Tendon prestressing device for pre-tensioning method and construction method thereof
By combining the structure and construction method of the pre-tensioned cable prestressed device, the problems of early deformation and low grouting efficiency in large-span tunnels with weak surrounding rock were solved, realizing active support of the surrounding rock and long-term effectiveness of the prestressed structure, thus improving the overall stability of the tunnel.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- SOUTHWEST JIAOTONG UNIV
- Filing Date
- 2023-09-05
- Publication Date
- 2026-07-24
AI Technical Summary
Existing technologies cannot effectively control the early deformation of large-span tunnels in weak surrounding rock. Traditional prestressed anchor bolts are small in size and have low grouting efficiency, resulting in high risks to the stability of the tunnel structure. Moreover, once the anchor section cracks, it is prone to failure.
The pre-tensioned cable prestressing device is adopted. Through the combination structure of anchor cable, outer pipe, grouting inner pipe and clamping plate, grouting is performed after applying pre-tightening force to achieve active support and early deformation control of the surrounding rock. The anchor cable is made of multi-strand steel strands and high-bonding-strength resin anchoring agent, combined with early-strength rapid-setting micro-expansion grouting material to fill the cracks.
It significantly improves the shear strength and bearing capacity of the surrounding rock, controls early deformation, improves grouting efficiency, ensures the long-term effectiveness of the prestressed structure, and prevents the loosening of the surrounding rock and structural failure.