Data processing method, apparatus and electronic device

By configuring work item rules to automatically create target work items, the problem of low efficiency in creating work items in the existing technology is solved, and fast and accurate work item creation is achieved.

CN116681242BActive Publication Date: 2025-10-10BEIJING ZITIAO NETWORK TECH CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202310653532.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2025-10-10
Estimated Expiration
2043-06-02

AI Technical Summary

Technical Problem

In the prior art, the process of creating a work item is inefficient and requires manual input of a large amount of field information, resulting in a long time consumption.

Method used

By configuring the work item rules, a first rule including a trigger condition and configuration information is obtained, a target work item is automatically created in response to the trigger condition, and field values ​​are quickly filled in using pre-configured information.

Benefits of technology

Improves the efficiency of work item creation, reduces user manual input time, and improves the accuracy and consistency of field values.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116681242B_ABST
    Figure CN116681242B_ABST
Patent Text Reader

Abstract

Embodiments of the present disclosure disclose a data processing method and device and electronic equipment. A specific implementation of the method comprises: obtaining a first rule for creating a work item based on a configuration operation of a rule for creating a work item; the first rule comprises a trigger condition and configuration information; and creating a target work item based on the configuration information in response to the trigger condition in the first rule being met. Thus, a new data processing method is provided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of computer technology, and in particular to a data processing method, device, and electronic device. Background Art

[0002] With the development of computers, users can use electronic devices to achieve various functions. For example, users can use electronic devices to interact with other users or use electronic devices to advance their work.

[0003] In some scenarios, data management-based tools or platforms (such as project management systems) can be built to accelerate project launch and avoid project risks by creating standardized business processes. Summary of the Invention

[0004] This disclosure section is provided to briefly introduce concepts that will be described in detail in the detailed description section below. This disclosure section is not intended to identify key features or essential features of the claimed technical solution, nor is it intended to limit the scope of the claimed technical solution.

[0005] In a first aspect, an embodiment of the present disclosure provides a data processing method, which includes: obtaining a first rule for creating a work item based on a configuration operation for creating a work item rule; the first rule includes a trigger condition and configuration information; in response to satisfying the trigger condition in the first rule, creating a target work item based on the configuration information.

[0006] In second aspect, an embodiment of the present disclosure provides a data processing device, including: an acquisition unit, used to acquire a first rule for creating a work item based on a configuration operation of creating a work item rule; the first rule includes a trigger condition and configuration information; a creation unit, used to create a target work item based on the configuration information in response to satisfying the trigger condition in the first rule.

[0007] In a third aspect, an embodiment of the present disclosure provides an electronic device comprising: one or more processors; a storage device for storing one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the data processing method as described in the first aspect.

[0008] In a fourth aspect, an embodiment of the present disclosure provides a computer-readable medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the data processing method as described in the first aspect.

[0009] The data processing method, apparatus, and electronic device provided by the embodiments of the present disclosure can obtain a first rule for creating a work item based on a configuration operation for creating a work item rule; the first rule includes a trigger condition and configuration information; and in response to satisfying the trigger condition in the first rule, a target work item is created based on the configuration information. Thus, when the trigger condition is satisfied, the pre-configured configuration information can be used to quickly create a work item, improving the efficiency of creating work items. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The above and other features, advantages, and aspects of the various embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that the originals and elements are not necessarily drawn to scale.

[0011] Figure 1 is a flow chart of an embodiment of a data processing method according to the present disclosure;

[0012] Figure 2 is a schematic diagram of an application scenario of the data processing method according to the present disclosure;

[0013] Figure 3A 、 Figure 3B 、 Figure 3C 、 Figure 3D 、 Figure 3E 、 Figure 3F 、 Figure 3G is a schematic diagram of an application scenario of the data processing method according to the present disclosure;

[0014] Figure 4A and Figure 4B is a schematic diagram of an application scenario of the data processing method according to the present disclosure;

[0015] Figure 5 is a schematic structural diagram of an embodiment of a data processing device according to the present disclosure;

[0016] Figure 6 is an exemplary system architecture to which the data processing method of an embodiment of the present disclosure may be applied;

[0017] Figure 7 It is a schematic diagram of the basic structure of an electronic device provided according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0018] The following describes embodiments of the present disclosure in more detail with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as limited to the embodiments described herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are for illustrative purposes only and are not intended to limit the scope of protection of the present disclosure.

[0019] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.

[0020] As used herein, the term "including" and its variations are open-ended, i.e., "including but not limited to." The term "based on" means "based, at least in part, on." The term "one embodiment" means "at least one embodiment," the term "another embodiment" means "at least one additional embodiment," and the term "some embodiments" means "at least some embodiments." Other terms are defined in the following description.

[0021] It should be noted that the concepts of "first" and "second" mentioned in this disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0022] It should be noted that the modifications of "one" and "multiple" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, they should be understood as "one or more".

[0023] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0024] Here, for the convenience of explanation, some concepts that may be involved in this disclosure are first introduced.

[0025] Space is a basic unit of organizational collaboration, which can be the management of a single project or a collection of multiple projects.

[0026] A work item is a collaborative task for a team, or it can be a collection of tasks broken down into a project. Work items can be categorized into different types based on their content, such as requirements, defects, versions, iterations, and milestones.

[0027] Feature, can refer to the software function required by the user to solve a problem / achieve a goal, which can help team members track specific details.

[0028] Node, the stage division point of the requirement.

[0029] Issue, refers to the business requirement that does not meet the initial definition. For example, pop-up window does not display, etc.

[0030] Version, refers to the collection of requirements delivered to users.

[0031] Sprint, by breaking down large-granularity projects into executable, quickly delivered tasks in a short cycle, and repeatedly executing the production cycle, the development process is incrementally forward.

[0032] Project, a project is a temporary effort to complete a product or service. Temporary means that there is a specific start time and end time. The final result of the project is not repeated.

[0033] Field, defines the basic unit of work item attributes.

[0034] Form, a page used to carry fields.

[0035] Creation Page Form, a page used to carry fields in scenarios such as creating requirements / defects / iterations, etc.

[0036] Flowchart, the display form of the process after automatic configuration.

[0037] Semantization of flowchart, the structured text display form of the content of the flowchart.

[0038] Trigger, used to start the automatic process, with events to trigger. Events such as creating a requirement, deleting a defect.

[0039] Operation, the action to be performed after the trigger is triggered. For example, notification, field operation, node operation. For example, when there is repetition or mechanical creation process in the business process, the platform may provide a method to quickly create data; for example, when the process node flows to the specified node, the relevant personnel can be pushed to the notification.

[0040] Condition, a set of work item query dimensions, that is, when the trigger belongs to the work item meets the following field conditions, perform a certain action.

[0041] Optionally, in actual scenarios, a trigger may be referred to as a trigger condition, or a set of a trigger and a condition may be referred to as a trigger condition.

[0042] One or more embodiments provided in this disclosure may provide a method for automatically creating a target work item (as an example, this method may be applied to a project management system). Specifically, a user may set a trigger condition and configure the work item field value of the target work item. When the trigger condition is met, the electronic device may automatically create the corresponding target work item based on the user's configuration information. This allows for automatic creation of work items, saving the user the time of manually creating work items.

[0043] For example, when a requirement is about to be released (e.g., a code release node), a target work item for the release can be automatically created and associated with the current requirement, with the actual release time of the corresponding code release node written in. This automatically creates a target work item for the release plan, allowing those involved in the release plan to refer to the actual release time and advance the work content indicated by the target work item.

[0044] For example, when there are too many requirements, you can divide the requirements into several stages. When the previous stage is completed, the requirements of the next stage are automatically created.

[0045] For example, you can automatically create a timed, recurring work item based on the iteration cycle. For example, if a product version needs to be iterated every Monday, then a work item related to the iteration will be created every Monday.

[0046] For example, consider customer service data for a product, where user feedback is received and you want to push it to R&D personnel for follow-up and resolution. In this scenario, when a user feedback work item is created, an aggregated demand work item can be automatically created, and some data from the feedback work item can be automatically synchronized to the aggregated demand work item.

[0047] At least one embodiment of the present disclosure can provide a data processing method that can support referencing and synchronizing the data sources of other work items (such as associated work items of trigger conditions) as preset values ​​when setting the target field of a user's target work item, thereby achieving synchronization and connection of various types of data and saving the user time in configuring the target field.

[0048] Please refer to Figure 1 , which shows the process of an embodiment of the data processing method according to the present disclosure. Figure 1 The data processing method shown includes the following steps:

[0049] Step 101: Based on a configuration operation of creating a work item rule, a first rule for creating a work item is obtained.

[0050] In this embodiment, the execution subject of the data processing method (eg, a server and / or a terminal device) may obtain a first rule for creating a work item based on a configuration operation for creating a work item rule.

[0051] Here, the first rule may include a trigger condition and configuration information.

[0052] Here, the above configuration operation may include an operation of configuring a trigger condition, and may also include an operation of setting configuration information.

[0053] Here, the content of the trigger condition can be set according to the actual scenario, such as receiving feedback data, and the time point is a preset time.

[0054] Here, the above configuration information can be used to create the specific content of the target work item. Optionally, the configuration information can include one or more of the following but is not limited to: field value, number sub-configuration information, and association relationship sub-configuration information.

[0055] Step 102: In response to satisfying a trigger condition in the first rule, create a target work item based on the configuration information.

[0056] As an example, the trigger condition may include that the current time point is 8 pm. Then, when the actual time reaches 8 pm, the trigger condition is satisfied. The electronic device may create a target work item based on the configuration information.

[0057] For example, a user performs a configuration operation at 8:00 AM, generating a first rule. At 8:00 PM that same day, the triggering condition for the first rule is met, and the electronic device automatically creates the target work item. This example also shows that there may be a time difference between creating the work item and the configuration operation.

[0058] It should be noted that the data processing method provided in this embodiment can obtain a first rule for creating a work item based on a configuration operation for creating a work item rule; the first rule includes a trigger condition and configuration information; and in response to the trigger condition in the first rule being met, a target work item is created based on the configuration information. Thus, when the trigger condition is met, the pre-configured configuration information can be used to quickly create a work item, improving the efficiency of creating work items.

[0059] In some embodiments, the configuration operation based on the creation work item rule obtains the first rule for creating the work item, including: displaying at least one target field of the target work item to be created; and generating configuration information of the target work item based on the target field value configuration operation of the at least one target field.

[0060] Here, the target work item may include one or more fields (for the convenience of description, referred to as target fields in this disclosure).

[0061] Here, a display control for the target field can be displayed. The first user can enter the field value of the target field. The configuration operation of the target field value can be implemented in various ways, such as manual user input, displaying a preset value as a default value for the user to determine, or providing preset options for the user to select. The source of the preset options can include associated field values ​​in other work items.

[0062] It should be noted that the target field in the target work item to be created and the target field configuration operation configure the field value. The configured target field value can be used as part of the target work item configuration information to quickly create the target work item. This allows you to quickly create a work item using the pre-configured target field value when the trigger condition is met, improving the efficiency of work item creation.

[0063] Please refer to Figure 2 , Figure 2 An exemplary scenario showing a target field is shown. Figure 2 In the example, multiple fields are shown, such as requirement name, requirement type, business line, priority, requirement description, role, and personnel. It is understood that the setting of field types can be specifically set according to different actual application scenarios and is not limited here.

[0064] exist Figure 2 In the display control corresponding to each field, the user can select and confirm the field value of the target field. Then, the electronic device can generate configuration information of the target work item based on the determined field value. The configuration information can be used to generate the target work item.

[0065] In some embodiments, the at least one target field comprises a first field.

[0066] Here, the first field may be any field in the at least one target field.

[0067] The above steps, based on the target field value configuration operation of the at least one target field, generate the configuration information of the target work item, which may include: displaying at least one candidate associated field value corresponding to the first field; and determining the first field value of the first field based on the selection confirmation operation for the at least one candidate associated field value.

[0068] Here, the candidate associated field values ​​include field values ​​in other work items.

[0069] In some embodiments, the other work items include associated work items of the trigger condition and / or associated work items of the first user.

[0070] Optionally, the first user may be the current operating user or an associated user of the current operating user. The associated work items of the first user may include work items associated with the current operating user or work items associated with the associated users.

[0071] In some embodiments, the associated work item of the trigger condition includes at least one of the following: a first associated work item bound to the trigger condition, and a second associated work item associated with the first associated work item.

[0072] For example, a trigger condition configuration includes the following: When work item A meets the first condition, work item A is the first associated work item bound to the trigger condition. Work item A may be associated with work item B. For example, work item A is an iteration-type work item and is associated with work item B, which is a requirement-type work item. In this case, work item B is the associated work item of work item A, that is, the second work item.

[0073] It's important to note that displaying candidate associated field values ​​allows users to determine the target field value from these candidate associated field values, saving time on manual field value entry and improving the efficiency of obtaining configuration information. Furthermore, the relationship between the target work item and other work items can be established. By leveraging the correlation between other field values ​​and the target field value, user input errors can be reduced, thereby improving the accuracy of the target work item's field value.

[0074] In some embodiments, displaying at least one candidate associated field value corresponding to the first field includes: selecting an associated field that matches the target field type from the other work items based on the target field type; and displaying the associated field value of the selected associated field as a candidate associated field value.

[0075] Optionally, type-based matching rules can be pre-set based on the actual scenario. For example, a target field of the person type can match the person type field in other work items. For another example, a target field of the time type can match the time type field in a work item.

[0076] It should be noted that, according to the field type, matching the associated field values ​​of the target field type from other work items can improve the accuracy of the candidate associated field values ​​displayed by the field.

[0077] In some embodiments, the candidate associated field values ​​corresponding to the target field of the name type include at least one of the following: a field value of the target work item, and a field value of other work items.

[0078] In some embodiments, the candidate associated field values ​​corresponding to the text-type target field include at least one of the following: a field value of the target work item, and a field value of other work items.

[0079] In some embodiments, the candidate associated field value corresponding to the target field of the personnel type includes personnel on at least one of the following fields in other work items: role field, node field, and personnel field.

[0080] In some embodiments, the candidate associated field values ​​corresponding to the target field of the selected type include field values ​​in other work items that match the subtype to be filled in, wherein the target field of the selected type includes at least one subtype to be filled in.

[0081] In some embodiments, the candidate associated field value corresponding to the target field of the associated work item type includes a field value of a field of the associated work item type in the other work item.

[0082] Optionally, the other work items mentioned above may include but are not limited to work items associated with the triggering condition.

[0083] In some embodiments, the candidate associated field value corresponding to the target field of the name type includes at least one of the following: a field value of the target work item, and a field value of the associated work item of the trigger condition.

[0084] As an example, the work item name type field supports referencing the target work item, and also supports referencing at least one of the following associated work items of the trigger condition: single-line text, multi-line text, single-select personnel, multi-select personnel, single selection, multi-select, cascading single selection, cascading multi-select, radio button, date, number, single-value external system signal field, all of which are modified to text display during splicing (filtering the current operation field, for example, the name is not allowed to reference the name of the target work item).

[0085] As an example, see Figure 3A , Figure 3A This example illustrates a display control for a target field value (e.g., a requirement name). For example, a user can first enter a preset character in the first display control as a trigger. A second display control can then be displayed, which can include options for candidate associated field values ​​and preset values. Selecting a candidate associated field value displays the corresponding reference data. Selecting a preset value displays the corresponding preset value.

[0086] Therefore, by setting the second type of display control, users can not only directly enter field values, but also quickly reference associated field values ​​in associated work items through reference input to complete the field value configuration of the new work item.

[0087] In some instances, the name field value of the created target work item may include a number value that matches the set number sub-configuration information. A number setting option may be set in a display control corresponding to the target field, and triggering the number setting option may display the number setting control.

[0088] As an example, see Figure 3B , which shows an exemplary style of the number setting control.

[0089] For example, the starting value can be a number with two decimal places, serving as the baseline for numbering. The first work item created will use this value as the reference, and subsequent work items will increment based on the starting value. The incremental difference can be a number with two decimal places, increasing from the starting value and incrementing each time the rule is triggered. The preset auto-increment number is displayed in the text box as a label with the format "Auto-increment number / xx-starting, xx-increasing," for example, starting with 2.16 and incrementing by 0.01).

[0090] In some embodiments, the candidate associated field value corresponding to the text-type target field includes at least one of the following: a field value of the target work item, and a field value of an associated work item of the trigger condition.

[0091] As an example, text (single-line text, multi-line text, rich text) type fields support referencing target work items, and also support referencing at least one of the following associated work items of the trigger condition: single-line text, multi-line text, single-select personnel, multi-select personnel, single selection, multi-select, cascading single selection, cascading multi-select, radio button, date, number, single-value external system signal field. All of them are modified to text display (filtering the current operation field) during splicing.

[0092] Optional. If the reference value is actually empty, filtering is performed directly. Multiple values ​​of the multi-select type are concatenated with ",". Cascading type values ​​are displayed as "first-level options / second-level options / third-level options". Date fields support user-selectable date formats, and the time zone obtains the time zone of the current rule operator.

[0093] Optionally, if the field value of the added associated field has no value when the work item is created, the associated field will be automatically filtered out when the work item is created.

[0094] As an example, see Figure 3C , which shows the display control corresponding to the target field of text type.

[0095] As an example, a target field of text type supports referencing current work item field values ​​and / or associated work item field values, supports inserting multiple reference values, and can concatenate fixed text, adding up to M (e.g., 5) reference values.

[0096] As examples, switch type fields, date type fields, date interval type fields, date type fields, time type fields, number type fields, uniform resource locator type fields, and single-value external system signal type fields support fields of the same field type in other work items that reference trigger conditions (such as associated work items of trigger conditions).

[0097] Here, if the user references a date type field in a text type field, a pop-up window for selecting the date format will be displayed. The date display format needs to be defined, supporting five display styles: year-month-day, year-month, year, brief year-month, and month-day.

[0098] As an example, see Figure 3D , which shows the display control corresponding to the target field of date type.

[0099] In some embodiments, the candidate associated field value corresponding to the target field of the personnel type includes the personnel on at least one of the following fields in the associated work item of the trigger condition: role field, node field, and personnel field.

[0100] For example, a field of type Personnel (single-select Personnel, multi-select Personnel) supports referencing personnel on the Role, Node, and Personnel fields in the associated work item of the trigger condition.

[0101] As an example, see Figure 3E , which shows the display control corresponding to the target field of the person type.

[0102] For example, the target field of the Person type supports referencing the person in the Role / Node / Person field in the associated work item, or setting a fixed person. If multiple persons are referenced in a single-select person field, only the first one is retained.

[0103] In some embodiments, the target field of the selected type, the corresponding candidate associated field value includes the field value in the associated work item of the trigger condition that matches the subtype to be filled in, wherein the target field of the selected type includes at least one subtype to be filled in.

[0104] For example, select a field of the same type (such as single select, multiple select, cascading single select, cascading multiple select, or radio button): This field supports referencing a field of the same type in the associated work item of the trigger condition.

[0105] As an example, see Figure 3F , which shows the target field of the selected type.

[0106] Select a field type to reference the field value of the same field type in the associated work item or set a fixed value.

[0107] In some embodiments, the candidate associated field value corresponding to the target field of the associated work item type of the trigger condition includes the field value of the associated work item type of the trigger condition in the associated work item of the trigger condition.

[0108] As an example, the associated work item type field of the trigger condition (associated work item of single-select trigger condition, associated work item of multiple-select trigger condition) supports referencing the associated work item field of the trigger condition in the single-select and / or multiple-select trigger condition.

[0109] In some embodiments, the at least one target field includes a second field. The second field may be any field in the at least one target field.

[0110] In some embodiments, the second field value of the second field includes at least two of the following: a preset value selected by the user, a candidate associated field value selected by the user, and a field value input by the user.

[0111] Here, the candidate associated field values ​​selected by the user include field values ​​of other work items.

[0112] Optionally, the other field values ​​include field values ​​in a work item associated with the trigger condition.

[0113] In some embodiments, for a target field of text type or a target field of name type, the candidate associated field value is added to the cursor position of the text box and mixed with the preset value, wherein the text in the text box is spliced ​​and displayed according to the position of the candidate associated field addition position and the preset value (or the field value entered by the user). It can be understood that the candidate associated field value after addition is a dynamic parameter. The candidate associated field value is added to the text box and supports mixing with fixed text (i.e., text entered by the user). The overall effect of the text display can be spliced ​​and displayed according to the position of the candidate associated field addition position and the fixed text (such as text entered by the user). The added dynamic parameters are added to the cursor position in the text box by default. The added dynamic parameters support deletion.

[0114] It should be noted that the target field value may include field values ​​determined in multiple forms, and various field values ​​may be displayed in a spliced ​​manner, which may increase the variety of target field values ​​determined and improve the accuracy of the target field value.

[0115] In some embodiments, the configuration information includes numbered sub-configuration information; and the creating the target work item based on the configuration information includes: if the trigger condition is a timed loop type, creating at least two target work items over time.

[0116] Here, the target work items of the at least two target work items created include numbers that are consistent with the creation order and match the numbering sub-configuration information.

[0117] In some embodiments, the at least one target field includes a third field.

[0118] In some embodiments, the configuration operation based on the create work item rule, obtaining the first rule for creating the work item, includes: in response to the reference number in the third field, displaying a number setting control, wherein the number setting control is used to set number sub-configuration information;

[0119] The third field value includes a number value that matches the set number sub-configuration information.

[0120] Here, the number setting control is used to set the number sub-configuration information, and the number sub-configuration information includes at least one of the following but is not limited to: the number starting value and the incremental value difference.

[0121] In some instances, the third field may be a name field of the created target work item, and the name field value may include a number value that matches the set number sub-configuration information.

[0122] As an example, see Figure 3B , which shows an exemplary style of the number setting control.

[0123] Therefore, for target work items with numbering requirements, they can be automatically numbered in the order of creation time, and the numbers of the work items are set according to the preset numbering format.

[0124] In some embodiments, the configuration operation based on the creation work item rule obtains the first rule for creating a work item, including at least one of the following: displaying a second display control in response to a trigger operation of a first display control corresponding to a target field; displaying a candidate associated field value in response to a selection operation of a candidate associated field value option.

[0125] Here, the second display control includes candidate associated field value options.

[0126] Here, the specific operation mode of the trigger operation can be set according to actual needs and is not limited here. Optionally, the user inputting a preset character (such as @) can be used as a data reference trigger operation. Optionally, the user triggering a preset control can be used as a data reference trigger operation.

[0127] In some embodiments, the second display control includes a preset value option.

[0128] In some embodiments, the method further includes: displaying a preset value in response to a selection operation on the preset value option.

[0129] Thus, by displaying the preset field, the step of filling in or selecting the field value by the user can be saved.

[0130] As an example, please refer to Figure 3E , Figure 3E An exemplary scenario of the display control corresponding to the field value of the personnel type is shown. As an example, the user can first input a preset character (for example, @) in the first display control as a trigger operation. Then, the second display control can be displayed, which can include candidate associated field value options (for example, marked with the reference field value) and preset value options (for example, marked with the personnel field value). When the candidate associated field value option is selected, the corresponding reference data (for example, the field value of other work items) is displayed. The preset value option displays the corresponding preset value (for example, the contact person of the current user).

[0131] Thus, by setting the second display control, the user can not only directly input the field value, but also quickly reference the associated field value in the associated work item through reference input to complete the field value configuration of the newly created work item.

[0132] In some embodiments, the at least one target field includes a fourth field. The fourth field can be a number type field or a uniform resource locator type field.

[0133] In some embodiments, the display of the at least one target field of the target work item to be created includes: if the fourth field is a number type field or a uniform resource locator type field, a character receiving control is displayed when the first option is triggered, and candidate associated field values are displayed when the second option is triggered.

[0134] Here, the character receiving control is used to display numbers or uniform resource locators; the fourth field value includes the content received by the character receiving control and / or the candidate associated field value selected and confirmed by the user.

[0135] Here, the character receiving control is used to display numbers or uniform resource locators. Please refer to Figure 3G , which shows the display control corresponding to the uniform resource locator type field.

[0136] Thus, a new interaction mode can be provided to switch between inputting and referencing the number type field (or the uniform resource locator type field).

[0137] In some embodiments, the configuration operation based on the creation work item rule obtains the first rule for creating the work item, including: configuring the operation based on the trigger condition to obtain the configured trigger condition; in response to the operation type selection instruction for adding the corresponding operation for the trigger condition, displaying at least one operation type, wherein the at least one operation type includes a new work item type; in response to the selection operation for the new work item type, displaying at least one target field of the target work item to be created.

[0138] As an example, see Figure 4A , Figure 4A Shown Figure 1 Exemplary scenarios of embodiments.

[0139] Figure 4A The flowchart of the automated configuration is shown. The flowchart shows the trigger conditions (illustrated by triggers in the figure) and the operations corresponding to the trigger conditions. The user can add the specific content of the trigger conditions and the specific content of the operations. The user performs the operation type selection operation, which can trigger the generation of the operation type selection instruction and then display at least one operation type. You can refer to Figure 4B At least one of the operation types shown.

[0140] Users can choose Figure 4B Create a work item type as shown in the example. Then, you can display the target field for the work item to be created. Alternatively, you can display the target field directly after the user selects the work item type. Alternatively, you can display the target field after triggering the field value setting control on the order creation page.

[0141] In this way, trigger conditions and configuration information can be quickly configured.

[0142] In some embodiments, displaying at least one target field of the target work item to be created includes: displaying at least one preset work item type; determining the target work item type of the target work item from the preset work item types according to user selection; and displaying at least one target field corresponding to the target work item type.

[0143] Please refer to Figure 4A Before displaying the target fields, you can select the work item type, which will display the order creation page corresponding to the work item type. The order creation page carries the field values ​​corresponding to the work item.

[0144] In this way, corresponding target fields can be displayed for work items of different work item types, thereby improving the efficiency of establishing and configuring work item field values.

[0145] In some embodiments, the configuration information includes association relationship sub-configuration information, and the association relationship sub-configuration information indicates that an association relationship is bound between the target work item and the third associated work item;

[0146] The method further includes: binding an association relationship between the created target work item and a third associated work item according to an instruction of the association relationship sub-configuration information.

[0147] In some scenarios, the target work item has an association relationship with other work items, providing Figure 4A The relationship binding control shown in can improve the speed of binding relationships, thereby improving the relevance and accuracy of relationships between work items.

[0148] In some embodiments, the method further includes: if the trigger condition is a timed loop type, graying out or hiding the association binding control, wherein the timed loop type indicates that the action is executed cyclically according to the passage of time, and the association binding control is used to bind the association relationship to the target work item.

[0149] In some scenarios, the work items created by a timed loop may be more time-sensitive than other work items. Therefore, when triggered by the trigger conditions corresponding to the timed loop type, the target work items created require less dependencies on other work items. Pre-hiding or dimming the binding controls for these dependencies can reduce display resource consumption and save user effort.

[0150] In some embodiments, the type of trigger condition includes at least one of the following: scheduled tasks, dynamic time tasks, creation of work items, archiving of work items, termination of work items, deletion of work items, change of work item status, transfer of work item nodes, field modification, personnel assignment, schedule change, and comment change.

[0151] In this way, it can meet the various timing requirements of automatically creating work items, provide multiple judgment opportunities, and improve the applicable scenarios of new work items.

[0152] In some embodiments, in response to satisfying the trigger condition in the first rule, creating the target work item based on the configuration information includes: sending a confirmation notification in response to satisfying the trigger condition in the first rule; and creating the target work item based on the configuration information according to a confirmation instruction returned based on the confirmation notification.

[0153] Here, the confirmation notification is used to request the second user to confirm whether to create the target work item.

[0154] As an example, a first user configures a first rule. In response to a trigger condition in the first rule being met, the electronic device may send a confirmation notification to the first user. The first user may issue a confirmation instruction in response to the confirmation notification. Upon receiving the confirmation instruction, the electronic device may create a target work item based on the configuration information in the first rule.

[0155] Therefore, under the premise that the first rule has been pre-configured, the target work item is automatically created after confirmation by the user, which can not only ensure the efficiency of creating the target work item, but also ensure that the target work item is created when there is a need for creation through user confirmation, thereby reducing resource waste.

[0156] Further references Figure 5 As an implementation of the methods shown in the above figures, the present disclosure provides an embodiment of a data processing device. Figure 1 Corresponding to the method embodiment shown, the device can be specifically applied to various electronic devices.

[0157] like Figure 5 As shown, the data processing apparatus of this embodiment includes: an acquisition unit 501 and a creation unit 502. The acquisition unit is configured to acquire a first rule for creating a work item based on a configuration operation for creating a work item rule; the first rule includes a trigger condition and configuration information; and the creation unit is configured to create a target work item based on the configuration information in response to the trigger condition in the first rule being met.

[0158] In this embodiment, the specific processing of the acquisition unit 501 and the creation unit 502 of the data processing device and the technical effects thereof can be referred to in Figure 1 The relevant descriptions of step 101 and step 102 in the corresponding embodiment are not repeated here.

[0159] In some embodiments, the configuration operation based on the creation work item rule obtains the first rule for creating the work item, including: displaying at least one target field of the target work item to be created; and generating configuration information of the target work item based on the target field value configuration operation of the at least one target field.

[0160] In some embodiments, the at least one target field includes a first field; and the configuration information of the target work item is generated based on the target field value configuration operation of the at least one target field, including: displaying at least one candidate associated field value corresponding to the first field, wherein the candidate associated field value includes field values ​​in other work items; and determining the first field value of the first field based on the selection confirmation operation for the at least one candidate associated field value.

[0161] In some embodiments, the other work items include associated work items of the trigger condition and / or associated work items of the first user; the associated work items of the trigger condition include at least one of the following: a first associated work item bound to the trigger condition, and a second associated work item associated with the first associated work item.

[0162] In some embodiments, displaying at least one candidate associated field value corresponding to the first field includes: selecting an associated field that matches the target field type from the other work items based on the target field type; and displaying the associated field value of the selected associated field as a candidate associated field value.

[0163] In some embodiments, the candidate associated field values ​​corresponding to the target field of the name type include at least one of the following: the field value of the target work item, the field value of other work items; the candidate associated field values ​​corresponding to the target field of the text type include at least one of the following: the field value of the target work item, the field value of other work items; the candidate associated field values ​​corresponding to the target field of the personnel type include personnel on at least one of the following fields in other work items: role field, node field, personnel field; the candidate associated field values ​​corresponding to the target field of the selection type include field values ​​in other work items that match the subtype to be filled in, wherein the target field of the selection type includes at least one subtype to be filled in; the candidate associated field values ​​corresponding to the target field of the associated work item type include field values ​​of fields of the associated work item type in the other work items.

[0164] In some embodiments, the at least one target field includes a second field, and the second field value of the second field includes at least two of the following: a preset value selected by the user, a candidate associated field value selected by the user, and a field value entered by the user; wherein the candidate associated field value selected by the user includes field values ​​of other work items.

[0165] In some embodiments, the configuration information includes numbering sub-configuration information; and the creation of a target work item based on the configuration information includes: if the trigger condition is a timed loop type, then creating at least two target work items over time; wherein, the target work item among the at least two target work items created includes a number that is consistent with the creation order and matches the numbering sub-configuration information.

[0166] In some embodiments, the at least one target field includes a third field; and the configuration operation based on the creation work item rule obtains the first rule for creating a work item, including: in response to the reference number in the third field, displaying a number setting control, wherein the number setting control is used to set the number sub-configuration information; wherein the third field value includes a number value that matches the set number sub-configuration information.

[0167] In some embodiments, the at least one target field includes a fourth field; the at least one target field that displays the target work item to be created includes: if the fourth field is a numeric type field or a uniform resource locator type field, a character receiving control is displayed when the first option is triggered, and a candidate associated field value is displayed when the second option is triggered; wherein the character receiving control is used to display numbers or uniform resource locators; the fourth field value includes the content received by the character receiving control and / or the candidate associated field value selected and confirmed by the user.

[0168] In some embodiments, the configuration operation based on the creation work item rule obtains the first rule for creating the work item, including: configuring the operation based on the trigger condition to obtain the configured trigger condition; in response to the operation type selection instruction for adding the corresponding operation for the trigger condition, displaying at least one operation type, wherein the at least one operation type includes a new work item type; in response to the selection operation for the new work item type, displaying at least one target field of the target work item to be created.

[0169] In some embodiments, displaying at least one target field of the target work item to be created includes: displaying at least one preset work item type; determining the target work item type of the target work item from the preset work item types according to user selection; and displaying at least one target field corresponding to the target work item type.

[0170] In some embodiments, the configuration information includes association relationship sub-configuration information, which indicates that the target work item is bound to the third associated work item in an association relationship; the device is also used to: bind the created target work item to the third associated work item in an association relationship according to the indication of the association relationship sub-configuration information.

[0171] In some embodiments, the device is also used to: if the trigger condition is a timed loop type, gray out or hide the association binding control, wherein the timed loop type indicates that the action is executed cyclically according to the passage of time, and the association binding control is used to bind the association to the target work item.

[0172] In some embodiments, the type of trigger condition includes at least one of the following: scheduled tasks, dynamic time tasks, creation of work items, archiving of work items, termination of work items, deletion of work items, change of work item status, transfer of work item nodes, field modification, personnel assignment, schedule change, and comment change.

[0173] In some embodiments, the creating the target work item based on the configuration information in response to the trigger condition in the first rule being met comprises: sending a confirmation notification in response to the trigger condition in the first rule being met, wherein the confirmation notification is used to request a second user to confirm whether to create the target work item; and creating the target work item based on the configuration information according to a confirmation instruction returned based on the confirmation notification.

[0174] Please refer to Figure 6 , Figure 6 An exemplary system architecture in which the image generation method of one embodiment of the present disclosure can be applied is shown.

[0175] As shown in Figure 6 , the system architecture can include terminal devices 601, 602, 603, a network 604, and a server 605. The network 604 is a medium for providing a communication link between the terminal devices 601, 602, 603 and the server 605. The network 604 can include various connection types, such as wired, wireless communication links, or optical fiber cables, etc.

[0176] The terminal devices 601, 602, 603 can interact with the server 605 through the network 604 to receive or send messages, etc. Various client applications, such as web browser applications, search applications, news information applications, etc. can be installed on the terminal devices 601, 602, 603. The client applications in the terminal devices 601, 602, 603 can receive instructions of a user and complete corresponding functions according to the instructions of the user, such as adding corresponding information in information according to the instructions of the user.

[0177] The terminal devices 601, 602, 603 can be hardware or software. When the terminal devices 601, 602, 603 are hardware, they can be various electronic devices with display screens and supporting web browsing, including but not limited to smart phones, tablet computers, e-book readers, MP3 (Moving Picture Experts Group Audio Layer III) players, MP4 (Moving Picture Experts Group Audio Layer IV) players, laptop computers, desktop computers, etc. When the terminal devices 601, 602, 603 are software, they can be installed in the above-mentioned electronic devices. They can be implemented as multiple software or software modules (such as software or software modules used to provide distributed services), or as a single software or software module. No specific limitation is made herein.

[0178] The server 605 may be a server that provides various services, such as receiving information acquisition requests sent by the terminal devices 601, 602, and 603, acquiring display information corresponding to the information acquisition requests through various means according to the information acquisition requests, and sending relevant data of the display information to the terminal devices 601, 602, and 603.

[0179] It should be noted that the image generation method provided in the embodiment of the present disclosure can be executed by a terminal device, and accordingly, the image generation device can be set in the terminal devices 601, 602, and 603. In addition, the image generation method provided in the embodiment of the present disclosure can also be executed by the server 605, and accordingly, the image generation device can be set in the server 605.

[0180] It should be understood that Figure 6 The number of terminal devices, networks and servers in the embodiment is merely illustrative. Any number of terminal devices, networks and servers may be provided as required.

[0181] Reference below Figure 7 , which shows an electronic device (eg Figure 6 The terminal device in the embodiments of the present disclosure may include, but is not limited to, mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), in-vehicle terminals (such as in-vehicle navigation terminals), and fixed terminals such as digital TVs and desktop computers. Figure 7 The electronic device shown is only an example and should not limit the functions and scope of use of the embodiments of the present disclosure.

[0182] like Figure 7 As shown, the electronic device may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 701, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 702 or a program loaded from a storage device 708 into a random access memory (RAM) 703. Various programs and data required for the operation of the electronic device 700 are also stored in the RAM 703. The processing device 701, the ROM 702, and the RAM 703 are connected to each other via a bus 704. An input / output (I / O) interface 705 is also connected to the bus 704.

[0183] Typically, the following devices may be connected to the I / O interface 705: an input device 706 including, for example, a touch screen, a touchpad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; an output device 707 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; a storage device 708 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 709. The communication device 709 may allow the electronic device to communicate with other devices wirelessly or by wire to exchange data. Although Figure 7 The electronic device is shown with various devices, but it should be understood that it is not required to implement or possess all of the devices shown. More or fewer devices may be implemented or possessed instead.

[0184] In particular, according to an embodiment of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present disclosure includes a computer program product, which includes a computer program carried on a non-transitory computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 709, or installed from the storage device 708, or installed from the ROM 702. When the computer program is executed by the processing device 701, the above-mentioned functions defined in the method of the embodiment of the present disclosure are performed.

[0185] It should be noted that the computer-readable medium mentioned above in the present disclosure may be a computer-readable signal medium or a computer-readable storage medium, or any combination of the two. A computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or component, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present disclosure, a computer-readable storage medium may be any tangible medium that contains or stores a program that can be used by or in conjunction with an instruction execution system, device, or component. In the present disclosure, a computer-readable signal medium may include a data signal propagated in baseband or as part of a carrier wave, which carries computer-readable program code. Such a propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. A computer-readable signal medium may also be any computer-readable medium other than a computer-readable storage medium that can transmit, propagate, or transport a program for use by or in conjunction with an instruction execution system, apparatus, or device. The program code contained on the computer-readable medium may be transmitted using any suitable medium, including but not limited to wires, optical cables, RF (radio frequency), etc., or any suitable combination thereof.

[0186] In some embodiments, the client and server can communicate using any currently known or future developed network protocol, such as HTTP (HyperText Transfer Protocol), and can be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0187] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0188] The computer readable medium described above carries one or more programs, when the one or more programs are executed by the electronic device, cause the electronic device to: obtain a first rule of creating a work item based on a configuration operation of creating a work item rule; the first rule includes a trigger condition and configuration information; and create a target work item based on the configuration information in response to the trigger condition in the first rule being met.

[0189] Computer program code for carrying out operations of the present disclosure can be written in any one or more of a variety of programming languages or combinations of languages, including an object oriented programming language such as Java, Smalltalk, C++ or the like, and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code can execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the latter scenario, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or the connection can be made to an external computer (for example, through the Internet using an Internet Service Provider).

[0190] The flow diagrams and the block diagrams in the drawings are illustrations of architectures, functionalities, and operations of possible implementations of systems, methods, and computer program products according to various embodiments of present disclosure. In this regard, each block in the flow diagrams or block diagrams can represent a module, a procedure, or a part of code, which comprises one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions noted in the blocks can occur in a different order than that noted in the figures. For example, two blocks noted in succession can in fact be executed substantially concurrently or in the opposite order, depending on the functionality involved. It is also noted that each block in the block diagrams and / or flow diagrams, and combinations of blocks in the block diagrams and / or flow diagrams, can be implemented by dedicated hardware-based systems that perform the specified functions or operations, or can be implemented by a combination of dedicated hardware and computer instructions.

[0191] The units described in the embodiments of the present disclosure can be implemented by software, or can be implemented by hardware. In some cases, the name of the unit does not constitute a limitation on the unit itself. For example, the obtaining unit can also be described as a "unit for obtaining the first rule".

[0192] The functions described above herein may be performed, at least in part, by one or more hardware logic components. For example, and without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chip (SOCs), complex programmable logic devices (CPLDs), and the like.

[0193] In the context of the present disclosure, a machine-readable medium can be a tangible medium that can contain or store a program for use by or in conjunction with an instruction execution system, device or equipment. A machine-readable medium can be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium can include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium can include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0194] The above description is merely a preferred embodiment of the present disclosure and an illustration of the technical principles employed. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by the specific combination of the above-mentioned technical features, but also includes other technical solutions formed by any combination of the above-mentioned technical features or their equivalents without departing from the above-mentioned disclosed concepts. For example, a technical solution formed by replacing the above-mentioned features with (but not limited to) technical features with similar functions disclosed in this disclosure.

[0195] In addition, although each operation is described in a specific order, this should not be understood as requiring these operations to be performed in the specific order shown or in a sequential order. Under certain circumstances, multitasking and parallel processing may be advantageous. Similarly, although some specific implementation details have been included in the above discussion, these should not be interpreted as limiting the scope of the present disclosure. Some features described in the context of a separate embodiment can also be implemented in a single embodiment in combination. On the contrary, the various features described in the context of a single embodiment can also be implemented in multiple embodiments individually or in any suitable sub-combination mode.

[0196] Although the subject matter has been described in language specific to structural features and / or methodological logical acts, it should be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or acts described above. Rather, the specific features and acts described above are merely example forms of implementing the claims.

Claims

1. A data processing method, characterized in that: include: Based on the configuration operation of creating a work item rule, obtaining a first rule for creating a work item; The first rule includes a trigger condition and configuration information; In response to satisfying a trigger condition in the first rule, creating a target work item based on the configuration information; The method further includes: if the trigger condition is a timed loop type, graying out or hiding an association binding control, wherein the timed loop type indicates that an action is executed cyclically according to the passage of time, and the association binding control is used to bind an association to the target work item; The configuration operation based on the rule for creating a work item, obtaining a first rule for creating a work item, includes: Display at least one target field of the target work item to be created; Based on the target field value configuration operation on the at least one target field, configuration information of the target work item is generated.

2. The method according to claim 1, characterized in that The at least one target field includes a first field; and The generating the configuration information of the target work item based on the target field value configuration operation of the at least one target field includes: Displaying at least one candidate associated field value corresponding to the first field, wherein the candidate associated field value includes a field value in other work items; According to a selection confirmation operation on the at least one candidate associated field value, a first field value of the first field is determined.

3. The method according to claim 2, characterized in that The other work items include work items associated with the trigger condition and / or work items associated with the first user; The associated work item of the trigger condition includes at least one of the following: a first associated work item bound to the trigger condition, and a second associated work item associated with the first associated work item.

4. The method according to claim 2, characterized in that The displaying of at least one candidate associated field value corresponding to the first field includes: According to the target field type, selecting, from the other work items, associated fields that match the target field type; Displays the related field values ​​of the selected related field as candidate related field values.

5. The method according to claim 2, characterized in that The method includes one or more of the following: The candidate associated field values ​​corresponding to the target field of the name type include at least one of the following: a field value of the target work item, a field value of other work items; The candidate associated field values ​​corresponding to the target field of the text type include at least one of the following: the field value of the target work item, the field value of other work items; The candidate associated field values ​​corresponding to the target field of the personnel type include personnel on at least one of the following fields in other work items: role field, node field, and personnel field; The candidate associated field values ​​corresponding to the target field of the selected type include field values ​​in other work items that match the subtype to be filled in, wherein the target field of the selected type includes at least one subtype to be filled in; The candidate associated field values ​​corresponding to the target field of the associated work item type include field values ​​of fields of the associated work item type in the other work items.

6. The method according to claim 1, characterized in that The at least one target field includes a second field, The second field value of the second field includes at least two of the following: a preset value selected by the user, a candidate associated field value selected by the user, and a field value input by the user; The candidate associated field values ​​selected by the user include field values ​​of other work items.

7. The method according to claim 1, characterized in that The configuration information includes numbered sub-configuration information; and The creating a target work item based on the configuration information includes: If the trigger condition is a timed loop type, at least two target work items are created over time; The target work items of the at least two target work items created include numbers that are consistent with the creation order and match the numbering sub-configuration information.

8. The method according to claim 1, characterized in that The at least one target field includes a third field; and The configuration operation based on the rule for creating a work item, obtaining a first rule for creating a work item, includes: In response to the reference number in the third field, displaying a number setting control, wherein the number setting control is used to set the number sub-configuration information; The third field value includes a number value that matches the set number sub-configuration information.

9. The method according to claim 1, characterized in that The at least one target field includes a fourth field; The displaying of at least one target field of the target work item to be created includes: If the fourth field is a numeric type field or a Uniform Resource Locator type field, a character receiving control is displayed when the first option is triggered, and a candidate associated field value is displayed when the second option is triggered; Among them, the character receiving control is used to display numbers or uniform resource locators; The fourth field value includes the content received by the character receiving control and / or the candidate associated field value selected and confirmed by the user.

10. The method according to claim 1, characterized in that The configuration operation based on the rule for creating a work item, obtaining a first rule for creating a work item, includes: Configure an operation based on the trigger condition and obtain the configured trigger condition; In response to an operation type selection instruction for adding a corresponding operation for a trigger condition, displaying at least one operation type, wherein the at least one operation type includes a new work item type; In response to a selection operation on the new work item type, at least one target field of a target work item to be created is displayed.

11. The method according to claim 1, wherein The displaying of at least one target field of the target work item to be created includes: Display at least one preset work item type; Determining a target work item type of the target work item according to user selection from preset work item types; At least one target field corresponding to the target work item type is displayed.

12. The method according to claim 1, characterized in that The configuration information includes association relationship sub-configuration information, and the association relationship sub-configuration information indicates that an association relationship is bound between the target work item and the third associated work item; The method further includes: binding an association relationship between the created target work item and a third associated work item according to an instruction of the association relationship sub-configuration information.

13. The method according to claim 1, wherein The types of trigger conditions include at least one of the following: scheduled tasks, dynamic time tasks, creating work items, archiving work items, terminating work items, deleting work items, work item status changes, work item node transfers, field modifications, personnel assignments, schedule changes, and comment changes.

14. The method according to claim 1, wherein In response to satisfying a trigger condition in the first rule, creating a target work item based on the configuration information includes: In response to satisfying the trigger condition in the first rule, sending a confirmation notification, wherein the confirmation notification is used to request the second user to confirm whether to create the target work item; A target work item is created based on the configuration information according to a confirmation instruction returned based on the confirmation notification.

15. A data processing device, characterized in that: include: an acquiring unit, configured to acquire a first rule for creating a work item based on a configuration operation for creating a work item rule; The first rule includes a trigger condition and configuration information; a creating unit, configured to create a target work item based on the configuration information in response to satisfying a trigger condition in the first rule; The device is further configured to gray out or hide an association binding control if the trigger condition is of a timed loop type, wherein the timed loop type indicates that an action is executed cyclically according to the passage of time, and the association binding control is used to bind an association to a target work item; The acquisition unit is further configured to display at least one target field of the target work item to be created; and generate configuration information of the target work item based on a target field value configuration operation on the at least one target field.

16. An electronic device, characterized in that: include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 14.

17. A computer-readable medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 14 is implemented.

Citation Information

Patent Citations

  • Method for carrying out overall lifecycle management on software project based on project lifecycle management (PLMS), subversion (SVN) and Jenkins

    CN105893050A

  • Bug defect restoration method and system in system version development process

    CN106326110A

  • Application rule configuration method and device and page processing method

    CN112328347A

  • Live broadcast room creation method and device, electronic equipment and storage medium

    CN112383787A

  • Data processing method and related equipment

    CN112785242A