A method for constructing a power grid dispatching control model

CN116544946BActive Publication Date: 2026-05-29ZHEJIANG ZHENENG ENERGY SERVICE CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
ZHEJIANG ZHENENG ENERGY SERVICE CO LTD
Filing Date
2023-05-25
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

The lack of monitoring and inspection of safety indicators in existing technologies leads to problems such as inaccurate warning messages issued when the power grid load is too high or when the power grid is operating normally.

Method used

By classifying user electricity consumption data and regional electricity consumption data into two levels, calculating the load weight values ​​of users at each level, and constructing a power grid dispatch and control model, accurate judgment and dispatch control of power grid operation can be achieved.

Benefits of technology

It improves the accuracy of power grid load assessment, reduces errors caused by extreme conditions, and ensures the safe and stable operation of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116544946B_ABST
    Figure CN116544946B_ABST
Patent Text Reader

Abstract

The application provides a kind of construction method of power grid dispatching control model, it is related to power grid dispatching technical field, the application first to user power consumption data and regional power consumption data are collected, according to user power consumption data and regional power consumption data, twice division is carried out to user, obtains second division historical user, to user is multistage division, again through the analysis of user historical power consumption data and regional historical power consumption data, obtains the load weight value of each level user, according to load weight value, the regional power consumption load is calculated, and according to regional power consumption load, scheduling control is carried out, the application is analyzed by historical data, provides data support for judging power grid operation condition, to solve the problem that safety index monitoring and checking are lacked in prior art, safety index parameter deviation occurs, resulting in inaccurate judgment result.
Need to check novelty before this filing date? Find Prior Art