Distributed heterogeneous flow shop scheduling method based on hybrid initialization meme algorithm

By using the hybrid initialization meme algorithm, the production scheduling problem of distributed heterogeneous factories was solved, and the maximum completion time, total energy consumption and total yield were optimized, thus achieving efficient scheduling and resource utilization of distributed heterogeneous factories.

CN117077975BActive Publication Date: 2026-06-26HARBIN INST OF TECH

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
HARBIN INST OF TECH
Filing Date
2023-09-11
Publication Date
2026-06-26

Smart Images

  • Figure CN117077975B_ABST
    Figure CN117077975B_ABST
Patent Text Reader

Abstract

The application belongs to the field of workshop scheduling, and aims at solving the problem that the existing production scheduling method is only applicable to the homogeneous factory model.The method comprises the following steps: S1, establishing a distributed heterogeneous flow shop scheduling model; S2, initializing the basic parameters of the meme algorithm, and generating an initial population according to a hybrid initialization strategy; S3, evaluating the fitness value of the population individuals, and performing a Pareto non-dominated sorting; S4, performing a crossover operation on the individuals in the population with a certain probability; S5, performing a collaborative search on the population by using a search operator; S6, merging the offspring population and the parent population, and selecting half of the individuals as local search targets; S7, performing a local search on the selected target individuals; S8, updating the population; S9, if the algorithm meets the stopping condition, ending the algorithm process, and outputting a non-dominated solution set; otherwise, the algorithm goes to S4 and continues iteration.
Need to check novelty before this filing date? Find Prior Art