A tool and process for permanently placing distributed optical fiber into oil and gas wells

By designing hydraulically driven short sections of oil pipes and optical cable fixing assembly tools in oil and gas wells, the problems of poor fiber down-entry complexity and fixability in traditional methods are solved, and the safe down-entry of optical fibers under the oil-free pump assembly type well type is achieved. Stable connection ensures real-time acquisition and emergency response of underground data.

CN117722176BActive Publication Date: 2024-11-08VISION (TIANJIN) ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311741288.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-11-08
Estimated Expiration
2043-12-18

AI Technical Summary

Technical Problem

Traditional oil and gas well output profile measurement methods are difficult to achieve real-time, accurate and efficient data acquisition, especially in the production process of oil and gas wells, and the downward and fixed permanent distributed fibers under the oil-free pump assembly type well type are complex. Sex and security challenges.

Method used

A tool including oil pipe short sections, piston assembly and optical cable fixing assembly was designed to achieve safe downward and fixation of optical fibers through hydraulic systems, and to achieve stable connection and rapid disconnection of optical fibers using shear pins and hydraulic drives to ensure that optical fibers are in a stable manner. The underground can be smoothly downstream and quickly shut down in an emergency.

Benefits of technology

It realizes smooth downward and stable fixation of optical fibers, avoids obstacles and lags in the middle, ensures real-time acquisition of underground data and rapid response in emergencies, and improves the monitoring and maintenance efficiency of oil and gas wells.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117722176B_ABST
    Figure CN117722176B_ABST
Patent Text Reader

Abstract

The present invention discloses a tool and process for permanently placing distributed optical fiber into oil and gas wells. The tool includes an oil pipe short section connected to the oil pipe, a piston assembly and an optical cable fixing assembly are sequentially arranged from top to bottom in the oil pipe short section, and the piston assembly and the optical cable fixing assembly are fixedly connected by shear pins; the piston assembly includes a piston body, a No. 1 sealing ring is arranged on the outer wall of the piston body, a central channel, No. 1 and No. 2 hydraulic pipelines are arranged in the piston body, a No. 2 sealing ring is arranged in the central channel, and the No. 1 and No. 2 hydraulic pipelines are respectively connected to the No. 1 and No. 2 check valves; two shear pins are arranged at the bottom end of the piston body. The present invention utilizes the cooperation of this set of special downhole tools with the wellhead device, casing, and oil pipe to provide a basic means for the promotion and application of optical fiber monitoring operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of oil and gas well testing, and in particular relates to a tool and a process for permanently placing distributed optical fibers into oil and gas wells. Background Art

[0002] The production profile of oil and gas wells, wellbore integrity, and well opening and closing dynamics are important information related to the production and operation status of oil and gas wells. This information is crucial to the daily maintenance of oil and gas wells, the extension of their life cycle, and the optimization and adjustment of mining plans. Traditional methods for measuring the production profile of oil and gas wells, such as seven-parameter logging, have long failed to enable oil and gas companies to obtain real-time, rich, and highly accurate production profile data due to the defects of the methods themselves, the complexity of the construction methods, and the high measurement environment requirements. If distributed optical fiber is introduced and used for dynamic monitoring of oil and gas well production, it will provide new ideas for solving the above problems. After the permanent distributed optical fiber is permanently deployed to the oil and gas wells, the production profile can be monitored around the clock as needed. A large amount of real-time data can meet the expectations of oil and gas field operators to monitor the dynamics of the production profile around the clock.

[0003] In the permanent mode, once the optical fiber is deployed in place, it will become part of the production string structure and run through the entire life cycle of oil and gas production. Due to the differences in the types of oil and gas wells and the methods of production, the methods and device designs for lowering permanent optical fibers also present complexity and diversity. According to the presence or absence of oil pipes and oil pump assemblies, oil and gas wells can be divided into three types: (1) No production string type. This type of oil and gas well only has casing, no oil pipes and oil pump assemblies. (2) No oil pump assembly type. This type of oil and gas well has casing and oil pipes, but no oil pump assemblies. (3) With oil pump assembly type. This type of oil and gas well has not only casing and oil pipes, but also oil pump assemblies. The present invention is directed to (2) No oil pump assembly type.

[0004] To achieve the smooth lowering and stable operation of the permanent optical fiber in the above-mentioned well type (2), the following problems need to be solved: ① After the optical fiber is lowered into the well, it is divided into two parts, the upper part is in the oil pipe, extending from the wellhead to the bottom of the oil pipe; the lower part extends from the bottom of the oil pipe and extends to the bottom of the well or the lower boundary of the lowest production layer. ② The distributed optical fiber is smoothly lowered to the bottom of the well in a relatively safe manner, and obstacles and jams are avoided as much as possible. ③ It can be well fixed and protected during the lowering process and subsequent monitoring work. ④ In emergency situations (such as abnormal downhole pressure), the well can be quickly shut down. ⑤ The distributed optical fiber can be quickly and conveniently connected and disconnected with the ground system. ⑥ The lowering tool can achieve stable docking with the wellhead device and other auxiliary devices of the oil and gas well, and form a fluid circulation channel with the casing.

[0005] In traditional oil and gas well operations, the running method and technology mainly using tool string hanging weight, cable crawler, pumping, continuous tubing, etc. cannot meet the above six requirements at the same time. Therefore, a new process method and corresponding tools are needed to achieve the above goals. Summary of the invention

[0006] The purpose of the present invention is to propose a tool and process for permanently placing distributed optical fibers into oil and gas wells. By using this set of special downhole tools in conjunction with wellhead devices, casing, and oil pipes, the above-mentioned six problems faced by placing permanently placed distributed optical fibers in wells without oil well pump assemblies can be solved, providing a basic means for the promotion and application of optical fiber monitoring operations.

[0007] The technical solution adopted by the present invention is:

[0008] A tool for permanently placing distributed optical fibers into oil and gas wells, comprising a tubing nipple connected to an oil pipe thread, a piston assembly and an optical cable fixing assembly being arranged in order from top to bottom in the tubing nipple, and the piston assembly and the optical cable fixing assembly being fixedly connected by a shear pin;

[0009] The piston assembly includes a piston body, a No. 1 sealing ring is arranged on the outer wall of the piston body, a center channel, a No. 1 hydraulic pipeline and a No. 2 hydraulic pipeline are respectively arranged axially in the piston body, a No. 2 sealing ring is arranged in the center channel, the upper ends of the No. 1 hydraulic pipeline and the No. 2 hydraulic pipeline are respectively connected to the No. 1 check valve and the No. 2 check valve; the upper and lower ends of the center channel respectively penetrate the piston body, the lower ends of the No. 1 hydraulic pipeline and the No. 2 hydraulic pipeline both penetrate the piston body downward, and the inlet ends of the No. 1 check valve and the No. 2 check valve both penetrate the piston body upward; two shear pins are arranged at the bottom end of the piston body.

[0010] The piston assembly cooperates with the completion tubing, ground hydraulic power and optical cable fixing assembly to complete the lowering process of the optical cable and provide a switch-type channel for the ground hydraulic power to reach the optical cable fixing assembly. After the optical cable is anchored at the predetermined position, it is retracted to the ground through the wellhead hydraulic power. On the one hand, the optical cable fixing assembly provides a switch-type channel for the ground hydraulic power to drive the push-and-lean assembly, and on the other hand, the push-and-lean arm is supported on the inner wall of the casing to fix the optical cable at the predetermined position underground.

[0011] The center channel provides a passage for the optical cable to pass through the piston and reach the clamping device in the optical cable fixing assembly. The No. 1 sealing ring and the No. 2 sealing ring respectively realize the sealing between the piston and the oil pipe short section, and between the optical cable and the center channel of the piston. The No. 1 one-way valve is opened under the pressure P1, and the hydraulic pressure is transmitted to the anchoring device in the optical cable fixing assembly through the No. 1 hydraulic pipeline, driving the push arm to open and support it on the casing wall; the No. 2 one-way valve is opened under the pressure P2, and the hydraulic pressure is transmitted to the shear pin connecting the piston assembly and the optical cable fixing assembly through the No. 1 hydraulic pipeline and the No. 2 hydraulic pipeline, so that the pin breaks, the piston assembly is separated from the optical cable fixing assembly, and the P2 value is greater than the P1 value; the positioning key is engaged with the positioning groove on the optical cable fixing assembly to prevent relative rotation between the piston assembly and the optical cable fixing assembly. The shear pin fixes the piston assembly and the optical cable fixing assembly together when the optical cable is lowered; after the optical cable is anchored, it is disconnected under the action of the ground hydraulic pressure, so that the piston assembly and the optical cable fixing assembly are separated.

[0012] Further, the optical cable fixing assembly includes an optical cable fixing assembly body, a shear pin integrated with the bottom end of the piston body and an optical cable bottom locking device are provided at the top of the optical cable fixing assembly body, a No. 3 hydraulic pipeline, a No. 4 hydraulic pipeline and a high-pressure energy storage device are also provided in the optical cable fixing assembly body, the inlet of the No. 3 hydraulic pipeline is simultaneously connected to the outlet of the No. 1 hydraulic pipeline and the outlet of the No. 2 hydraulic pipeline, and the outlet of the No. 3 hydraulic pipeline and the inlet of the No. 4 hydraulic pipeline are both connected to the high-pressure energy storage device;

[0013] A piston sleeve is fixed at the lower part of the main body of the optical cable fixing assembly, a piston is arranged inside the piston sleeve, and the piston sleeve is connected to the outlet of the No. 4 hydraulic pipeline;

[0014] A pushing anchor center axis is fixed at the lower end of the piston sleeve, a driving ring and a sliding block are slidably provided on the pushing anchor center axis, the upper end of the driving ring is connected to the piston, the lower end of the driving ring is overlapped with the sliding block, the sliding block is hinged with a barbed pushing arm, a fixing block is provided at the bottom end of the pushing anchor center axis, a supporting arm is hinged on the fixing block, and the pushing arm is hinged to the supporting arm.

[0015] The high-pressure fluid in the outlet of the No. 3 hydraulic pipeline, the No. 4 hydraulic pipeline and the high-pressure energy storage device is released to the upper part of the piston, squeezing the piston to push the drive ring to slide on the central axis of the push anchor, driving the slider to move up and down, and then closing and opening the push arm and the support arm.

[0016] Furthermore, the high-pressure energy storage device includes a sealed energy storage device housing, a laterally movable piston spring assembly is provided in the energy storage device housing, and a No. 3 one-way valve and a needle valve are respectively provided on one side of the piston spring assembly; the inlet of the No. 3 one-way valve is connected to the outlet of the No. 3 hydraulic pipeline, and the outlet of the needle valve is connected to the inlet of the No. 4 hydraulic pipeline.

[0017] The No. 3 check valve is connected to the ground pump through the No. 1 to No. 3 hydraulic pipelines. When the ground pump pressure reaches the preset value, it opens, and then immediately opens the needle valve to release the high-pressure hydraulic force. The piston spring assembly and the hydraulic oil together form an energy storage assembly to increase the pressure.

[0018] Furthermore, a positioning key is provided at the bottom end of the piston body, and a positioning groove matching the positioning key is provided at the top end of the optical cable fixing assembly body.

[0019] The positioning key is engaged with the positioning groove to prevent relative rotation between the piston assembly and the optical cable fixing assembly.

[0020] Furthermore, the optical cable bottom locking device is a Swaglock cable locking device.

[0021] The integrated shear pin means that one end of the shear pin is fixedly connected to the main body of the optical cable fixing assembly, and the other end is fixedly connected to the piston body; the optical cable bottom locking device is used to clamp the bottom end of the optical cable.

[0022] Furthermore, a blocking step is provided at the lower end of the inner part of the oil pipe nipple.

[0023] The tubing nipple is located at the lower end of the completion tubing and is connected to the completion tubing through a threaded connection to provide positioning for the piston assembly after it reaches the predetermined position at the bottom of the well. The blocking step clamps the main body of the optical cable fixing assembly to provide blocking support for the entire hydraulic pushing process.

[0024] A process for permanently placing distributed optical fibers into oil and gas wells comprises the following steps:

[0025] S1: At the wellhead, connect the tubing nipple to the lower end of the production tubing; first lower the tubing connected with the tubing nipple, and then lower the remaining tubing one by one until the tubing nipple reaches the bottom of the well or the predetermined depth;

[0026] S2: On the ground, pass the optical fiber through the central hole of the blowout preventer and the piston assembly in turn; tie a knot at the bottom of the optical cable, and then put it into the sealing cavity of the locking device at the bottom of the optical cable to seal and lock it;

[0027] S3: Fix the piston assembly and the optical cable fixing assembly together with shear pins to form an assembly, and then press the assembly into the oil pipe for at least 1 meter;

[0028] S4: Lower the blowout preventer, connect the blowout preventer and the wellhead, and conduct a pressure test;

[0029] S5: Start the pump and deliver the assembly to the bottom of the well or a predetermined position at a safe speed;

[0030] S6: Increase the pump pressure to a predetermined threshold value I, so that the No. 1 check valve on the piston assembly opens, hydraulically drives the push arm, and opens the support arm to support the casing;

[0031] S7: Continue to increase the pump pressure to a predetermined threshold value II, so that the No. 2 check valve on the piston assembly opens, and the hydraulic pressure acts on the contact end surface of the piston assembly and the optical cable fixing assembly, and the force causes the shear pin to break, and the piston assembly and the optical cable fixing assembly are separated;

[0032] S8: Adjust the pump pressure to form a reverse suction force and pull the piston assembly upward;

[0033] S9: Open the connection between the BOP and the wellhead, use the cable clip to fix the composite cable and hang it on the wellhead (on the hook);

[0034] S10: Cut the composite cable near the drum, continuously pull out the oil pipe, connect the ground optical fiber, connect the acquisition system, and start data acquisition.

[0035] Beneficial effects of the present invention:

[0036] The present invention can smoothly lower the optical cable into a designated position underground through the cooperation of the piston assembly and the optical cable fixing assembly, and can solve the problems of the traditional method that is easy to encounter obstacles, poor protection, and unable to quickly shut in the well, which is specifically manifested as follows:

[0037] (1) After the optical fiber is lowered into the well, it is divided into two parts, the upper part is in the oil pipe, extending from the wellhead to the bottom of the oil pipe; the lower part extends from the bottom of the oil pipe to the bottom of the well or the lower boundary of the lowest production layer. The implementation method is: pumping process + bottom fixation, the specific process is the method and tools of steps S1+S2+S5+S6+S7;

[0038] (2) The distributed optical fiber is smoothly lowered to the bottom of the well in a relatively safe manner, avoiding obstructions or jams along the way. The implementation method is: pumping process + precise control of pump pressure. The specific process is steps S1+S2+S5+S6+S7+S8 and the tools used;

[0039] (3) It can be well fixed and protected during the lowering process and subsequent monitoring work. The implementation method is: pumping in the tubing + bottom fixing, and the specific process is the method and tools of steps S1+S2+S3+S9;

[0040] (4) In an emergency (such as abnormal downhole pressure), the well can be shut down quickly. The implementation method is: permanent placement in the oil pipe, the specific process is the method of steps S1+S2 and the tools used;

[0041] (5) Distributed optical fiber can be quickly and conveniently connected and disconnected with the ground system. The implementation method is: rapid cutting and splicing of optical fiber, and the specific process is the method and tools used in step S10;

[0042] (6) The running tool can achieve stable docking with the wellhead device and other auxiliary devices of the oil and gas well, and form a fluid circulation channel with the casing. The implementation method is: permanent placement in the oil pipe + fixing in the casing + piston assembly + optical cable fixing assembly. The specific process is the method and tools used in steps S1+S2+S3+S4+S9;

[0043] The present invention is essentially different from the traditional pumping method, which is specifically manifested in:

[0044] ① Different working environment. Traditional pumping works in casing, with a relatively open working space and a relatively simple pipe string structure. The working environment of this case is a composite space structure composed of casing and tubing, with a complex pipe string structure and a greater risk of obstruction or jamming.

[0045] ② Different working objects. Traditional pumping is mainly used to transmit downhole tools with high mechanical strength, such as packers, bridge plugs, and perforating tool strings. In this case, the optical cable with low mechanical strength is transmitted, which requires higher protection for the transmission object (anti-collision, anti-bending, etc.).

[0046] ③ The control process is different. Traditional pumping has relatively rough requirements on the pressure change of the fluid entering the well, as long as it can push the tool string down safely; in the pumping process of this case, the wellhead pump pressure needs to be finely adjusted and accurately controlled to complete the orderly opening of valves of different levels in the downhole tool string. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a schematic diagram of the overall structure of the tool of the present invention;

[0048] Figure 2 is a schematic diagram of the piston assembly structure;

[0049] Figure 3 is a schematic diagram of the structure of the optical cable fixing assembly;

[0050] Figure 4 It is a schematic diagram of the structure of a high-voltage energy storage device;

[0051] Figure 5 It is a schematic diagram of a tubing nipple;

[0052] In the figure, 1, oil pipe short joint, 101, blocking step, 2, piston assembly, 201, piston body, 202, No. 1 sealing ring, 203, center channel, 204, No. 1 hydraulic pipeline, 205, No. 2 hydraulic pipeline, 206, No. 2 sealing ring, 207, No. 1 check valve, 208, No. 2 check valve, 209, positioning key, 3, optical cable fixing assembly, 301, optical cable fixing assembly body, 302, optical cable bottom locking device, 303, No. 3 hydraulic pipeline, 30 4. No. 4 hydraulic pipeline, 305. High-pressure energy storage device, 3051. Energy storage device housing, 3052. Piston spring assembly, 3053. No. 3 check valve, 3054. Needle valve, 306. Piston sleeve, 307. Piston, 308. Push-to-anchor center shaft, 309. Drive ring, 310. Slider, 311. Barbed push-to-anchor arm, 312. Fixed block, 313. Support arm, 314. Positioning groove, 4. Shear pin, A. Casing, B. Production oil pipe, C. Optical fiber. DETAILED DESCRIPTION

[0053] like Figures 1 to 5 As shown, a tool for permanently placing distributed optical fibers into oil and gas wells comprises an oil pipe nipple 1 threadedly connected to an oil pipe, a piston assembly 2 and an optical cable fixing assembly 3 are sequentially arranged from top to bottom in the oil pipe nipple 1, and the piston assembly 2 and the optical cable fixing assembly 3 are fixedly connected via a shear pin 4; the piston assembly 2 comprises a piston body 201, a No. 1 sealing ring 202 is arranged on the outer wall of the piston body 201, a central channel 203, a No. 1 hydraulic pipeline 204 and a No. 2 hydraulic pipeline 205 are respectively arranged in the piston body 201 along the axial direction, A No. 2 sealing ring 206 is provided in the central channel 203, and the upper ends of the No. 1 hydraulic pipeline 204 and the No. 2 hydraulic pipeline 205 are respectively connected to the No. 1 non-return valve 207 and the No. 2 non-return valve 208; the upper and lower ends of the central channel 203 respectively penetrate the piston body 201, the lower ends of the No. 1 hydraulic pipeline 204 and the No. 2 hydraulic pipeline 205 both penetrate the piston body 201 downward, and the inlet ends of the No. 1 non-return valve 207 and the No. 2 non-return valve 208 both penetrate the piston body 201 upward; two shear pins 4 are provided at the bottom end of the piston body 201.

[0054] The piston assembly 2 cooperates with the completion tubing, the ground hydraulic power and the optical cable fixing assembly 3 to complete the lowering process of the optical cable, and provides a switch-type channel for the ground hydraulic power to reach the optical cable fixing assembly 3. After the optical cable is anchored at a predetermined position, it is retracted to the ground through the wellhead hydraulic power. On the one hand, the optical cable fixing assembly 3 provides a switch-type channel for the ground hydraulic power to drive the push-and-lean assembly, and on the other hand, the push-and-lean arm is supported on the inner wall of the casing to fix the optical cable at a predetermined position underground.

[0055] The center channel 203 provides a passage for the optical cable to pass through the piston and reach the clamping device in the optical cable fixing assembly. The No. 1 sealing ring 202 and the No. 2 sealing ring 206 respectively realize the sealing between the piston and the oil pipe short section, and between the optical cable and the center channel 203 of the piston. The No. 1 check valve 207 is opened under the pressure P1, and the hydraulic pressure is transmitted to the anchor device in the optical cable fixing assembly through the No. 1 hydraulic pipeline 204, driving the push arm to open and support it on the casing wall; the No. 2 check valve 208 is opened under the pressure P2, and the hydraulic pressure is transmitted to the shear pin connecting the piston assembly and the optical cable fixing assembly through the No. 1 hydraulic pipeline 204 and the No. 2 hydraulic pipeline 205, so that the pin breaks, the piston assembly is separated from the optical cable fixing assembly, and the P2 value is greater than the P1 value; the positioning key 209 is engaged with the positioning groove located on the optical cable fixing assembly to prevent relative rotation between the piston assembly and the optical cable fixing assembly. The shear pin 4 fixes the piston assembly and the optical cable fixing assembly together when the optical cable is lowered; after the optical cable is anchored, it is disconnected under the action of the ground hydraulic pressure, so that the piston assembly and the optical cable fixing assembly are separated.

[0056] The optical cable fixing assembly 3 comprises an optical cable fixing assembly body 301, a shear pin 4 integrated with the bottom end of the piston body 201 and an optical cable bottom locking device 302 are arranged at the top of the optical cable fixing assembly body 301, a No. 3 hydraulic pipeline 303, a No. 4 hydraulic pipeline 304 and a high-pressure energy storage device 305 are also arranged in the optical cable fixing assembly body 301, the inlet of the No. 3 hydraulic pipeline 303 is simultaneously connected to the outlet of the No. 1 hydraulic pipeline 204 and the outlet of the No. 2 hydraulic pipeline 205, the outlet of the No. 3 hydraulic pipeline 303 and the inlet of the No. 4 hydraulic pipeline 304 are both connected to the high-pressure energy storage device 305; A piston sleeve 306 is fixed to the lower part of the body 301, and a piston 307 is arranged inside the piston sleeve 306, and the piston sleeve 306 is connected to the outlet of the No. 4 hydraulic pipeline 304; a pushing anchor center axis 308 is fixed to the lower end of the piston sleeve 306, and a driving ring 309 and a sliding block 310 are slidably arranged on the pushing anchor center axis 308, the upper end of the driving ring 309 is connected to the piston 307, and the lower end of the driving ring 309 is overlapped with the sliding block 310, the sliding block 310 is hinged with a barbed pushing arm 311, and a fixing block 312 is provided at the bottom end of the pushing anchor center axis 308, a supporting arm 313 is hinged on the fixing block 312, and the pushing arm 311 is hinged to the supporting arm 313.

[0057] The high-pressure fluid in the outlet of the No. 3 hydraulic pipeline 303, the No. 4 hydraulic pipeline 304 and the high-pressure energy storage device 305 is released to the upper part of the piston, squeezing the piston to push the drive ring 309 to slide on the push anchor center axis 308, driving the slider 310 to move upward and downward, and then closing and opening the push arm 311 and the support arm 313.

[0058] The high-pressure energy storage device 305 includes a sealed energy storage device housing 3051, on which a transversely moving piston spring assembly 3052 is provided, and on one side of the piston spring assembly 3052, a No. 3 one-way valve 3053 and a needle valve 3054 are respectively provided; the inlet of the No. 3 one-way valve 3053 is connected to the outlet of the No. 3 hydraulic pipeline 303, and the outlet of the needle valve 3054 is connected to the inlet of the No. 4 hydraulic pipeline 304.

[0059] The No. 3 check valve 3053 is connected to the ground pump through the No. 1 to No. 3 hydraulic pipelines. When the ground pump pressure reaches a preset value, it opens, and then immediately opens the needle valve 3054 to release the high-pressure hydraulic force. The piston spring assembly 3052 and the hydraulic oil together form an energy storage assembly to increase the pressure.

[0060] A positioning key 209 is also provided at the bottom end of the piston body 201 , and a positioning groove 314 matching the positioning key 209 is provided at the top end of the optical cable fixing assembly body 301 .

[0061] The positioning key 209 is engaged with the positioning groove 314 to prevent relative rotation between the piston assembly and the optical cable fixing assembly.

[0062] The optical cable bottom locking device 302 is a Swaglock cable locking device.

[0063] The integrated shear pin 4 means that one end of the shear pin 4 is fixedly connected to the optical cable fixing assembly body 301, and the other end is fixedly connected to the piston body 201; the optical cable bottom locking device is used to clamp the bottom end of the optical cable.

[0064] A blocking step 101 is provided at the lower end of the inner part of the oil pipe nipple 1 .

[0065] The tubing nipple 1 is located at the lower end of the completion tubing and is connected to the completion tubing by a threaded connection to provide positioning for the piston assembly after it reaches a predetermined position at the bottom of the well. The blocking step 101 clamps the optical cable fixing assembly body 301 to provide blocking support for the entire hydraulic pushing process.

[0066] A process for permanently placing distributed optical fibers into oil and gas wells comprises the following steps:

[0067] S1: At the wellhead, connect the tubing nipple 1 to the lower end of the production tubing; first lower the tubing connected with the tubing nipple 1, and then lower the remaining tubings one by one until the tubing nipple 1 reaches the bottom of the well or the predetermined depth;

[0068] S2: On the ground, pass the optical fiber (also called composite cable or optical cable) through the central hole 203 of the blowout preventer and the piston assembly 2 in sequence; tie a knot at the bottom end of the optical cable, and then put it into the sealing cavity of the locking device 302 at the bottom of the optical cable to seal and lock it;

[0069] S3: Fix the piston assembly 2 and the optical cable fixing assembly 3 together with the shear pin 4 to form an assembly, and then press the assembly into the oil pipe for at least 1 meter;

[0070] S4: Lower the blowout preventer, connect the blowout preventer and the wellhead, and conduct a pressure test;

[0071] S5: Start the pump and deliver the assembly to the bottom of the well or a predetermined position at a safe speed;

[0072] S6: Increase the pump pressure to a predetermined threshold value I, so that the No. 1 check valve 207 on the piston assembly 2 opens, hydraulically drives the push arm 311, and opens the support arm 313 to support the sleeve;

[0073] S7: Continue to increase the pump pressure to a predetermined threshold II, so that the second check valve 208 on the piston assembly 2 is opened, and the hydraulic pressure acts on the contact end surface of the piston assembly 2 and the optical cable fixing assembly 3, and the force causes the shear pin 4 to disconnect, and the piston assembly 2 and the optical cable fixing assembly 3 are separated;

[0074] S8: Adjust the pump pressure to form a reverse suction force to pull out the piston assembly 2 upward;

[0075] S9: Open the connection between the BOP and the wellhead, use the cable clip to fix the composite cable and hang it on the wellhead (on the hook);

[0076] S10: Cut the composite cable near the drum, continuously pull out the oil pipe, connect the ground optical fiber, connect the acquisition system, and start data acquisition.

Claims

1. A tool for permanently placing distributed optical fibers into oil and gas wells, characterized in that: The invention comprises an oil pipe nipple (1) threadedly connected to an oil pipe, a piston assembly (2) and an optical cable fixing assembly (3) being arranged in order from top to bottom in the oil pipe nipple (1), the piston assembly (2) and the optical cable fixing assembly (3) being fixedly connected via a shear pin (4); the piston assembly (2) comprises a piston body (201), a first sealing ring (202) being arranged on the outer wall of the piston body (201), a central hole (203), a first hydraulic pipeline (204) and a second hydraulic pipeline (205) being arranged in the piston body (201) along the axial direction, and a piston assembly (203) being arranged in the central hole (203). The No. 2 sealing ring (206), the upper ends of the No. 1 hydraulic pipeline (204) and the No. 2 hydraulic pipeline (205) are respectively connected to the No. 1 check valve (207) and the No. 2 check valve (208); the upper and lower ends of the central channel (203) respectively penetrate the piston body (201), the lower ends of the No. 1 hydraulic pipeline (204) and the No. 2 hydraulic pipeline (205) both penetrate the piston body (201) downward, and the inlet ends of the No. 1 check valve (207) and the No. 2 check valve (208) both penetrate the piston body (201) upward; two shear pins (4) are provided at the bottom end of the piston body (201); The optical cable fixing assembly (3) comprises an optical cable fixing assembly body (301), a shear pin (4) integrated with the bottom end of the piston body (201) and an optical cable bottom locking device (302) are provided at the top of the optical cable fixing assembly body (301), a No. 3 hydraulic pipeline (303), a No. 4 hydraulic pipeline (304) and a high-pressure energy storage device (305) are also provided in the optical cable fixing assembly body (301), the inlet of the No. 3 hydraulic pipeline (303) is simultaneously connected to the outlet of the No. 1 hydraulic pipeline (204) and the outlet of the No. 2 hydraulic pipeline (205), and the outlet of the No. 3 hydraulic pipeline (303) and the inlet of the No. 4 hydraulic pipeline (304) are both connected to the high-pressure energy storage device (305); at the bottom of the optical cable fixing assembly body (301), a shear pin (4) integrated with the bottom end of the piston body (201) and an optical cable bottom locking device (302) are provided, and a No. 3 hydraulic pipeline (303) and a No. 4 hydraulic pipeline (304) are provided. A piston sleeve (306) is fixed at the top, a piston (307) is arranged in the piston sleeve (306), and the piston sleeve (306) is connected to the outlet of the fourth hydraulic pipeline (304); a push anchor center axis (308) is fixed at the lower end of the piston sleeve (306), a driving ring (309) and a slider (310) are slidably arranged on the push anchor center axis (308), the upper end of the driving ring (309) is connected to the piston (307), the lower end of the driving ring (309) is overlapped with the slider (310), the slider (310) is hinged with a barbed push arm (311), a fixing block (312) is arranged at the bottom end of the push anchor center axis (308), a support arm (313) is hinged on the fixing block (312), and the push arm (311) is hinged with the support arm (313).

2. A tool for permanently placing distributed optical fibers into oil and gas wells as claimed in claim 1, characterized in that: The high-pressure energy storage device (305) comprises a sealed energy storage device housing (3051), a piston spring assembly (3052) capable of transverse movement is provided in the energy storage device housing (3051), and a No. 3 check valve (3053) and a needle valve (3054) are provided on one side of the piston spring assembly (3052); the inlet of the No. 3 check valve (3053) is connected to the outlet of the No. 3 hydraulic pipeline (303), and the outlet of the needle valve (3054) is connected to the inlet of the No. 4 hydraulic pipeline (304).

3. A tool for permanently placing distributed optical fibers into oil and gas wells as claimed in claim 1, characterized in that: A positioning key (209) is also provided at the bottom end of the piston body (201), and a positioning groove (314) matching the positioning key (209) is provided at the top end of the optical cable fixing component body (301).

4. A tool for permanently placing distributed optical fibers into oil and gas wells as claimed in claim 1, characterized in that: The optical cable bottom locking device (302) is a Swaglock cable locking device.

5. A tool for permanently placing distributed optical fibers into oil and gas wells as claimed in claim 1, characterized in that: A blocking step (101) is provided at the lower end inside the oil pipe nipple (1).

6. A process for lowering a permanently distributed optical fiber into an oil and gas well using a tool for lowering a permanently distributed optical fiber into an oil and gas well as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: S1: At the wellhead, connect the tubing nipple (1) to the lower end of the production tubing (B); first lower the production tubing (B) connected with the tubing nipple (1), and then lower the remaining production tubings (B) one by one until the tubing nipple (1) reaches the bottom of the well or the predetermined depth; S2: On the ground, the optical fiber (C) is passed through the blowout preventer at the wellhead and the central hole (203) of the piston assembly (2) in sequence; after the bottom end of the optical fiber (C) is knotted, it is placed in the sealing cavity of the optical cable bottom locking device (302) for sealing and locking; S3: The piston assembly (2) and the optical cable fixing assembly (3) are fixed together with shear pins (4) to form an assembly, and then the assembly is pressed into the production tubing (B) for at least 1 meter; S4: Lower the blowout preventer, connect the blowout preventer and the wellhead, and conduct a pressure test; S5: Start the pump and deliver the assembly to the bottom of the well or a predetermined position at a safe speed; S6: increasing the pump pressure to a predetermined threshold value 1, so that the first check valve (207) on the piston assembly (2) opens, hydraulically driving the push arm (311), and opening the support arm (313) to support the sleeve (A); S7: Continue to increase the pump pressure to a predetermined threshold value 2, so that the second check valve (208) on the piston assembly (2) opens, and the hydraulic pressure acts on the contact end surfaces of the piston assembly (2) and the optical cable fixing assembly (3), so that the shear pin (4) is disconnected, and the piston assembly (2) and the optical cable fixing assembly (3) are separated; S8: Adjust the pump pressure to generate reverse suction force to pull the piston assembly (2) upward; S9: Open the connection between the BOP and the wellhead, use the cable clamp to fix the optical fiber (C) and hang it at the wellhead; S10: Cut the optical fiber (C) near the drum, continuously pull out the production tubing (B), connect the ground optical fiber (C), connect the acquisition system, and start data acquisition.