Optical line protection monitoring method and system based on optical cable routing detection
By constructing a light circuit protection monitoring model and assisting users in issuing maintenance tasks, the problem of low light circuit monitoring efficiency in the existing technology is solved, and the precise position monitoring and maintenance efficiency of light circuits is improved.
Patent Information
- Application Number
- CN202311541431.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-18
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-11-18
AI Technical Summary
The existing light line protection monitoring technology lacks intuitive comprehensive monitoring methods, which leads to low timely delivery of maintenance tasks and low monitoring efficiency, making it difficult for maintenance personnel to accurately determine the location and burial depth of optical cables, which increases the complexity of maintenance.
The optical line protection monitoring method based on optical cable routing detection, by obtaining optical cable routing detection information and monitoring information, a light line protection monitoring model is constructed, and users can issue maintenance tasks in the visual model, improving the timeliness and efficiency of maintenance tasks .
It realizes intuitive monitoring of the precise location and conditions of light lines in the city, improves the timeliness and monitoring efficiency of maintenance tasks, reduces maintenance complexity, and improves maintenance efficiency.
Smart Images

Figure CN117614532B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of optical line protection monitoring, and in particular to an optical line protection monitoring method and system based on optical cable route detection. Background Art
[0002] In order to ensure the stability of optical lines for data communication, it is necessary to perform protection monitoring on the optical lines. Generally, when performing protection monitoring on optical lines, it is necessary to first perform fault monitoring on the optical lines. When a fault is detected, the maintenance personnel are notified to handle the fault on the optical lines. However, when handling the fault, the maintenance personnel need to first perform optical cable routing detection on the optical lines, accurately determine the buried position, buried depth and other parameters of the optical lines, and then perform digging and cable planing, which is relatively cumbersome. In addition, the protection monitoring personnel need to monitor the conditions of each optical cable in the city one by one, and then issue the maintenance tasks for the optical lines. There is a lack of intuitive methods for comprehensive protection monitoring of each optical line in the city, which reduces the timeliness of the issuance of maintenance tasks for the optical lines and reduces the monitoring efficiency of the protection monitoring personnel. Therefore, a solution is urgently needed. Summary of the invention
[0003] The present invention provides an optical line protection monitoring method and system based on optical cable route detection. Users can view the precise location and line conditions of each optical line in the city, and intuitively perform comprehensive protection monitoring on each optical line in the city. The system also assists users in issuing optical line maintenance tasks, thereby improving the timeliness of issuing optical line maintenance tasks and the monitoring efficiency of protection monitoring personnel. When issuing optical line maintenance tasks, maintenance personnel can accurately know the location of the optical line and directly perform maintenance work such as digging and cable planing, thereby improving maintenance efficiency.
[0004] The present invention provides an optical line protection monitoring method based on optical cable routing detection, comprising:
[0005] Obtain optical cable routing detection information and optical cable monitoring information of optical lines;
[0006] Construct an optical line protection monitoring model based on optical cable route detection information, optical cable monitoring information and preset three-dimensional city maps;
[0007] Visual output optical line protection monitoring model;
[0008] When at least one user views the optical line protection monitoring model, the auxiliary user issues an optical line maintenance task based on the optical line protection monitoring model.
[0009] Preferably, assisting the user to issue an optical line maintenance task based on the optical line protection monitoring model includes:
[0010] Determining whether the user meets the assistance opportunity conditions;
[0011] When it meets the requirements, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model;
[0012] When the user defines the maintenance work area in the optical line protection monitoring model, the maintenance task formulation basis information in the maintenance work area is obtained;
[0013] Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared;
[0014] Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model;
[0015] When the user selects a maintenance task from the list of maintenance tasks to be selected, the maintenance task selected by the user is used as the optical line maintenance task and issued;
[0016] Among them, auxiliary timing conditions include:
[0017] There is a corresponding regional association relationship in the preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times;
[0018] or,
[0019] The sum of the trigger values corresponding to the multiple first area content types in the second model area viewed in the optical line protection monitoring model within the most recent preset time by the user in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold;
[0020] or,
[0021] The third model area that the user last viewed before performing a viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user first viewed after performing a viewing area switching operation meet the area conditions in the preset area condition library.
[0022] Preferably, based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared, including:
[0023] Construct the first information description vector of the maintenance task formulation basis information;
[0024] Determine a plurality of maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected;
[0025] Based on multiple maintenance tasks to be selected, a list of maintenance tasks to be selected is prepared;
[0026] and / or,
[0027] Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform;
[0028] Based on the maintenance experience of multiple optical lines, a model for generating maintenance tasks to be selected is trained;
[0029] Input the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list;
[0030] Among them, the maintenance experience conditions include:
[0031] The vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template;
[0032] There is a corresponding personnel association relationship between the party generating the optical line maintenance experience and the user on the optical line maintenance experience platform in a preset personnel association relationship database;
[0033] The total number of application events corresponding to the optical line maintenance experience in a preset application event library is greater than or equal to a preset number threshold.
[0034] Preferably, the optical line protection monitoring method based on optical cable route detection further includes:
[0035] determining whether the first model region meets the first model region condition;
[0036] When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model;
[0037] Generate a region switching link for switching the viewing region to the fifth model region;
[0038] Generate a list of candidate switching areas based on the area switching link and the area name of the fifth model area;
[0039] Mapping the list of candidate switching areas into the optical line protection monitoring model;
[0040] When the user selects a to-be-selected switching area from the to-be-selected switching area list, the first model area is switched to the to-be-selected switching area selected by the user;
[0041] Among them, the first model area conditions include:
[0042] at least one other user is viewing the first model area;
[0043] The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user;
[0044] The second model region conditions include:
[0045] The fifth model area was not viewed by anyone;
[0046] The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to the preset fitness value threshold;
[0047] The second area content type in the fifth model area exists in a preset standard area content type library.
[0048] Preferably, the optical line protection monitoring method based on optical cable route detection further includes:
[0049] Track and obtain the execution status information of optical line maintenance tasks;
[0050] The execution status information is mapped into the optical line protection monitoring model.
[0051] The present invention provides an optical line protection monitoring system based on optical cable routing detection, comprising:
[0052] An information acquisition module, used to acquire optical cable routing detection information and optical cable monitoring information of an optical line;
[0053] A model building module, used to build an optical line protection monitoring model based on optical cable route detection information, optical cable monitoring information and a preset three-dimensional city map;
[0054] A visualization output module, used for visualizing and outputting the optical line protection monitoring model;
[0055] The user assistance module is used to assist the user to issue an optical line maintenance task based on the optical line protection monitoring model when at least one user views the optical line protection monitoring model.
[0056] Preferably, the user assistance module assists the user in issuing optical line maintenance tasks based on the optical line protection monitoring model, including:
[0057] Determining whether the user meets the assistance opportunity conditions;
[0058] When it meets the requirements, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model;
[0059] When the user defines the maintenance work area in the optical line protection monitoring model, the maintenance task formulation basis information in the maintenance work area is obtained;
[0060] Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared;
[0061] Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model;
[0062] When the user selects a maintenance task from the list of maintenance tasks to be selected, the maintenance task selected by the user is used as the optical line maintenance task and issued;
[0063] Among them, auxiliary timing conditions include:
[0064] There is a corresponding regional association relationship in the preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times;
[0065] or,
[0066] The sum of the trigger values corresponding to the multiple first area content types in the second model area viewed in the optical line protection monitoring model within the most recent preset time by the user in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold;
[0067] or,
[0068] The third model area that the user last viewed before performing a viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user first viewed after performing a viewing area switching operation meet the area conditions in the preset area condition library.
[0069] Preferably, the user assistance module prepares a list of maintenance tasks to be selected based on the maintenance task formulation basis information, including:
[0070] Construct the first information description vector of the maintenance task formulation basis information;
[0071] Determine a plurality of maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected;
[0072] Based on multiple maintenance tasks to be selected, a list of maintenance tasks to be selected is prepared;
[0073] and / or,
[0074] Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform;
[0075] Based on the maintenance experience of multiple optical lines, a model for generating maintenance tasks to be selected is trained;
[0076] Input the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list;
[0077] Among them, the maintenance experience conditions include:
[0078] The vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template;
[0079] There is a corresponding personnel association relationship between the party generating the optical line maintenance experience and the user on the optical line maintenance experience platform in a preset personnel association relationship database;
[0080] The total number of application events corresponding to the optical line maintenance experience in a preset application event library is greater than or equal to a preset number threshold.
[0081] Preferably, the optical line protection monitoring system based on optical cable route detection further includes:
[0082] View the Region Switching Tips module for including:
[0083] determining whether the first model region meets the first model region condition;
[0084] When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model;
[0085] Generate a region switching link for switching the viewing region to the fifth model region;
[0086] Generate a list of candidate switching areas based on the area switching link and the area name of the fifth model area;
[0087] Mapping the list of candidate switching areas into the optical line protection monitoring model;
[0088] When the user selects a to-be-selected switching area from the to-be-selected switching area list, the first model area is switched to the to-be-selected switching area selected by the user;
[0089] Among them, the first model area conditions include:
[0090] at least one other user is viewing the first model area;
[0091] The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user;
[0092] The second model region conditions include:
[0093] The fifth model area was not viewed by anyone;
[0094] The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to the preset fitness value threshold;
[0095] The second area content type in the fifth model area exists in a preset standard area content type library.
[0096] Preferably, the optical line protection monitoring system based on optical cable route detection further includes:
[0097] Supplementary mapping modules to include:
[0098] Track and obtain the execution status information of optical line maintenance tasks;
[0099] The execution status information is mapped into the optical line protection monitoring model.
[0100] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0101] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0102] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0103] Figure 1 Flow chart of an optical line protection monitoring method based on optical cable route detection in an embodiment of the present invention;
[0104] Figure 2 Schematic diagram of an optical line protection monitoring system based on optical cable route detection in an embodiment of the present invention. DETAILED DESCRIPTION
[0105] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0106] The present invention provides an optical line protection monitoring method based on optical cable routing detection, such as Figure 1 As shown, including:
[0107] Step S1: Obtaining optical cable routing detection information and optical cable monitoring information of the optical line;
[0108] Step S2: constructing an optical line protection monitoring model based on the optical cable routing detection information, the optical cable monitoring information and a preset three-dimensional city map;
[0109] Step S3: Visualize the output optical line protection monitoring model;
[0110] Step S4: when at least one user views the optical line protection monitoring model, the auxiliary user issues an optical line maintenance task based on the optical line protection monitoring model.
[0111] In this embodiment, the optical cable route detection information includes: the buried position and buried depth of each optical line in the city, which can be obtained by the staff carrying an optical cable route detector for daily optical cable route detection; the optical cable monitoring information includes: OTDR monitoring results, which can be obtained by the staff using the OTDR monitor to monitor the optical line; the three-dimensional city map is a three-dimensional map of the city where the optical line is located, which also displays the real-time positions of a large number of optical line maintenance personnel; when constructing an optical line protection monitoring model, when the optical cable route detection information and the optical cable monitoring information are mapped into the three-dimensional city map, a three-dimensional optical cable model is generated based on the optical cable route detection information, and an information box for placing the corresponding optical cable monitoring information is set next to the three-dimensional optical cable model; when the optical line protection monitoring model is visually output, the user can view it; when the user views the optical line protection monitoring model, the user is assisted in issuing optical line maintenance tasks based on the optical line protection monitoring model;
[0112] In this application, users can view the precise location and line conditions of each optical line in the city, and intuitively conduct comprehensive protection monitoring of each optical line in the city. The system also assists users in issuing optical line maintenance tasks, which improves the timeliness of issuing optical line maintenance tasks and the monitoring efficiency of protection monitoring personnel. When issuing optical line maintenance tasks, maintenance personnel can accurately know the location of the optical line and directly carry out maintenance work such as digging and cable planing, thereby improving maintenance efficiency.
[0113] In one embodiment, the auxiliary user issues an optical line maintenance task based on the optical line protection monitoring model, including:
[0114] Determining whether the user meets the assistance opportunity conditions;
[0115] When it meets the requirements, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model;
[0116] When the user defines the maintenance work area in the optical line protection monitoring model, the maintenance task formulation basis information in the maintenance work area is obtained;
[0117] Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared;
[0118] Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model;
[0119] When the user selects a maintenance task from the list of maintenance tasks to be selected, the maintenance task selected by the user is used as the optical line maintenance task and issued;
[0120] Among them, auxiliary timing conditions include:
[0121] Condition A1: There is a corresponding regional association relationship in the preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times;
[0122] or,
[0123] Condition A2: the sum of the trigger values corresponding to the multiple first area content types in the second model area viewed in the optical line protection monitoring model within the most recent preset time by the user in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold;
[0124] or,
[0125] Condition A3: The third model area that the user last viewed before performing the viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user first viewed after performing the viewing area switching operation meet the area conditions in the preset area condition library.
[0126] In this embodiment, when the user meets the assistance timing conditions, it means that the user needs to issue assistance for the optical line maintenance task, that is, assistance is performed without the user inputting an assistance request. The user's need for assistance is determined adaptively and imperceptibly, thereby improving intelligence and humanization. In addition, when viewing the optical line protection monitoring model, the user may need to issue optical line maintenance tasks multiple times. If an assistance request is input each time, it is cumbersome. Therefore, this setting is more applicable. The maintenance work area demarcation prompt information is used to prompt the user to demarcate the maintenance work area within the optical line protection monitoring model, for example: "Please demarcate the maintenance work area immediately". The maintenance work area is the area where the user needs to arrange optical line maintenance work. When the maintenance work area demarcation prompt information is mapped to the optical line protection monitoring model, the user can be viewed; the maintenance task formulation basis information includes: the basis required for arranging optical line maintenance work in the maintenance work area, such as: the location of the faulty optical cable, the type of optical cable fault, the working status of the maintenance personnel (whether they are idle), the location of the maintenance personnel, etc.; based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared, and there are multiple maintenance tasks to be selected recommended to the user for selection in the list of maintenance tasks to be selected. When the list of maintenance tasks to be selected is mapped to the optical line protection monitoring model, the user can view and select the maintenance tasks to be selected that he or she approves, and the system will issue them as optical line maintenance tasks; the user can directly define the maintenance work area where he or she wants to arrange optical line maintenance work, and the system will automatically recommend maintenance tasks to improve the efficiency of issuing optical line maintenance tasks;
[0127] In condition A1, N is a positive integer and can be set by the technician according to actual needs; the historical maintenance work area is the maintenance work area historically demarcated by the user since the user started to view the optical line protection monitoring model; when there is a regional association relationship between the first model area and the historical maintenance work area, it means that the user may also want to arrange optical line maintenance work in the first model area, for example: the regional association relationship is that the optical cables in the two areas are connected to each other (the user wants to arrange optical line maintenance work again to achieve maintenance of all optical cables); therefore, when condition A1 is met, it means that the user may want to arrange optical line maintenance work;
[0128] In condition A2, the preset time may be, for example, 200 seconds; the first area content type may be, for example, the faulty optical cable location, the faulty optical cable model, etc.; the larger the trigger value corresponding to the first area content type, the more likely the user is to want to arrange optical line maintenance work, for example, the first area content type is the faulty optical cable location, the trigger value is 5, and another example: the first area content type is the maintenance personnel location, the trigger value is 7; the trigger value and the threshold may be, for example, 20; the trigger value may be set in advance by the technician according to actual needs; when the sum of the trigger values is greater than or equal to the trigger value and the threshold, it indicates that the user may want to arrange optical line maintenance work;
[0129] In condition A3, there is an option in the optical line protection monitoring model for users to switch viewing areas, such as switching to a park, etc. When the user selects it, a viewing area switching operation occurs; when the third model area and the fourth model area have regional conditions, it means that the user may want to arrange optical line maintenance work, for example: the regional conditions are that the contents of the two areas are the faulty optical cable location and the maintenance personnel location respectively, which means that the user wants to dispatch maintenance personnel to the faulty optical cable location for repair; therefore, when condition A3 is met, it means that the user may want to arrange optical line maintenance work.
[0130] The introduction of three auxiliary timing conditions, A1, A2, and A3, can quickly and accurately identify whether the user wants to arrange optical line maintenance work, greatly improving the applicability of the system.
[0131] In one embodiment, based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared, including:
[0132] Construct the first information description vector of the maintenance task formulation basis information;
[0133] Determine a plurality of maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected;
[0134] Based on multiple maintenance tasks to be selected, a list of maintenance tasks to be selected is prepared;
[0135] and / or,
[0136] Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform;
[0137] Based on the maintenance experience of multiple optical lines, a model for generating maintenance tasks to be selected is trained;
[0138] Input the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list;
[0139] Among them, the maintenance experience conditions include:
[0140] Condition B1: the vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template;
[0141] Condition B2: There is a corresponding personnel association relationship between the party that generates the optical line maintenance experience on the optical line maintenance experience platform and the user in the preset personnel association relationship database;
[0142] Condition B3: The total number of application events corresponding to the optical line maintenance experience in the preset application event library is greater than or equal to a preset number threshold.
[0143] In this embodiment, a first information description vector of the maintenance task formulation basis information is constructed in vector form; there are multiple maintenance tasks to be selected corresponding to different first information description vectors in the maintenance task library to be selected, and the multiple maintenance tasks to be selected corresponding to the first information description vector can be set in advance by technical personnel according to actual needs; based on the multiple maintenance tasks to be selected, a list of maintenance tasks to be selected is prepared; the optical line maintenance experience platform is a platform for various optical line managers to share optical line maintenance experience, and the optical line maintenance experience is the experience of optical line managers in formulating maintenance tasks according to the on-site conditions of the optical line; based on the multiple optical line maintenance experiences, the neural network model is trained, and when the neural network model is trained to convergence, it becomes a maintenance task generation model to be selected that can prepare a list of maintenance tasks to be selected according to the maintenance task formulation basis information; introducing two methods to prepare a list of maintenance tasks to be selected greatly improves the applicability of the system;
[0144] In condition B1, the similarity threshold may be, for example, 70%; the information vector extraction template includes: extracting the optical line site situation from the optical line maintenance experience, and constructing a second information description vector of the extracted optical line site situation; when the second information description vector is sufficiently similar to the first information description vector, the optical line maintenance experience is applicable to assisting the user in issuing the optical line maintenance task, thereby improving the rationality of the optical line maintenance experience screening;
[0145] In condition B2, the generator is other optical line management personnel; when there is an association relationship between the generator and the user, it means that the optical line maintenance experience generated by the generator is more suitable for the auxiliary user to issue optical line maintenance tasks, for example: the association relationship is the same preference for issuing optical line maintenance tasks; therefore, setting condition B2 further improves the rationality of optical line maintenance experience screening;
[0146] In condition B3, the application event is that the optical line maintenance experience has been used in history to train the candidate maintenance task generation model, and the candidate maintenance task in the candidate maintenance task list output by the historically trained candidate maintenance task generation model is selected (indicating that the historical assistance is reasonable); therefore, setting condition B3 further improves the rationality of the optical line maintenance experience screening.
[0147] In one embodiment, the optical line protection monitoring method based on optical cable route detection further includes:
[0148] determining whether the first model region meets the first model region condition;
[0149] When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model;
[0150] Generate a region switching link for switching the viewing region to the fifth model region;
[0151] Generate a list of candidate switching areas based on the area switching link and the area name of the fifth model area;
[0152] Mapping the list of candidate switching areas into the optical line protection monitoring model;
[0153] When the user selects a to-be-selected switching area from the to-be-selected switching area list, the first model area is switched to the to-be-selected switching area selected by the user;
[0154] Among them, the first model area conditions include:
[0155] at least one other user is viewing the first model area;
[0156] The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user;
[0157] The second model region conditions include:
[0158] The fifth model area was not viewed by anyone;
[0159] The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to the preset fitness value threshold;
[0160] The second area content type in the fifth model area exists in a preset standard area content type library.
[0161] In this embodiment, when the first model area meets the first model area condition, it means that the user is not suitable to continue viewing the first model area; the fifth model area does not meet the first model area condition but meets the second model area condition, and is suitable for the user to view; a region switching link is generated to switch the viewing area to the fifth model area, and the user clicks the region switching link to switch to view the corresponding fifth model area; based on the region switching link and the region name of the fifth model area (for example: XX Park, etc.), a list of areas to be switched is generated; the list of areas to be switched is mapped to the optical line protection monitoring model, and the user can view and select the area to be switched to, and the system responds to the switching;
[0162] Different model areas have preset appropriate value libraries, namely, the preset first appropriate value library corresponding to the first model area and the preset second appropriate value library corresponding to the fifth model area; the appropriate library contains appropriate values corresponding to different users, namely, the first appropriate value, the second appropriate value and the third appropriate value; the larger the appropriate value corresponding to the user, the more suitable the user is to view the corresponding model area; when presetting the appropriate value for the user, it can be set according to the user's familiarity with the model area, jurisdiction, viewing time, etc. Generally, the greater the familiarity, the higher the jurisdiction, and the longer the viewing time, the higher the appropriate value; there are multiple standard area content types in the standard area content type library, and the standard area content type represents that the model area urgently needs to be viewed by the user, for example: the standard area content type is optical cable fault content, etc.; when the first model area condition is met, it means that other users who are more suitable for viewing the model area are viewing it, and the user can switch; when the second model area condition is met, it means that the user is suitable for viewing and can switch;
[0163] Generally, there will be multiple optical line management personnel jointly viewing the optical line protection monitoring model. When viewing, the optical line management personnel will randomly conduct area viewing. However, if this is implemented, it may lead to insufficient comprehensiveness of the optical line protection monitoring jointly viewed by various users. Therefore, the embodiment of the present invention sets the first model area condition and the second model area condition. When the user needs to switch the viewing area, the system will remind him to ensure the comprehensiveness of the optical line protection monitoring jointly viewed by various users, thereby improving the applicability of the system.
[0164] In one embodiment, the optical line protection monitoring method based on optical cable route detection further includes:
[0165] Track and obtain the execution status information of optical line maintenance tasks;
[0166] The execution status information is mapped into the optical line protection monitoring model.
[0167] In this embodiment, the execution status information of the optical line maintenance task can also be sensed and acquired, and mapped into the optical line protection monitoring model for users to view; the execution status information includes: task execution progress, such as: optical cable repair progress, etc.
[0168] The present invention provides an optical line protection monitoring system based on optical cable routing detection, such as Figure 2 As shown, including:
[0169] Information acquisition module 1, used to obtain optical cable routing detection information and optical cable monitoring information of the optical line;
[0170] Model building module 2, used to build an optical line protection monitoring model based on optical cable route detection information, optical cable monitoring information and a preset three-dimensional city map;
[0171] A visualization output module 3, used for visually outputting an optical line protection monitoring model;
[0172] The user assistance module 4 is used to assist the user in issuing an optical line maintenance task based on the optical line protection monitoring model when at least one user views the optical line protection monitoring model.
[0173] The user assistance module 4 assists the user in issuing optical line maintenance tasks based on the optical line protection monitoring model, including:
[0174] Determining whether the user meets the assistance opportunity conditions;
[0175] When it meets the requirements, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model;
[0176] When the user defines the maintenance work area in the optical line protection monitoring model, the maintenance task formulation basis information in the maintenance work area is obtained;
[0177] Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared;
[0178] Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model;
[0179] When the user selects a maintenance task from the list of maintenance tasks to be selected, the maintenance task selected by the user is used as the optical line maintenance task and issued;
[0180] Among them, auxiliary timing conditions include:
[0181] There is a corresponding regional association relationship in the preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times;
[0182] or,
[0183] The sum of the trigger values corresponding to the multiple first area content types in the second model area viewed in the optical line protection monitoring model within the most recent preset time by the user in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold;
[0184] or,
[0185] The third model area that the user last viewed before performing a viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user first viewed after performing a viewing area switching operation meet the area conditions in the preset area condition library.
[0186] The user assistance module 4 prepares a list of maintenance tasks to be selected based on the maintenance task formulation basis information, including:
[0187] Construct the first information description vector of the maintenance task formulation basis information;
[0188] Determine a plurality of maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected;
[0189] Based on multiple maintenance tasks to be selected, a list of maintenance tasks to be selected is prepared;
[0190] and / or,
[0191] Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform;
[0192] Based on the maintenance experience of multiple optical lines, a model for generating maintenance tasks to be selected is trained;
[0193] Input the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list;
[0194] Among them, the maintenance experience conditions include:
[0195] The vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template;
[0196] There is a corresponding personnel association relationship between the party generating the optical line maintenance experience and the user on the optical line maintenance experience platform in a preset personnel association relationship database;
[0197] The total number of application events corresponding to the optical line maintenance experience in a preset application event library is greater than or equal to a preset number threshold.
[0198] The optical line protection monitoring system based on optical cable route detection also includes:
[0199] View the Region Switching Tips module for including:
[0200] determining whether the first model region meets the first model region condition;
[0201] When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model;
[0202] Generate a region switching link for switching the viewing region to the fifth model region;
[0203] Generate a list of candidate switching areas based on the area switching link and the area name of the fifth model area;
[0204] Mapping the list of candidate switching areas into the optical line protection monitoring model;
[0205] When the user selects a to-be-selected switching area from the to-be-selected switching area list, the first model area is switched to the to-be-selected switching area selected by the user;
[0206] Among them, the first model area conditions include:
[0207] at least one other user is viewing the first model area;
[0208] The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user;
[0209] The second model region conditions include:
[0210] The fifth model area was not viewed by anyone;
[0211] The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to the preset fitness value threshold;
[0212] The second area content type in the fifth model area exists in a preset standard area content type library.
[0213] The optical line protection monitoring system based on optical cable route detection also includes:
[0214] Supplementary mapping modules to include:
[0215] Track and obtain the execution status information of optical line maintenance tasks;
[0216] The execution status information is mapped into the optical line protection monitoring model.
[0217] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. An optical line protection monitoring method based on optical cable routing detection, It is characterized in that include: Obtain optical cable routing detection information and optical cable monitoring information of optical lines; Constructing an optical line protection monitoring model based on the optical cable route detection information, the optical cable monitoring information and a preset three-dimensional city map; Visually outputting the optical line protection monitoring model; When at least one user views the optical line protection monitoring model, assisting the user to issue an optical line maintenance task based on the optical line protection monitoring model; The step of assisting the user to issue an optical line maintenance task based on the optical line protection monitoring model includes: Determining whether the user meets the auxiliary opportunity condition; When the conditions are met, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model; When the user defines a maintenance work area in the optical line protection monitoring model, obtaining maintenance task formulation basis information in the maintenance work area; Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared; Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model; When the user selects a maintenance task to be selected from the list of maintenance tasks to be selected, the maintenance task to be selected by the user is used as the optical line maintenance task and issued; The auxiliary timing conditions include: There is a corresponding regional association relationship in a preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times; or, The sum of the trigger values corresponding to the multiple first area content types in the second model area in the optical line protection monitoring model viewed by the user within the most recent preset time in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold; or, The third model area that the user viewed last before performing the viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user viewed first after performing the viewing area switching operation meet the area conditions in the preset area condition library.
2. The optical line protection monitoring method based on optical cable route detection as claimed in claim 1, It is characterized in that The step of preparing a list of maintenance tasks to be selected based on the maintenance task formulation basis information includes: Constructing a first information description vector of the maintenance task formulation basis information; Determine a plurality of the maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected; Based on the plurality of maintenance tasks to be selected, preparing the list of maintenance tasks to be selected; and / or, Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform; Based on the plurality of optical line maintenance experiences, training a generation model for maintenance tasks to be selected; Inputting the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list; The maintenance experience conditions include: The vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template; There is a corresponding personnel association relationship between the generator of the optical line maintenance experience on the optical line maintenance experience platform and the user in a preset personnel association relationship database; The total number of application events corresponding to the optical line maintenance experience in a preset application event library is greater than or equal to a preset number threshold.
3. The optical line protection monitoring method based on optical cable route detection as claimed in claim 1, It is characterized in that Also includes: determining whether the first model region meets a first model region condition; When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model; generating an area switching link for switching the viewing area to the fifth model area; generating a list of to-be-selected switching areas based on the area switching link and the area name of the fifth model area; Mapping the list of candidate switching areas into the optical line protection monitoring model; When the user selects a to-be-selected switching area from the to-be-selected switching area list, switching the first model area to the to-be-selected switching area selected by the user; Wherein, the first model region condition includes: at least one other user is viewing the first model area; The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user; Wherein, the second model region condition includes: The fifth model area is unattended; The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to a preset fitness value threshold; The second area content type in the fifth model area exists in a preset standard area content type library.
4. The optical line protection monitoring method based on optical cable route detection as claimed in claim 1, It is characterized in that Also includes: Tracking and obtaining the execution status information of the optical line maintenance task; The execution status information is mapped into the optical line protection monitoring model.
5. An optical line protection monitoring system based on optical cable routing detection, It is characterized in that include: An information acquisition module, used to acquire optical cable routing detection information and optical cable monitoring information of an optical line; A model building module, used to build an optical line protection monitoring model based on the optical cable routing detection information, the optical cable monitoring information and a preset three-dimensional city map; A visualization output module, used for visually outputting the optical line protection monitoring model; A user assistance module, configured to assist at least one user in issuing an optical line maintenance task based on the optical line protection monitoring model when the user views the optical line protection monitoring model; The user assistance module assists the user in issuing an optical line maintenance task based on the optical line protection monitoring model, including: Determining whether the user meets the auxiliary opportunity condition; When the conditions are met, the preset maintenance work area demarcation prompt information is mapped into the optical line protection monitoring model; When the user defines a maintenance work area in the optical line protection monitoring model, obtaining maintenance task formulation basis information in the maintenance work area; Based on the maintenance task formulation basis information, a list of maintenance tasks to be selected is prepared; Mapping the list of maintenance tasks to be selected into the optical line protection monitoring model; When the user selects a maintenance task to be selected from the list of maintenance tasks to be selected, the maintenance task to be selected by the user is used as the optical line maintenance task and issued; The auxiliary timing conditions include: There is a corresponding regional association relationship in a preset regional association relationship library between the first model area currently viewed by the user in the optical line protection monitoring model and the historical maintenance work area previously demarcated by the user N times; or, The sum of the trigger values corresponding to the multiple first area content types in the second model area in the optical line protection monitoring model viewed by the user within the most recent preset time in the preset trigger value library is greater than or equal to the preset trigger value and threshold; the viewing time of the user viewing the second model area is greater than or equal to the preset time threshold; or, The third model area that the user viewed last before performing the viewing area switching operation in the optical line protection monitoring model and the fourth model area that the user viewed first after performing the viewing area switching operation meet the area conditions in the preset area condition library.
6. An optical line protection monitoring system based on optical cable route detection as claimed in claim 5, It is characterized in that The user assistance module prepares a list of maintenance tasks to be selected based on the maintenance task formulation basis information, including: Constructing a first information description vector of the maintenance task formulation basis information; Determine a plurality of the maintenance tasks to be selected corresponding to the first information description vector from a preset maintenance task library to be selected; Based on the plurality of maintenance tasks to be selected, preparing the list of maintenance tasks to be selected; and / or, Monitor multiple optical line maintenance experiences that meet the maintenance experience conditions from a preset optical line maintenance experience platform; Based on the plurality of optical line maintenance experiences, training a generation model for maintenance tasks to be selected; Inputting the maintenance task formulation basis information into the candidate maintenance task generation model to obtain the candidate maintenance task list; The maintenance experience conditions include: The vector similarity between the second information description vector of the optical line maintenance experience and the first information description vector is greater than or equal to a preset similarity threshold; the second information description vector is extracted from the optical line maintenance experience based on a preset information vector extraction template; There is a corresponding personnel association relationship between the generator of the optical line maintenance experience on the optical line maintenance experience platform and the user in a preset personnel association relationship database; The total number of application events corresponding to the optical line maintenance experience in a preset application event library is greater than or equal to a preset number threshold.
7. An optical line protection monitoring system based on optical cable route detection as claimed in claim 5, It is characterized in that Also includes: View the Region Switching Tips module for including: determining whether the first model region meets a first model region condition; When the condition is met, determining a plurality of fifth model regions that do not meet the condition of the first model region and meet the condition of the second model region from the optical line protection monitoring model; generating an area switching link for switching the viewing area to the fifth model area; generating a list of to-be-selected switching areas based on the area switching link and the area name of the fifth model area; Mapping the list of candidate switching areas into the optical line protection monitoring model; When the user selects a to-be-selected switching area from the to-be-selected switching area list, switching the first model area to the to-be-selected switching area selected by the user; Wherein, the first model region condition includes: at least one other user is viewing the first model area; The first fitness value corresponding to other users in the preset first fitness value library corresponding to the first model area is greater than the second fitness value corresponding to the user; Wherein, the second model region condition includes: The fifth model area is unattended; The third fitness value corresponding to the user in the preset second fitness value library corresponding to the fifth model area is greater than or equal to a preset fitness value threshold; The second area content type in the fifth model area exists in a preset standard area content type library.
8. An optical line protection monitoring system based on optical cable route detection as claimed in claim 5, It is characterized in that Also includes: Supplementary mapping modules to include: Tracking and obtaining the execution status information of the optical line maintenance task; The execution status information is mapped into the optical line protection monitoring model.
Citation Information
Patent Citations
Three-dimensional visual monitoring method, system and device and storage medium
CN111429575A
Cable channel panoramic management and control system based on multi-dimensional information perception
CN116089625A
Visual intelligent management system and method for communication machine room
CN116310236A
GIS-based communication optical cable fault point positioning method and device
CN116846463A
Integrated management apparatus for monitoring and operating optical line and integrated management method using same
WO2017195953A1
