Calculation method and system for the productivity of primary production in aquatic ecosystem structure model as it changes with environmental conditions
By coupling the water quality model in the aquatic ecosystem structure model, taking into account factors such as nutrients, temperature and light, calculating the maximum productivity of primary production and combining it with environmental conditions, the problem of simulation deviation caused by fixed productivity or single factor consideration in the existing technology is solved. Improved model adaptability and accuracy.
Patent Information
- Application Number
- CN202410459631.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-04-17
AI Technical Summary
When calculating the productivity of primary production, existing aquatic ecosystem structure models usually use fixed values or only consider nutrient correlations, ignoring changes in environmental conditions, resulting in large deviations in simulation results.
By constructing a coupling between an aquatic ecosystem structure model and a water quality model, taking into account multiple factors such as nutrients, temperature, and light, the correlation between the productivity of primary production and changes in environmental conditions is set, the maximum productivity of primary production is calculated, and the productivity is calculated based on environmental conditions.
It improves the adaptability and simulation accuracy of the ecosystem structure model, provides a more accurate calculation of primary production productivity, and enhances the adaptability and simulation effect of the model.
Smart Images

Figure CN118278317B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of productivity of primary production, and in particular to a method and a system for calculating the productivity of primary production in an aquatic ecosystem structure model as it changes with environmental conditions. Background Art
[0002] The aquatic ecosystem structure model is based on the principle of trophic dynamics to directly construct the structure of the aquatic ecosystem, describe the flow of energy or materials, and determine the energy balance model of ecological parameters. The material balance equation of each trophic level organism in the ecosystem is: Production = Catches + Predation + Biomass accumulation + Net migration + Other mortality. The productivity of each trophic level is generally given in the calculation process of the ecosystem structure model, that is, production / biomass (P / B). The starting point of the trophic level in the aquatic ecosystem is generally primary production (phytoplankton), so the production / biomass (P / B) value of primary production is of great significance to the structure and energy flow of the entire ecosystem.
[0003] In the temporal dynamic modeling of aquatic ecosystem structure, a fixed production / biomass (P / B) value of primary production is usually given. However, the growth of aquatic ecosystems with phytoplankton as the main primary producer is obviously restricted by environmental conditions. If a fixed primary production / biomass (P / B value) is still used in the temporal dynamic model, it will bring a large deviation to the model simulation results.
[0004] At present, ecosystem structure models generally use fixed values when setting the productivity of primary production, or only consider the correlation with nutrients. However, in aquatic ecosystems, the productivity of primary production changes with changes in environmental conditions, and as the beginning of the trophic level of the ecosystem, the value will have a great impact on the trophic structure of the system. Aquatic ecosystems are ecosystems composed of aquatic biological communities and water environments. Aquatic ecosystem structure models aim to construct food web structures between biological communities and simulate material circulation and energy flow within the system. Aquatic ecosystem structure models contain organisms at different trophic levels, and the lowest trophic level organisms are generally phytoplankton, also known as primary production. The productivity of primary production is the main channel for energy input to the entire ecosystem. In most cases, ecosystem structure models set the generation rate of primary production to a fixed value, or only related to water nutrients. According to ecological knowledge, the main environmental factors for phytoplankton growth include light, water temperature, and nutrient concentration. Therefore, if environmental factors are not considered or only one environmental factor is considered, the productivity of phytoplankton will be inaccurate. Summary of the invention
[0005] In response to the above-mentioned problems, the present invention aims to provide a calculation method and a calculation system for the coupling of the ecosystem structure model with the hydrodynamic and water quality model, and to give a primary production productivity calculation method that considers multiple factors such as nutrients, temperature and light, which can further improve the adaptability and simulation accuracy of the ecosystem structure model.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is as follows: a method for calculating the productivity of primary production in an aquatic ecosystem structure model as it changes with environmental conditions, characterized in that it comprises the following steps:
[0007] S1. Construct the coupling between the aquatic ecosystem structure model and the water quality model, specifically including calculating the free nutrients in the system at the initial moment and the total nutrients in the system at the initial moment, coupling the calculation results with the water quality model to obtain the total nutrients in the system at any moment. The coupling process is as follows:
[0008] Initial free nutrients The calculation formula is as follows:
[0009]
[0010] in: is the free nutrients at the initial moment, t / km 2 ; Other variables are the same as below;
[0011] Total nutrients of aquatic ecosystem at the initial moment N T,0 The calculation formula is as follows:
[0012]
[0013] in: N T,0 is the total nutrients of the aquatic ecosystem at the initial moment, t / km 2 ; is the proportion of free nutrients in the water body at the initial moment (value given by the model), %; B i,0 is the biomass of each trophic level at the initial time (value given by the model), t / km 2 ; is the nutrient content of organisms at each trophic level (fixed value), %;
[0014] The total nutrient content of the system at any time is calculated as follows:
[0015]
[0016] in: N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km2 ; I is the rate of inflow of nutrients from all sources into the system, t / (km 2 d); v is the total nutrient loss rate in the system (including volume exchange, sedimentation, capture, etc.), 1 / d. I and v Calculated from hydrodynamic water quality models and fishing data.
[0017] Set time multiplier , which is determined by the nutrients flowing into and out of the system. The total nutrients in the system at any time are calculated as: . Realize the coupling of water quality model and ecological dynamics model.
[0018] S2. Set the correlation between the productivity of primary production and the changes in environmental conditions in the aquatic ecosystem structure model, including nutrient limitation calculation, temperature limitation calculation and light limitation calculation. The nutrient limitation calculation is based on the free nutrients in the system at any time, and the specific calculation is as follows:
[0019] The formula for calculating free nutrients in the system at any time is as follows:
[0020]
[0021] in: is the free nutrient concentration in the system at any time, t / km 2 ; N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km 2 ; B i,t is the biomass of each trophic level at any time (calculated by the ecosystem structure model), t / km 2 ; Other variables are the same as before;
[0022] Nutrient limitation calculations:
[0023]
[0024] in: F(N) is the limiting function of nutrients on primary production productivity; is the free nutrient concentration in the system at any time, t / km 2 ; K N is the nutrient limiting constant, t / km 2 ;
[0025] Temperature limit calculation:
[0026] F(T) = T t / (K T +T t )
[0027] in: F(T) is the limiting function of water temperature on primary production productivity; T t is the water temperature at any time (given by hydrological data), ℃; K T is the temperature limit constant, °C;
[0028] Lighting limitation calculation:
[0029] F(R) =R t / (K R +R t )
[0030] in: F(R) is the limiting function of light on primary production productivity; R t is the light intensity at any time (given by meteorological data), W / m 2 ; K R is the light limiting constant, W / m 2 .
[0031] K N , K T , K R The value of N f,0 / (K N +N f,0 ) = ( 1 / Max rel. P / B) (1 / 3) , T 0 / (K T +T 0 ) = ( 1 / Max rel. P / B) (1 / 3) , R 0 / (K R +R 0 )= ( 1 / Max rel. P / B) (1 / 3) , N f,0 is the free nutrient concentration at the initial moment, T 0 is the water temperature at the initial moment, R 0 is the light intensity at the initial moment; Max rel. P / B is the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) It is the inverse of the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) (1 / 3) It is the third power of the inverse of the ratio of maximum productivity to basic productivity.
[0032] S3. Based on the correlation between the coupling and the change of environmental conditions, the productivity of primary production under environmental conditions at any time is calculated, specifically including calculating the maximum productivity of primary production and calculating it in combination with the correlation of the change of environmental conditions. The calculation process is as follows:
[0033] The maximum production rate of the primary production is calculated as follows:
[0034] P / B max =(P / B 0 )*(Max rel. P / B)
[0035] in: P / B max is the maximum productivity of primary production, 1 / a; P / B 0 is the basic productivity (given by the model), 1 / a; Max rel. P / B is the ratio of maximum productivity to basic productivity (given by the model);
[0036] The productivity of primary production under environmental conditions at any time is calculated as:
[0037] P / B t =P / B max *F(N)*F(T)*F(R)
[0038] in: P / B t is the productivity of primary production at any moment taking environmental factors into account, 1 / a; P / B max is the maximum productivity of primary production, 1 / a; other variables are the same as before. Maximum productivity P / Bmax use P / B The initial value is multiplied by a factor greater than 1.P / Bmax As an upper limit, consider the limiting effects of nutrients, water temperature and light on primary production at the same time.
[0039] This application also provides a calculation system for the productivity of primary production in an aquatic ecosystem structure model as it changes with environmental conditions, including:
[0040] A coupling module for coupling aquatic ecosystem structure models with water quality models;
[0041] Environmental conditions module, used to calculate the correlation between the productivity of primary production and changes in environmental conditions in aquatic ecosystem structure models;
[0042] The productivity calculation module comprehensively calculates the productivity of primary production under environmental conditions at any time based on the calculation results of the coupling module and the environmental conditions module.
[0043] The beneficial effects of the present invention are as follows: the calculation method of the present application, by setting a function of the change of the production / biomass (P / B value) of primary production in the aquatic ecosystem structure model with environmental conditions, and constructing a coupling link between the aquatic ecosystem structure model and the water quality model, comprehensively calculates the primary production productivity with high accuracy by considering environmental influencing factors, thereby further improving the adaptability and simulation accuracy of the ecosystem structure model. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 It refers to the temporal changes in the primary production biomass of the aquatic ecosystem of the present invention.
[0045] Figure 2 It is the change of relative biomass of each trophic level of the aquatic ecosystem of the present invention over time. DETAILED DESCRIPTION
[0046] In order to enable those skilled in the art to better understand the technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0047] Refer to the attached Figures 1 - 2 The method for calculating the productivity of primary production in the aquatic ecosystem structure model as it changes with environmental conditions includes the following steps:
[0048] S1. Construct the coupling between the aquatic ecosystem structure model and the water quality model, specifically including calculating the free nutrients in the system at the initial moment and the total nutrients in the system at the initial moment, coupling the calculation results with the water quality model to obtain the total nutrients in the system at any moment. The coupling process is as follows:
[0049] Initial free nutrients The calculation formula is as follows:
[0050]
[0051] in: is the free nutrients at the initial moment, t / km 2 ; Other variables are the same as below.
[0052] The total nutrient concentration in an aquatic ecosystem at any time N T , including nutrients bound to organisms N B and free nutrients in the surrounding environment Among them, free nutrients It can be absorbed and utilized by primary production. The total nutrients of aquatic ecosystem at the initial moment N T,0 The calculation formula is as follows:
[0053]
[0054] in: N T,0 is the total nutrients of the aquatic ecosystem at the initial moment, t / km 2 ; is the proportion of free nutrients in the water body at the initial moment (value given by the model), %; B i,0 is the biomass of each trophic level at the initial time (value given by the model), t / km 2 ; is the nutrient content of organisms at each trophic level (fixed value), %;
[0055] Assume that at any time t the total nutrients in the system N T,t The change of is determined by the rate of nutrients flowing into the system and the total nutrient loss rate of the system. The total nutrient calculation formula of the system at any time is as follows:
[0056]
[0057] in: N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km 2 ; I is the rate of inflow of nutrients from all sources into the system, t / (km 2 d); v is the total nutrient loss rate in the system (including volume exchange, sedimentation, capture, etc.), 1 / d. I and v It is calculated from the hydrodynamic water quality model and fishing data, realizing the coupling of the water quality model and the ecological dynamics model.
[0058] Set time multiplier , which is determined by the nutrients flowing into and out of the system. The total nutrients in the system at any time are calculated as follows:
[0059]
[0060] S2. Set the correlation between the productivity of primary production and the changes in environmental conditions in the aquatic ecosystem structure model, including nutrient limitation calculation, temperature limitation calculation and light limitation calculation. The nutrient limitation calculation is based on the free nutrients in the system at any time, and the specific calculation is as follows:
[0061] The free nutrient concentration in an aquatic ecosystem at any time is the difference between the total nutrient concentration and the nutrient concentration of the organism. The calculation formula is as follows:
[0062]
[0063] in: is the free nutrient concentration in the system at any time, t / km 2 ; N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km 2 ; B i,t is the biomass of each trophic level at any time (calculated by the model), t / km 2 ; Other variables are the same as before.
[0064] The productivity of primary production ( P / B ) and free nutrients ( N f ) have a certain restriction relationship, nutrient restriction calculation:
[0065]
[0066] in: F(N) is the limiting function of nutrients on primary production productivity; is the free nutrient concentration in the system at any time, t / km 2 ; K N is the nutrient limiting constant, t / km 2 .
[0067] The productivity of primary production ( P / B ) and water temperature ( T ), the temperature limit calculation is:
[0068] F(T) = T t / (K T +Tt )
[0069] in: F(T) is the limiting function of water temperature on primary production productivity; T t is the water temperature at any time (given by hydrological data), ℃; K T is the temperature limit constant, ℃.
[0070] The productivity of primary production ( P / B ) and light ( R ), the illumination limit calculation:
[0071] F(R) =R t / (K R +R t )
[0072] in: F(R) is the limiting function of light on primary production productivity; R t is the light intensity at any time (given by meteorological data), W / m 2 ; K R is the light limiting constant, W / m 2 , light limiting constant K R Calculated by the following formula: R 0 / (K R +R 0 ) =(1 / Max rel. P / B) (1 / 3) .
[0073] K N , K T , K R The value of N f,0 / (K N +N f,0 ) = ( 1 / Max rel. P / B) (1 / 3) , T 0 / (K T+T 0 ) = ( 1 / Max rel. P / B) (1 / 3) , R 0 / (K R +R 0 ) = ( 1 / Max rel. P / B) (1 / 3) , N f,0 is the free nutrient concentration at the initial moment, T 0 is the water temperature at the initial moment, R 0 is the light intensity at the initial moment; Max rel. P / B is the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) It is the inverse of the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) (1 / 3) It is the third power of the inverse of the ratio of maximum productivity to basic productivity.
[0074] The water temperature limiting function is similar to the light limiting function. The nutrient limiting function is similar to light and water temperature. The calculation of nutrient concentration involves the coupling of water quality model and ecosystem structure model. The total nutrients in the water body are divided into two parts: nutrients in organisms and free nutrients in the water body. The production of phytoplankton is only related to free nutrients. The total nutrients in the water body are calculated by the water quality model based on the nutrients input and output of the system at each moment. The nutrients in the organisms are directly related to the biomass, which is calculated by the ecological model at each time step.
[0075] Therefore, the free nutrients at a certain moment are obtained by subtracting the nutrients in the organism from the total nutrients at that moment. This can achieve the coupling of the water quality model and the ecosystem structure model, namely: water quality model - total nutrients - free nutrients - nutrient limitation function F(N)— Primary production productivity—ecological model.
[0076] S3. Based on the correlation between the coupling and the change of environmental conditions, the productivity of primary production under environmental conditions at any time is calculated, specifically including calculating the maximum productivity of primary production and calculating it in combination with the correlation of the change of environmental conditions. The calculation process is as follows:
[0077] Productivity is defined as the ratio of production to biomass ( P / B), the maximum productivity of primary production is calculated by the basic productivity and the corresponding proportion. The maximum productivity of primary production is calculated as follows:
[0078] P / B max =(P / B 0 )*(Max rel. P / B)
[0079] in: P / B max is the maximum productivity of primary production, 1 / a; P / B 0 is the basic productivity (given by the model), 1 / a; Max rel. P / B is the ratio of maximum productivity to basic productivity (given by the model).
[0080] The productivity of primary production ( P / B ) is related to the limitations of nutrients, temperature, and light. The productivity of primary production under environmental conditions at any time is calculated as:
[0081] P / B t =P / B max *F(N)*F(T)*F(R)
[0082] in: P / B t is the productivity of primary production at any moment taking environmental factors into account, 1 / a; P / B max is the maximum productivity of primary production, 1 / a; other variables are the same as before. Maximum productivity P / Bmax use P / B The initial value is multiplied by a factor greater than 1. P / Bmax As an upper limit, consider the limiting effects of nutrients, water temperature and light on primary production at the same time.
[0083] The value of the above-mentioned restriction function is between 0 and 1. Taking the illumination restriction function as an example, F(R)=R t / (K R +R t ) The calculation result of this formula is greater than 0 and less than 1, and increases with the increase of nutrient concentration, water temperature, and light. The increase rate is fast in the early stage and slows down in the later stage. The change law of the above limiting function is consistent with cognition.
[0084] This application also provides a calculation system for the productivity of primary production in an aquatic ecosystem structure model as it changes with environmental conditions, including:
[0085] A coupling module for coupling aquatic ecosystem structure models with water quality models;
[0086] Environmental conditions module, used to calculate the correlation between the productivity of primary production and changes in environmental conditions in aquatic ecosystem structure models;
[0087] The productivity calculation module comprehensively calculates the productivity of primary production under environmental conditions at any time based on the calculation results of the coupling module and the environmental conditions module.
[0088] Example 1
[0089] (1) The simulation duration of this example is 10 years, the time step is 1 month, and the environmental conditions vary with the month within the year. Assume that the maximum productivity of primary production in the water area is P / B max is 1000, unit: 1 / a.
[0090] Initial conditions: Assume that the base productivity is low and set to P / B 0 =100 (1 / a), corresponding to the initial free nutrient N f,0 =150 t / km 2 , water temperature T 0 =5℃, light intensity R 0 =280 W / m 2 , then Max rel. P / B =P / B max / (P / B 0 )=10.
[0091] Calculate K N , K T , K R The value of N f,0 / (K N +N f,0 )=(1 / Max rel. P / B) (1 / 3) , T 0 / (K T +T 0 ) =(1 / Max rel. P / B) (1 / 3) , R 0 / (K R +R 0 ) =(1 / Max rel. P / B) (1 / 3) , N f,0 is the free nutrient concentration at the initial moment, T 0 is the water temperature at the initial moment, R 0 is the light intensity at the initial moment; Max rel. P / B is the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B)It is the inverse of the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B ) (1 / 3) It is the third power of the inverse of the ratio of maximum productivity to basic productivity.
[0092] (2) Proportion of free nutrients in water at the initial moment , which is 30%.
[0093] (3) Total nutrients of aquatic ecosystem at the initial time N T,0 , First, calculate the total amount of nutrients in the organism based on the biomass of each trophic level at the initial moment , is 112t / km 2 .but, N T,0 = 112 / (1-0.3)=160t / km 2 .
[0094] (4) Free nutrients at the initial moment The calculation formula is as follows:
[0095]
[0096] (5) Total nutrients in the system at any time N T,t The change in is determined by the rate of nutrient inflow into the system and the total rate of nutrient loss from the system:
[0097]
[0098] in, , I and v Calculated from a hydrodynamic water quality model and catch data. The value is (1.1,1.1,1.2,1.3,1.4,1.3,1.2,1.1,1.1,1.1,1.0,1.0), then the value of each month in a year is N T,t The values are (176,176,192,208,224,208,192,176,176,176,160,160)
[0099] (6) Based on hydrological data, the water temperature for each month of the year T t The value is (10,12,15,18,20,24,25,20,15,10,8,8), the water temperature at the initial moment T 0 = 8. According to meteorological data, the light intensity in each month of the yearR t The value is (340,360,380,420,480,530,600,700,600,550,450,300), the initial light intensity R 0 =300.
[0100] (7) The maximum productivity of primary production is calculated as follows:
[0101] P / B max =(P / B 0 )*(Maxrel.P / B)
[0102] Where P / B 0 is the basic productivity (given by the model, 240,1 / a); Maxrel.P / B is the ratio of the maximum productivity to the basic productivity (given by the model, 8), then the maximum productivity P / B max It is 1920,1 / a.
[0103] (8) Productivity of primary production ( P / B ) and free nutrients There is a certain restriction relationship between them, nutrient restriction calculation:
[0104] F(N) = N f,t / (K N +N f,t )
[0105] in: K N is the nutrient limiting constant, t / km 2 , so that N f,0 / (K N +N f,0 ) = ( 1 / Maxrel.P / B) (1 / 3) , Calculated K N =48t / km 2 .
[0106] (9) Productivity of primary production ( P / B ) and water temperature ( T ), the temperature limit calculation is:
[0107] F(T) = T t / (K T +T t )
[0108] in: K T is the temperature limit constant, °C, such that T 0 / (K T +T 0 ) = ( 1 / Maxrel.P / B) (1 / 3) , calculated K T =8℃ 。 The temperature limit for each month in a year is F(T) The values are (0.56, 0.60, 0.65, 0.69, 0.71, 0.75, 0.76, 0.71, 0.65, 0.56, 0.50, 0.50).
[0109] (10) Productivity of primary production ( P / B ) and light ( R ), the illumination limit calculation:
[0110] F(R) =R t / (K R +R t )
[0111] in: K R is the light limiting constant, W / m 2 , so that R 0 / (K R +R 0 ) = ( 1 / Maxrel.P / B) (1 / 3)) , calculated K R =300W / m 2 . Then the light limit for each month of the year is F(R) The values are (0.53, 0.55, 0.56, 0.58, 0.62, 0.64, 0.67, 0.70, 0.67, 0.65, 0.60, 0.50).
[0112] (11) Productivity of primary production ( P / B ) is related to the limitations of nutrients, temperature, and light. The productivity of primary production under environmental conditions at any time is calculated as:
[0113] P / B t =P / B max *F(N)*F(T)*F(R)
[0114] Initial moment P / B 0 =1920*0.5*0.5*0.5=240(1 / a).
[0115] (12) Using the ecosystem structure model, calculate the biomass of each trophic level in the system after one time step (i.e., one month) to obtain the total amount of nutrients in the organisms: , is 120t / km 2 .
[0116] According to (5), we can know N T,1 =176t / km 2 ,but , F(N) 1 =0.54 According to (9) and (10), F(T) 1 = 0.56, F(R) 1 =0.53 ,but P / B 1 =P / B max *F(N)*F(T)*F(R)= 1920*0.54*0.56*0.53=307.7(1 / a)
[0117] (13) Based on the productivity of primary production P / B 1 , calculate the total amount of nutrients in each trophic level organisms in the system at the next moment ,according to N T,2 calculate , and then calculate F(N) 2 , and then calculate P / B 2 , repeat the above steps until the calculation of all durations is completed.
[0118] The calculation conditions and results are shown in Table 1 below:
[0119]
[0120] Table 1 Calculation conditions and calculation results of productivity at different stages in Example 1 Example 2
[0121] Initial conditions: Assuming the base productivity is high, set to P / B 0 =500 (1 / a), according to the three limiting constants K calculated above N =173.17, K T =5.77, K R =423.24, we can know the free nutrient salt N corresponding to the initial moment f,0 =666 t / km 2 , water temperature T 0 =22℃, light intensity R 0 =1244 W / m 2 .
[0122] The calculation conditions and results are shown in Table 2 below:
[0123]
[0124] Table 2 Calculation conditions and calculation results of productivity at different stages in Example 2
[0125] From the above examples 1-2, it can be seen that the calculation method proposed in the invention has the following known conditions: the maximum productivity of primary production, the productivity at the initial moment, and the corresponding free nutrient concentration in the water, water temperature, and light. N 、 Temperature limit constant K T 、 Light limiting constant K R The value of the limiting function under different nutrient salt, temperature and light conditions can then be calculated, thereby calculating the productivity of primary production under specific conditions.
[0126] For a particular aquatic ecosystem, the nutrient limitation constant K N 、 Temperature limit constant K T 、 Light limiting constant K R is fixed. In a year, temperature, light and nutrient concentrations will fluctuate with the seasons or other conditions. Therefore, the primary production productivity at the initial moment may be at a low level or at a high level. From the above two test cases, no matter what the state at the initial moment is, as long as the environmental conditions are determined, the value of the limit function is determined.
[0127] Depend on Figures 1 - 2 The calculation results show that the productivity of primary production (P / B ) changes with nutrients, temperature, and light throughout the year, causing the biomass of primary production to change within the year. Under the influence of the food web, the biomass of other trophic levels within the entire ecosystem also changes accordingly.
[0128] The principle of the present invention is that the calculation method sets the correlation between the productivity of primary production in the aquatic ecosystem structure model and the change of environmental conditions by constructing the coupling between the aquatic ecosystem structure model and the water quality model, and calculates the productivity of primary production under environmental conditions at any time based on the correlation between the coupling and the change of environmental conditions. It provides a calculation method for primary production productivity that takes into account multiple factors such as nutrients, temperature and light, which can further improve the adaptability and simulation accuracy of the ecosystem structure model.
[0129] The above shows and describes the basic principle, main features and advantages of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention claimed.
Claims
1. Calculation method of primary production productivity in aquatic ecosystem structural model as a function of environmental conditions, It is characterized in that The following steps are involved: S1. Construct the coupling between the aquatic ecosystem structure model and the water quality model, specifically including calculating the free nutrients in the system at the initial moment and the total nutrients in the system at the initial moment, coupling the calculation results with the water quality model to obtain the total nutrients in the system at any moment. The coupling process is as follows: Initial free nutrients N f,0 The calculation formula is as follows: N f,0 =N T,0 *p f,0 = ∑Ƞ i *B i,0 / (1-p f,0 )*p f,0 ; in: N f,0 is the free nutrients at the initial moment, t / km 2 ; Other variables are the same as below; Total nutrients of aquatic ecosystem at the initial moment N T,0 The calculation formula is as follows: N T,0 =∑Ƞ i *B i,0 / (1-p f,0 ); in: N T,0 is the total nutrients of the aquatic ecosystem at the initial moment, t / km 2 ; p f,0 is the proportion of free nutrients in the water body at the initial moment, %; B i,0 is the biomass of each trophic level at the initial time, t / km 2 ; Ƞ i is the nutrient content of organisms at each trophic level, %; The total nutrient content of the system at any time is calculated as follows: dN T,t / dt = I-v T,t ; in: N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km 2 ; I is the rate of inflow of nutrients from all sources into the system, t / (km 2 d); v is the total nutrient loss rate in the system, 1 / d, I and v Calculated from hydrodynamic water quality models and fishing data; Set time multiplier f t = f(I,v) , which is determined by the nutrients flowing into and out of the system; the total nutrients in the aquatic ecosystem at any time t is: N T,t = f t *N T,0 ; S2. Set the correlation between the productivity of primary production and the changes in environmental conditions in the aquatic ecosystem structure model, including nutrient limitation calculation, temperature limitation calculation and light limitation calculation. The nutrient limitation calculation is based on the free nutrients in the system at any time, and the specific calculation is as follows: The formula for calculating free nutrients in the system at any time is as follows: N f,t = N T,t -∑Ƞ i *B i,t; in: N f,t is the free nutrient concentration in the system at any time, t / km 2 ; N T,t is the total nutrients in the aquatic ecosystem at any time t, t / km 2 ; B i,t is the biomass of each trophic level at any time, t / km 2 ; Other variables are the same as before; Nutrient limitation calculations: F(N) = N f,t / (K N +N f,t ) in: F(N) is the limiting function of nutrients on primary production productivity; N f,t is the free nutrient concentration in the system at any time, t / km 2 ; K N is the nutrient limiting constant, t / km 2 ; Temperature limit calculation: F(T) = T t / (K T +T t ) ; in: F(T) is the limiting function of water temperature on primary production productivity; T t is the water temperature at any time, °C; K T is the temperature limit constant, °C; Lighting limitation calculation: F(R) =R t / (K R +R t ) ; in: F(R) is the limiting function of light on primary production productivity; R t is the light intensity at any time, W / m 2 ; K R is the light limiting constant, W / m 2 ; K N , K T , K R The value of N f,0 / (K N +N f,0 ) = ( 1 / Max rel. P / B) (1 / 3) , T 0 / (K T +T 0 ) = ( 1 / Max rel. P / B) (1 / 3) , R 0 / (K R +R 0 ) = ( 1 / Max rel. P / B) (1 / 3) , N f,0 is the free nutrient concentration at the initial moment, T 0 is the water temperature at the initial moment, R 0 is the light intensity at the initial moment; Max rel. P / B is the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) It is the inverse of the ratio of maximum productivity to basic productivity; ( 1 / Max rel. P / B) (1 / 3) It is the third power of the inverse of the ratio of the maximum productivity to the basic productivity; S3. Based on the correlation between the coupling and the change of environmental conditions, the productivity of primary production under the environmental conditions at any time is calculated, specifically including calculating the maximum productivity of primary production, and calculating it in combination with the correlation of the change of environmental conditions. The calculation process is as follows: The maximum production rate of the primary production is calculated as follows: P / B max =(P / B 0 )*(Max rel. P / B) ; in: P / B max is the maximum productivity of primary production, 1 / a; P / B 0 is the basic productivity, 1 / a; Max rel. P / B is the ratio of maximum productivity to basic productivity; The productivity of primary production under environmental conditions at any time is calculated as: P / B t =P / B max *F(N)*F(T)*F(R) ; in: P / B t is the productivity of primary production at any moment taking environmental factors into account, 1 / a; P / B max is the maximum productivity of primary production, 1 / a; other variables are the same as before, the maximum productivity P / Bmax use P / B The initial value is multiplied by a multiple greater than 1 to give P / Bmax As an upper limit, consider the limiting effects of nutrients, water temperature and light on primary production at the same time.
2. A system for realizing the method for calculating the productivity of primary production in the aquatic ecosystem structure model as a function of environmental conditions as described in claim 1, It is characterized in that include: A coupling module for coupling aquatic ecosystem structure models with water quality models; Environmental conditions module, used to calculate the correlation between the productivity of primary production and changes in environmental conditions in aquatic ecosystem structure models; The productivity calculation module comprehensively calculates the productivity of primary production under environmental conditions at any time based on the calculation results of the coupling module and the environmental conditions module.
Citation Information
Patent Citations
Method of eutrophic water body restoration based on ecosystem model and biomanipulation technology
AU2020101936A4
A method for simulating an ecosystem model of a shallow lake
CN109101707A
Water environment nutrition state evaluation method based on primary productivity model
CN114331127A
Dynamic simulation and scheduling method and device for water volume-water quality-aquatic organism coupled aggregate community
CN115034425A
Method for calculating total primary productivity of ecological system
CN115601201A