, IP planning, virtual local area network planning, etc. described in the above steps, and the embodiments of the present application do not make any limitations thereto.
[0104] S305. The provincial orchestration and coordination module sends the planned resource information to the corresponding controller.
[0105] S306. The unified orchestration and coordination module initializes the planned resource information.
[0106] Exemplarily, the unified orchestration and coordination module initializes the planned resource information by adapting the unified orchestration and coordination module according to the synchronized planned resource information, so that the unified orchestration and coordination module can follow the planned resource information.
[0107] It can be understood that the above steps S302 and S303 can be carried out simultaneously or successively, and the embodiments of the present application do not make any limitations on the order of the steps.
[0108] According to Figure 3 As shown, when the resource planning module sends device planning, port planning, IP planning, and local area network planning to the unified orchestration and coordination module, it may need to cross business systems. Therefore, the resource planning module can also send device planning, port planning, IP planning, and local area network planning to the business system, and the business system saves the received device planning, port planning, IP planning, and local area network planning.
[0109] Figure 4 It is a schematic diagram of the process for opening a base station bearer circuit provided by the embodiments of the present application. According to Figure 4 As shown, the process for opening the base station bearer circuit includes the following steps:
[0110] S401. The planning and deployment module queries the 5G base station bearer circuit opening information from the business system.
[0111] Exemplarily, the 5G base station bearer circuit opening information includes information on whether the 5G base station bearer circuit is occupied, and may also include other information, and the embodiments of the present application do not make any limitations thereto.
[0112] S402. The business system feeds back the query result that the 5G base station bearer circuit is not occupied to the planning and site opening module.
[0113] S403. The planning and site opening module sends a 5G base station bearer circuit opening service application to the unified orchestration and coordination module.
[0114] S404. The unified orchestration and collaboration module performs orchestration based on the planned resource information.
[0115] S405. The unified orchestration and collaboration module sends the orchestrated planned resource information to the provincial capacity platforms, that is, to the provincial orchestration and collaboration module.
[0116] S406. The provincial orchestration and collaboration module arranges the JSION format according to the template and the planned resource information in accordance with the YANG model, and configures and issues the message planned resource information for orchestration.
[0117] S407. The provincial orchestration and collaboration module sends the orchestrated JSION to the corresponding controller.
[0118] S408. The controller issues instructions to the device.
[0119] S409. The device returns information on successful / failed activation to the controller.
[0120] S410. The controller sends information on successful / failed activation to the provincial orchestration and collaboration module.
[0121] S411. The provincial orchestration and collaboration module returns information on successful / failed activation to the overall capacity platform, that is, returns information on successful / failed activation to the unified orchestration and collaboration module.
[0122] S412. The unified orchestration and collaboration module pushes back information on successful / failed activation to the business system.
[0123] S413. The business system feeds back information on successful activation of the 5G base station bearer circuit to the planning site opening module, and the planning site opening module performs operations such as 5G base station construction and upload of construction data.
[0124] S414. The planning site opening module queries the 5G base station bearer circuit status information from the business system.
[0125] S415. The business system feeds back the bearer circuit status to the planning site opening module: port status, optical attenuation, bit error, etc.
[0126] According to the above embodiments, when the planning site opening module in the present application conducts business queries from the business system, it can query the issued application form business on the business query page, filter the provinces and cities of the application form, and support business queries through filtering by information such as business number, device IP, issued status, business scenario, and business type, improving the efficiency of querying business. By viewing the details of the application form, the basic information of the business application form can be viewed, including scenario number, business area, business status, etc. Support for querying configured issued tasks, which can be queried according to the configured issued number. Support for viewing configured issued information, including configuration information, resource information, and issued information.
[0127] It is understandable that the business system can perform business statistics. When performing business statistics, the business distribution statistics page can be used to view the information of devices or ports for which the configuration has been successfully distributed, including province, city, device IP, device type, device name, interface name, interface IP, vlan, configuration time, etc.; filtering can be performed according to province, city, device IP, interface name, and interface IP address, and the data export function is supported for convenient offline use.
[0128] In summary, the technical solution provided by this application enables the 5G base station opening system to automatically send network parameters to the unified orchestration and coordination module on the bearer side. The capability platform corresponding to the unified orchestration and coordination module performs automated orchestration for different scenarios and different input information, supports device configuration distribution, realizes the simultaneous startup and shutdown of 5G base stations and bearer-side circuits, and automated configuration distribution, greatly improving the construction efficiency of the bearer network. After the configuration distribution fails, the configuration rollback and configuration backup can fully ensure that there is no garbage data on the device, avoiding the problem of incorrect commands caused by technicians manually executing configuration commands on different devices.
[0129] In another embodiment of this application, the business system and the orchestration and coordination system in the base station opening system do not perform special processing for any manufacturer or model. The orchestration and coordination shields the differences between device manufacturers and can fully automatically generate a configuration file, send it to the controller, and distribute the configuration to the access device to take effect, effectively shielding the differences in the configuration methods of access devices of different manufacturers and models. No special processing is required when using devices from other manufacturers later, improving compatibility. The orchestration and coordination system forms several small configuration categories for different configurations, namely Vpn-svc, Bgp, Vpn-config, Routing, Vpn-attachment, which can be combined according to different scenarios. Ideal scenarios can form new instances and scenarios through different combinations, reducing manual orchestration and improving the flexibility of the system.
[0130] In another embodiment of this application, after the devices in the base station opening system of this application are automatically online or their status changes, the business system and the unified orchestration and coordination module can synchronize device information and port information at regular intervals, for example, once a day, within a preset time period. After the resource planning module plans the devices and ports, it synchronizes and pushes them to the orchestration and coordination system in real time, and supports the orchestration and coordination system to pull the full amount of planning information at one time.
[0131] In another embodiment of the present application, when the province arrangement coordination module is issued with configurations or the controller issues configurations to devices, the issuance may fail due to network connection problems or incorrect filling of the issued information. In this case, the business system can be used to control a re-issuance. For example, the user can click the re-issuance button on the business system. At this time, the arrangement coordination module will filter out the device configurations that have been successfully issued for the current application form and only re-issue the device configurations that failed to be issued previously, and push the status of whether the re-issuance is successful to the business system.
[0132] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application and are not intended to limit them. Although the present application has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features. However, such modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A base station commissioning system, characterized in that, Including: An orchestration collaboration system, a controller, a planning site opening module, and devices; The orchestration collaboration system includes a unified orchestration collaboration module and a provincial orchestration collaboration module; The unified orchestration collaboration module is configured to, when receiving an opening application for opening a target base station bearer circuit sent by a service system, orchestrate the planning resource information required for opening the target base station bearer circuit, and send the orchestrated target planning resource information to the provincial orchestration collaboration module; The provincial orchestration collaboration module is configured to generate a message corresponding to the target planning resource information, and send the message to the controller; The controller is configured to generate an opening instruction corresponding to the target base station bearer circuit according to the message, and send the opening instruction to the devices, and the opening instruction includes the target planning resource information; The devices are configured to open the target base station bearer circuit according to the target planning resource information, and send the result of successful or failed opening of the target base station bearer circuit to the controller; So that the controller sends the result of successful opening of the target base station bearer circuit to the provincial orchestration collaboration module, so that the provincial orchestration collaboration module forwards it to the unified orchestration collaboration module; The planning site opening module is configured to perform a base station site opening operation when receiving the result of successful opening of the target base station bearer circuit.
2. The base station commissioning system according to claim 1, wherein The base station site opening system further includes a service system, and the service system is configured to store the opening information of the base station bearer circuit, and when receiving an opening information query instruction of the target base station bearer circuit sent by the planning site opening module, send a query result of whether the target base station bearer circuit is occupied to the planning site opening module; The planning site opening module is further configured to, when receiving the query result that the target base station bearer circuit is not occupied, send an opening application for opening the target base station bearer circuit to the unified orchestration collaboration module in the orchestration collaboration system.
3. The base station commissioning system according to claim 1 or 2, characterized in that, The base station site opening system further includes a resource planning module; The resource planning module is configured to perform preliminary planning on multiple resource information, and send the planned planning resource information to the unified orchestration collaboration module; The unified orchestration collaboration module is further configured to synchronize the planning resource information to the provincial orchestration collaboration module and the controller according to provincial information.
4. The base station commissioning system according to claim 3, characterized in that, The service system is further configured to store the status information of the base station bearer circuit, and perform real-time update on the stored status information of the base station bearer circuit; The service system is further configured to, after completing the base station site opening, when receiving a status information query instruction of the base station bearer circuit sent by the planning site opening module, send the corresponding status information of the base station bearer circuit to the planning site opening module.
5. The base station startup system according to claim 1 or 2, characterized in that The controller is further configured to, when receiving the result of failed opening of the target base station bearer circuit sent by the devices, send the target planning resource information and the result of failed opening of the target base station bearer circuit to the service system.
6. A method for commissioning a base station, characterized in that, Applied to the base station site opening system according to any one of claims 1-4, the method includes: When the unified orchestration and collaboration module receives an activation application sent by the business system for activating the bearer circuit of the target base station, it orchestrates the planned resource information required for activating the bearer circuit of the target base station, and sends the orchestrated target planned resource information to the provincial orchestration and collaboration module; The provincial orchestration and collaboration module configures the target planned resource information into a JSON message according to the YANG model, and issues the JSON message to the controller; The controller generates an activation instruction corresponding to the bearer circuit of the target base station according to the message, and issues the activation instruction to the device, and the activation instruction includes the target planned resource information; The device activates the bearer circuit of the target base station according to the target planned resource information, and sends the result of successful or failed activation of the bearer circuit of the target base station to the controller; If the planning base station opening module receives the result of successful activation of the bearer circuit of the target base station, it performs the base station opening operation.
7. The method according to claim 6, wherein The method further includes: When the business system receives the activation information query instruction of the bearer circuit of the target base station sent by the planning base station opening module, it determines the target activation information corresponding to the bearer circuit of the target base station in the stored activation information of the bearer circuit of the base station, and the target activation information includes occupied or unoccupied; The business system determines whether the bearer circuit of the target base station is occupied according to the target activation information, and sends the query result of whether it is occupied to the planning base station opening module; If the query result is unoccupied, the planning base station opening module sends an activation application for activating the bearer circuit of the target base station to the unified orchestration and collaboration module.
8. The method according to claim 7, characterized in that, The base station opening system further includes a resource planning module; Before the unified orchestration and collaboration module receives the activation application sent by the business system for activating the bearer circuit of the target base station, the method further includes: The resource planning module preliminarily plans the multiple resource information according to the service types of the multiple resource information, and sends the planned planned resource information to the unified orchestration and collaboration module; The unified orchestration and collaboration module synchronizes the planned resource information to the provincial orchestration and collaboration module and the controller according to the provincial information.
9. The method according to claim 8, characterized in that, The method further includes: The business system updates the status information of the bearer circuit of the base station stored in real time; After completing the base station opening, when the business system receives the status information query instruction of the bearer circuit of the base station sent by the planning base station opening module, it sends the corresponding status information of the bearer circuit of the base station to the planning base station opening module, and the status information includes at least one of port status, optical attenuation, and error code.
10. The method according to claim 6, characterized in that, The method further includes: When the controller receives the result of failed activation of the bearer circuit of the target base station sent by the device, it sends the target planned resource information and the result of failed activation of the bearer circuit of the target base station to the provincial orchestration and collaboration module; The unified orchestration and collaboration module forwards the target planned resource information and the result of failed activation of the bearer circuit of the target base station received by the provincial orchestration and collaboration module to the business system; The service system records the target planned resource information and the result of the failure in opening the bearer circuit of the target base station.
11. The method according to claim 8, wherein The resource information includes at least two of device identifier, port, virtual local area network (VLAN), routing target (RT), routing differentiator (RD), and IP address.
Citation Information
Patent Citations
Service orchestrator-based metropolitan area network service processing method
CN109120459A
Methods and devices for radio communications
IN201947025774A