Engineering information management system and method
Through the project management, workflow and role permission modules of the engineering information management system, the complex and complicated data acquisition problems in construction projects are solved, and unified cloud management and personalized development of data are realized, and work efficiency is improved.
Patent Information
- Application Number
- CN202310514128.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-12-27
- Estimated Expiration
- 2043-05-08
AI Technical Summary
In the construction project quality management system, data acquisition is complicated and complicated, resulting in low work efficiency. The use of multiple independent systems in the existing technology causes data isolation and docking to consume a large amount of development resources.
Design an engineering information management system, including project management module, workflow module and role permission module, obtain common data through the cloud platform, generate engineering project sections, and display and manage project files based on usage permissions to realize the cloud of data Unified management and personalized development.
It realizes efficient integration and unified management of data in different business scenarios, improves data usage convenience and work efficiency, and reduces the consumption of development resources.
Smart Images

Figure CN116664065B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering information management, and in particular to an engineering information management system and method. Background Art
[0002] The construction engineering quality management system industry involves multiple safety indicators and corresponding inspection and testing methods for buildings. Different inspection methods require different data sources and business processes. In addition, the amount of data is large and the workflow is complex and detailed. Therefore, it is not practical to develop functions in a low-code or even code-free way. However, there are a lot of similarities in business management processes and basic data. At present, all companies adopt the method of developing multiple independent systems to meet business needs, but the result is that the data between multiple systems is isolated from each other, and the connection and opening up require a lot of development resources.
[0003] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention
[0004] The main purpose of the present invention is to provide an engineering information management system, aiming to solve the technical problem in the existing enterprise project management that data acquisition comes from different businesses, data acquisition is cumbersome and complicated, resulting in low work efficiency.
[0005] To achieve the above object, the present invention provides an engineering information management system, which includes: a project management module, a workflow module, a data management module and a role authority module;
[0006] The project management module is used to associate historical projects through the cloud platform, obtain common data based on the associated historical projects, obtain individual data of the current project, obtain current project information based on the common data and the individual data, and obtain multiple project sections based on the current project information;
[0007] The workflow module is used to generate corresponding project files according to the business data of the engineering project section;
[0008] The data management module is used to generate corresponding folders according to the project files of the engineering projects, and determine the project data of each engineering project according to the folders;
[0009] The role permission module is used to obtain the company department structure, determine data usage permissions based on the company department structure, display corresponding project files based on the usage permissions, and use and modify the project files based on the usage permissions.
[0010] Optionally, the project management module is further used to obtain current project information according to the individual data of the current project, and determine the content configuration of the current project according to the current project information;
[0011] The project management module is further used to configure and set project members of the current engineering project based on the content;
[0012] The project management module is also used to build the current engineering project section according to the current project information, the content configuration and the project members.
[0013] Optionally, the workflow module is also used to associate with the enterprise knowledge base, perform problem query and problem classification according to the enterprise knowledge base, obtain business data submission guidelines, and submit business data according to the business data submission guidelines.
[0014] Optionally, the workflow module is also used to perform document export, data association and permission control through extension components;
[0015] The workflow module is also used to obtain operation instructions of the mobile terminal and perform on-site business management and location supervision according to the operator instructions.
[0016] Optionally, the role authority module is further used to obtain cooperation forms of cooperation units, external units, and government units, determine external use permissions based on the cooperation forms, and provide problem feedback based on the external use permissions;
[0017] The role authority module is also used to set employee information according to the company department structure and manage employee certificate qualifications based on the employee information;
[0018] The role authority module is also used to obtain project members of each engineering project and display project files of the corresponding engineering project to the project members.
[0019] Optionally, the role permission module is also used to obtain the storage location of the project information when the project information is modified; when the storage location is a local project library, the project information is directly modified; when the storage location is a cloud project library, it is determined whether the project information modification permission is met. If the project information modification permission is not met, a permission review is performed, and whether the project information modification is performed is determined based on the review results. If the project information modification permission is met, the project information is modified.
[0020] In addition, to achieve the above purpose, the present invention also proposes a method for managing engineering information, the method comprising:
[0021] The project management module obtains common data according to the associated projects and obtains individual data of the current project; obtains current project information according to the common data and the individual data, and obtains multiple project sections according to the current project information;
[0022] The workflow module generates a corresponding project file according to the business data of the engineering project section;
[0023] The data management module generates corresponding folders according to the project files of the engineering projects, and determines the project data of each engineering project according to the folders;
[0024] The role permission module obtains the company department structure, determines data usage permissions based on the company department structure, displays corresponding project files based on the usage permissions, and uses and modifies the project files based on the usage permissions.
[0025] Optionally, the building of the current engineering project section according to the common data and the individual data includes:
[0026] The project management module obtains current project information according to the current project personality data, and determines the content configuration of the current project according to the current project information;
[0027] The project management module sets the project members of the current engineering project based on the content configuration;
[0028] The project management module builds the current engineering project section according to the current project information, the content configuration and the project members.
[0029] Optionally, before the workflow module generates a corresponding project file according to the business data of the engineering project section, it further includes:
[0030] The workflow module is associated with the enterprise knowledge base, performs problem query and problem classification according to the enterprise knowledge base, obtains business data submission guidance; and submits business data according to the business data submission guidance.
[0031] Optionally, displaying the corresponding project file according to the usage permission, and using and modifying the project file according to the usage permission, further includes:
[0032] The role authority module obtains the cooperation form of the cooperation unit, external unit, and government unit, determines the external use authority based on the cooperation form, and provides problem feedback based on the external use authority;
[0033] The role authority module sets employee information according to the company department structure and manages employee credentials based on the employee information;
[0034] The role authority module obtains project members of each engineering project and displays project files of the corresponding engineering project to the project members.
[0035] The present invention aggregates project management modules, workflow functions, data management functions, and personnel and role authority management functions for different business scenarios to efficiently integrate data from the same enterprise or business ecosystem, implements unified cloud management for common data, and independently develops and deploys services for personalized data. The two are dynamically combined to solve the technical problem of low work efficiency caused by the acquisition of data from different businesses and cumbersome and complicated data acquisition in enterprise project management. The present invention aggregates data from different business scenarios for unified management, displays common data together, and manages personalized data independently, thereby increasing the convenience of data use and effectively improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 A system structure diagram of the first embodiment of the engineering information management system of the present invention;
[0037] Figure 2 This is a diagram showing the project list interface in the project information management system of the present invention;
[0038] Figure 3 This is a diagram showing the user interface of the project management module in the engineering information management system of the present invention;
[0039] Figure 4 A display diagram of a login interface for a user in the engineering information management system of the present invention;
[0040] Figure 5 This is a diagram showing the underlying architecture of the system in the engineering information management system of the present invention;
[0041] Figure 6 It is a flow chart of user authority review in the engineering information management system of the present invention;
[0042] Figure 7 This is a system flow chart of the first embodiment of the engineering information management method of the present invention.
[0043] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0044] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0045] The embodiment of the present invention provides a project information management system, referring to Figure 1 , Figure 1 This is a structural diagram of a first embodiment of an engineering information management system of the present invention.
[0046] In this embodiment, the engineering information management system includes: a project management module 10 , a workflow module 20 , a data management module 30 and a role authority module 40 .
[0047] It should be noted that the system in this embodiment includes a software infrastructure of unified data resources and unified general modules built on Java. On this infrastructure, a system is implemented that integrates project management modules 10, workflow modules 20, data management modules 30, and role authority modules 40 for different business scenarios. This system efficiently integrates the data of the same enterprise or business ecosystem, realizes unified cloud management on common data, and dynamically combines the two through independent development and deployment of services on personalized data. Module assembly is selected according to the business scenarios solved by the system, and data is quickly acquired in combination with a general building cloud database, thereby realizing the dynamic development of various types of construction engineering safety management systems and efficient and fast user use.
[0048] The project management module 10 is used to associate historical projects through the cloud platform, obtain common data based on the associated historical projects, obtain individual data of the current project, obtain current project information based on the common data and the individual data, and obtain multiple project sections based on the current project information.
[0049] It is understandable that the cloud platform is a cloud space that stores historical project data; on the cloud platform, one can see all historical projects that are visible within the current user's permissions, and can review all historical projects related to the current project in historical projects as needed. Related historical projects may have the same person in charge, may be in the same area, etc., and can all be related historical projects.
[0050] It should be understood that associating historical projects can be understood as sharing common data between the current engineering project and historical engineering projects.
[0051] It should be emphasized that all engineering projects use the same architecture, and relevant data can be obtained more conveniently by associating historical projects. Because it is the same architecture, multiple engineering projects can be better coupled, thereby achieving the system characteristics of fast development, high cohesion and low coupling.
[0052] It should be noted that common data refers to data that many different projects need to fill in in common, such as project name, project address, project parties, project geological survey information, etc. Common data only needs to be filled in once, and other projects can obtain the common data of the project after associating with the project. In simple terms, when each project enters project information, it will indicate which information is common data. When there are historical projects that can be associated in the historical projects, after the association, the underlying architecture of the historical projects will be copied, and the common information will be retained on the underlying architecture. The individual data of the project can also be expanded on the underlying architecture.
[0053] In the specific implementation, to associate a historical project, you can view the project list, from which you can find the historical project you want to associate. The project list can be referenced Figure 2 .
[0054] The project management module 10 is further used to obtain current project information according to the individual data of the current project, and determine the content configuration of the current project according to the current project information.
[0055] It should be noted that the current project data may include the current project position settings, current project files, current project experts, current project progress, etc.
[0056] It is understandable that content configuration may include configurations related to the current engineering project, such as project information management, expert library management, specification library management, and external unit management.
[0057] It should be emphasized that the core underlying architecture and multiple application modules enable enterprises to quickly deploy systems related to the construction industry with the help of the underlying architecture, and to reference each module according to the actual application scenario to realize the functions of the new system. At the same time, the referenced modules support independent development according to the agreed specifications, thus meeting the scenarios where the construction engineering management industry has personalized software needs in different segments and regions.
[0058] In the specific implementation, because Project A is complex and has a long construction period, it requires timely distribution of external materials and requires experts to conduct construction training based on the actual construction situation. Therefore, under the underlying architecture of Project A, an application module for the expert database and external unit management for Project A can be set up; Project B has a short construction period and a small amount of work, so only the application module for project construction documents can be added under the underlying architecture of Project B. Project A and Project B belong to the same project management architecture, and other personalized modules can be assembled according to the actual project application requirements of the two projects.
[0059] The project management module 10 is further used to set project members of the current engineering project based on the content configuration.
[0060] It is understandable that project members may include project leaders, project managers, project supervisors, project members, experts, etc.
[0061] It should be noted that each project content configuration in the project management architecture may include one or more project members.
[0062] The project management module 10 is further used to build a current engineering project section according to the current project information, the content configuration and the project members.
[0063] It is understandable that the project management architecture is an underlying architecture in the engineering information management system, which is equivalent to the model room of a house when building a house; the current project information can be simply understood as the planning information of various dimensions of the house, and the content configuration is equivalent to the division of the internal structure of the house, such as the division of the kitchen, living room, and room; project members are equivalent to the construction personnel responsible for building different structures of the house.
[0064] It should be understood that the current project section may be a project section about the current project obtained after the project information has been filled in, the corresponding functional modules have been configured according to the content, and the corresponding project members have been added to each functional module.
[0065] In the specific implementation, the user interface of the project management module 10 in this system can refer to Figure 3 According to the business demand analysis, the developers introduce the engineering project management module 10 on the basic system and establish the data correspondence with the cloud platform project management module 10; after the establishment, the engineering project information of this system directly obtains the cloud project ID, and when the project needs to be edited, it is determined whether it can be read-only or read-write according to the permissions obtained by the system.
[0066] The workflow module 20 is used to generate corresponding project files according to the business data of the engineering project section.
[0067] It is understandable that project files can be automatically generated into Word / Excel / PDF by module when users submit data according to work business processes, which can greatly improve efficiency and save employees' document processing time.
[0068] The workflow module 20 is also used to associate with the enterprise knowledge base, perform problem query and problem classification according to the enterprise knowledge base, obtain business data submission guidelines, and submit business data according to the business data submission guidelines.
[0069] It should be noted that the enterprise knowledge base may include work data, problem base and specification base. After linking the enterprise knowledge base, if you encounter problems when using this system, or if problems arise when performing business processes, you can directly query the problem in the enterprise knowledge base. Based on the query, you can get the corresponding business data submission guidelines, that is, the pre-set solutions to each problem, and you can submit business data according to the business data submission guidelines.
[0070] The workflow module 20 is also used to perform document export, data association and authority control through extension components.
[0071] It is understandable that the workflow module 20 integrates a powerful process engine component, and implements functions such as document export, data association, and permission control through extension components. The extension components can be simply regarded as an important supplement to the basic component library, which can be quickly reused by application developers. Different extension components can have different functions.
[0072] The workflow module 20 is also used to obtain operation instructions of the mobile terminal, and perform on-site business management and location supervision according to the operator instructions.
[0073] It is understandable that the mobile terminal can be a mobile phone or a computer. Users can enter the system through a mobile phone or a computer to perform business operations. Positioning and taking photos can be achieved through the mobile terminal. The mobile terminal can realize functions such as on-site business management and location supervision.
[0074] The data management module 30 is used to generate corresponding folders according to the project files of the engineering projects, and determine the project data of each engineering project according to the folders.
[0075] It is understandable that the project data may be data related to the project, such as construction progress data, project budget data, personnel transfer data, etc.
[0076] It should be understood that the data of each project includes many types, and each type of data includes data from different time periods and changes in project content. By generating corresponding folders based on the project files of the engineering project, different types of data can be centrally managed, making it easier for users to change, search, and use the project data.
[0077] The role permission module 40 is used to obtain the company department structure, determine data usage permissions based on the company department structure, display corresponding project files based on the usage permissions, and use and modify the project files based on the usage permissions.
[0078] It is understandable that the company's departmental structure can include a 5-level subsidiary / departmental architectural design, which can be quickly supported by group management and control, and combined with departments to achieve adequate authority management.
[0079] In a specific implementation, the user enters from the login interface, the system can identify the permissions used, and display the files that can be displayed within the permissions to the user according to the user's permissions. The login interface can refer to Figure 4 .
[0080] It is understandable that the invention realizes the interconnection and cloud sharing of the core data of each application module. Synchronizing different reference methods (closed reference and open reference, semi-open reference) can realize flexible data application scenarios. For example, when multiple systems are internal enterprise systems, an open reference mode can be adopted to make the engineering information independent as a cloud database. Different systems can share and jointly maintain the engineering information in the cloud, avoiding the need for repeated entry of engineering information between different subsidiaries or business departments, and can also obtain real-time synchronization of updated information. In semi-open mode, an associated data table can be established for the shared cloud engineering information library, and data fields can be supplemented according to the application's own scenarios, and only used under this system. In closed mode, modules and data structures are directly copied, and only the application itself can use and modify them.
[0081] In the specific implementation, taking the application of engineering project information in semi-open mode as an example, the implementation process of a system related to engineering project management is as follows:
[0082] Directly deploy the underlying code and establish the basic application; reference the engineering project management module 10 to establish the data correspondence with the cloud platform project management module 10; expand the data items according to the business scenario, such as the project's associated order table; after the system is built, when adding a new business record, call up the cloud platform's project data list and directly select the association;
[0083] After association, subsequent data queries of the new system can be directly queried from the cloud platform of the system. At the same time, after association, new associated orders can be added in this system. This part of data is stored in this system and is not synchronized with the cloud, and there is no such data in the cloud. When this system needs to modify engineering information, it can be initiated in this system, but it needs cloud control and review (by configuring whether this system has modification authority when quoting to improve information management efficiency).
[0084] It is worth noting that the business systems related to construction engineering in the present invention can be quickly developed and implemented, and the value of data commonality can be enabled, with significant efficiency improvements. The scenarios focused on by the present invention are in the field of construction engineering. In business scenarios such as project management, equipment management, safety inspection management, and information management, a higher level of informatization can be quickly achieved with the help of common data resources (such as engineering information, project information, and equipment information).
[0085] In the specific implementation, the underlying architecture of this system includes three parts: front-end, middle-end and back-end. For details, please refer to Figure 5 The user's front desk is divided into the employee side and the external unit side. The system has designed a universal external unit module so that relevant units in the construction industry can intuitively understand the progress of various project work. These modules and results are in the basic system and can be quickly implemented during deployment, reducing a lot of development costs.
[0086] This embodiment aggregates the project management module 10, workflow functions, data management functions, and personnel and role authority management functions of different business scenarios to efficiently integrate the data of the same enterprise or business ecosystem, realizes unified cloud management for common data, and independently develops and deploys services for personalized data. The two are dynamically combined to solve the technical problem of low work efficiency caused by the acquisition of data from different businesses in enterprise project management, which is cumbersome and complicated. It realizes the unified management of data from different business scenarios, the joint display of common data, and the independent management of personalized data, thereby increasing the convenience of data use and effectively improving work efficiency.
[0087] The present invention also provides a second embodiment of a project information management system.
[0088] Based on the above first embodiment, refer to Figure 1 The role authority module 40 in the engineering information management system of this embodiment is also used to obtain cooperation forms of cooperation units, external units, and government units, determine external use permissions based on the cooperation forms, and provide problem feedback based on the external use permissions.
[0089] It is understandable that the development of an engineering project may include not only the construction party, but also multiple other units, such as co-developers, suppliers, government supervisory departments, etc. Although other units do not participate in the construction of the engineering project, other units are closely related to the development of the engineering project and need to be able to understand relevant information about the engineering project, such as project progress, project expenses, project budget and other information.
[0090] It should be noted that a module for other units other than the project construction party to enter can be added to the role authority management module, and other units other than the project construction party can be included in the cooperation form. The role authority module 40 displays corresponding information to other units that log in to the system based on the information in the cooperation form. Other units can also provide feedback and communication based on this module.
[0091] The role authority module 40 is also used to set employee information according to the company department structure and perform employee certificate qualification management based on the employee information.
[0092] It is understandable that the company's department structure can include a 5-level subsidiary / department infrastructure, and employee information can be set in each subsidiary, where the employee information can include employee position, employee department, employee title, employee years of service and other information.
[0093] It should be noted that employee certificate qualification management can be employee certificate expiration management or employee professional title qualification management; employee qualification management can obtain employee certificate usage time, acquisition time, expiration time, etc. through employee information. When the current time exceeds the expiration time, a reminder can be issued to update the employee certificate qualification.
[0094] The role authority module 40 is also used to obtain project members of each engineering project and display project files of the corresponding engineering project to the project members.
[0095] It is understandable that project members in a project have different positions: finance, manager, engineer, architect, programmer, etc. Project members with different positions can view different file contents. For example, the project manager can view data and folders such as project name, project progress, personnel changes, and business processes; however, the finance department can see account balances, project budgets, and project expenses, but cannot view the project's construction information.
[0096] It should be noted that when a user logs into the system, the role authority module 40 determines the user's authority according to the user's account.
[0097] The role permission module 40 is also used to obtain the storage location of the project information when the project information is modified; when the storage location is a local project library, the project information is directly modified; when the storage location is a cloud project library, it is determined whether the project information modification permission is met. If the project information modification permission is not met, a permission review is performed, and whether the project information modification is performed is determined based on the review results. If the project information modification permission is met, the project information is modified.
[0098] In the specific implementation, the project information is entered and saved locally and in the cloud. When viewing the project information from the cloud, it is necessary to determine whether the cloud has given full authority to this system for information management. Any modification of the cloud data needs to go through the review process of the cloud data center. For the specific process, please refer to Figure 6 .
[0099] This embodiment uses the role permission module 40 to provide problem feedback and communication modules for other external units based on user permissions. Different permissions are granted to project members with different positions based on the company's department structure. The corresponding project files can be displayed based on the user's permissions, and employee certificate qualification management can be performed based on project member information. Optimized permission management can be achieved through the role permission module 40, which enables more secure and effective use of data.
[0100] Reference Figure 7 , Figure 7 It is a flowchart of the first embodiment of the engineering information management method of the present invention.
[0101] like Figure 7 As shown, the engineering information management method proposed in the embodiment of the present invention is applied to the engineering information management system and includes: a project management module 10, a workflow module 20, a data management module 30 and a role authority module 40;
[0102] The project management module 10 obtains common data according to the associated projects and obtains individual data of the current project; obtains current project information according to the common data and the individual data, and obtains multiple project sections according to the current project information;
[0103] The workflow module 20 generates corresponding project files according to the business data of the engineering project section;
[0104] The data management module 30 generates corresponding folders according to the project files of the engineering projects, and determines the project data of each engineering project according to the folders;
[0105] The role authority module 40 obtains the company department structure, determines data usage authority according to the company department structure, displays corresponding project files according to the usage authority, and uses and modifies the project files according to the usage authority.
[0106] This embodiment aggregates project management modules, workflow functions, data management functions, and personnel and role authority management functions of different business scenarios to efficiently integrate data from the same enterprise or business ecosystem, implements unified cloud management for common data, and independently develops and deploys services for personalized data. The two are dynamically combined to solve the technical problem of low work efficiency caused by the acquisition of data from different businesses in enterprise project management, which is cumbersome and complicated. It achieves unified management of data from different business scenarios, common data is displayed together, and personalized data is managed independently, thereby increasing the convenience of data use and effectively improving work efficiency.
[0107] In one embodiment, the project information management method further includes: the project management module 10 obtains current project information according to the current project personality data, and determines the content configuration of the current project according to the current project information;
[0108] The project management module 10 sets the project members of the current engineering project based on the content configuration;
[0109] The project management module 10 builds the current project section according to the current project information, the content configuration and the project members
[0110] In one embodiment, the engineering information management method further includes: the workflow module 20 is associated with an enterprise knowledge base, performs problem query and problem classification according to the enterprise knowledge base, and obtains business data submission guidelines; and submits business data according to the business data submission guidelines.
[0111] In one embodiment, the engineering information management method further includes: the role authority module 40 obtains a cooperation form of a cooperation unit, an external unit, or a government unit, determines external use authority according to the cooperation form, and provides problem feedback according to the external use authority;
[0112] The role authority module 40 sets employee information according to the company department structure and manages employee credentials according to the employee information;
[0113] The role authority module 40 obtains project members of each engineering project and displays project files of the corresponding engineering project to the project members.
[0114] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.
[0115] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.
[0116] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or system including the element.
[0117] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0118] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0119] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A project information management system, characterized in that: The engineering information management system includes: a project management module, a workflow module, a data management module and a role authority module; The project management module is used to associate historical projects through the cloud platform, obtain common data based on the associated historical projects, obtain individual data of the current project, obtain current project information based on the common data and the individual data, and obtain multiple project sections based on the current project information; The workflow module is used to generate corresponding project files according to the business data of the engineering project section; The data management module is used to generate corresponding folders according to the project files of the engineering projects, and determine the project data of each engineering project according to the folders; The role permission module is used to obtain the company department structure, determine the data usage permission according to the company department structure, display the corresponding project file according to the usage permission, and use and modify the project file according to the usage permission; The project management module obtains current project information according to the current project personality data, and determines the content configuration of the current project according to the current project information; The project management module sets the project members of the current engineering project based on the content configuration; The project management module builds the current engineering project section according to the current project information, the content configuration and the project members; The workflow module is associated with the enterprise knowledge base, and performs problem query and problem classification according to the enterprise knowledge base to obtain a business data submission guide; and submits business data according to the business data submission guide; The role authority module is also used to set employee information according to the company department structure and manage employee certificate qualifications based on the employee information; The role authority module is also used to obtain project members of each engineering project and display project files of the corresponding engineering project to the project members.
2. The engineering information management system according to claim 1, characterized in that: The project management module is further used to obtain current project information according to the current project personality data, and determine the content configuration of the current project according to the current project information; The project management module is further used to configure and set project members of the current engineering project based on the content; The project management module is also used to build the current engineering project section according to the current project information, the content configuration and the project members.
3. The engineering information management system according to claim 1, characterized in that: The workflow module is also used to associate with the enterprise knowledge base, perform problem query and problem classification according to the enterprise knowledge base, obtain business data submission guidelines, and submit business data according to the business data submission guidelines.
4. The engineering information management system according to claim 1, characterized in that: The workflow module is also used to perform document export, data association and permission control through extension components; The workflow module is also used to obtain operation instructions of the mobile terminal and perform on-site business management and location supervision according to the operation instructions.
5. The engineering information management system according to claim 1, characterized in that: The role permission module is also used to obtain the storage location of the project information when the project information is modified; when the storage location is a local project library, the project information is directly modified; when the storage location is a cloud project library, it is determined whether the project information modification permission is met. If the project information modification permission is not met, a permission review is performed, and whether the project information modification is determined based on the review results. If the project information modification permission is met, the project information is modified.
6. A method for engineering information management, characterized in that: The engineering information management method is applied to the engineering information management system including: a project management module, a workflow module, a data management module and a role authority module; The project management module obtains common data according to the associated projects and obtains individual data of the current project; obtains current project information according to the common data and the individual data, and obtains multiple project sections according to the current project information; The workflow module generates a corresponding project file according to the business data of the engineering project section; The data management module generates corresponding folders according to the project files of the engineering projects, and determines the project data of each engineering project according to the folders; The role authority module obtains the company department structure, determines the data usage authority according to the company department structure, displays the corresponding project files according to the usage authority, and uses and modifies the project files according to the usage authority; The role authority module obtains the cooperation form of the cooperation unit, external unit, and government unit, determines the external use authority based on the cooperation form, and provides problem feedback based on the external use authority; The role authority module sets employee information according to the company department structure and manages employee credentials based on the employee information; The role authority module obtains project members of each engineering project and displays project files of the corresponding engineering project to the project members.