The automatic operation flow of the monitoring system for the transition of the hydroelectric generating unit from cold standby to repair and drainage to the spiral case and tail horizontal pressure
By designing an automated operation process, the complexity and safety hazards of switching hydropower station units from cold standby to maintenance and draining water to the level of the spiral casing and tail section were solved, achieving efficient and safe equipment operation and improving the power plant's production management level.
Patent Information
- Application Number
- CN202310537238.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-14
- Publication Date
- 2026-01-16
- Estimated Expiration
- 2043-05-14
AI Technical Summary
During the process of switching a hydropower station unit from cold standby to maintenance and draining water to the horizontal pressure of the spiral casing and tail section, the existing technology has many operation steps, is time-consuming and labor-intensive, and the failure of equipment operation interlock may lead to system grounding or equipment damage, affecting the safe and stable operation of the power grid.
Design an automated operation procedure for a monitoring system. Through program conditional execution judgment, automatically execute equipment operations such as switching the generator set from cold standby to maintenance and draining water to the horizontal pressure of the volute and tail section. This includes the automatic control of equipment such as outlet switches, isolating switches, and grounding switches, ensuring that the operation sequence is accurate and error-free.
It shortened the operation time, reduced the burden on operators, ensured the accuracy of the operation process and the safety and stability of the power grid, and improved the safety production management level of the power plant.