A stepped plane aluminum-plastic panel suspended ceiling construction device and a construction method thereof

CN116591375BActive Publication Date: 2026-08-28ZHEJIANG BAOSHENG CONSTR GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310356354.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-06
Publication Date
2026-08-28
Estimated Expiration
2043-04-06

AI Technical Summary

Technical Problem

[0003]在安装吊杆的过程中,通常使用膨胀螺丝将吊杆固定在屋顶上,但是由于屋顶表面不平整或者施工误差的原由,导致吊杆安装完成后稍微倾斜;当多根吊杆由于施工原因稍微倾斜时,导致安装在吊杆下方的龙骨骨架位置发生偏移,铝塑板与骨架之间的间距不是太小就是太大,导致铝塑板安装不平整甚至易从骨架上掉落;在安装铝塑板的过程中,铝塑板表面易留有手印等污物,当铝塑板卡在龙骨表面后,工人需用站在脚手架用布把板面全部擦拭干净,工人仰头长时间清理铝塑板导致脖子手臂酸痛,且用布擦拭铝塑板过程中,有时工人有力过大将安装后的铝塑板向上顶起,导致铝塑板错位

Benefits of technology

[0020]本发明提供一种跌级式平面铝塑板吊顶施工装置及其施工方法,在安装所述主龙骨的过程中,当由于所述吊杆在安装过程中表面稍微倾斜时,此时放置所述安装板内部的所述主龙骨也处于倾斜状态,转动所述安装板底端的所述螺杆,所述螺杆带动所述橡胶垫向上运动,从而使所述橡胶垫向上运动与所述主龙骨接触,所述橡胶垫运动推动所述主龙骨向上运动,通过调节两个所述橡胶垫的高度,从而将所述主龙骨调平,在所述安装板内部移动所述主龙骨,使所述主龙骨运动到适宜的安装位置,再转动所述安装板侧壁的所述螺杆,将所述主龙骨固定在所述安装板的内部;防止所述主龙骨和所述次龙骨的位置发生偏移,从而使所述铝塑板与所述次龙骨之间的间距适宜,有利于稳定的将所述铝塑板卡在所述次龙骨的表面,且所述限位机构卡合所述铝塑板,进一步防止所述铝塑板从所述次龙骨的表面掉落,增加所述铝塑板在所述次龙骨的表面的稳定性,便于清理所述铝塑板的表面;当所述铝塑板安装结束后,所述控制机构运作使所述固定壳内部产生吸力,外界空气通过所述凹槽不断进入所述固定壳的内部,同时所述固定壳内部产生吸力使所述橡胶垫吸住所述铝塑板的表面;且所述控制机构运作使清洗液通过所述喷头喷出喷到所述铝塑板的表面;所述第一固定板与所述铝塑板之间存在一定的间隙,在所述第一固定板与所述固定壳之间运动的气体同时向上吸引从所述喷头喷出的清洗液,便于清洗液运向上运动到所述铝塑板的表面;且当空气在所述固定壳和所述连接机构的内部运作时,气体推动所述连接机构运作从而推动所述转轴和所述清理刷转动,推动所述支撑杆,使所述支撑杆带动所述橡胶垫和所述清理刷在所述铝塑板的表面运动,所述橡胶垫运动方向与所述主龙骨平行且与所述次龙骨垂直,此时所述橡胶垫、所述清理刷和所述擦拭机构在所述铝塑板的表面运动,所述清理刷转动清理所述铝塑板表面的清洗液和污渍,所述擦拭机构将残留在所述铝塑板表面的水渍擦去;在擦拭所述铝塑板的过程中,所述橡胶垫吸引所述铝塑板,使所述橡胶垫向下拉扯所述铝塑板,使所述铝塑板紧贴所述次龙骨,减小所述铝塑板被顶起的机率,便于工人快速清理所述铝塑板的表面;随着所述清理刷转动与所述第二固定板侧壁的所述压条接触,所述压条挤压所述清理刷,使所述清理刷内部吸附的水分压出,与此同时,外界空气通过所述凹槽向下运动进入所述固定壳的内部,空气带动被压出的污水不断进入所述支撑杆的内部,便于所述清理刷清理所述铝塑板的表面;当人们向上推力过大将所述铝塑板顶起时,关闭所述水泵,所述真空泵运作使所述橡胶垫紧贴在所述铝塑板的表面,此时工人只需要向下拉动所述支撑杆,使所述支撑杆带动所述固定壳、所述橡胶垫和所述铝塑板向下运动复位即可。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116591375B_ABST
    Figure CN116591375B_ABST
Patent Text Reader

Abstract

The application provides a stepped plane aluminum-plastic plate suspended ceiling construction device and a construction method thereof. The stepped plane aluminum-plastic plate suspended ceiling construction device and the construction method thereof comprise: a floor; a suspended ceiling; a supporting mechanism, a rubber pad is installed at the top edge of the fixed shell, and the side wall of the rubber pad is provided with the groove with a trapezoidal cross section; a cleaning mechanism; the side wall of the fixed shell is symmetrically provided with the inclined rod, the side walls of the first fixed plate and the second fixed plate are respectively fixedly connected with the inclined rod, the side wall of the first fixed plate is obliquely provided with a plurality of nozzles, the side wall of the second fixed plate is fixedly connected with the pressing strip with a semicircular cross section, and the pressing strip is slidingly connected with the side wall of the cleaning brush; a wiping mechanism; a pulling mechanism; a connecting mechanism; a control mechanism; and a limiting mechanism. The stepped plane aluminum-plastic plate suspended ceiling construction device and the construction method thereof have the advantages of facilitating quick cleaning of the aluminum-plastic plate and preventing misplacement of the aluminum-plastic plate.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Practical indoor roof sweeper

    CN112535441A

  • Full-rigid connection structure for suspended ceiling

    CN202324292U