A simple and easy water collecting well with turnover on construction site
By using large-diameter corrugated pipes and recycled steel bars and wooden formwork to process grates, reusable construction site water collection wells are constructed, solving the problem of labor and material consumption for temporary construction site water collection wells. This achieves simplified construction and material reuse, thus realizing the goals of green construction and standardization.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- TIANJIN WUQING DISTRICT CONSTRUCTION ENG CORP
- Filing Date
- 2023-03-27
- Publication Date
- 2026-07-03
AI Technical Summary
The existing construction method for temporary water collection wells at construction sites is labor-intensive and material-intensive, lacks reusability, and makes it difficult to achieve green construction and on-site standardization.
Large-diameter corrugated pipes are used as well walls, and scrap steel bars and wooden templates are combined to process grates, forming a reusable water collection well structure.
It achieves simple construction, material saving, meets the requirements of green construction and on-site standardization, and the materials can be reused.
Smart Images

Figure CN116290052B_ABST