BIM-based collaborative design method, device, equipment and storage medium
Patent Information
- Application Number
- CN202311092527.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-28
- Publication Date
- 2026-11-03
- Estimated Expiration
- 2043-08-28
AI Technical Summary
In current architectural engineering design, the efficiency of collaboration among different disciplines is low, and design changes are difficult to detect and handle, leading to difficulties in design modification.
The BIM-based collaborative design method is adopted to obtain the professional preliminary design model, analyze the component model and design parameters, generate the initial model, and perform conflict detection and parameter modification to generate the collaborative design model after review and confirmation.
It improves the efficiency of collaborative design among multiple disciplines, reduces design changes and modifications, and enables positive collaborative design among multiple disciplines.
Smart Images

Figure CN117633948B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of architectural design, and in particular to a BIM-based collaborative design method, apparatus, equipment, and storage medium. Background Technology
[0002] Architectural engineering is a complex systems engineering project involving multiple disciplines and roles, multiple constraints, long cycles, and large investments. It involves architectural, structural, water supply and drainage, HVAC, and electrical engineering, among others. During the architectural design process, these disciplines are interdependent, requiring frequent data retrieval and information exchange to complete their respective designs. However, currently, architectural design primarily employs a two-dimensional design approach. After completing their own design, the two-dimensional drawings and design reports are delivered to other disciplines. This design method suffers from problems such as frequent design changes, difficulty in detecting changes, and low collaboration efficiency. Summary of the Invention
[0003] This invention provides a BIM-based collaborative design method, device, electronic equipment, and storage medium, which improves collaborative efficiency and reduces design changes and modifications through positive collaborative design among multiple disciplines.
[0004] In a first aspect, the present invention provides a BIM-based collaborative design method, comprising the following steps:
[0005] Obtain a professional preliminary design model;
[0006] The preliminary design model of the aforementioned discipline is analyzed to obtain the component model and design parameters;
[0007] Based on the component model and the design parameters, a preliminary model is generated;
[0008] According to preset parameters, conflict detection is performed on the initial model and prompt information is generated, wherein the conflict detection includes intra-professional conflict detection and inter-professional conflict detection;
[0009] In response to parameter modification operations by relevant professionals, a first model is generated, wherein the first model is a collaborative design model determined based on the review and confirmation by the relevant professionals.
[0010] Furthermore, obtaining the professional preliminary design model includes the following steps:
[0011] Obtain CAD design drawings and standardize them according to drafting standards;
[0012] The CAD design drawings are used to perform a model conversion operation to obtain a BIM model containing drawing information, wherein the drawing information includes component type, component parameters, and system coordinates;
[0013] In response to parameter modification operations performed by relevant professionals on the CAD design drawings, a BIM model containing the corresponding modified parameters is generated.
[0014] Furthermore, after generating the first model, the process further includes the following steps:
[0015] Based on the first model, generate an exportable first model file;
[0016] In response to the relevant professionals' detailed operations on the first model file, a professional detailed design model is obtained;
[0017] Based on the aforementioned professional detailed design model, generate a detailed model;
[0018] In response to the review and approval of the enhanced model by relevant professionals, a second model is generated;
[0019] Based on the second model, a model performance analysis report is generated, wherein the performance analysis report is presented in a visual manner.
[0020] Furthermore, after generating the second model, the process also includes:
[0021] Based on the second model, generate an exportable second model file;
[0022] In response to the in-depth operations performed on the second model file by relevant professionals, a professional final design model is obtained;
[0023] Based on the professional final design model, generate the final model;
[0024] In response to the review and approval of the final model by relevant professionals, a third model is generated;
[0025] Based on the third model, an auxiliary estimate of the engineering quantity is generated, wherein the auxiliary estimate of the engineering quantity is presented in a visual manner.
[0026] Secondly, the present invention also provides a BIM-based collaborative design device, comprising:
[0027] The preliminary model acquisition module is used to acquire professional preliminary design models;
[0028] The component acquisition module is used to parse the preliminary design model of the discipline and obtain the component model and design parameters;
[0029] The initial model generation module is used to generate an initial model based on the component model and the design parameters;
[0030] The conflict detection module is used to perform conflict detection on the initial model according to preset parameters and generate prompt information. The conflict detection includes intra-disciplinary conflict detection and inter-disciplinary conflict detection.
[0031] The first model acquisition module is used to generate a first model in response to parameter modification operations by relevant professionals, wherein the first model is a collaborative design model determined based on the review and confirmation of the relevant professionals.
[0032] Furthermore, the preliminary model acquisition module also includes:
[0033] The drawing standardization unit is used to acquire CAD design drawings and standardize them according to drafting standards.
[0034] The model conversion unit is used to perform a model conversion operation on the CAD design drawings to obtain a BIM model containing drawing information, wherein the drawing information includes component type, component parameters, and system coordinates;
[0035] The BIM model generation unit is used to generate a BIM model containing the corresponding modified parameters in response to parameter modification operations of relevant professionals on the CAD design drawings.
[0036] Furthermore, it also includes:
[0037] The first model file generation unit is used to generate an exportable first model file based on the first model.
[0038] The professional detailing model acquisition unit is used to acquire a professional detailing design model in response to the detailing operation of the first model file by relevant professionals.
[0039] The model generation unit is used to generate a detailed model based on the professional detailed design model.
[0040] The second model generation unit is used to generate a second model in response to the review and approval operation of the refined model by relevant professionals.
[0041] The performance analysis unit is used to generate a model performance analysis report based on the second model, wherein the performance analysis report is presented in a visual manner.
[0042] Furthermore, it also includes:
[0043] The second model file generation unit is used to generate an exportable second model file based on the second model.
[0044] The professional final design model acquisition unit is used to acquire the professional final design model in response to the relevant professionals' in-depth operations on the second model file;
[0045] The final model generation unit is used to generate a final model based on the professional final design model.
[0046] The third model generation unit is used to generate a third model in response to the review and approval operation of the final model by relevant professionals.
[0047] The auxiliary quantity estimate unit is used to generate an auxiliary quantity estimate based on the third model, wherein the auxiliary quantity estimate is presented in a visual manner.
[0048] Thirdly, embodiments of this application provide an electronic device, including:
[0049] At least one memory and at least one processor;
[0050] The memory is used to store one or more programs;
[0051] When the one or more programs are executed by the at least one processor, the at least one processor implements the steps of a BIM-based collaborative design method as described in the first aspect.
[0052] Fourthly, embodiments of this application provide a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of a BIM-based collaborative design method as described in the first aspect.
[0053] This invention obtains a preliminary design model for a specific discipline, analyzes it to acquire component models and design parameters, and generates a preliminary model based on these parameters. Then, it performs conflict detection on the preliminary model according to preset parameters and generates prompts. The conflict detection includes intra-discipline and inter-discipline conflict detection. Simultaneously, in response to parameter modification operations by relevant professionals, it generates a collaborative design model confirmed after review and approval by these professionals. This invention reconstructs the models of each discipline on a collaborative design platform to generate a BIM model usable for collaborative design, achieving positive collaborative design among multiple disciplines, significantly improving the efficiency of collaboration between disciplines, and reducing design changes and modifications.
[0054] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Attached Figure Description
[0055] Figure 1 A diagram illustrating the application environment of a BIM-based collaborative design method in one exemplary embodiment;
[0056] Figure 2 A flowchart illustrating the steps of a BIM-based collaborative design method in one exemplary embodiment;
[0057] Figure 3 This is a schematic diagram of a BIM-based collaborative design device provided in an exemplary embodiment;
[0058] Figure 4 This is an internal structural diagram of a computer device provided in one exemplary embodiment;
[0059] Figure 5 This is an internal structural diagram of a computer device provided in one exemplary embodiment. Detailed Implementation
[0060] To make the objectives, technical solutions, and advantages of this application clearer, the embodiments of this application will be described in further detail below with reference to the accompanying drawings.
[0061] It should be understood that the described embodiments are merely some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of the embodiments of this application.
[0062] The terminology used in the embodiments of this application is for the purpose of describing particular embodiments only and is not intended to limit the embodiments of this application. The singular forms “a,” “the,” and “the” used in the embodiments of this application and the appended claims are also intended to include the plural forms unless the context clearly indicates otherwise. It should also be understood that the term “and / or” as used herein refers to and includes any or all possible combinations of one or more of the associated listed items.
[0063] In the following description, when referring to the accompanying drawings, unless otherwise indicated, the same numbers in different drawings represent the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this application. Rather, they are merely examples of apparatuses and methods consistent with some aspects of this application as detailed in the appended claims. In the description of this application, it should be understood that the terms "first," "second," "third," etc., are used only to distinguish similar objects and are not necessarily used to describe a specific order or sequence, nor should they be construed as indicating or implying relative importance. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.
[0064] Furthermore, in the description of this application, unless otherwise stated, "a plurality of" means two or more.
[0065] "AND / OR" describes the relationship between related objects, indicating that there can be three relationships. For example, A AND / OR B can represent: A alone, A and B simultaneously, or B alone. The character " / " generally indicates that the objects before and after it are in an "OR" relationship.
[0066] Building Information Modeling (BIM) is a technology and tool widely used in the construction and engineering industry. It digitally integrates various information throughout the building design, construction, and operation processes. BIM systems not only provide comprehensive project information but also enable collaborative work at each stage, supporting project planning, design, construction, and operation. BIM systems have gained increasingly widespread application and recognition in recent years and have achieved a significant position in the construction industry.
[0067] However, design work requires extensive collaboration with various disciplines across different organizations, whether it's schematic design or construction drawing design, or general contracting or specialized design. Design habits also differ significantly between disciplines; for example, architects might use 3D modeling, while mechanical and electrical engineers might prefer 2D models. Therefore, to achieve collaborative design based on BIM technology, it's necessary to provide a collaborative platform that allows various disciplines to switch from traditional software design workflows to BIM design workflows.
[0068] Based on the above considerations, this application provides a BIM-based collaborative design method, applied to a BIM-based collaborative design platform, with the specific application environment as follows: Figure 1As shown in the diagram, terminal 102 communicates with server 104 via a network. The collaborative design platform based on the BIM system is stored on server 104, while the data storage system can store the data that the collaborative design platform based on the BIM system needs to process. The data storage system can be integrated on server 104 or placed on the cloud or other network servers. Server 104 obtains relevant modeling data uploaded by the terminals via the network, processes the modeling data accordingly, and then returns it to each local terminal via the network. Terminal 102 can be, but is not limited to, various personal computers, laptops, smartphones, tablets, IoT devices, and portable wearable devices. IoT devices can be smart speakers, smart TVs, smart air conditioners, smart vehicle devices, etc. Portable wearable devices can be smartwatches, smart bracelets, head-mounted devices, etc. Server 104 can be implemented using a standalone server or a server cluster composed of multiple servers.
[0069] like Figure 2 As shown, this application provides a BIM-based collaborative design method, applied to a BIM-based collaborative design platform, which includes the following method steps:
[0070] S201: Obtain a professional preliminary design model.
[0071] Specifically, the preliminary models completed by each discipline based on the project planning scheme are obtained. The preliminary design models of each discipline can be built directly on the BIM-based collaborative design platform through the platform's built-in database, or the model design can be completed on other software on the local terminal, the model file can be exported, and then uploaded to the collaborative design platform.
[0072] In a preferred embodiment, the files acquired by the collaborative platform are not limited to 3D modeling files; they can also be CAD design drawings. These CAD design drawings are then standardized according to drafting standards. A model conversion operation is performed on the CAD design drawings to obtain a BIM model containing drawing information, including component type, component parameters, and system coordinates. In other words, the CAD design drawings are used in the subsequent BIM model creation after conversion, thereby enabling professionals accustomed to using CAD for drafting to participate in BIM collaborative design. After generating the BIM model containing drawing information, the original CAD file is associated with this model as a supplement to the BIM model.
[0073] In a specific example, the disciplines include, but are not limited to, architecture, structural engineering, plumbing, HVAC, and electrical engineering. Taking the construction drawing design stage of the above-ground portion of a residential building as an example, the preliminary design model includes the following: Architectural modeling: the edges of the floor slabs on the changing floors, molding models, full-height windows and curtain walls, roof frames and curtain walls, K-pipes on each floor, partial lowering of the ground floor slab, confirmation of louvers at the basement air vents, confirmation of the ground floor electrical room, the elevation of the double-layer slab of the ventilation shaft, and modeling related to the integrated piping on the living balconies. Structural modeling includes: based on the architectural modeling and structural calculations, completing the modeling of structural walls, columns, and primary and secondary beams on each floor. Plumbing modeling includes: coordinating the location of water pipe shafts, roof rainwater drainage locations, modifications to the layout of fire hydrants and risers, the main horizontal trunk pipes in the elevated floor, riser locations, and related modeling of the integrated piping on the living balconies. HVAC modeling includes: the heating and ventilation fans on the ground floor and roof, adjustments and modifications to the positions of louvers on each floor, and modeling related to the integrated piping on the living balconies. Electrical engineers are also responsible for modeling the integrated piping system for the living balconies.
[0074] S202: Analyze the preliminary design model of the aforementioned profession to obtain the component model and design parameters.
[0075] After each discipline completes the model design on other software on their local terminals, exports the model file, and then uploads it to the collaborative design platform, the platform needs to parse and reconstruct the BIM model. Specifically, open-source software can be used to parse the uploaded file, reading the components and their attributes contained in the file, including but not limited to discipline, subsystem, component, attribute information, and attribute values. Among them, components are associated with the 3D model through coding, and attribute types include geometric parameters, location information, association information, and design parameters such as specifications.
[0076] S203: Generate a preliminary model based on the component model and the design parameters.
[0077] Based on the read file information, the BIM model is reconstructed to be expressed in the form of a structure tree. Simultaneously, the collaborative design platform stores the parsed component types and component design parameters, generating component databases for different disciplines according to attribute types.
[0078] S204: Based on preset parameters, perform conflict detection on the initial model and generate prompt information, wherein the conflict detection includes intra-professional conflict detection and inter-professional conflict detection.
[0079] Specifically, a 3D collision detection algorithm can be used to perform cross-disciplinary conflict detection on the initial model, identifying conflicts within the same discipline and between different disciplines and providing suggestions or reminders. For example, it can detect conflicts between disciplines such as curtain wall, landscape, municipal engineering, steel structure, architecture, structure, mechanical and electrical engineering, and interior decoration. In terms of specific conflict issues, it can detect them in real time, such as when walking through a transfer layer, the beam height increases, or the originally agreed-upon net height space for pipelines is insufficient.
[0080] S205: In response to the parameter modification operation by the relevant professionals, a first model is generated, wherein the first model is a collaborative design model determined based on the review and confirmation by the relevant professionals.
[0081] Relevant professionals access the collaborative platform to view component models and related design parameters, and also receive prompts generated by the platform after conflict detection. After fulfilling the coordination and review process for the civil engineering model, each discipline optimizes and adjusts the model, and the platform generates and stores verification records.
[0082] When relevant professionals need to modify the model portion under their responsibility, they can apply for modification permissions to directly modify components or their design parameters on the collaborative platform. Alternatively, they can export the BIM model, modify the exported file on their local terminal's modeling software, and then re-upload it to the collaborative platform to reconstruct the BIM model. Modification operations on the model will generate prompts and notify all relevant designers via messages.
[0083] In a preferred embodiment, considering that the conventional modeling process for architectural engineering generally involves initial model, intermediate model, and final model, which is a process of gradually improving the model, the collaborative design method for subsequent modeling also includes:
[0084] Based on the first model, an exportable first model file is generated; in response to the relevant professionals' detailed operation on the first model file, a professional detailed design model is obtained; based on the professional detailed design model, a detailed model is generated; in response to the relevant professionals' review operation on the detailed model, a second model is generated; based on the second model, a model performance analysis report is generated, wherein the performance analysis report is presented in a visual manner.
[0085] In a specific example, the second model is the intermediate model stage. It involves various disciplines, including but not limited to architecture, structural engineering, plumbing, HVAC, and electrical engineering. Taking the construction drawing design stage of the above-ground portion of a residential building as an example, the architectural modeling content in the intermediate model design includes: refining the model elevations, including the roof, the edges of the elevated floor, roof trusses, and canopies; providing wall views for each floor; numbering and indexing the initial model data and verifying sectional relationships; and confirming the modeling of the partial lower slab on the first floor. The structural engineering modeling content includes: based on the architectural intermediate model content, completing the arrangement and modification of structural walls, columns, and primary and secondary beams on each floor; designing floor slabs according to the lower slab elevation and thickness; and modeling the relevant double-layer slabs for the first-floor electrical room and ventilation shaft. The plumbing modeling content includes: completing the relevant modeling of the main horizontal pipes and risers in the elevated floor; and completing the relevant adjustments of the single-row and ventilation pipes on the second floor through 2D processing. The HVAC modeling content includes: adjusting and modifying the positions of the HVAC fans on the first floor and roof, and the louvers on each floor. Electrical engineers are also responsible for confirming the information on indoor distribution boxes and home wiring boxes, as well as modeling the main equipment in the elevator lobby.
[0086] Simultaneously, the platform's built-in performance analysis module can calculate performance indicators, including but not limited to, thermal radiation, site wind, indoor ventilation, lighting, and energy consumption, based on an intermediate model. This allows for targeted optimization of the current model based on the performance evaluation results.
[0087] In a preferred embodiment, after refining the intermediate model, the method further includes: generating an exportable second model file based on the second model; obtaining a professional final design model in response to a professional's refining operation on the second model file; generating a final model based on the professional final design model; generating a third model in response to a professional's review operation on the final model; and generating an auxiliary estimate of the engineering quantity based on the third model, wherein the auxiliary estimate of the engineering quantity is presented in a visual manner.
[0088] Specifically, the third model is the final model. Taking the construction drawing design stage of the above-ground part of a residential building as an example, in the final model design, the architectural profession is responsible for organizing and overlaying the model, adjusting the design based on the collaborative results of the intermediate model, reviewing and approving the model, and then completing the model according to the construction drawing BIM delivery standards. Other professions are responsible for adjusting the design based on the collaborative results of the intermediate model, reviewing and approving the model, and then completing the model according to the construction drawing BIM delivery standards.
[0089] Meanwhile, the platform's built-in auxiliary estimation module for engineering quantities can be used to perform auxiliary estimation of engineering quantities, thereby enabling the final model to be evaluated based on the engineering quantities and corresponding optimizations to be made based on the evaluation results.
[0090] This application provides a BIM-based collaborative design method. It acquires a preliminary design model for a specific discipline, analyzes the model to obtain component models and design parameters, generates a preliminary model based on these parameters, and then performs conflict detection on the preliminary model according to preset parameters, generating prompts. The conflict detection includes intra-discipline and inter-discipline conflict detection. Simultaneously, in response to parameter modification operations by relevant professionals, a final collaborative design model is generated after review and confirmation by these professionals. This application reconstructs the models of each discipline on a collaborative design platform to generate a BIM model usable for collaborative design, achieving positive multi-discipline collaborative design, significantly improving the efficiency of multi-discipline collaboration, and reducing design changes and modifications.
[0091] This application also provides a BIM-based collaborative design device 300, such as... Figure 3 As shown, it includes:
[0092] Preliminary model acquisition module 301 is used to acquire professional preliminary design models;
[0093] The component acquisition module 302 is used to parse the preliminary design model of the discipline and acquire the component model and design parameters;
[0094] The initial model generation module 303 is used to generate an initial model based on the component model and the design parameters;
[0095] The conflict detection module 304 is used to perform conflict detection on the initial model according to preset parameters and generate prompt information, wherein the conflict detection includes intra-professional conflict detection and inter-professional conflict detection.
[0096] The first model acquisition module 305 is used to generate a first model in response to parameter modification operations by relevant professionals, wherein the first model is a collaborative design model determined based on the review and confirmation of the relevant professionals.
[0097] In one exemplary example, the preliminary model acquisition module 301 further includes:
[0098] The drawing standardization unit is used to acquire CAD design drawings and standardize them according to drafting standards.
[0099] The model conversion unit is used to perform a model conversion operation on the CAD design drawings to obtain a BIM model containing drawing information, wherein the drawing information includes component type, component parameters, and system coordinates;
[0100] The BIM model generation unit is used to generate a BIM model containing the corresponding modified parameters in response to parameter modification operations of relevant professionals on the CAD design drawings.
[0101] In one exemplary example, a BIM-based collaborative design device 300 further includes:
[0102] The first model file generation unit is used to generate an exportable first model file based on the first model.
[0103] The professional detailing model acquisition unit is used to acquire a professional detailing design model in response to the detailing operation of the first model file by relevant professionals.
[0104] The model generation unit is used to generate a detailed model based on the professional detailed design model.
[0105] The second model generation unit is used to generate a second model in response to the review and approval operation of the refined model by relevant professionals.
[0106] The performance analysis unit is used to generate a model performance analysis report based on the second model, wherein the performance analysis report is presented in a visual manner.
[0107] In one exemplary example, a BIM-based collaborative design device 300 further includes:
[0108] The second model file generation unit is used to generate an exportable second model file based on the second model.
[0109] The professional final design model acquisition unit is used to acquire the professional final design model in response to the relevant professionals' in-depth operations on the second model file;
[0110] The final model generation unit is used to generate a final model based on the professional final design model.
[0111] The third model generation unit is used to generate a third model in response to the review and approval operation of the final model by relevant professionals.
[0112] The auxiliary quantity estimate unit is used to generate an auxiliary quantity estimate based on the third model, wherein the auxiliary quantity estimate is presented in a visual manner.
[0113] In one embodiment, a computer device is provided, which may be a server, and its internal structure diagram may be as follows: Figure 4As shown, this computer device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides the environment for the operating system and computer programs in the non-volatile storage media to run. The database stores data. The I / O interfaces are used for exchanging information between the processor and external devices. The communication interface is used for communicating with external terminals via a network. When the computer program is executed by the processor, it implements a BIM-based collaborative design method.
[0114] In one embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as follows: Figure 5 As shown, the computer device includes a processor, memory, input / output interfaces, a communication interface, a display unit, and an input device. The processor, memory, and input / output interfaces are connected via a system bus, and the communication interface, display unit, and input device are also connected to the system bus via the input / output interfaces. The processor provides computing and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system and computer programs. The internal memory provides an environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The input / output interfaces are used for exchanging information between the processor and external devices. The communication interface is used for wired or wireless communication with external terminals; wireless communication can be achieved through Wi-Fi, mobile cellular networks, NFC (Near Field Communication), or other technologies. When the computer program is executed by the processor, it implements a BIM-based collaborative design method. The display unit is used to create a visually visible image and can be a display screen, a projection device, or a virtual reality imaging device. The display screen can be an LCD screen or an e-ink screen. The input device of the computer device can be a touch layer covering the display screen, or buttons, trackballs, or touchpads set on the casing of the computer device, or external keyboards, touchpads, or mice, etc.
[0115] This application also provides a computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements a BIM-based collaborative design method as described in any of the above embodiments.
[0116] This invention can take the form of a computer program product implemented on one or more storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing program code. Computer-readable storage media include permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information can be computer-readable instructions, data structures, program modules, or other data. Examples of computer storage media include, but are not limited to: phase-change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technologies, CD-ROM, digital versatile optical disc (DVD) or other optical storage, magnetic tape, magnetic magnetic disk storage or other magnetic storage devices, or any other non-transfer medium that can be used to store information accessible by a computing device.
[0117] It should be understood that the embodiments of this application are not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from their scope. The scope of the embodiments of this application is limited only by the appended claims.
[0118] The above-described embodiments are merely illustrative of several implementation methods of the embodiments of this application, and their descriptions are relatively specific and detailed, but they should not be construed as limiting the scope of the invention patent. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the embodiments of this application, and these all fall within the protection scope of the embodiments of this application.
Claims
1. A BIM-based collaborative design method, characterized in that, Includes the following steps: Obtain a professional preliminary design model; The preliminary design model of the aforementioned discipline is analyzed to obtain the component model and design parameters; Based on the component model and the design parameters, a preliminary model is generated; According to preset parameters, conflict detection is performed on the initial model and prompt information is generated. The conflict detection includes intra-professional conflict detection and inter-professional conflict detection. In response to parameter modification operations by relevant professionals, a first model is generated, wherein the first model is a collaborative design model determined based on the review and confirmation of the relevant professionals; After generating the first model, the method further includes the following steps: generating an exportable first model file based on the first model; obtaining a professional detailed design model in response to the detailed operation of the first model file by relevant professionals; generating a detailed model based on the professional detailed design model; generating a second model in response to the review operation of the detailed model by relevant professionals; and generating a model performance analysis report based on the second model, wherein the performance analysis report is presented in a visual manner. After generating the second model, the method further includes: generating an exportable second model file based on the second model; obtaining a professional final design model in response to the relevant professionals' in-depth operation on the second model file; generating a final model based on the professional final design model; generating a third model in response to the relevant professionals' review and approval operation on the final model; and generating an auxiliary estimate of the engineering quantity based on the third model, wherein the auxiliary estimate of the engineering quantity is presented in a visual manner.
2. The BIM-based collaborative design method according to claim 1, characterized in that, The process of obtaining the professional preliminary design model includes the following steps: Obtain CAD design drawings and standardize them according to drafting standards; The CAD design drawings are used to perform a model conversion operation to obtain a BIM model containing drawing information, wherein the drawing information includes component type, component parameters, and system coordinates; In response to parameter modification operations performed by relevant professionals on the CAD design drawings, a BIM model containing the corresponding modified parameters is generated.
3. A BIM-based collaborative design device, characterized in that, include: The preliminary model acquisition module is used to acquire professional preliminary design models; The component acquisition module is used to parse the preliminary design model of the discipline and obtain the component model and design parameters; The initial model generation module is used to generate an initial model based on the component model and the design parameters; The conflict detection module is used to perform conflict detection on the initial model according to preset parameters and generate prompt information. The conflict detection includes intra-disciplinary conflict detection and inter-disciplinary conflict detection. The first model acquisition module is used to generate a first model in response to parameter modification operations by relevant professionals, wherein the first model is a collaborative design model determined based on the review and confirmation of the relevant professionals. Also includes: The first model file generation unit is used to generate an exportable first model file based on the first model. The professional detailing model acquisition unit is used to acquire a professional detailing design model in response to the detailing operation of the first model file by relevant professionals. The model generation unit is used to generate a detailed model based on the professional detailed design model. The second model generation unit is used to generate a second model in response to the review and approval operation of the refined model by relevant professionals. The performance analysis unit is used to generate a model performance analysis report based on the second model, wherein the performance analysis report is presented in a visual manner; The second model file generation unit is used to generate an exportable second model file based on the second model. The professional final design model acquisition unit is used to acquire the professional final design model in response to the relevant professionals' in-depth operations on the second model file; The final model generation unit is used to generate a final model based on the professional final design model. The third model generation unit is used to generate a third model in response to the review and approval operation of the final model by relevant professionals. The auxiliary quantity estimate unit is used to generate an auxiliary quantity estimate based on the third model, wherein the auxiliary quantity estimate is presented in a visual manner.
4. The BIM-based collaborative design device according to claim 3, characterized in that, The preliminary model acquisition module also includes: The drawing standardization unit is used to acquire CAD design drawings and standardize them according to drafting standards. The model conversion unit is used to perform a model conversion operation on the CAD design drawings to obtain a BIM model containing drawing information, wherein the drawing information includes component type, component parameters, and system coordinates; The BIM model generation unit is used to generate a BIM model containing the corresponding modified parameters in response to parameter modification operations of the CAD design drawings by relevant professionals.
5. An electronic device, characterized in that, include: At least one memory and at least one processor; The memory is used to store one or more programs; When the one or more programs are executed by the at least one processor, the at least one processor implements the steps of a BIM-based collaborative design method as described in claim 1 or 2.
6. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by the processor, it implements the steps of a BIM-based collaborative design method as described in claim 1 or 2.
Citation Information
Patent Citations
Multi-specialty forward collaborative design interaction method for urban rail transit
CN111311181A
Three-dimensional digital design intelligent rollover and drawing auditing method
CN112364404A
Three-dimensional building model splitting processing method based on BIM
CN115510545A
