A budget and final accounts data processing system and processing method

By designing the budget and final accounts data processing system, the problem of single budget and final accounts review and analysis methods in the existing technology and lack of unified standards is solved, detailed analysis of budget and final accounts information and reasonable budget preparation are achieved, and management efficiency and budget accuracy are improved.

CN117291482BActive Publication Date: 2024-11-01JIANGSU SU TING INFORMATION TECHNOLOGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310929088.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-07-27
Publication Date
2024-11-01
Estimated Expiration
2043-07-27

AI Technical Summary

Technical Problem

The existing budget and final accounts review report has a single analysis method and a lack of unified review standards and methods, which leads to insufficient review and is difficult to effectively support the realization of the goal of maximizing corporate value.

Method used

A budget and final accounting data processing system is designed, including data collection, preprocessing, information storage, data processing, data analysis and data display units, through integrating and processing of budget and final accounting information, calculating deviation value, comparing processing and analyzing signal generation , provide detailed budget and final accounts information table and analysis results, and support reasonable budget preparation.

Benefits of technology

It improves the efficiency of budget and final accounts information management, reduces duplicate work, reduces error rate, provides the ability to quickly understand the budget and final accounts data of sub-projects, helps budget personnel identify and correct amount differences, and ensures the rationality of the next budget preparation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117291482B_ABST
    Figure CN117291482B_ABST
Patent Text Reader

Abstract

The present invention discloses a budget data processing system and method, a data collection unit, a preprocessing unit, an information storage repository, a data processing unit, a data analysis unit, and a data display unit, and the present invention relates to the field of data processing technology. The present invention processes a project collection table with complete records of n target projects in the early stage in the information storage repository through a data processing unit to obtain an analysis signal, and the analysis signal indicates that the difference between the budget amount and the final settlement amount in the sub-project is large, that is, the budget amount in the budget information is unreasonable, and an error abnormality prompt can be given to the budget personnel when they make a project budget for the next target project. The unreasonable budget amount in the budget information is further analyzed by the data analysis unit to obtain an unreasonable result, which can provide data support for the budget personnel to make a project budget for the next target project, so that the budget personnel can reasonably make a budget amount when they make a project budget for the next target project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a budget and final accounting data processing system and processing method. Background Art

[0002] Budget and final accounts are the general term for budget and final accounts. They are the advance estimates of production and operation activities. Their purpose is to determine the budget targets of budget management. On the one hand, they are based on the analysis of the internal value chain and external value chain of the enterprise, and on the other hand, they are based on the analysis of the historical data of the enterprise. Through in-depth mining and analysis of historical data, we can find activities, operations or projects that really contribute to the value creation of the enterprise, so that the budget targets determined based on the budget analysis results can more effectively support the realization of the goal of maximizing the value of the enterprise; secondly, to assist in the preparation of the budget, budget analysis can determine whether the relevant decisions made on the basis of the value chain analysis are reasonable, and then affect the preparation of the next budget, so that the basis for the preparation of the next budget is more reasonable.

[0003] However, due to the large quantity, variety, strong correlation and independent dispersion of budget data, the current budget review report still has the following problems: First, the review and analysis methods are single and not detailed enough; Second, there are no unified review and analysis standards and methods.

[0004] Therefore, the present invention provides a budget data processing system and method, which can effectively analyze and process the budget data and obtain corresponding conclusion data, so as to make the basis for the next budget preparation more reasonable. Summary of the invention

[0005] In view of the deficiencies of the prior art, the present invention provides a budget data processing system and method, which solves the problems raised in the background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a budget data processing system, comprising:

[0007] The data collection unit is used to collect the budget and final accounting information of the target project, and then send the budget and final accounting information to the pre-processing unit; the target project includes a number of sub-projects, and the budget and final accounting information includes the budget amount and final accounting amount corresponding to each sub-project;

[0008] A pre-processing unit is used to import the budget and final accounting information of the target project into the pre-trained processing model for integration processing, obtain the project collection table, and send it to the information storage repository;

[0009] Information repository for storing project collection forms with complete records;

[0010] The data processing unit is used to obtain multiple project collection tables with complete records of n target projects in the previous period from the information storage library, and extract the corresponding budget and final settlement amount difference in the sub-project area marked in the same area, then obtain the absolute value of the budget and final settlement amount difference, then calculate the deviation value of the absolute value of the budget and final settlement amount difference in the sub-project, and compare the deviation value with a preset deviation threshold to obtain a corresponding comparison result, then perform comparison processing based on the comparison result to obtain an analysis signal, and then send the analysis signal to the data display unit and the data analysis unit;

[0011] A data analysis unit is used to obtain all budget and final settlement amount differences of the corresponding sub-project in the previous n target projects according to the analysis signal, and then extract the budget and final settlement amount differences whose values ​​are positive and negative and their corresponding quantities, and then perform calculation and analysis on them to obtain the analysis results of the budget and final settlement amount differences corresponding to the positive and negative values, and then compare the analysis results to obtain the corresponding comparison information, and then merge all the comparison information of the corresponding sub-projects to generate a budget and final settlement information table, and then generate the budget and final settlement information table into a data display unit;

[0012] The data display unit is used to obtain and display the corresponding sub-items according to the analysis signal, and is also used to display the budget information table.

[0013] Preferably, the processing model integration process is as follows:

[0014] SA1. The processing model obtains the sub-projects of the target project and generates a blank project collection table based on the target project;

[0015] Then the project collection table is divided into a corresponding number of sub-project areas according to the number of sub-projects;

[0016] Then extract each sub-project into each sub-project area in the target project table.

[0017] SA3. Then, according to the sub-projects corresponding to the sub-project area, extract the budget amount and final settlement amount of the corresponding sub-project and enter them into the corresponding sub-project area;

[0018] SA4. Then calculate the difference between the budget amount and the final settlement amount corresponding to each sub-project to obtain the difference between the budget amount and the final settlement amount of each sub-project. The calculation method is as follows:

[0019] SA41. Select a group of sub-projects and mark the budget amount and final settlement amount of the project as YE and JE respectively;

[0020] SA42. Then, the difference C between the budget and final accounts of the sub-project is calculated by formula 1: C = YE-JE;

[0021] SA5. Then enter the difference between the budget and final accounts of each sub-project into the corresponding sub-project area to obtain a complete project collection table.

[0022] Preferably, the data processing unit performs comparison processing as follows:

[0023] First, the deviation value and the preset deviation threshold are marked as P1 and P1y respectively;

[0024] If P1>P1y, it means that the deviation value of the sub-item is large. Then, the corresponding Ji values ​​are deleted in descending order of |Ji-Jp| and the remaining deviation value P1 is calculated accordingly until P1≤P1y;

[0025] Where Ji represents the absolute value of the difference between the budget and final accounts, i=1, 2, ..., n, i represents the number of the project collection table.

[0026] Preferably, the data processing unit performs the comparison processing as follows:

[0027] Extract the deleted Ji and get the number of deleted Ji u1, then compare u1 / n with u0 / n:

[0028] When u1 / n>u0 / n, it means that the error of the budget and final accounting method of the sub-project is large, and further analysis of the sub-project is required to generate an analysis signal;

[0029] When u1 / n≤u0 / n, it means that the error of the budget and final accounting method of the sub-project is moderate, and no further analysis is required for the sub-project, and no analysis signal is generated;

[0030] Among them, u0 is the preset quantity threshold, u1 / n represents the proportion of the deleted Ji in all Ji, u0 / n represents the ratio of the quantity threshold to the number of all Ji, and u0 is set according to the specific value of n, and u1 and u0 are both less than n.

[0031] Preferably, if P1≤P1y, it means that the deviation value of the sub-item is moderate, and no further analysis is required for the sub-item, and no analysis signal is generated.

[0032] Preferably, the specific analysis method of the data analysis unit is as follows:

[0033] SC1. Select a sub-project, extract the negative budget differences from all budget differences of the sub-project, and mark them as Ft1, t1 = 1, 2, ..., u2, and u2 ≤ n, and the number of negative budget differences, and mark them as u2; extract the positive budget differences, and mark them as Zt2, t2 = 1, 2, ..., u3, and u3 ≤ n, and the number of positive budget differences, and mark them as u3;

[0034] SC2, then through the formula: and Calculate the contrast coefficients FY of all Ft1 and ZY of all Zt2 in the sub-project respectively, where β1 and β2 are preset proportional coefficients;

[0035] SC3, then compare FY and ZY. and To compare the size, and Perform comparison and obtain corresponding comparison information;

[0036] SC4. Then all the comparative information of the corresponding sub-projects will be integrated to generate the budget information table.

[0037] Preferably, it also includes:

[0038] A tag library, which contains the area tags corresponding to each sub-item area tag, and the area tag is a corresponding tag code set for each sub-item, and is used for the processing model to add area tags to the corresponding sub-item area;

[0039] The information encryption unit is used to obtain the zone mark corresponding to the sub-project zone where the sub-project is located, and then generate an encryption public key and a decryption private key according to the zone mark combined with the RSA encryption algorithm, and then transmit the encryption public key to the pre-processing unit, and use the encryption public key to encrypt the corresponding sub-project to obtain the sub-project ciphertext, and at the same time transmit the decryption private key to the data extraction unit;

[0040] The data extraction unit is used to obtain the sub-project ciphertext of the corresponding sub-project according to the analysis signal, and then decrypt the sub-project ciphertext by using the decryption private key to obtain all the data of the corresponding sub-project area, and then transmit it to the data analysis unit.

[0041] A method for processing budget and final accounting data is implemented by the above-mentioned budget and final accounting data processing system.

[0042] Beneficial Effects

[0043] The present invention provides a budget and final accounting data processing system and method. Compared with the prior art, it has the following beneficial effects:

[0044] The present invention improves the management efficiency of budget and final accounting information by independently managing sub-projects, avoids duplication of work, wastes time and resources, and reduces the error rate. At the same time, by calculating the difference between the budget amount and the final accounting amount of the sub-project, it is convenient for subsequent analysis of the project. At the same time, there is no need for users to actively calculate, so that users can directly and quickly understand the budget and final accounting data of the corresponding sub-projects.

[0045] The present invention calculates deviation values ​​for the project collection table with complete records of n target projects in the early stage in the information storage library through a data processing unit, and then performs comparison and comparison processing to obtain an analysis signal. The analysis signal indicates that the difference between the budget amount and the final settlement amount in the sub-project is large, that is, the budget amount in the budget information is unreasonable, and an abnormal error prompt can be given to the budget personnel when they perform project budgeting for the next target project. The unreasonable budget amount in the budget information is further analyzed by the data analysis unit to obtain an unreasonable result, which can provide data support for the budget personnel to perform project budgeting for the next target project, so as to facilitate the budget personnel to reasonably make a budget amount when performing project budgeting for the next target project.

[0046] The present invention generates corresponding encryption public keys and decryption private keys based on the RSA encryption algorithm combined with zone marks. While preventing financial data leakage and loss caused by data communication leakage, the corresponding sub-items are encrypting through zone marks, which can quickly extract designated sub-items and effectively prevent financial data misoperation, resulting in sub-item extraction errors, thereby affecting sub-item analysis. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 is a system block diagram of the present invention;

[0048] Figure 2 It is a schematic diagram of the process of the pretreatment unit of the present invention. DETAILED DESCRIPTION

[0049] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] As embodiment 1 of the present invention

[0051] See also Figure 1 The present invention provides a technical solution: a budget data processing system, comprising:

[0052] A data collection unit is used to collect the budget information of the target project and then send the budget information to the pre-processing unit;

[0053] The target project includes several sub-projects;

[0054] The budget and final accounts information includes the budget amount and final accounts amount corresponding to each sub-project;

[0055] The pre-processing unit is used to integrate the budget and final accounting information of the target project, obtain the project collection table, and send it to the information repository in the following way:

[0056] SA1. Import the target project and budget information into the pre-trained processing model;

[0057] SA2. The processing model obtains the sub-projects of the target project and generates a blank project collection table based on the target project;

[0058] Then the project collection table is divided into a corresponding number of sub-project areas according to the number of sub-projects;

[0059] Then, each sub-item is extracted into each sub-item area in the target item table, and at the same time, the corresponding sub-item area is marked according to the preset marking library;

[0060] The tag library is used to store the zone tags of all sub-project zones, and the zone tags are used to set corresponding tag codes for each sub-project, so as to facilitate the rapid extraction of data when the sub-projects are subsequently analyzed;

[0061] This embodiment improves the management efficiency of budget information by independently managing sub-projects, avoids duplication of work, wastes time and resources, and reduces the error rate;

[0062] SA3. Then, according to the sub-projects corresponding to the sub-project area, extract the budget amount and final settlement amount of the corresponding sub-project and enter them into the corresponding sub-project area;

[0063] SA4. Then calculate the difference between the budget amount and the final settlement amount corresponding to each sub-project to obtain the difference between the budget amount and the final settlement amount of each sub-project. The calculation method is as follows:

[0064] SA41. Take a group of sub-projects as an example, and mark the budget amount and final settlement amount of the project as YE and JE respectively;

[0065] SA42. Then, the difference C between the budget and final accounts of the sub-project is calculated by formula 1: C = YE-JE;

[0066] SA5. Then enter the difference between the budget and final accounts of each sub-project into the corresponding sub-project area to obtain a complete project collection table;

[0067] This embodiment calculates the difference between the budget amount and the final settlement amount of the sub-project, which facilitates subsequent analysis of the project. At the same time, the user does not need to actively calculate, so that the user can directly and quickly understand the budget and final settlement data of the corresponding sub-project;

[0068] Information repository for storing project collection forms with complete records;

[0069] As the second embodiment of the present invention

[0070] This embodiment, based on the first embodiment, further includes:

[0071] The data processing unit is used to obtain multiple project collection tables with complete records of n target projects in the previous period from the information storage library, and extract the corresponding budget and final settlement amount difference in the sub-project area marked in the same area, then obtain the absolute value of the budget and final settlement amount difference, then calculate the deviation value of the absolute value of the budget and final settlement amount difference in the sub-project, and compare the deviation value with a preset deviation threshold to obtain a corresponding comparison result, then perform comparison processing based on the comparison result to obtain an analysis signal, and then send the analysis signal to the data display unit and the data analysis unit;

[0072] SB1. Obtain multiple project collection tables with complete records of n target projects in the early stage;

[0073] SB2. Extract the budget and final accounts amount difference corresponding to the sub-project area marked in the same area from multiple project collection tables, and mark it as Ci, i = 1, 2, ..., n, i represents the number of the project collection table;

[0074] SB3, then take the absolute value Ji of each Ci and substitute it into the formula Calculate the deviation value P1 of the difference between the budget and final accounts in the sub-project, where Jp is the average value of the absolute value of the corresponding budget and final accounts difference involved in the calculation of the corresponding deviation value, and then compare P1 with the preset deviation threshold P1y:

[0075] If P1>P1y, it means that the deviation value of the sub-item is large. Then, the corresponding Ji values ​​are deleted in descending order of |Ji-Jp| and the remaining deviation value P1 is calculated accordingly until P1≤P1y;

[0076] SB4, then extract the deleted Ji and obtain the number u1 of deleted Ji;

[0077] u1 / n is then compared to u0 / n:

[0078] When u1 / n>u0 / n, it means that the error of the budget and final accounting method of the sub-project is large, and further analysis of the sub-project is required to generate an analysis signal;

[0079] When u1 / n≤u0 / n, it means that the error of the budget and final accounting method of the sub-project is moderate, and no further analysis is required for the sub-project, and no analysis signal is generated;

[0080] If P1≤P1y, it means that the deviation value of the sub-item is moderate, no further analysis is required for the sub-item, and no analysis signal is generated;

[0081] Where u0 is the preset quantity threshold, u1 / n represents the ratio of the number of deleted Ji to the number of all Ji, u0 / n represents the ratio of the quantity threshold to the number of all Ji, and u0 is set according to the specific value of n, and both u1 and u0 are less than n;

[0082] In this embodiment, the data processing unit calculates the deviation value of the project collection table with complete records of the previous n target projects in the information storage library, and then performs comparison and comparison processing to obtain an analysis signal, which indicates that the difference between the budget amount and the final settlement amount in the sub-project is large, that is, the budget amount in the budget information is unreasonable;

[0083] The data display unit is used to obtain and display the corresponding sub-projects according to the analysis signal, and can provide error and abnormality prompts for budget personnel when they make project budgets for the next target project;

[0084] A data analysis unit is used to obtain all budget and final settlement amount differences of the corresponding sub-project in the previous n target projects according to the analysis signal, and then extract the budget and final settlement amount differences whose values ​​are positive and negative and their corresponding quantities, and then perform calculation and analysis on them to obtain the analysis results of the budget and final settlement amount differences corresponding to the positive and negative values, and then compare the analysis results to obtain the corresponding comparison information, and then merge all the comparison information of the corresponding sub-projects to generate a budget and final settlement information table, and then generate the budget and final settlement information table into a data display unit;

[0085] The specific analysis method of the data analysis unit is as follows:

[0086] SC1. Taking a sub-project as an example, from all the budget and final settlement amount differences of the sub-project, extract the budget and final settlement amount differences with negative values ​​and mark them as Ft1, t1=1, 2, ..., u2, and u2≤n, and the number of budget and final settlement amount differences with negative values, and mark them as u2; at the same time, extract the budget and final settlement amount differences with positive values ​​and mark them as Zt2, t2=1, 2, ..., u3, and u3≤n, and the number of budget and final settlement amount differences with positive values ​​and mark them as u3;

[0087] SC2, then through the formula: and Calculate the contrast coefficients FY of all Ft1 and ZY of all Zt2 in the sub-project respectively, where β1 and β2 are preset proportional coefficients;

[0088] SC3, then compare FY and ZY. and To compare the size, and Compare and obtain corresponding comparison information; where:

[0089] like This means that the overall budget amount of this sub-project is too high among the previous n target projects;

[0090] like This means that the overall budget amount of this sub-project is lower than that of the previous n target projects;

[0091] like This means that the overall budget polarization of the budget amount of this sub-project in the previous n target projects is serious;

[0092] like This means that among the previous n target projects, the number of subprojects with higher budget amounts is greater than the number with lower budget amounts.

[0093] like This means that among the previous n target projects, the number of subprojects with higher budget amounts is greater than the number with lower budget amounts.

[0094] like This means that among the n target projects in the previous period, the number of sub-projects with higher budget amounts is equal to the number of sub-projects with lower budget amounts, and the budget polarization is serious;

[0095] If FY>ZY, it means that the budget and final accounts information of this sub-project differ greatly among the previous n target projects, specifically, the overall data of the budget amount is too high;

[0096] If FY<ZY, it means that the budget and final accounts information of this sub-project differ greatly among the previous n target projects, and specifically, the overall data of the budget amount is low;

[0097] If FY=ZY, it means that the budget and final accounting information of this sub-project is quite different among the previous n target projects, specifically, the budget information is severely polarized;

[0098] SC4. Then, all the comparative information of the corresponding sub-projects is integrated to generate a budget information table;

[0099] This embodiment further analyzes the unreasonable budget amount in the budget information through the data analysis unit to obtain unreasonable results;

[0100] The data display unit is also used to display the budget information table, which can provide data support for the budget personnel to make a project budget for the next target project, so that the budget personnel can give a more reasonable estimated budget amount when making a project budget for the next target project;

[0101] By processing the budget data, it is possible to determine whether the relevant decisions made on the basis of budget analysis are reasonable, so that relevant personnel can conduct in-depth analysis of the various reasons for the differences between the budget and final accounts, find out the main reasons, grasp the main contradictions, and then influence the next budget preparation, so as to make the basis for the next budget preparation more reasonable;

[0102] As the third embodiment of the present invention

[0103] See also Figure 2 Based on the first and second embodiments, this embodiment further includes:

[0104] The information encryption unit is used to obtain the zone mark corresponding to the sub-project zone where the sub-project is located, and then generate an encryption public key and a decryption private key according to the zone mark combined with the RSA encryption algorithm, and then transmit the encryption public key to the pre-processing unit, and use the encryption public key to encrypt the corresponding sub-project to obtain the sub-project ciphertext, and at the same time transmit the decryption private key to the data extraction unit;

[0105] a data extraction unit, for obtaining a sub-project ciphertext of a corresponding sub-project according to the analysis signal, and then decrypting the sub-project ciphertext by using a decryption private key to obtain all data of the corresponding sub-project area, and then transmitting it to the data analysis unit;

[0106] By generating the corresponding encryption public key and decryption private key based on the RSA encryption algorithm combined with the zone mark, while preventing the leakage and loss of financial data caused by data communication leakage, the corresponding sub-items are encrypted through the zone mark, which can quickly extract the specified sub-items, effectively preventing the misoperation of financial data, resulting in sub-item extraction errors, and further affecting the analysis of sub-items.

[0107] The present invention also provides a technical solution: a budget data processing system and a processing method. The method uses the above-mentioned budget data processing system to process the budget data, so it will not be described in detail here.

[0108] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0109] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A budget data processing system, It is characterized in that include: A data collection unit is used to collect the budget information of the target project and then send the budget information to the pre-processing unit; The target project includes several sub-projects, and the budget and final accounting information includes the budget amount and final accounting amount corresponding to each sub-project; A pre-processing unit is used to import the budget and final accounting information of the target project into the pre-trained processing model for integration processing, obtain the project collection table, and send it to the information storage repository; The processing model integration process is as follows: SA1. The processing model obtains the sub-projects of the target project and generates a blank project collection table based on the target project; SA2, then divide the project collection table into corresponding number of sub-project areas according to the number of sub-projects; Each sub-project is then extracted to each sub-project area in the target project table; SA3. Then, according to the sub-projects corresponding to the sub-project area, extract the budget amount and final settlement amount of the corresponding sub-project and enter them into the corresponding sub-project area; SA4. Then calculate the difference between the budget amount and the final settlement amount corresponding to each sub-project to obtain the difference between the budget amount and the final settlement amount of each sub-project. The calculation method is as follows: SA41. Select a group of sub-projects and mark the budget amount and final settlement amount of the project as YE and JE respectively; SA42. Then, the difference C between the budget and final accounts of the sub-project is calculated by formula 1: C = YE-JE; SA5. Then enter the difference between the budget and final accounts of each sub-project into the corresponding sub-project area to obtain a complete project collection table; Information repository for storing project collection forms with complete records; The data processing unit is used to obtain multiple project collection tables with complete records of n target projects in the previous period from the information repository, and extract the corresponding budget and final settlement amount difference in the sub-project area marked in the same area, then obtain the absolute value of the budget and final settlement amount difference, and then calculate the deviation value of the absolute value of the budget and final settlement amount difference in the sub-project, and compare the deviation value with the preset deviation threshold to obtain the corresponding comparison result. The comparison processing method is as follows: First, the deviation value and the preset deviation threshold are marked as P1 and P1y respectively; If P1>P1y, it means that the deviation value of the sub-item is large. Then, the corresponding Ji values ​​are deleted in descending order according to |Ji-Jp| and the remaining deviation value P1 is calculated accordingly until P1≤P1y; Where Ji represents the absolute value of the difference between the budget and final accounts, i = 1, 2, ..., n, i represents the number of the project collection table; Then, a comparison process is performed based on the comparison result to obtain an analysis signal, and then the analysis signal is sent to the data display unit and the data analysis unit; The comparison process is as follows: Extract the deleted Ji and get the number u1 of deleted Ji, then compare u1 / n with u0 / n: When u1 / n>u0 / n, it means that the error of the budget and final accounting method of the sub-project is large, and further analysis of the sub-project is required to generate an analysis signal; When u1 / n≤u0 / n, it means that the error of the budget and final accounting method of the sub-project is moderate, and no further analysis is required for the sub-project, and no analysis signal is generated; Where u0 is the preset quantity threshold, u1 / n represents the ratio of the number of deleted Ji to the number of all Ji, u0 / n represents the ratio of the quantity threshold to the number of all Ji, and u0 is set according to the specific value of n, and both u1 and u0 are less than n; The data analysis unit is used to obtain all budget and final settlement amount differences of the corresponding sub-project in the previous n target projects according to the analysis signal, and then extract the budget and final settlement amount differences whose values ​​are positive and negative and their corresponding quantities, and then perform calculation and analysis on them to obtain the analysis results of the budget and final settlement amount differences corresponding to the positive and negative values, and then compare the analysis results to obtain corresponding comparison information, and then merge all the comparison information of the corresponding sub-projects to generate a budget and final settlement information table, and then send the budget and final settlement information table to the data display unit; The specific analysis method of the data analysis unit is as follows: SC1. Select a sub-project, extract the negative budget differences from all budget differences of the sub-project, and mark them as Ft1, t1 = 1, 2, ..., u2, and u2 ≤ n, and the number of negative budget differences, and mark them as u2; extract the positive budget differences, and mark them as Zt2, t2 = 1, 2, ..., u3, and u3 ≤ n, and the number of positive budget differences, and mark them as u3; SC2, then through the formula: and Calculate the contrast coefficients FY of all Ft1 and ZY of all Zt2 in the sub-project respectively, where β1 and β2 are preset proportional coefficients; SC3, then compare FY and ZY. and To compare the size, and Perform comparison and obtain corresponding comparison information; SC4. All the comparison information of the corresponding sub-projects is then integrated to generate a budget information table data display unit, which is used to obtain the corresponding sub-projects and display them according to the analysis signal, and is also used to display the budget information table.

2. A budget data processing system according to claim 1, It is characterized in that If P1≤P1y, it means that the deviation value of the sub-item is moderate, no further analysis is required for the sub-item, and no analysis signal is generated.

3. A budget data processing system according to claim 1, It is characterized in that Also includes: A tag library, which contains the area tags corresponding to each sub-item area tag, and the area tag is a corresponding tag code set for each sub-item, and is used for the processing model to add area tags to the corresponding sub-item area; The information encryption unit is used to obtain the zone mark corresponding to the sub-project zone where the sub-project is located, and then generate an encryption public key and a decryption private key according to the zone mark combined with the RSA encryption algorithm, and then transmit the encryption public key to the pre-processing unit, and use the encryption public key to encrypt the corresponding sub-project to obtain the sub-project ciphertext, and at the same time transmit the decryption private key to the data extraction unit; The data extraction unit is used to obtain the sub-project ciphertext of the corresponding sub-project according to the analysis signal, and then decrypt the sub-project ciphertext by using the decryption private key to obtain all the data of the corresponding sub-project area, and then transmit it to the data analysis unit.

4. A method for processing budget and final accounts data, It is characterized in that The method is implemented by a budget data processing system as described in any one of claims 1-3.

Citation Information

Patent Citations

  • Project budget execution management and control method and system based on financial big data

    CN110659881A

  • Fund performance supervision big data platform

    CN113554408A

  • Non-tax collection big data analysis system