Dynamic early warning system and method for rock burst in TBM tunnel based on multi-source information fusion
Through multi-source information fusion technology, including preliminary estimation, multi-criteria calculation and deep learning, advanced classification, dynamic correction and real-time early warning of rock burst disasters in TBM tunnels are achieved, solving the shortcomings of microseismic monitoring systems in the existing technology and improving Construction efficiency and safety.
Patent Information
- Application Number
- CN202410400215.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-04-03
AI Technical Summary
In TBM tunnel construction, the existing microseismic monitoring system has poor anti-interference ability, inconvenient on-site layout, and poor data collection quality. It is difficult to effectively predict and respond to the suddenness of rock burst disasters, affecting construction efficiency and safety.
A TBM tunnel rockburst dynamic early warning system based on multi-source information fusion is adopted, including a rockburst disaster advance classification module, a dynamic correction module and a real-time early warning module. Through preliminary estimation, multi-criteria calculation, multi-model fusion, multi-source information collection and depth Learn technology to achieve advanced classification, dynamic correction and real-time warning of rock burst disasters.
It realizes advanced classification, dynamic correction and real-time warning of rock burst disasters during TBM construction, improves construction efficiency and safety, can respond quickly according to changes in stratigraphic conditions, and reduces the impact of rock burst disasters on construction.
Smart Images

Figure CN118167430B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of TBM tunnel excavation, and in particular relates to a TBM tunnel rock burst dynamic early warning system and method based on multi-source information fusion. Background Art
[0002] As my country continues to increase its investment in transportation infrastructure such as roads and railways in the central and western regions, this has greatly promoted the development of deep and long tunnel excavation technology with full-section tunnel boring machines (TBMs) as the main construction method. In recent years, through the practical application of TBMs in large-scale projects such as the Qinling Tunnel, the Dianzhong Water Diversion Tunnel, and the Sichuan-Tibet Railway Tunnel, scientific and technical personnel have accumulated a lot of experience, and are also facing greater opportunities and challenges than ever before. As TBMs are increasingly used in deep and long tunnel projects, they are inevitably troubled by rock burst disasters during TBM excavation, especially when TBMs pass through complete hard rock sections. Due to the deep burial depth of the tunnel, a large amount of elastic strain energy is stored in the surrounding rock. When the surrounding rock is disturbed by TBM excavation, rock burst disasters are very likely to occur. Due to the suddenness of rock burst disasters, equipment damage and construction delays are often caused, which seriously threatens the personal safety of construction workers.
[0003] At present, microseismic monitoring is often used to predict rock burst disasters in TBM tunnel construction. However, the commonly used microseismic monitoring systems have problems such as poor anti-interference ability, inconvenient on-site deployment, poor data collection quality, and difficult data transmission, which affects the efficiency of on-site microseismic monitoring and prediction. At the same time, it is difficult to cope with the suddenness of rock burst disasters by relying solely on microseismic monitoring. TBM construction of deep buried tunnels urgently needs a complete rock burst disaster prediction system and method to conduct advanced classification, dynamic correction and real-time warning of tunnel rock burst disasters, avoid rock burst disasters, and improve the efficiency and safety of TBM excavation. Summary of the invention
[0004] In order to solve the above problems, the present invention proposes a TBM tunnel rockburst dynamic early warning system and method based on multi-source information fusion.
[0005] The TBM tunnel rockburst dynamic early warning system based on multi-source information fusion of the present invention comprises: a rockburst disaster advance classification module, which makes a preliminary estimate of the rockburst disaster levels at different mileages of the TBM tunnel to guide the TBM construction design; a rockburst disaster dynamic correction module, which makes corrections to the preliminary estimation results as the excavation progresses to assist in TBM design changes; and a rockburst disaster real-time early warning module, which makes a real-time early warning of the rockburst tendency based on the rockburst level correction results to guide the implementation of on-site safety prevention and control measures.
[0006] The rockburst disaster advance classification module includes a preliminary estimation module, a multi-criteria calculation module, a multi-model fusion module and a rockburst grade preliminary determination module.
[0007] The preliminary estimation module estimates the maximum tangential stress, uniaxial compressive strength, axial stress, elastic strain energy, loss strain energy, point load strength, rock mass integrity coefficient, and maximum principal stress parameters of different mileage sections of the TBM tunnel based on the preliminary geological survey data of the TBM tunnel, and obtains quantitative results of each parameter.
[0008] The multi-criteria calculation module adopts the E.Hoek, Turchaninov method, Kidybinski method and Russense criterion, and combines the quantitative results of rock mass mechanical parameters at different mileages of the TBM tunnel to perform calculations and solutions to obtain rock burst grade results under different criterion conditions.
[0009] The multi-model fusion module adopts the improved DS evidence theory to fuse the rockburst grade prediction results of different criteria, and the rockburst grade preliminary judgment module determines the advanced classification results of rockburst disasters at different mileage sections of the TBM tunnel according to the fusion results.
[0010] The DS evidence theory determines the fusion weights of different models through the basic probability value (Basic Probability Assignment, BPA), and introduces the credibility factor η i BPA is modified to reduce the conflict between different evidence sources. The improved formula of DS evidence theory is as follows:
[0011]
[0012]
[0013] In the formula, u i represents the distance between the observations of evidence set i and the observations of other evidence sets, u i The smaller the value, the higher the credibility; M(S) represents the BPA (BPA, also known as m function) of event S. In order to reduce the conflict between different sources of evidence, η i Take u i exponential function, which ensures that when u i When η is larger i It can quickly approach 0.
[0014] The rockburst disaster dynamic correction module includes a multi-source information collection module, a rock mass mechanics parameter mapping module, a rock mass mechanics parameter correction module and a rockburst grade correction module.
[0015] The rockburst disaster real-time warning module includes a microseismic monitoring module, a microseismic event database module, a rockburst event database module and a microseismic-rockburst mapping module.
[0016] The present invention amplifies the early warning method of the TBM tunnel rock burst dynamic early warning system based on multi-source information fusion, comprising the following steps:
[0017] A. Collect the geological survey data of TBM tunnel in the early stage, estimate the rock mass mechanical parameters of different mileage sections of TBM tunnel, and calculate the rock burst grade of different mileages under various rock burst criteria according to the rock mass mechanical parameter estimation results;
[0018] B. Based on the DS evidence theory, the prediction results of rockburst levels under different criteria are integrated into multiple models to obtain the advanced classification results of rockburst disasters at different mileage sections of TBM tunnels;
[0019] C. Collect multi-source information data such as real-time TBM excavation parameter information, advance drilling information, and face geological catalog information, and build a multi-source information-rock mass mechanical parameter long-short-term memory neural network mapping model based on the actual excavation exposure of the surrounding rock of the TBM tunnel;
[0020] D. Accurately predict the rock mass mechanical parameters of different mileage sections of the TBM tunnel based on the long short-term memory neural network mapping model, correct the estimated results of the rock mass mechanical parameters, substitute the corrected results into the multi-criteria calculation module and the multi-model fusion module to obtain the corrected level of rock burst disaster;
[0021] E. Install various types of microseismic monitoring equipment to monitor microseismic signals, extract microseismic characteristic parameters, and build a microseismic event database based on microseismic event monitoring results and microseismic characteristic parameters;
[0022] F. Record the rock burst disasters revealed by TBM excavation, build a rock burst disaster database, and use the gated neural network method to build a microseismic event-rock burst disaster mapping model to achieve real-time early warning of rock burst disasters;
[0023] G. As the TBM excavation mileage continues to increase, it is only necessary to repeat steps C to F to obtain the corrected level of rock burst disasters in the current excavation stratum and realize real-time early warning of rock burst disasters; when excavating a new TBM tunnel, it is only necessary to repeat steps A to F to realize advanced classification, dynamic correction and real-time early warning of rock burst disasters.
[0024] The beneficial effects of the present invention are:
[0025] (1) The present invention can realize the advanced classification, dynamic correction and real-time warning of rock burst disasters in deep-buried and long tunnels constructed by TBM, and effectively promote the development of safe and efficient TBM excavation technology;
[0026] (2) The present invention adopts a variety of machine learning algorithms and deep learning algorithms, which can provide quantitative guidance and real-time warning for the determination of rock burst disaster levels in TBM tunnels under different geological conditions, guide the designation of on-site construction design plans and the implementation of rock burst treatment measures, and reduce the impact of rock burst disasters on construction.
[0027] (3) The present invention adopts a dynamic learning strategy with real-time follow-up, and continuously optimizes the sample database of the model according to the real-time changes of the learning samples, thereby achieving rapid response to changes in formation conditions and improving the efficiency of rock burst warning in deep tunnels under TBM construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a framework diagram of the TBM tunnel rockburst dynamic early warning system based on multi-source information fusion of the present invention. DETAILED DESCRIPTION
[0029] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0030] like Figure 1 As shown, the TBM tunnel rockburst dynamic warning system based on multi-source information fusion of the present invention includes: a rockburst disaster advance classification module, a rockburst disaster dynamic correction module and a rockburst disaster real-time warning module. The rockburst disaster advance classification module makes a preliminary estimate of the rockburst disaster level at different mileages of the TBM tunnel to guide the TBM construction design; the rockburst disaster correction module makes corrections to the preliminary estimation results as the excavation progresses to assist in TBM design changes; the rockburst disaster real-time warning module makes a real-time warning of the rockburst tendency based on the rockburst level correction results to guide the implementation of on-site safety prevention and control measures.
[0031] The rockburst disaster advance classification module includes a preliminary estimation module, a multi-criteria calculation module, a multi-model fusion module and a rockburst grade preliminary judgment module.
[0032] Preliminary estimation module: collect preliminary geological survey data and estimate the rock mass mechanical parameters of different mileage sections of the TBM tunnel. Specifically, the preliminary estimation module estimates the maximum tangential stress, uniaxial compressive strength, axial stress, elastic strain energy, loss strain energy, point load strength, rock mass integrity coefficient, and maximum principal stress parameters of different mileage sections of the TBM tunnel based on the preliminary geological survey data of the TBM tunnel, and obtains the quantitative results of each parameter.
[0033] Multi-criteria calculation module: Calculate the rockburst levels at different mileages under various criteria based on the estimated results of rock mass mechanics parameters. Specifically, the multi-criteria calculation module uses the E.Hoek, Turchaninov method, Kidybinski method and Russense criteria, combined with the quantitative results of rock mass mechanics parameters at different mileages of the TBM tunnel to calculate and solve, and obtain the rockburst level results under different criteria.
[0034] The calculation formulas of the four methods are shown in formulas (1), (2), (3) and (4) respectively.
[0035]
[0036]
[0037]
[0038]
[0039] In the formula, σ max is the maximum tangential stress of the tunnel section, R c is the uniaxial compressive strength of rock, σ θmax is the cavern tangential stress, σ L is the axial stress of the cave, W et is the ratio of elastic strain energy to loss strain energy, σ θ is the maximum tangential stress in the cave.
[0040] The multi-model fusion module uses the improved DS evidence theory to fuse the rockburst grade prediction results of different criteria.
[0041] The rockburst grade preliminary judgment module determines the advanced classification results of rockburst disasters at different mileage sections of the TBM tunnel based on the fusion results.
[0042] DS evidence theory determines the fusion weights of different models through the basic probability assignment (BPA). Traditional DS evidence theory will produce Zaldeh paradox when synthesizing high-conflict evidence sources. To solve this problem, the credibility factor η is introduced. i BPA is modified to reduce the conflict between different evidence sources. The improved formula of DS evidence theory is as follows:
[0043]
[0044]
[0045] In the formula, u i represents the distance between the observations of evidence set i and the observations of other evidence sets, u iThe smaller the value, the higher the credibility; M(S) represents the BPA of event S. To reduce the conflict between different sources of evidence, η i Take u i exponential function, which ensures that when u i When η is larger i It can quickly approach 0.
[0046] The rockburst disaster dynamic correction module includes a multi-source information collection module, a rock mechanics parameter mapping module, a rock mechanics parameter correction module and a rockburst grade correction module.
[0047] Multi-source information collection module: collects real-time TBM excavation information, advance drilling information, and face geological catalog information. Specifically, the multi-source information collection module collects excavation parameter information such as cutterhead thrust, cutterhead torque, gripper jack pressure, cutterhead penetration, cutterhead speed, and TBM net excavation speed during TBM excavation, as well as advance drilling information such as drilling pressure, drilling speed, and drilling torque, and collects face geological catalog information at different mileage sections.
[0048] Rock mass mechanics parameter mapping module: A mapping model of multi-source information of components and rock mass mechanics parameters based on the actual exposure of the surrounding rock. Specifically, the rock mass mechanics parameter mapping module is based on the actual exposure of the surrounding rock of the TBM tunnel, and uses a deep learning long short-term memory neural network method to construct a mapping model of multi-source information and rock mass mechanics parameters, so as to achieve accurate prediction of rock mass mechanics parameters through multi-source information.
[0049] Rock mass mechanics parameter correction module: The rock mass mechanics parameters of different sections of the TBM tunnel are corrected based on the mapping model. Specifically, the rock mass mechanics parameter correction module dynamically corrects the rock mass mechanics parameters estimated by the preliminary estimation module according to the real-time prediction results of the rock mass mechanics parameter mapping module, and obtains accurate rock mass mechanics parameters of different sections of the tunnel.
[0050] Rockburst level correction module: Calculates the rockburst disaster correction level based on the rock mass mechanical parameter correction results. Specifically, the rockburst level correction module uses the corrected accurate rock mass mechanical parameters to substitute into the multi-criteria calculation module and the multi-model fusion module to obtain the rockburst disaster correction level.
[0051] The rockburst disaster real-time warning module includes a microseismic monitoring module, a microseismic event database module, a rockburst event database module and a microseismic-rockburst mapping module.
[0052] Microseismic monitoring module: Install microseismic monitoring equipment, monitor microseismic signals, and extract microseismic characteristic parameters. Specifically, after comprehensive equipment model comparison, the microseismic monitoring module uses two models of microseismic monitoring: the SSS microseismic monitoring system of China Science Microseismic and the all-fiber microseismic monitoring instrument to ensure the stability of signal acquisition. The microseismic monitoring equipment monitors the microseismic signals of the TBM tunnel and extracts characteristic parameters such as time, energy, magnitude, and location of microseismic events.
[0053] The microseismic event database module builds a microseismic event database based on microseismic event monitoring results and microseismic characteristic parameters.
[0054] The rockburst event database module records the rockburst disasters revealed by TBM excavation and builds a rockburst disaster database.
[0055] The microseismic-rockburst mapping module uses a deep learning gated neural network method to construct a mapping model between microseismic events and rockburst disasters, and realizes real-time early warning of rockburst disasters in deep and long TBM tunnels.
[0056] The present invention amplifies the early warning method of the TBM tunnel rock burst dynamic early warning system based on multi-source information fusion, comprising the following steps:
[0057] A. Collect the geological survey data of TBM tunnel in the early stage, estimate the rock mass mechanical parameters of different mileage sections of TBM tunnel, and calculate the rock burst grade of different mileages under various rock burst criteria according to the rock mass mechanical parameter estimation results;
[0058] B. Based on the improved formula of DS evidence theory, multi-model fusion is performed on the rockburst grade prediction results under different criteria to obtain the advanced classification results of rockburst disasters at different mileage sections of TBM tunnels;
[0059] C. Collect multi-source information data such as real-time TBM excavation parameter information, advance drilling information, and face geological catalog information, and build a multi-source information-rock mass mechanical parameter long-short-term memory neural network mapping model based on the actual excavation exposure of the surrounding rock of the TBM tunnel;
[0060] D. Accurately predict the rock mass mechanical parameters of different mileage sections of the TBM tunnel based on the long short-term memory neural network mapping model, correct the estimated results of the rock mass mechanical parameters, substitute the corrected results into the multi-criteria calculation module and the multi-model fusion module to obtain the corrected level of rock burst disaster;
[0061] E. Install various types of microseismic monitoring equipment to monitor microseismic signals, extract microseismic characteristic parameters, and build a microseismic event database based on microseismic event monitoring results and microseismic characteristic parameters;
[0062] F. Record the rock burst disasters revealed by TBM excavation, build a rock burst disaster database, and use the gated neural network method to build a microseismic event-rock burst disaster mapping model to achieve real-time early warning of rock burst disasters;
[0063] G. As the TBM excavation mileage continues to increase, it is only necessary to repeat steps C to F to obtain the corrected level of rock burst disasters in the current excavation stratum and realize real-time early warning of rock burst disasters; when excavating a new TBM tunnel, it is only necessary to repeat steps A to F to realize advanced classification, dynamic correction and real-time early warning of rock burst disasters.
[0064] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.
Claims
1. A dynamic early warning system for rockburst in TBM tunnels based on multi-source information fusion, It is characterized in that include: A rockburst disaster advance classification module, which makes a preliminary estimate of the rockburst disaster levels at different mileages of the TBM tunnel to guide the TBM construction design; the rockburst disaster advance classification module includes a preliminary estimation module, a multi-criteria calculation module, a multi-model fusion module and a rockburst level preliminary determination module; A rockburst hazard dynamic correction module, which makes corrections to the preliminary estimation results as the excavation progresses, assisting in TBM design changes; The rockburst disaster dynamic correction module includes a multi-source information collection module, a rock mass mechanics parameter mapping module, a rock mass mechanics parameter correction module and a rockburst grade correction module; and A rockburst disaster real-time warning module, which provides real-time warning of rockburst tendency based on the rockburst level correction result, and guides the implementation of on-site safety prevention and control measures; the rockburst disaster real-time warning module includes a microseismic monitoring module, a microseismic event database module, a rockburst event database module and a microseismic-rockburst mapping module.
2. According to claim 1, the TBM tunnel rockburst dynamic early warning system based on multi-source information fusion, It is characterized in that The preliminary estimation module estimates the maximum tangential stress, uniaxial compressive strength, axial stress, elastic strain energy, loss strain energy, point load strength, rock mass integrity coefficient, and maximum principal stress parameters of different mileage sections of the TBM tunnel based on the preliminary geological survey data of the TBM tunnel, and obtains quantitative results of each parameter.
3. The TBM tunnel rockburst dynamic early warning system based on multi-source information fusion according to claim 1, It is characterized in that The multi-criteria calculation module adopts the E.Hoek method, Turchaninov method, Kidybinski method and Russense criterion, and combines the quantitative results of rock mass mechanical parameters at different mileages of the TBM tunnel to perform calculations and solutions to obtain rock burst grade results under different criterion conditions.
4. The TBM tunnel rockburst dynamic early warning system based on multi-source information fusion according to claim 1, It is characterized in that The multi-model fusion module adopts the improved DS evidence theory to fuse the rockburst grade prediction results of different criteria, and the rockburst grade preliminary judgment module determines the advanced classification results of rockburst disasters at different mileage sections of the TBM tunnel according to the fusion results.
5. The TBM tunnel rockburst dynamic early warning system based on multi-source information fusion according to claim 4, It is characterized in that The DS evidence theory determines the fusion weights of different models through the basic probability value (BPA) and introduces the credibility factor η i BPA is modified to reduce the conflict between different evidence sources. The improved formula of DS evidence theory is as follows: In the formula, u i represents the distance between the observations of evidence set i and the observations of other evidence sets, u i The smaller the value, the higher the credibility; M(S) represents the BPA of event S. To reduce the conflict between different sources of evidence, η i Take u i exponential function, which ensures that when u i When η is larger i It can quickly approach 0.
6. An early warning method for a TBM tunnel rockburst dynamic early warning system based on multi-source information fusion according to any one of claims 1 to 5, It is characterized in that The following steps are involved: A. Collect the preliminary geological survey data of TBM tunnels and calculate the rockburst levels at different distances under various rockburst criteria; B. Obtain the advanced classification results of rock burst disasters at different mileage sections of TBM tunnels; C. Construct a multi-source information-rock mass mechanical parameter long-short term memory neural network mapping model based on the actual excavation exposure of the surrounding rock of the TBM tunnel; D. Obtain the modified level of rockburst hazard; E. Install microseismic monitoring equipment, monitor microseismic signals, and build a microseismic event database based on microseismic event monitoring results and microseismic characteristic parameters; F. Construct a microseismic event-rock burst disaster mapping model to achieve real-time early warning of rock burst disasters; G. Repeat steps C to F continuously to obtain the corrected level of rock burst disaster in the current excavation stratum and realize real-time early warning of rock burst disaster. When excavating a new TBM tunnel, repeat steps A to F to realize advanced classification, dynamic correction and real-time early warning of rock burst disaster.
Citation Information
Patent Citations
Tunnel rock burst early warning method based on micro-seismic information and deep convolutional neural network
CN110298503A
Construction method for tunnel in violent rockburst section in high-altitude area
CN111305877A
Intelligent sensing early warning system and method and pretreatment tunneling method
CN117514184A
Physics-based and data-driven integrated method for rock burst hazard assessment
US20230152479A1