A three-layer monitoring architecture for vehicle controller
By adopting a three-layer monitoring architecture in the new energy vehicle controller, combined with a multi-core main control chip for lock-step core and memory testing, and a power supply chip with monitoring functions, the problem of insufficient torque control safety in the existing technology is solved and achieved Provides more efficient fault handling and safety monitoring to ensure rapid recovery and safe status of the system in the event of a fault.
Patent Information
- Application Number
- CN202410062925.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-01-17
AI Technical Summary
The existing hierarchical architecture of new energy vehicle controllers suffers from incomplete layering, insufficient coverage, and failure to consider the design and testing of the monitoring layer software, resulting in insufficient torque control safety, which may lead to traffic accidents and life hazards.
Adopting a three-layer monitoring architecture, including functional layer, functional monitoring layer and controller monitoring layer, using multi-core main control chip with lock-step core and memory test and power supply chip with monitoring function, through redundant software logic and hardware monitoring module , to achieve safe monitoring and fault handling of torque output, ensuring that the system quickly recovers or enters a safe state within the fault tolerance time interval.
Provides a three-layer monitoring architecture for vehicle controllers that meets functional safety requirements, implements more detailed safety control based on the EGAS architecture, ensures that the system can quickly recover or enter a safe state in case of a fault, and improves the safety of torque control and stability.
Smart Images

Figure CN117590789B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of safety control of new energy vehicles, and in particular to a three-layer monitoring architecture for a whole vehicle controller. Background Art
[0002] Since new energy vehicles have significant advantages such as environmental protection, emission reduction, and energy saving, the development of new energy vehicles is an important way to solve automobile pollution and protect the environment. As new energy vehicles continue to develop in the direction of intelligence and integration, the number and complexity of automotive electronic and electrical systems continue to increase, which puts forward new requirements for the overall safety of the vehicle. As the core control unit of new energy vehicles, the vehicle control unit (VCU) is responsible for analyzing the driver's intentions and providing the expected torque to the motor control system to realize the driving of the vehicle. Since torque control is one of the core functions of VCU, it is directly related to the safety and stability of the vehicle. If the VCU outputs unexpected torque during vehicle driving, it may cause traffic accidents or even life-threatening. Therefore, improving the safety of VCU torque control becomes a necessary issue. The implementation of the layered architecture in the prior art still has problems such as incomplete layering, insufficient coverage, and failure to consider the design and testing of related modules of the monitoring layer software part. Therefore, the present invention proposes a three-layer monitoring architecture for a vehicle controller. Summary of the invention
[0003] In view of the above-mentioned problems, the present invention proposes a three-layer monitoring architecture for a vehicle controller.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A three-layer monitoring architecture for a vehicle controller includes:
[0006] The functional layer is used to implement the basic torque control function, analyze the driver's needs based on actual information, calculate the target torque, and finally output the control signal. The actual information includes pedal position, gear position, vehicle speed, and actual motor speed;
[0007] Function monitoring layer, which monitors the function layer through redundant software logic; the overall idea is to estimate the driver's target torque by another algorithm independent of the function layer, and compare the target torque with the actual torque based on the actual motor torque output fed back to the VCU by the motor controller. If the difference between the two is greater than a predefined threshold and lasts for more than a preset time, it will enter a safe state; in addition, a second independent information collection and processing path is used as redundancy for the function layer;
[0008] The controller monitoring layer consists of two parts: an independent monitoring module on the hardware and the monitoring software in the functional controller.
[0009] As a further technical solution of the present invention, in the controller monitoring layer, the SMU of the multi-core main control chip with lock-step core and memory test functions has a flexible Alarm configuration function.
[0010] As a further technical solution of the present invention, the controller monitoring layer hardware part: the Error Pin of the multi-core main control chip is connected to the ERR pin of the power chip. When an Alarm event occurs, the SMU of the multi-core main control chip reports the internal fault to the power chip through the Error Pin; when the safety status signals SS1 and SS2 of the power chip are both at low levels, the VCU will be kept in a reset state from the hardware level;
[0011] Alarms are divided into software alarms and hardware alarms. When an alarm occurs, a software alarm needs to call a function in the software to set the alarm, while a hardware alarm is automatically set by the chip hardware self-detection and triggers subsequent actions. When an alarm is generated, an interrupt will be entered. First, a function is called to clear the alarm state, and then a function is called to release the FSP. Secondly, the fault count is increased by 1 and stored in the defined Flash, where the initial value of the fault count is 0. Thirdly, the set DTC state function is called to set the defined SMU fault to the FAILED state. Finally, the software reset of the VCU will be triggered. When the fault count value exceeds 10 times and the alarm occurs again, the interrupt will enter the clear alarm state and then enter the While infinite loop, waiting for the SS1 and SS2 signals to change from high level to low level, so that the VCU is always in the reset state.
[0012] As a further technical solution of the present invention, the functional layer also has a diagnostic function.
[0013] As a further technical solution of the present invention, when the fault response of the functional monitoring layer is to shut down the torque output of the motor or reset the VCU, the functional monitoring layer is completed independently of the functional layer; however, when the fault response of the functional monitoring layer is to perform graded limitation on the torque output of the motor, since the functional monitoring layer is not a complete redundancy of the functional layer, it does not have the ability to control the torque output, so the implementation of the torque limitation depends on the functional layer. At this time, the functional monitoring layer needs to monitor the execution of the torque limitation of the functional layer.
[0014] As a further technical solution of the present invention, in the controller monitoring layer, a multi-core main control chip with lock-step core function and memory test is used as a functional controller, and a power supply chip with monitoring function is used as a monitoring controller, and the multi-core main control chip communicates with the power supply chip through SPI; the power supply chip periodically asks questions to the multi-core main control chip, and the multi-core main control chip answers within a specified time; if the power supply chip gets a wrong answer, it will repeatedly send the same question and start a fault counter; in order to detect the latent failure of the power supply chip, the multi-core main control chip will periodically send a wrong answer to test whether the monitoring function of the power supply chip is normal.
[0015] As a further technical solution of the present invention, the controller monitoring layer also includes voltage monitoring, memory testing, shutdown path testing and A / D conversion testing.
[0016] As a further technical solution of the present invention, the ERR pin is a signal switching between high and low levels in a normal state, and will be detected as an error when the high and low level switching stops and remains at a low level or a high level; the response of the ERR pin is divided into two types: immediate response and recovery delay response, and the recovery delay response mechanism of the power chip is used as the safety state control of the monitoring module of the controller monitoring layer;
[0017] When an alarm occurs, the ERR signal stops switching and remains at a low level; After that, an interrupt will be generated to indicate the recovery delay time Start; If the alarm occurs for longer than , that is, upon arrival After that, SS1 will be pulled low and then After that, SS2 is pulled to a low level. If the alarm occurs for a shorter time than , that is, upon arrival If the ERR signal starts switching again, SS1 and SS2 will remain high, Configured to 10ms, Configured as 0ms, the SS1 and SS2 pins are in the same condition.
[0018] As a further technical solution of the present invention, the three CPUs of the multi-core main control chip are two lock-step CPUs and one non-lock-step CPU, the two lock-step CPUs are CPU0 and CPU1, and the non-lock-step CPU is CPU2; in addition, CPU0 is a high-efficiency, low-power architecture, and CPU1 and CPU2 are high-performance architectures; since CPU0 is a high-efficiency, low-power architecture and has a lock-step core, it is allocated to the functional layer to realize basic functions, ensuring efficient execution of the torque control function, while reducing power consumption and improving reliability; secondly, since CPU1 is a high-performance architecture and has a lock-step core, it is allocated to the functional monitoring layer to realize the monitoring function of the functional layer, ensuring that the comparison and verification of the target torque and the actual torque can be quickly executed and the fault tolerance is improved through lock-step monitoring; finally, since CPU2 is a high-performance architecture, it is allocated to the controller monitoring layer software part to ensure that the A / D conversion test and memory test are executed faster.
[0019] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a three-layer monitoring architecture for a vehicle controller that meets the functional safety requirements. The present invention is based on a multi-core main control chip with lock-step core, memory test and other functions and a power chip with monitoring functions, and proposes a more detailed three-layer monitoring architecture based on the EGAS architecture, including the design and testing of security modules related to the software part of the processor monitoring layer. In addition, the three CPUs are respectively allocated to the three-layer architecture to achieve independent operation and fully cover the three layers, realizing the decoupling of software and hardware. At the same time, a fault handling strategy is designed to enable the system to quickly recover or quickly enter a safe state within a fault tolerance time interval of 100 milliseconds. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The schematic diagram is a structural diagram of a three-layer monitoring architecture for a vehicle controller.
[0021] Figure 2 This is a flowchart of alarm processing in a three-layer monitoring architecture for a vehicle controller.
[0022] Figure 3 The alarm time in a three-layer monitoring architecture of a vehicle controller exceeds the recovery delay time.
[0023] Figure 4 In a three-layer monitoring architecture for a vehicle controller, the alarm time is shorter than the recovery delay time. DETAILED DESCRIPTION
[0024] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods.
[0025] See also Figure 1As an embodiment of the present invention, a three-layer monitoring architecture for a vehicle controller includes:
[0026] Functional layer (Level 1), which is used to implement basic torque control functions, analyze driver needs based on actual information, calculate target torque, and finally output control signals. The functional layer also has diagnostic functions, such as checking the rationality of pedal signals, etc. Based on the diagnostic results, the functional layer will also execute corresponding fault responses. The actual information includes pedal position, gear position, vehicle speed, and actual motor speed;
[0027] Under the premise of ensuring that the pedal torque demand is valid, such as the motor is enabled, not in charging state and the vehicle is in Ready state, the pedal torque demand can be determined based on the pedal opening, gear position, vehicle speed and actual motor speed.
[0028] In order to improve the calculation efficiency and simplify the calculation process, Level 1 selects the table lookup method to calculate the pedal torque. The actual motor speed is obtained by the CAN message sent by the motor control system (MCU) to the VCU, and the maximum torque corresponding to the actual motor speed is determined by the table lookup linear interpolation method, and then the obtained maximum torque is multiplied by the pedal opening to obtain the pedal torque. The present invention considers the pedal torque to be the target torque.
[0029] Function monitoring layer (Level 2), which monitors the function layer through redundant software logic; the overall idea is to estimate the driver's target torque by another algorithm independent of the function layer, and compare the target torque with the actual torque based on the actual motor torque output fed back to the VCU by the motor controller. If the difference between the two is greater than a predefined threshold and lasts for more than a preset time, it will enter a safe state; in addition, a second independent information collection and processing path is used as redundancy for the function layer;
[0030] When the fault response of the functional monitoring layer is to shut down the torque output of the motor or reset the VCU, the functional monitoring layer is completed independently of the functional layer; however, when the fault response of the functional monitoring layer is to perform graded limitation on the torque output of the motor, since the functional monitoring layer is not a complete redundancy of the functional layer and does not have the ability to control the torque output, the implementation of the torque limitation depends on the functional layer. At this time, the functional monitoring layer needs to monitor the execution of the torque limitation of the functional layer.
[0031] Level 2 uses a different target torque calculation method from Level 1. For the purpose of simplicity and higher accuracy than the table-based linear interpolation method, a curve fitting method is used to obtain the maximum torque at the actual motor speed. The calculated target torque is compared with the actual motor output torque fed back to the VCU by the motor controller. When the difference between the actual output torque and the target torque exceeds 5%, different fault responses are enabled: When the difference between the target torque and the actual torque is less than 5%, the fault level is no fault, and the speed limit is 140 , the fault response is normal operation; when the difference between the target torque and the actual torque is greater than 5% and less than 10%, the fault level is level 3 fault, and the speed limit is 80 ,The fault response is to issue an alarm to notify the driver, limit the vehicle speed and try to reset the VCU; when the difference between the target torque and the actual torque is greater than 10% and less than 20%, the fault level is a secondary fault, and the speed is limited to 30 ,The fault response is to issue an alarm to notify the driver, limit the vehicle speed and try to reset the VCU; when the difference between the target torque and the actual torque is greater than 20%, the fault level is a level 1 fault, and the speed limit is 0 ,The fault response is that the VCU interrupts the torque output and controls the vehicle to stop.
[0032] The controller monitoring layer (Level 3) consists of two parts: an independent monitoring module in hardware and monitoring software in the functional controller.
[0033] In the controller monitoring layer, a multi-core main control chip (such as AURIXTC275) with a lock-step core function and a memory test is used as a functional controller, and a power chip (such as TLF35584) with a monitoring function is used as a monitoring controller. The multi-core main control chip (such as AURIX TC275) communicates with the power chip (such as TLF35584) through SPI; the power chip (such as TLF35584) periodically asks questions to the multi-core main control chip (such as AURIX TC275), and the multi-core main control chip (such as AURIXTC275) answers within a specified time; if the power chip (such as TLF35584) gets an incorrect answer, it will repeatedly send the same question and start a fault counter; in order to detect the latent failure of the power chip (such as TLF35584), the multi-core main control chip (such as AURIX TC275) will periodically send an incorrect answer to test whether the monitoring function of the power chip (such as TLF35584) is normal. The controller monitoring layer also includes voltage monitoring, memory testing, shutdown path testing and A / D conversion testing.
[0034] Level 3 software part, safety function modules are designed for the software part in Level 3, mainly including question and answer monitoring, shutdown path test, A / D conversion test and memory test.
[0035] Question and answer monitoring: Using the functional watchdog function of a power chip with monitoring function (such as TLF35584), the power chip with monitoring function (such as TLF35584) asks questions and expects to get the correct answer from the multi-core main control chip (such as AURIX TC275) with lock-step core, memory test and other functions within a defined time period. If the answer is wrong or the correct answer is received at the wrong time, it is considered an incorrect answer. In addition, in order to test that the function of the power chip with monitoring function (such as TLF35584) is in a normal state, the multi-core main control chip (such as AURIXTC275) with lock-step core, memory test and other functions will give wrong answers within a certain time interval. Wrong answers will increase the functional watchdog fault counter. When the count exceeds the threshold, the power chip with monitoring function (such as TLF35584) will trigger the VCU reset.
[0036] Shutdown path test: Shutdown path test. Mainly to ensure safe shutdown in case of failure. Each vehicle must be tested before starting, and the motor can only be authorized to run after the test passes. If the shutdown path fails, the VCU will remain in the reset state until the motor can be authorized to run.
[0037] A / D conversion test: Mainly to ensure that the A / D conversion function is normal. If the A / D conversion function fails, it will cause the driver's torque demand analysis to deviate, thus causing abnormal torque control. When the A / D conversion fails, TC275 will be reset and the fault will be eliminated, otherwise the vehicle cannot start.
[0038] Memory test: Ensure that the internal RAM and FLASH modules of multi-core master chips (such as AURIX TC275) with lock-step core and memory test functions can work properly, and help detect hardware problems and prevent software problems caused by hardware problems, thereby improving the stability, reliability and safety of multi-core master chips (such as AURIX TC275) with lock-step core and memory test functions. Before each vehicle is started, a RAM and FLASH test should be performed, and the startup is allowed only when there are no faults. At least addressing errors, address buffer overflow errors and bit flip errors need to be detected in the memory test.
[0039] In this embodiment, in the controller monitoring layer, the SMU of a multi-core master chip (such as AURIX TC275) with lock-step core and memory test function has a flexible Alarm configuration function. The present invention sets the corresponding Alarm events from the software and hardware levels for the designed three-layer control architecture:
[0040] Alarm-01: The level and module are Level 1. The alarm event is that the redundant acceleration or braking signal is unreliable. The safety mechanism involved is software monitoring, and the module triggered is a software module.
[0041] Alarm-02: The level and module are Level 2 (shutdown path test). The alarm event is that when Level 2 outputs a shutdown signal to the external control module, the shutdown fails. The safety mechanism involved is software monitoring, and the module triggered is the software module.
[0042] Alarm-03: The level and module are Level 2 (torque comparison verification). The alarm event is when the difference between the actual output torque of the motor and the target torque sent by the VCU exceeds 5%. The safety mechanism involved is software monitoring, and the module triggered is the software module.
[0043] Alarm-04: The level and module are Level 2 (program flow check). The alarm event is that a software module in Level 2 does not run correctly according to the program logic. The safety mechanism involved is software monitoring, and the module triggered is a software module.
[0044] Alarm-05: The level and module are Level 3 (shutdown path test). The alarm event is that when Level 3 outputs a shutdown signal to the external control module, the shutdown fails. The safety mechanism involved is software monitoring, and the module triggered is the software module.
[0045] Alarm-06: The level and module are Level 3 (A / D conversion test). The alarm event is that the error of converting the analog signal value of the pedal sensor input into the digital signal value is too large. The safety mechanism involved is software monitoring, and the module triggered is the software module.
[0046] Alarm-07: The level and module are Level 3 (memory test), the alarm event is SRAM addressing error, the safety mechanism involved is SRAM monitoring, and the triggered module is the hardware module;
[0047] Alarm-08: The level and module are Level 3 (memory test), the alarm event is SRAM address buffer overflow, the security mechanism involved is SRAM monitoring, and the triggered module is the hardware module;
[0048] Alarm-09: The level and module are Level 3 (memory test), the alarm event is a single-bit error in SRAM, the safety mechanism involved is SRAM monitoring, and the module triggered is a hardware module;
[0049] Alarm-10: The level and module are Level 3 (memory test), the alarm event is PFLASH addressing error, the safety mechanism involved is PFLASH monitoring, and the triggered module is the hardware module;
[0050] Alarm-11: The level and module are Level 3 (memory test), the alarm event is PFLASH address buffer overflow, the safety mechanism involved is PFLASH monitoring, and the triggered module is the hardware module;
[0051] Alarm-12: The level and module are Level 3 (memory test), the alarm event is a single-bit error in PFLASH, the safety mechanism involved is PFLASH monitoring, and the module triggered is a hardware module;
[0052] In this embodiment, the controller monitoring layer hardware part:
[0053] The Error Pin of the multi-core main control chip (such as AURIX TC275) is connected to the ERR pin of the power chip (such as TLF35584). When an Alarm event occurs, the SMU of the multi-core main control chip (such as AURIX TC275) reports the internal fault to the power chip (such as TLF35584) through the Error Pin; when the safety status signals SS1 and SS2 of the power chip (such as TLF35584) are both at low levels, the VCU will be kept in a reset state from a hardware level;
[0054] Alarms are divided into software alarms and hardware alarms. When an alarm occurs, the software alarm needs to call a function in the software to set the alarm, while the hardware alarm is automatically set by the chip hardware self-detection and triggers subsequent actions. When the alarm is generated, an interrupt will be entered. First, the function will be called to clear the alarm state, and then the function will be called to release the FSP. Secondly, the fault count will be increased by 1 and stored in the defined Flash, where the initial value of the fault count is 0. Thirdly, the set DTC state function will be called to set the defined SMU fault to the FAILED state. Finally, the software reset of the VCU will be triggered. When the fault count value exceeds 10 times and the alarm occurs again, the interrupt will enter the clear alarm state and then enter the While infinite loop, waiting for the SS1 and SS2 signals to change from high level to low level, so that the VCU will be in the reset state. The alarm processing flow is as follows: Figure 2 shown.
[0055] In this embodiment, the ERR pin is a high-low level switching signal in a normal state. When the high-low level switching stops and remains at a low level or a high level, it will be detected as an error. The response of the ERR pin is divided into two types: immediate response and recovery delay response. The recovery delay response mechanism of the power chip is used as the safety state control of the monitoring module of the controller monitoring layer.
[0056] When an alarm occurs, the ERR signal stops switching and remains at a low level; After that, an interrupt will be generated to indicate the recovery delay time Start; If the alarm occurs for longer than , that is, upon arrival After that, SS1 will be pulled low and then After SS2 is pulled to a low level, Figure 3 If the alarm occurs for a shorter time than , that is, upon arrival If the ERR signal starts switching again, SS1 and SS2 will remain high. Figure 4 As shown. Among them, Configured to 10ms, Configured as 0ms, the SS1 and SS2 pins are in the same condition.
[0057] In this embodiment, the three CPUs of the multi-core main control chip (such as AURIX TC275) are two lock-step CPUs and one non-lock-step CPU (CPU2), the two lock-step CPUs are CPU0 and CPU1, and the non-lock-step CPU is CPU2; in addition, CPU0 is a high-efficiency, low-power architecture, and CPU1 and CPU2 are high-performance architectures; according to the three-layer architecture designed by the present invention, the three CPUs are now allocated. First, since CPU0 is a high-efficiency, low-power architecture and has a lock-step core, it is allocated to the functional layer for realizing basic functions, ensuring efficient execution of torque control functions, while reducing power consumption and improving reliability; secondly, since CPU1 is a high-performance architecture and has a lock-step core, it is allocated to the functional monitoring layer for realizing the monitoring function of the functional layer, ensuring that the comparison and verification of the target torque and the actual torque can be quickly executed and the fault tolerance can be improved through lock-step monitoring; finally, since CPU2 is a high-performance architecture, it is allocated to the controller monitoring layer software part to ensure that the A / D conversion test and memory test are executed faster.
[0058] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A three-layer monitoring architecture for a vehicle controller, characterized in that: include: The functional layer is used to implement the basic torque control function, analyze the driver's needs based on actual information, calculate the target torque, and finally output the control signal. The actual information includes pedal position, gear position, vehicle speed, and actual motor speed; A function monitoring layer, which monitors the function layer through redundant software logic; Estimate the driver's target torque and compare the target torque with the actual motor torque based on the actual motor torque output fed back to the VCU by the motor controller. If the difference between the two is greater than a predefined threshold and lasts for more than a preset time, the vehicle will enter a safe state. In addition, a second independent information collection and processing path is used as redundancy for the functional layer; The controller monitoring layer consists of two parts: monitoring software in the functional controller and independent monitoring modules on the hardware; In the controller monitoring layer, the SMU of the multi-core master chip with lock-step core and memory test functions has a flexible alarm configuration function; Hardware part of the controller monitoring layer: The Error Pin of the multi-core main control chip is connected to the ERR pin of the power chip. When an Alarm event occurs, the SMU of the multi-core main control chip reports the internal fault to the power chip through the Error Pin; when the safety status signals SS1 and SS2 of the power chip are both low, the VCU will be kept in a reset state from the hardware level; Alarms are divided into software alarms and hardware alarms. When an alarm occurs, a software alarm needs to call a function in the software to set the alarm, while a hardware alarm is automatically set by the chip hardware self-detection and triggers subsequent actions. When an alarm is generated, an interrupt will be entered. First, a function will be called to clear the alarm state, and then a function will be called to release the FSP. Secondly, the fault count will be increased by 1 and stored in the defined Flash, where the initial value of the fault count is 0. Thirdly, the function of setting the DTC state is called to set the defined SMU fault to the FAILED state. Finally, the software reset of the VCU will be triggered. When the fault count value exceeds 10 times and the alarm occurs again, the interrupt will enter the clear alarm state and then enter the While infinite loop, waiting for the SS1 and SS2 signals to change from high level to low level, so that the VCU will be in the reset state. In the controller monitoring layer, a multi-core main control chip with lock-step core function and memory test is used as a functional controller, and a power chip with monitoring function is used as a monitoring module. The multi-core main control chip communicates with the power chip through SPI; the power chip periodically asks questions to the multi-core main control chip, and the multi-core main control chip answers within a specified time; if the power chip gets a wrong answer, it will repeatedly send the same question and start a fault counter; in order to detect the latent failure of the power chip, the multi-core main control chip will periodically send a wrong answer to test whether the monitoring function of the power chip is normal; The ERR pin is a high-low level switching signal in a normal state. When the high-low level switching stops and remains at a low level or a high level, it will be detected as an error. The response of the ERR pin is divided into two types: immediate response and recovery delay response. The recovery delay response mechanism of the power chip is used as the safety state control of the monitoring module of the controller monitoring layer. When an alarm occurs, the ERR signal stops switching and remains at a low level; After that, an interrupt will be generated to indicate the recovery delay time Start; If the alarm occurs for longer than , that is, upon arrival After that, SS1 will be pulled low and then After that, SS2 is pulled to a low level. If the alarm occurs for a shorter time than , that is, upon arrival If the ERR signal starts switching again, SS1 and SS2 will remain high, where Configured to 10ms, Configured as 0ms, the SS1 and SS2 pins are in the same condition.
2. The three-layer monitoring architecture for a vehicle controller according to claim 1 is characterized in that: The functional layer also has a diagnostic function.
3. The three-layer monitoring architecture for a vehicle controller according to claim 1 is characterized in that: The controller monitoring layer also includes voltage monitoring, memory testing, shutdown path testing and A / D conversion testing.
4. The three-layer monitoring architecture for a vehicle controller according to claim 1 is characterized in that: The three CPUs of the multi-core master control chip are two lock-step CPUs and one non-lock-step CPU, the two lock-step CPUs are CPU0 and CPU1, and the non-lock-step CPU is CPU2; CPU0 is assigned to the functional layer, CPU1 is assigned to the functional monitoring layer, and CPU2 is assigned to the controller monitoring layer software part.