Coal mining method based on comprehensive prevention and control of rock burst and gas

By adopting the method of double tunnel air inlet and bedding drilling in high-capacity coal mines, combined with the use of hydraulic supports and scraper conveyors, permanent coal pillars are set up, which solves the problems of rock pressure and gas outbursts, and realizes gas control The dual effect of coal protection and coal protection improves coal mining efficiency and safety.

CN118065957BActive Publication Date: 2024-10-22YANKUANG ENERGY GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410316542.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-10-22
Estimated Expiration
2044-03-20

AI Technical Summary

Technical Problem

During the mining process of high-capacity coal mines, the coexistence of rockburst and gas leads to coal and gas outbursts, which are difficult to effectively prevent and control with existing technology. Moreover, if the width of the coal pillar in the tunnel is small, it is difficult to protect, and if it is wide, it will cause coal loss, and it is difficult to During the resumption of mining, how to reduce the loss of coal pillars in tunnels and ensure the effect of gas prevention and control is a challenge.

Method used

Adopt a coal mining method based on comprehensive prevention and control of rockburst and gas, including setting up a communication tunnel between the transport tunnel and the return tunnel, carrying out air intake in the double tunnel, and using hydraulic supports, scraper conveyors and shearers. The coal body is mined, and the coal body is decompressed and gas is pre-extracted through bedding drilling. Permanent coal pillars are set up to prevent gas from flowing in and reduce coal losses.

Benefits of technology

It ensures the gas control effect during coal mining, reduces construction interference, ensures the stability of transportation and auxiliary transportation tunnels, avoids gas outbursts and coal losses, and improves coal mining efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118065957B_ABST
    Figure CN118065957B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of coal mine gas control and comprehensive prevention and control of rock burst, and specifically relates to a coal mining method based on comprehensive prevention and control of rock burst and gas, including using the auxiliary transport lane of the front working face as the return air lane of the present working face, excavating the auxiliary transport lane and the transport lane; excavating a cut from the transport lane to the return air lane direction to a certain depth of the coal pillar of the front working face lane; setting a fan at a hydraulic support directly opposite to the return air lane; drilling holes in the coal seam between the two lanes, unloading the coal body between the two lanes, and pre-extracting gas; cutting a groove at the return air lane to form a cutter groove, pushing the coal mining machine into the cutter groove, and completing the cutter; and mining. The present invention adopts double lane air intake, and the air volume is sufficient to ensure the gas control effect. The large width of the lane coal pillar of the present invention can ensure the stability of the lane and prevent stress concentration coal and gas from protruding. The loss of the lane coal pillar can be reduced in the later stage, and a permanent coal pillar is left to prevent the goaf of the front working face from affecting the present working face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of coal mine gas control and comprehensive prevention and control of rock burst, and in particular relates to a coal mining method based on comprehensive prevention and control of rock burst and gas. Background Art

[0002] Rock burst refers to the dynamic phenomenon of sudden and violent destruction of coal and rock around the shaft or working face due to the instantaneous release of elastic deformation energy, which is often accompanied by coal and rock ejection, loud noise and air waves. It is one of the major disasters in coal mines. At the same time, gas is often present in coal seams. When rock burst and gas coexist, coal and gas outbursts are likely to occur. Therefore, it is necessary to prevent and control rock burst and gas during coal seam mining to reduce gas outbursts and impacts caused by gas, and reduce the harm caused by gas to mine ventilation, such as gas poisoning and gas explosion.

[0003] For coal mining faces with an annual output of more than 3 million tons, a two-in-one-out horizontal tunnel layout is often used to match its high production capacity requirements. This tunnel layout has sufficient ventilation, little interference with the production process, and is conducive to gas prevention and control and impact ground pressure control. However, it is necessary to leave a horizontal tunnel coal pillar between the transport horizontal tunnel and the auxiliary transport horizontal tunnel to facilitate the stability and maintenance of the transport horizontal tunnel and the auxiliary transport horizontal tunnel. However, if the width of the horizontal tunnel coal pillar is small, it is difficult to play an ideal protective role. If it is too wide, it is easy to cause coal loss, and the horizontal tunnel coal pillar is difficult to re-mine. If it is re-mined later, the workload will be large. Therefore, how to reduce the loss of horizontal tunnel coal pillars and ensure the coal and gas prevention and control effects and high production capacity requirements has always been a problem that engineers want to solve. Summary of the invention

[0004] In view of the above technical problems, the present invention proposes a coal mining method based on comprehensive prevention and control of rock burst and gas, comprising the following steps:

[0005] S1. Use the auxiliary transport tunnel of the previous working face as the return air tunnel of the current working face, excavate the auxiliary transport tunnel and transport tunnel of the current working face, and arrange connecting tunnels at intervals along the axial direction of the tunnel to connect the auxiliary transport tunnel and the transport tunnel;

[0006] S2. Dig and cut from the transport lane to the return air lane to a certain depth of the coal pillar in the lane of the front working face, and leave a small coal pillar between the goaf and the front working face as a permanent coal pillar;

[0007] Preferably, in step S2, the width of the horizontal coal pillar is 40-50 m, and the width of the permanent coal pillar is 4-6 m.

[0008] S3. Hydraulic supports, scraper conveyors and coal mining machines are arranged in the cut; fans are installed at the hydraulic supports facing the return air lane, the air inlet of the fans is connected to the air suction pipe, the air suction pipe is arranged parallel to the cut and located on the coal pillar side of the front working face lane, the air outlet of the fans is connected to the air outlet duct, the air outlet duct is arranged facing the return air lane and points to the return air lane;

[0009] S4. Drill holes along the coal seam from the return air lane and the transport lane to the coal seam between the two lanes to relieve the pressure of the coal body between the two lanes and conduct gas pre-extraction;

[0010] S5. Cut a groove at the return air lane to form a cutter feed groove, push the coal mining machine into the cutter feed groove, and complete the cutter feed;

[0011] Preferably, in step S5, the depth of the feed groove is the width of the coal mining machine drum, and the length of the feed groove plus the width of the return air lane is greater than the length of the coal mining machine.

[0012] S6. The coal mining machine first mines the coal body on the side of the coal pillar in the horizontal lane of the front working face, and stops mining when it reaches the designed position of the permanent coal pillar;

[0013] Then, the coal between the return air lane and the transport lane is mined after being unloaded to the return air lane. The shearer is delayed for a certain distance to push the scraper conveyor and move the hydraulic support forward.

[0014] When mining the coal between the return air tunnel and the transport tunnel, the construction of the cutter slot for the next coal mining cycle is carried out;

[0015] The transport tunnel is used to transport the mined coal. Fresh air enters the coal mining area of ​​the working face from the transport tunnel and the auxiliary transport tunnel, and is discharged through the return air tunnel after being converted into exhaust air. The fan sucks air through the suction pipe, and the exhaust air passes through the self-suction pipe, the fan, and the air outlet tube in sequence before being discharged to the return air tunnel.

[0016] Preferably, in step S6, when mining the coal body between the return air tunnel and the transport tunnel, a grouting borehole is constructed toward the goaf of the front working face under a hydraulic support close to the permanent coal pillar side. The grouting borehole is constructed obliquely backward, and a grouting pipe is inserted into the grouting borehole. Grouting is injected from the grouting pipe toward the goaf of the front working face close to the permanent coal pillar side to seal the cracks in the permanent coal pillar.

[0017] Preferably, in step S6, the grouting drilling is constructed to within the direct top breaking position.

[0018] S7. Carry out the next coal mining cycle according to step S6, and repeat this cycle until the mining reaches the stop line.

[0019] The beneficial technical effects of the present invention are:

[0020] 1. The present invention adopts double horizontal tunnel air intake, and the air volume is sufficient to ensure the gas control effect during coal mining. In the construction of transport horizontal tunnel and return air horizontal tunnel, drilling holes along the layer is carried out to relieve the pressure of coal and pre-extract gas, which can prevent and control impact ground pressure and gas disasters while reducing interference with the construction process.

[0021] 2. The width of the coal pillar in the horizontal tunnel left between the transport horizontal tunnel and the auxiliary transport horizontal tunnel is large, which can ensure the stability of the transport horizontal tunnel and the auxiliary transport horizontal tunnel, and prevent the stress concentration of the coal pillar in the horizontal tunnel from being too large, which may cause coal and gas protrusion in the horizontal tunnel. At the same time, the coal pillar in the horizontal tunnel can be mined in the later stage to reduce coal loss. The permanent coal pillar left can prevent the goaf of the previous working face from affecting the production of the current working face, and avoid the gas in the goaf of the previous working face from flowing into the goaf of the current working face. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the plan layout of the coal mining method of the present invention (initial);

[0023] Figure 2 yes Figure 1 Middle partial enlarged picture;

[0024] Figure 3 It is a schematic diagram of the plan layout of the coal mining method of the present invention (during mining);

[0025] Figure 4 yes Figure 3 Middle partial enlarged picture;

[0026] In the figure, there is a coal pillar 1a in the tunnel of the previous working face; a coal pillar 1b in the tunnel of the current working face; a previous working connecting tunnel 2a; a connecting tunnel 2b in the current working face; a return air tunnel 3a (auxiliary transport tunnel of the previous working face); an auxiliary transport tunnel 3b; the current working face 4; a transport tunnel 5; a permanent coal pillar 6; a goaf 7; a mining stop line 8; a direct top breaking position 9; a hydraulic support 10; a scraper conveyor 11; a coal mining machine 12; a cutter slot 13; an air outlet 14; a fan 15; an air suction pipe 16; a grouting pipe 17; and an eye cut 18. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-4 The specific embodiments of the present invention are described in detail.

[0028] The coal mining method based on comprehensive prevention and control of rock burst and gas proposed by the present invention comprises the following steps:

[0029] S1. Figure 1 As shown, the auxiliary transport tunnel of the front working face is used as the return air tunnel 3a of the working face, and the auxiliary transport tunnel 3b and the transport tunnel 5 of the working face are excavated. The auxiliary transport tunnel 3b and the transport tunnel 5 are the tunnel coal pillars 1b of the working face. The connecting tunnels 2b of the working face are arranged at intervals along the axial direction of the tunnel to connect the auxiliary transport tunnel 3b and the transport tunnel 5. The connecting tunnels 2b of the working face are constructed in the tunnel coal pillars 1b of the working face.

[0030] S2. Figure 1-2As shown, a cut 18 is excavated from the transport tunnel 5 to the return air tunnel 3a. After excavating to the return air tunnel 3a, a certain depth is continued to be excavated into the front working face tunnel coal pillar 1a. The front working face tunnel coal pillar 1a is the tunnel coal pillar between the transport tunnel and the auxiliary transport tunnel of the front working face (later used as the return air tunnel 3a of the current working face). The width of the front working face tunnel coal pillar 1a and the current working face tunnel coal pillar 1b is 40-50m. The cut 18 is excavated to 4-6m away from the goaf of the front working face and stops. That is, a permanent coal pillar 6 with a width of 4-6m is left in the front working face tunnel coal pillar 1a. The permanent coal pillar is a part of the tunnel coal pillar. The permanent coal pillar is not mined. The part of the tunnel coal pillar other than the permanent coal pillar is mined in the subsequent working face. For example, the part of the tunnel coal pillar of the front working face other than the permanent coal pillar is mined in the current working face.

[0031] After the above steps, the working face 4 is formed. The return air tunnel 3a of the working face is located inside the working face instead of one side of the traditional working face, because there is coal body that needs to be mined on both sides of the return air tunnel 3a of the working face.

[0032] S3. Figure 1-2 As shown, a hydraulic support 10, a scraper conveyor 11, and a coal mining machine 12 are arranged in the cut-off eye 18. The arrangement of the hydraulic support 10, the scraper conveyor 11, and the coal mining machine 12 is the prior art and will not be described in detail here. A fan 15 is suspended at the hydraulic support directly opposite to the return air lane 3a. The air inlet of the fan 15 is connected to an air suction pipe 16. The air suction pipe 16 is arranged parallel to the cut-off eye 18 and is located on the coal pillar 1a side of the front working face lane. The air outlet of the fan 15 is connected to an air outlet duct 14. The air outlet duct 14 is arranged directly opposite to the return air lane 3a and points to the return air lane 3a.

[0033] S4. Drill holes along the coal seam between the return air lane 3a and the transport lane 5 to relieve the pressure of the coal body between the two lanes and conduct gas pre-extraction to prevent rock burst and gas disasters;

[0034] S5. Figure 1-4 As shown, a feed groove 13 is formed by cutting a groove in the return air lane 3a in the direction of the transport lane 5. The depth of the feed groove 13 is the width of the coal mining machine drum, that is, the single feed amount of a coal mining cycle, which is generally 800 mm. The length of the feed groove 13 plus the width of the return air lane 3a should be greater than the length of the coal mining machine 12. The coal mining machine 12 is pushed into the feed groove 13 to complete the feed. Compared with the existing oblique cutting feed method, the present invention can directly feed, greatly improve the feed efficiency, and thus improve the overall recovery efficiency;

[0035] S6. The coal mining machine 12 first mines the coal body on the side of the coal pillar 1a in the front working face lane, and stops when it mines to the designed position of the permanent coal pillar 6; then it goes to the return air lane 3a without loading, and then mines the coal body between the return air lane 3a and the transport lane 5, and pushes the scraper conveyor 11 and moves the hydraulic support 12 forward after the coal mining machine lags behind by about 30m; when mining the coal body between the return air lane 3a and the transport lane 5, the construction of the next coal mining cycle feed groove 13 is carried out, and at the same time, under the hydraulic support near the permanent coal pillar side, the hydraulic support 12 is moved forward. The working face goaf is constructed with grouting drilling, which is constructed obliquely backward. A grouting pipe 17 is inserted into the grouting drilling hole, and grouting is injected from the grouting pipe 17 to the goaf of the front working face close to the permanent coal pillar. The permanent coal pillar has a small width and is easy to become unstable after mining. Grouting can block the cracks in the permanent coal pillar to prevent the goaf of the front working face from being connected with the goaf 7 of the current working face, causing gas connection and making it difficult to control gas. After isolation, the difficulty of gas control can be reduced; the grouting drilling is constructed to within the direct top break position 9;

[0036] The transport tunnel 5 is used to transport the mined coal. The fresh air enters the coal mining area of ​​the working face from the transport tunnel 5 and the auxiliary transport tunnel 3b, and is discharged through the return air tunnel 3a after being converted into exhaust air. The fan 15 sucks air through the suction pipe 16, and a negative pressure is generated at the entrance of the suction pipe 16. The fresh air will flow to the coal pillar side of the front working face tunnel in the coal mining area. The exhaust air passes through the self-suction pipe 16, the fan 15, and the air outlet 14 in sequence and is discharged to the return air tunnel 3a.

[0037] S7. Carry out the next coal mining cycle according to step S6, and repeat this cycle until the mining reaches the stop line 8.

[0038] The present invention adopts two-lane air intake of transport lane and auxiliary transport lane, return air in the return air lane, and double-lane air intake, and the air volume is sufficient to ensure the gas control effect during coal mining. In the transport lane and return air lane, the coal body is depressurized and pre-extracted by drilling holes in the layer, which can reduce the interference of the construction process while preventing and controlling rock burst and gas disasters. The transportation work in the auxiliary transport lane does not interfere with the drilling construction in the layer. The transport lane adopts a belt conveyor to transport coal, and no additional work is required. The interference between coal transportation and drilling construction in the layer is small. The return air lane is also only used for returning air, and the return air has almost no effect on the drilling construction in the layer.

[0039] The coal pillar in the horizontal tunnel left between the transport horizontal tunnel and the auxiliary transport horizontal tunnel is large in width, which can ensure the stability of the transport horizontal tunnel and the auxiliary transport horizontal tunnel, and prevent the stress concentration of the coal pillar in the horizontal tunnel from being large, which may cause coal and gas protrusion in the horizontal tunnel. At the same time, the coal pillar in the horizontal tunnel can be mined in the later stage to reduce coal loss. The permanent coal pillar left can prevent the goaf of the previous working face from affecting the production of the current working face, and avoid the gas in the goaf of the previous working face from flowing into the goaf of the current working face.

[0040] Of course, the above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above embodiments. It should be noted that all equivalent substitutions and obvious deformation forms made by any technician familiar with the field under the guidance of this specification fall within the essential scope of this specification and should be protected by the present invention.

Claims

1. A coal mining method based on comprehensive prevention and control of rock burst and gas, characterized in that: The following steps are involved: S1. Use the auxiliary transport tunnel of the previous working face as the return air tunnel of the current working face, excavate the auxiliary transport tunnel and transport tunnel of the current working face, and arrange connecting tunnels at intervals along the axial direction of the tunnel to connect the auxiliary transport tunnel and the transport tunnel; S2. Dig and cut from the transport lane to the return air lane to a certain depth of the front working face lane coal pillar, and leave a small coal pillar between the front working face goaf as a permanent coal pillar; the lane coal pillar is 40-50m wide, and the permanent coal pillar is 4-6m wide; S3. Hydraulic supports, scraper conveyors and coal mining machines are arranged in the cut; fans are installed at the hydraulic supports facing the return air lane, the air inlet of the fans is connected to the air suction pipe, the air suction pipe is arranged parallel to the cut and located on the coal pillar side of the front working face lane, the air outlet of the fans is connected to the air outlet duct, the air outlet duct is arranged facing the return air lane and points to the return air lane; S4. Drill holes along the coal seam between the return air lane and the transport lane to relieve the pressure of the coal body between the two lanes and conduct gas pre-extraction; S5. Cut a groove at the return air lane to form a cutter feed groove, push the coal mining machine into the cutter feed groove, and complete the cutter feed; the depth of the cutter feed groove is the width of the coal mining machine drum, and the length of the cutter feed groove plus the width of the return air lane is greater than the length of the coal mining machine; S6. The coal mining machine first mines the coal body on the side of the coal pillar in the horizontal lane of the front working face, and stops mining when it reaches the designed position of the permanent coal pillar; Then, the coal between the return air lane and the transport lane is mined after being unloaded to the return air lane. The shearer is delayed for a certain distance to push the scraper conveyor and move the hydraulic support forward. When mining the coal between the return air tunnel and the transport tunnel, the construction of the cutter slot for the next coal mining cycle is carried out; The transport tunnel is used to transport the mined coal. Fresh air enters the coal mining area of ​​the working face from the transport tunnel and the auxiliary transport tunnel, and is discharged through the return air tunnel after being converted into exhaust air. The fan sucks air through the suction pipe, and the exhaust air passes through the self-suction pipe, the fan, and the air outlet tube in sequence before being discharged to the return air tunnel. S7. Carry out the next coal mining cycle according to step S6, and repeat this cycle until the mining reaches the stop line.

2. The coal mining method based on comprehensive prevention and control of rock burst and gas according to claim 1, characterized in that: In step S6, when mining the coal between the return air tunnel and the transport tunnel, a grouting borehole is constructed toward the goaf of the front working face under the hydraulic support close to the permanent coal pillar. The grouting borehole is constructed obliquely backward, and a grouting pipe is inserted into the grouting borehole. Grouting is injected from the grouting pipe toward the goaf of the front working face close to the permanent coal pillar to seal the cracks in the permanent coal pillar.

3. The coal mining method based on comprehensive prevention and control of rock burst and gas according to claim 2, characterized in that: In step S6, the grouting drilling is constructed to within the direct top breaking position.