Cover assembly and battery

By setting an appropriate pre-pressure width L in the blocking element of the cover assembly, the problem of insufficient friction between the sealant nail and the liquid injection hole is solved, ensuring the smooth progress of the helium inspection process and the accuracy of the sealing test.

CN118281513BActive Publication Date: 2024-10-01SVOLT ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410705086.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2024-10-01
Estimated Expiration
2044-06-03

AI Technical Summary

Technical Problem

During the battery helium inspection process, the friction between the sealing rubber nail and the liquid injection hole is insufficient, causing the rubber nail to pop out easily, affecting the accuracy of the sealing test.

Method used

A cover assembly is designed. The blocking element includes a sealing part and a supporting part. The preloading width L is between 0.2mm and 1.0mm to ensure proper contact between the supporting part and the inner wall of the injection hole to avoid insufficient or excessive friction. , ensure that the blockage component does not pop out during the helium inspection process, and reserve sufficient exhaust channels.

Benefits of technology

It effectively avoids the plugging components from popping up during the helium inspection, ensures the accuracy of sealing inspection and the appropriateness of the exhaust channel, and improves the smooth operation of the inspection tooling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118281513B_ABST
    Figure CN118281513B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of battery technology, and discloses a cover plate assembly and a battery, the cover plate assembly comprising: a cover plate is provided with a liquid injection hole; a plugging element comprises at least two supporting parts located on one side of a sealing part along an axial direction, and a avoiding part located between two adjacent supporting parts along a circumferential direction, in a conducting state, the supporting part is tightly matched with the inner wall of the liquid injection hole, and the avoiding part is spaced from the inner wall of the liquid injection hole; in a conducting state, the area where the supporting part abuts against the inner wall of the liquid injection hole is defined as a pre-pressing pressing part; along the circumference surrounding the plugging element, the size of the contact area between the pre-pressing pressing part and the inner wall of the liquid injection hole is a pre-pressing width L, wherein L satisfies 0.2mm≤L≤1.0mm. The cover plate assembly provided by the present invention can avoid the situation where the plugging element pops up due to insufficient friction generated in the area where the pre-pressing pressing part abuts against the inner wall of the liquid injection hole; and sufficient exhaust channels are reserved to ensure the smooth progress of the helium detection process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of batteries, and in particular to a cover plate assembly and a battery. Background Art

[0002] After the battery is filled with liquid, the filling hole of the battery shell needs to be sealed. Before sealing, a certain amount of special gas such as helium needs to be injected into the battery so that after sealing, the battery's sealing can be tested by detecting whether there is gas leakage at the filling hole of the battery.

[0003] Before conducting a helium test, a sealing nail is often inserted into the liquid injection hole, and then the battery cell is filled with helium under negative pressure. In related technologies, when the sealing nail is inserted into the liquid injection hole, when sufficient exhaust channels are reserved, it is easy to cause insufficient friction between the sealing nail and the liquid injection hole, causing the nail to pop out. Summary of the invention

[0004] In view of this, the present invention provides a cover plate assembly and a battery to solve the problem that when sufficient exhaust channels are reserved for helium inspection of battery cells, the friction between the sealing nails and the injection holes is insufficient.

[0005] In a first aspect, the present invention provides a cover plate assembly, comprising:

[0006] A cover plate, on which a liquid injection hole is provided;

[0007] The blocking element has a sealing state in which the injection hole is blocked, and a conducting state in which the injection hole is at least partially extended into the injection hole to make the injection hole partially conductive;

[0008] The blocking element comprises a sealing portion, which is tightly sealed against the inner wall of the injection hole in a sealed state;

[0009] The blocking element further includes at least two supporting parts located on one side of the sealing part along the axial direction, and an avoidance part located between two adjacent supporting parts along the circumferential direction. In the conducting state, the supporting parts are tightly matched with the inner wall of the injection hole, and the avoidance part is spaced from the inner wall of the injection hole.

[0010] In the conducting state, the area where the support part abuts the inner wall of the injection hole is defined as the pre-compression pressing part; along the circumference surrounding the blocking element, the size of the contact area between the pre-compression pressing part and the inner wall of the injection hole is the pre-compression width L, where L satisfies 0.2mm≤L≤1.0mm.

[0011] Beneficial effect: By setting the lower limit of the pre-pressing width L, it is possible to avoid the situation where the friction force generated in the area where the pre-pressing pressing part contacts the inner wall of the injection hole is insufficient, which causes the blocking element to pop up. By setting the upper limit of the pre-pressing width L, it is possible to avoid the situation where the support part occupies too much space, resulting in the exhaust channel being too narrow, thereby reserving enough exhaust channels to ensure the smooth progress of the helium inspection process; at the same time, setting the upper limit of the pre-pressing width L can also avoid the situation where the friction force generated in the area where the pre-pressing pressing part contacts the inner wall of the injection hole is too large, and avoid the situation where the inspection tooling cannot smoothly drive the blocking element into the injection hole.

[0012] In an optional embodiment, along the circumference of the blocking element, the circumferential dimension of the end of the support portion connected to the sealing portion is defined as d1, and the circumferential dimension of the end of the support portion away from the sealing portion is defined as d2, wherein d2>d1;

[0013] The preload width L satisfies: 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%.

[0014] Beneficial effect: When the blocking element is pressed into the injection hole by the detection tooling, it is preferred that the contact area between the blocking element and the inner wall of the injection hole is in the middle position of the support part, that is, the size of the pre-pressing width L is: along the circumference surrounding the blocking element, the size of the middle position of the support part, that is: 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%.

[0015] In an optional embodiment, along the radial direction, the outer edge of the support portion is flush with the outer edge of the sealing portion;

[0016] The pre-compression width L also satisfies: 1 / 120πC≤L≤1 / 6πC; wherein C is the diameter of the sealing portion along the radial direction.

[0017] Beneficial effect: By making the pre-stress width L satisfy 1 / 120πC≤L≤1 / 6πC; wherein C is the diameter of the sealing part in the radial direction, thereby limiting the proportion of the pre-stress width L in the whole circle, by making 1 / 120πC≤L, it is possible to ensure that the pre-stress width L has a sufficient proportion, avoiding the situation where the friction force generated in the area where the pre-stressing pressing part abuts against the inner wall of the injection hole is insufficient, resulting in the blocking element popping up. By making L≤1 / 6πC, it is possible to avoid the pre-stress width L accounting for too large a proportion of the whole circle, avoiding the support part occupying too much space, resulting in the exhaust channel being too narrow, thereby reserving enough exhaust channels to ensure the smooth progress of the helium detection process; at the same time, setting the upper limit of the pre-stress width L to be less than or equal to 1 / 6πC can also avoid the friction force generated in the area where the pre-stressing pressing part abuts against the inner wall of the injection hole being too large, avoiding the situation where the detection tooling cannot smoothly press the blocking element into the injection hole.

[0018] In an optional embodiment, the circumferential dimension of the support portion gradually increases from the sealing portion toward the axial direction away from the sealing portion, and the growth amount of the support portion satisfies: 1 / 6d1≤d2-d1≤1 / 2d1.

[0019] Beneficial effect: From the sealing part to the axial direction away from the sealing part, the circumferential dimension of the support part gradually increases, that is, along the direction in which the blocking element is installed into the injection hole, the circumferential dimension of the support part gradually increases. Correspondingly, after the blocking element is pressed into the injection hole, if the blocking element pops outward under the action of elastic force, the area of ​​the region where the support part abuts against the inner wall of the injection hole will gradually increase, thereby further limiting the popping out of the blocking element and improving the assembly reliability of the blocking element and the injection hole. By further limiting the growth amount of the support part, it is satisfied that: 1 / 6d1≤d2-d1≤1 / 2d1. By setting 1 / 6d1≤d2-d1, it is possible to ensure that the circumferential dimension of the support part is in a gradually increasing state, effectively preventing the blocking element from popping outward under the action of elastic force. And by setting d2-d1≤1 / 2d1, it is avoided that the circumferential dimension of the support part away from one end of the sealing part is too large, resulting in the occurrence of an exhaust passage that is too narrow, thereby reserving sufficient exhaust passages to ensure the smooth progress of the helium detection process.

[0020] In an optional embodiment, the blocking element is extruded; the blocking element is formed with a preparation pressing portion and a preparation reserved portion on an end surface of one end away from the support portion, and the preparation pressing portion surrounds the outer peripheral side of the preparation reserved portion;

[0021] The preparation pressing portion is suitable for abutting against the extrusion molding device, and the preparation reserved portion has no contact with the extrusion molding device.

[0022] Beneficial effect: A preparation pressing portion and a preparation reserved portion are formed on the end face of the plugging component away from the supporting portion. During the extrusion molding process, the extrusion molding equipment abuts against and presses the preparation pressing portion, while the preparation reserved portion has no contact with the extrusion molding equipment, thereby allowing excess waste materials of the plugging component to be concentrated in the preparation reserved portion area. Since the preparation reserved portion has no direct contact with the injection hole, burrs or flash formed in this area will not affect the subsequent sealing effect; thereby facilitating processing and improving manufacturing yield.

[0023] In an optional embodiment, the diameter D of the prepared reserved portion along the radial direction satisfies: 0.3 mm≤D≤2.3 mm.

[0024] Beneficial effect: By limiting the lower limit of the diameter D of the preparation reserved part in the radial direction, it is possible to avoid the situation where all the excess waste cannot be concentrated in the preparation reserved part, reduce the formation of burrs on the circumferential edge of the plugging element, and ensure that the burrs on the circumferential edge of the plugging element will not cause the plugging element to be skewed due to scratching the cavity wall of the conveying equipment during nailing and feeding, thereby improving the success rate of nailing and feeding. By limiting the upper limit of the diameter D of the preparation reserved part in the radial direction, it is possible to avoid the situation where the area of ​​the preparation pressing part is too small due to the diameter D of the preparation reserved part in the radial direction being too large, and ensure the area of ​​the contact area between the extrusion molding equipment and the preparation pressing part during the extrusion molding process, avoid the situation where all the excess waste cannot be concentrated in the preparation reserved part, reduce the formation of burrs on the circumferential edge of the plugging element, and ensure that the burrs on the circumferential edge of the plugging element will not cause the plugging element to be skewed due to scratching the cavity wall of the conveying equipment during nailing and feeding, thereby improving the success rate of nailing and feeding.

[0025] In an optional embodiment, along the circumference around the blocking element, a region where the support portion contacts the escape portion forms a transition portion with an R angle or a chamfer.

[0026] Beneficial effect: By forming an R-angle or chamfered transition portion in the area where the support portion contacts the avoidance portion, the manufacturability and assemblability of the product can be improved, production and manufacturing are convenient, and the installation of the unblocking element and the injection hole is also facilitated, making the edges and corners smoother and avoiding jamming during the assembly process.

[0027] In an optional embodiment, the blocking element further includes: a guide portion, the guide portion is connected to an end of the support portion away from the sealing portion; and the diameter of the guide portion gradually decreases in a direction away from the support portion.

[0028] Beneficial effect: By arranging the guide part at one end of the support part away from the sealing part, the guide part can play a guiding role when the unblocking element is installed into the liquid injection hole, thereby improving the smoothness of assembly.

[0029] In an optional embodiment, the material of the blocking element includes fluororubber or ethylene propylene diene monomer (EPDM).

[0030] Beneficial effects: The use of elastic material can improve the sealing effect between the plugging element and the injection hole, ensure good sealing, and facilitate the processing and manufacturing of the plugging element.

[0031] In a second aspect, the present invention further provides a battery, comprising: a cover plate assembly as described above.

[0032] Because the battery includes a cover plate assembly, it has the same effect as the cover plate assembly and is not described in detail here. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 It is a three-dimensional schematic diagram of the blocking element of the present invention;

[0035] Figure 2 It is a front view of the blocking element of the present invention;

[0036] Figure 3 A bottom view of the blocking element of the present invention;

[0037] Figure 4 It is a schematic diagram of the blocking element and the cover plate of the present invention being in a conducting state;

[0038] Figure 5 It is a schematic diagram of the blocking element and the cover plate of the present invention being in a sealed state;

[0039] Description of reference numerals:

[0040] 10. Blocking element; 1. Sealing part; 2. Support part; 3. Avoiding part; 4. Preparation of reserved part; 5. Preparation of pressing part; 6. Guide part; 7. Transition part; 20. Cover plate; 21. Liquid injection hole; 30. Exhaust channel. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0042] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0043] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0045] Combine the following Figures 1 to 5 , describing an embodiment of the present invention.

[0046] According to an embodiment of the present invention, on the one hand, a cover plate assembly is provided, comprising:

[0047] A cover plate 20 having a liquid injection hole 21 formed thereon;

[0048] The blocking element 10 has a sealed state in which the injection hole 21 is blocked, and a conductive state in which the injection hole 21 is at least partially extended into the injection hole 21 to make the injection hole 21 partially conductive;

[0049] The blocking element 10 comprises a sealing portion 1. In a sealed state, the sealing portion 1 is tightly sealed against the inner wall of the injection hole 21.

[0050] The blocking element 10 further includes at least two support portions 2 located on one side of the sealing portion 1 along the axial direction, and an avoidance portion 3 located between two adjacent support portions 2 along the circumferential direction. In the conducting state, the support portion 2 is tightly matched with the inner wall of the injection hole 21, and the avoidance portion 3 is spaced from the inner wall of the injection hole 21.

[0051] In the conducting state, the area where the support part 2 abuts against the inner wall of the injection hole 21 is defined as the pre-compression pressing part; along the circumference around the blocking element 10, the size of the contact area between the pre-compression pressing part and the inner wall of the injection hole 21 is the pre-compression width L, where L satisfies 0.2mm≤L≤1.0mm.

[0052] Combination Figure 4 , Figure 5 As shown, the blocking element 10 is suitable for being installed in the injection hole 21 along the axial direction. After the battery is injected, the injection hole of the battery shell needs to be sealed. When the sealing part 1 is tightly sealed against the inner wall of the injection hole 21, the injection hole 21 is completely sealed, thereby preventing the electrolyte inside the battery shell from flowing out. Before sealing, a certain amount of helium needs to be injected into the battery to detect the sealing of the battery.

[0053] In this embodiment, the blocking element 10 is segmented along the axial direction, so that it is not only suitable for sealing the injection hole 21, but also suitable for forming the exhaust channel 30 in the helium detection stage.

[0054] By at least partially extending the blocking element 10 into the injection hole 21, the injection hole 21 is not in a completely sealed state. At this time, the support portion 2 of the blocking element 10 located on one side of the sealing portion 1 along the axial direction is tightly fitted with the inner wall of the injection hole 21. Since an escape portion 3 is formed between two adjacent support portions 2 along the circumferential direction, when the support portion 2 is tightly fitted with the inner wall of the injection hole 21, the escape portion 3 is spaced from the inner wall of the injection hole 21, thereby forming an exhaust channel 30. The exhaust channel 30 realizes the internal and external conduction of the cover plate 20, thereby facilitating the injection of a certain amount of helium into the battery to detect the sealing of the battery.

[0055] When testing the sealing of the battery, it is necessary to press the blocking element 10 into the injection hole 21 through the testing tooling. The blocking element 10 is an elastic element and has a certain upward elastic force after being pressed into the injection hole 21. Therefore, after being pressed in, it is necessary to ensure that the friction force generated in the area where the support portion 2 abuts against the inner wall of the injection hole 21 is greater than the upward elastic force of the blocking element 10, so as to avoid the blocking element 10 from popping up.

[0056] In this embodiment, the area where the support portion 2 abuts against the inner wall of the injection hole 21 is defined as the pre-compression pressing portion; along the circumference surrounding the blocking element 10, the size of the contact area between the pre-compression pressing portion and the inner wall of the injection hole 21 is the pre-compression width L, and the pre-compression width L needs to satisfy 0.2mm≤L≤1.0mm.

[0057] As an optional embodiment, the specific value of the pre-pressing width L may be: 0.2 mm or 0.3 mm or 0.5 mm or 0.6 mm or 0.8 mm or 1 mm, etc.

[0058] By setting a lower limit of the pre-compression width L, it is possible to avoid the situation where the blocking element 10 pops up due to insufficient friction in the area where the pre-compression pressing portion contacts the inner wall of the injection hole 21 .

[0059] By setting an upper limit to the pre-compression width L, it is possible to avoid the support portion 2 occupying too much space, causing the exhaust channel 30 to be too narrow, thereby reserving a sufficient exhaust channel to ensure the smooth progress of the helium detection process; at the same time, setting an upper limit to the pre-compression width L can also avoid excessive friction generated in the area where the pre-compression pressing portion abuts against the inner wall of the injection hole 21, thereby avoiding the situation where the detection tooling cannot smoothly drive the unblocking element 10 into the injection hole 21.

[0060] In this embodiment, the blocking element 10 is formed with three support portions 2 , and an escape portion 3 is formed between every two adjacent support portions 2 . The escape portion 3 may specifically be an edge cut surface.

[0061] In some embodiments, in combination Figure 4 As shown, along the circumference of the blocking element 10, the circumferential dimension of the end of the support portion 2 connected to the sealing portion 1 is defined as d1, and the circumferential dimension of the end of the support portion 2 away from the sealing portion 1 is defined as d2, wherein d2>d1;

[0062] The preload width L satisfies: 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%.

[0063] In this embodiment, when the blocking element 10 is pressed into the injection hole 21 by the detection tooling, it is preferred that the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2, that is, the size of the pre-pressing width L is: along the circumference surrounding the blocking element 10, the size of the middle position of the support part 2, that is: 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%.

[0064] When the pre-pressing width L exceeds the upper limit of 1 / 2(d1+d2)·120%, the detection tooling presses the blocking element 10 into the injection hole 21 too shallowly. At this time, the support part 2 occupies too much space, which may easily cause the exhaust channel 30 to be too narrow, affecting the smooth progress of the helium detection process; when the pre-pressing width L exceeds the lower limit of 1 / 2(d1+d2)·80%, the detection tooling presses the blocking element 10 into the injection hole 21 too deeply, and the friction force generated in the area where the pre-pressing pressing part abuts against the inner wall of the injection hole 21 is insufficient, causing the blocking element 10 to easily move along the axial direction, thereby interfering with the normal progress of the helium detection process.

[0065] Preferably, the pre-pressing width L is selected as L=1 / 2(d1+d2).

[0066] In conjunction with Table 1 below, the actual use effects of the cover plate assembly of the present invention under different parameters are compared through several embodiments and comparative examples. Each group of embodiments or comparative examples produces more than 50 plugging elements 10, and the assembly pre-pressing yield is calculated by counting the assembly pre-pressing results of each group of embodiments or comparative examples.

[0067] Table 1

[0068]

[0069] In Example 1, d1=0.17mm, d2=0.23mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.2mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99.9%, which can meet actual needs.

[0070] In Example 2, d1=0.24mm, d2=0.37mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.305mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99.3%, which can meet actual needs.

[0071] In Example 3, d1=0.37mm, d2=0.48mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.425mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 98.2%, which can meet actual needs.

[0072] In Example 4, d1=0.47mm, d2=0.58mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.525mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99.9%, which can meet actual needs.

[0073] In Example 5, d1=0.57mm, d2=0.73mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.65mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99.8%, which can meet actual needs.

[0074] In Example 6, d1=0.62mm, d2=0.79mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.705mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99.1%, which can meet actual needs.

[0075] In Example 7, d1=0.79mm, d2=0.98mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is located in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=0.885mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 99%, which can meet actual needs.

[0076] In Example 8, d1=0.92mm, d2=1.08mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is in the middle position of the support part 2. The corresponding pre-pressing width is L=1 / 2(d1+d2)=1mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is 82.1%, which is average and can meet the actual needs to a certain extent.

[0077] In addition, in combination with Embodiment 1' to Embodiment 8', when the pre-pressing width L fluctuates within the range of 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%, it is verified through experiments that the assembly pre-pressing yield can also meet the requirements.

[0078] In Comparative Example 1, d1=0.14mm, d2=0.2mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is in the middle position of the support part 2, and the corresponding pre-pressing width is L=1 / 2(d1+d2)=0.17mm. The assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is only 25.1%. Due to the small pre-pressing width, after the blocking element 10 is driven into the injection hole 21, the blocking element 10 pops up due to insufficient friction, resulting in a low yield that cannot meet actual needs.

[0079] In Comparative Example 2, d1=0.16mm, d2=0.22mm are set, and the blocking element 10 is pressed into the injection hole 21 through the detection tooling, and the contact area between the blocking element 10 and the inner wall of the injection hole 21 is in the middle position of the support part 2, and the corresponding pre-pressing width is L=1 / 2(d1+d2)=0.19mm. The assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is only 33.3%. Due to the small pre-pressing width, after the blocking element 10 is driven into the injection hole 21, the blocking element 10 pops up due to insufficient friction, resulting in a low yield that cannot meet actual needs.

[0080] In comparative example 3, d1=1.02mm, d2=1.1mm are set, and the blocking element 10 is pressed toward the injection hole 21 by the detection tool. The corresponding pre-pressing width is L=1 / 2(d1+d2)=1.06mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is only 32%. Because the detection tool needs to set a reasonable upper limit of the pressing force when pressing the blocking element 10 into the injection hole 21, it is prevented that the blocking element 10 is deformed or the cover plate or the pole group is damaged due to excessive pressing force; in this comparative example, due to the excessive pre-pressing width, the friction force is too large, and a certain number of blocking elements 10 cannot be smoothly driven into the injection hole 21, resulting in assembly failure and low yield, which cannot meet actual needs.

[0081] In comparative example 4, d1=1.24mm, d2=1.32mm are set, and the blocking element 10 is pressed toward the injection hole 21 by the detection tool. The corresponding pre-pressing width is L=1 / 2(d1+d2)=1.28mm, and the assembly pre-pressing result is recorded; more than 50 blocking elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and it is found that the assembly pre-pressing yield is only 13%. Because the detection tool needs to set a reasonable upper limit of the pressing force when pressing the blocking element 10 into the injection hole 21, it is prevented that the blocking element 10 is deformed or the cover plate or the pole group is damaged due to excessive pressing force; in this comparative example, due to the excessive size of the pre-pressing width, the friction force is too large, and a certain number of blocking elements 10 cannot be smoothly driven into the injection hole 21, resulting in assembly failure and low yield, which cannot meet actual needs.

[0082] In comparative example 5, d1=1.98mm, d2=2.36mm are set, and the plugging element 10 is pressed toward the injection hole 21 by the detection tool. The corresponding pre-pressing width is L=1 / 2(d1+d2)=2.17mm, and the assembly pre-pressing result is recorded; more than 50 plugging elements 10 of this model are produced by proofing, and the experimental steps are repeated. The assembly pre-pressing results are summarized, and the assembly pre-pressing yield is 0%. Because the detection tool needs to set a reasonable upper limit of the pressing force when pressing the plugging element 10 into the injection hole 21, it is prevented that the plugging element 10 is deformed or the cover plate or the pole group is damaged due to excessive pressing force; in this comparative example, due to the excessive pre-pressing width, the friction force is too large, and the entire number of plugging elements 10 cannot be smoothly driven into the injection hole 21, resulting in assembly failure, which cannot meet actual needs.

[0083] In some embodiments, in combination Figure 1 As shown, along the radial direction, the outer edge of the support portion 2 is flush with the outer edge of the sealing portion 1;

[0084] The pre-compression width L also satisfies: 1 / 120πC≤L≤1 / 6πC; wherein C is the diameter of the sealing portion 1 along the radial direction.

[0085] Since the outer edge of the support portion 2 is flush with the outer edge of the sealing portion 1 in the radial direction, the projections of the outer edge of the support portion 2 and the outer edge of the sealing portion 1 in the axial direction overlap.

[0086] Therefore, the circumference of the outer edge of the sealing portion 1 can represent the circumference of a circle that is simultaneously tangent to the outer edges of the plurality of support portions 2 .

[0087] By making the pre-stress width L satisfy 1 / 120πC≤L≤1 / 6πC, where C is the diameter of the sealing part 1 in the radial direction, the proportion of the pre-stress width L in the whole circle is limited. By making 1 / 120πC≤L, it is possible to ensure that the pre-stress width L has a sufficient proportion, and avoid the situation where the friction force generated in the area where the pre-stressing pressing part abuts against the inner wall of the injection hole 21 is insufficient, resulting in the blocking element 10 popping up. By making L≤1 / 6πC, it is possible to avoid the pre-stress width L accounting for too large a proportion of the whole circle, avoid the support part 2 occupying too much space, and cause the exhaust channel 30 to be too narrow, thereby reserving enough exhaust channels to ensure the smooth progress of the helium detection process; at the same time, setting the upper limit of the pre-stress width L to be less than or equal to 1 / 6πC can also avoid the friction force generated in the area where the pre-stressing pressing part abuts against the inner wall of the injection hole 21 is too large, and avoid the situation where the detection tooling cannot smoothly press the blocking element 10 into the injection hole 21.

[0088] In some embodiments, in combination Figure 2 As shown, from the sealing portion 1 toward the axial direction away from the sealing portion 1, the circumferential dimension of the supporting portion 2 gradually increases, and the growth amount of the supporting portion 2 satisfies: 1 / 6d1≤d2-d1≤1 / 2d1.

[0089] The circumferential dimension of the support portion 2 gradually increases from the sealing portion 1 toward the axial direction away from the sealing portion 1, that is, along the direction in which the blocking element 10 is inserted into the injection hole 21, the circumferential dimension of the support portion 2 gradually increases. Correspondingly, after the blocking element 10 is pressed into the injection hole 21, if the blocking element 10 pops outward under the action of elastic force, the area of ​​the region where the support portion 2 abuts against the inner wall of the injection hole 21 will gradually increase, thereby further limiting the popping out of the blocking element 10 and improving the assembly reliability of the blocking element 10 and the injection hole 21.

[0090] This embodiment further limits the growth amount of the support portion 2 to meet the following conditions: 1 / 6d1≤d2-d1≤1 / 2d1. By setting 1 / 6d1≤d2-d1, it is possible to ensure that the circumferential dimension of the support portion 2 is in a gradually increasing state, effectively preventing the blocking element 10 from popping outward under the action of elastic force. And by setting d2-d1≤1 / 2d1, it is possible to avoid the circumferential dimension of the support portion 2 far from the end of the sealing portion 1 being too large, resulting in the exhaust passage 30 being too narrow, thereby reserving sufficient exhaust passages to ensure the smooth progress of the helium detection process.

[0091] In some embodiments, in combination Figure 1 As shown, the blocking element 10 is extruded; the blocking element 10 is formed with a preparation pressing portion 5 and a preparation reserved portion 4 on an end surface away from the support portion 2, and the preparation pressing portion 5 surrounds the outer peripheral side of the preparation reserved portion 4;

[0092] The preparation pressing portion 5 is suitable for abutting against the extrusion molding device, and the preparation reserved portion 4 has no contact with the extrusion molding device.

[0093] In the present embodiment, the blocking element 10 is made of an elastic material, and in the specific preparation process, extrusion molding is adopted. In order to prevent the formation of burrs and flashes on the blocking element 10 after demolding, especially to avoid the presence of burrs or flashes on the circumferential edge of the sealing part 1 that affect the smoothness of subsequent nailing and sealing effect, the blocking element 10 of the present embodiment is formed with a preparation pressing part 5 and a preparation reserved part 4 on the end face away from the support part 2. During the extrusion molding process, the extrusion molding equipment abuts against and presses the preparation pressing part 5, while the preparation reserved part 4 has no contact with the extrusion molding equipment, so that the excess waste of the blocking element 10 can be concentrated in the preparation reserved part 4 area. Since the preparation reserved part 4 has no direct contact with the injection hole 21, the burrs or flash formed in this area will not affect the subsequent sealing effect; thereby facilitating processing and improving manufacturing yield.

[0094] Optionally, the prepared reserved portion 4 may be formed into a roughly boss form after extrusion molding.

[0095] In some embodiments, in combination Figure 1 As shown, the diameter D of the prepared reserved portion 4 along the radial direction satisfies: 0.3 mm≤D≤2.3 mm.

[0096] As an optional embodiment, the specific value of the diameter D of the reserved portion 4 along the radial direction can be: 0.3mm or 0.5mm or 0.6mm or 0.8mm or 1mm or 1.3mm or 1.5mm or 1.8mm or 2mm or 2.3mm, etc.

[0097] In conjunction with the following Table 2, the actual use effects of the blocking element 10 of the present invention under different parameters of the diameter D of the reserved portion 4 along the radial direction are compared through several embodiments and comparative examples.

[0098] It should be noted that in the actual continuous operation of production, the blocking element 10 needs to be transported in sequence by the conveying equipment. When the burr size on the circumferential edge of the blocking element 10 is too large, it is easy to scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, and then easily leading to the failure of nailing and feeding. Only when the burr size is small and can smoothly pass through the cavity wall of the conveying equipment, will the blocking element 10 not be skewed, thereby ensuring the success of nailing and feeding. The measured burr size described in Table 2 below refers to: the burr size of the circumferential edge of the blocking element 10 that is easy to scratch the cavity wall of the conveying equipment; it is not the burr size in the area of ​​the preparation reserved portion 4.

[0099] Table 2

[0100]

[0101] In sample number 1, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.15 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is too small, the excess waste materials cannot be completely concentrated in the preparation reserved portion 4, and burrs are easily formed on the circumferential edge of the blocking element 10. The actual burr size is measured to be 0.23 mm. During the nailing and feeding process, the burrs on the circumferential edge of the blocking element 10 scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, resulting in the failure of nailing and feeding.

[0102] In sample number 2, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.23 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is too small, the excess waste materials cannot be completely concentrated in the preparation reserved portion 4, and burrs are easily formed on the circumferential edge of the blocking element 10. The actual burr size is measured to be 0.21 mm. During the nailing and feeding process, the burrs on the circumferential edge of the blocking element 10 scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, resulting in the failure of nailing and feeding.

[0103] In sample number 3, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.28 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is too small, the excess waste materials cannot be completely concentrated in the preparation reserved portion 4, and burrs are easily formed on the circumferential edge of the blocking element 10. The actual burr size is measured to be 0.17 mm. During the nailing and feeding process, the burrs on the circumferential edge of the blocking element 10 scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, resulting in nailing and feeding failure.

[0104] In sample number 4, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.3 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated to the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.15 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0105] In sample number 5, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.35 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.15 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0106] In sample number 6, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.72 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.12 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0107] In sample number 7, the diameter D of the preparation reserved portion 4 along the radial direction is set to 0.96 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.12 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0108] In sample number 8, the diameter D of the preparation reserved portion 4 along the radial direction is set to 1.28 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.11 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0109] In sample number 9, the diameter D of the preparation reserved portion 4 along the radial direction is set to 1.53 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.11 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0110] In sample number 10, the diameter D of the preparation reserved portion 4 along the radial direction is set to 1.76 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.12 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0111] In sample number 11, the diameter D of the preparation reserved portion 4 along the radial direction is set to 1.97 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.12 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0112] In sample number 12, the diameter D of the preparation reserved portion 4 along the radial direction is set to 2.15 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.13 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0113] In sample number 13, the diameter D of the preparation reserved portion 4 along the radial direction is set to 2.25 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.15 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0114] In sample number 14, the diameter D of the preparation reserved portion 4 along the radial direction is set to 2.3 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is moderate, the excess waste can be concentrated on the preparation reserved portion 4, and the size of the burr formed on the circumferential edge of the blocking element 10 is only 0.15 mm. During the nailing and feeding process, the blocking element 10 can smoothly pass through the cavity wall of the conveying equipment, and the blocking element 10 is aligned with the injection hole 21 to achieve smooth nailing, and the nailing and feeding is successful.

[0115] In sample number 15, the diameter D of the preparation reserved portion 4 along the radial direction is set to 2.3 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is too large and the overall diameter of the blocking element 10 is fixed, that is, the diameter of the sealing portion 1 along the radial direction is fixed, the area of ​​the preparation pressing portion 5 is smaller. During the extrusion molding process, the contact area between the extrusion molding equipment and the preparation pressing portion 5 becomes smaller, resulting in that the excess waste materials cannot be fully concentrated on the preparation reserved portion 4, and burrs are easily formed on the circumferential edge of the blocking element 10. The actual burr size is measured to be 0.18 mm. During the nailing and feeding process, the burrs on the circumferential edge of the blocking element 10 scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, resulting in nailing and feeding failure.

[0116] In sample number 16, the diameter D of the preparation reserved portion 4 along the radial direction is set to 3.0 mm. At this time, since the diameter D of the preparation reserved portion 4 along the radial direction is too large and the overall diameter of the blocking element 10 is fixed, that is, the diameter of the sealing portion 1 along the radial direction is fixed, the area of ​​the preparation pressing portion 5 is smaller. During the extrusion molding process, the contact area between the extrusion molding equipment and the preparation pressing portion 5 becomes smaller, resulting in that the excess waste materials cannot be fully concentrated on the preparation reserved portion 4, and burrs are easily formed on the circumferential edge of the blocking element 10. The actual burr size is measured to be 0.2 mm. During the nailing and feeding process, the burrs on the circumferential edge of the blocking element 10 scratch the cavity wall of the conveying equipment, causing the blocking element 10 to be skewed, resulting in nailing and feeding failure.

[0117] According to the experiment summary, the diameter D of the preparation reserved portion 4 along the radial direction is selected as: 0.3mm≤D≤2.3mm. By limiting the lower limit of the diameter D of the preparation reserved portion 4 along the radial direction, it is possible to avoid the situation where the excess waste cannot be fully concentrated in the preparation reserved portion 4, and reduce the formation of burrs on the circumferential edge of the plugging element 10. Therefore, during the nailing and feeding process, it is ensured that the burrs on the circumferential edge of the plugging element 10 will not cause the plugging element 10 to be skewed due to scratching the cavity wall of the conveying equipment, thereby improving the success rate of nailing and feeding. By limiting the upper limit of the diameter D of the preparation reserved portion 4 along the radial direction, it is possible to avoid a smaller area of ​​the preparation pressing portion 5 due to the diameter D of the preparation reserved portion 4 being too large along the radial direction. During the extrusion molding process, the contact area between the extrusion molding equipment and the preparation pressing portion 5 is ensured, and the situation in which excess waste materials cannot be fully concentrated in the preparation reserved portion 4 is avoided, and the formation of burrs on the circumferential edge of the blocking element 10 is reduced. Therefore, during the nailing and feeding process, it is ensured that the burrs on the circumferential edge of the blocking element 10 will not cause the blocking element 10 to be skewed due to scratching the cavity wall of the conveying equipment, thereby improving the success rate of nailing and feeding.

[0118] In some embodiments, in combination Figure 1 As shown, along the circumference around the blocking element 10 , the region where the support portion 2 contacts the escape portion 3 forms a transition portion 7 with an R angle or a chamfer.

[0119] By forming an R-angled or chamfered transition portion 7 in the area where the support portion 2 contacts the avoidance portion 3, the manufacturability and assemblability of the product can be improved, production and manufacturing can be facilitated, and the installation of the blocking element 10 and the injection hole 21 can be facilitated, making the edges and corners smoother and avoiding jamming during the assembly process.

[0120] In some embodiments, in combination Figure 1 As shown, the blocking element 10 further includes: a guide portion 6 , which is connected to one end of the support portion 2 away from the sealing portion 1 ; and the diameter of the guide portion 6 gradually decreases in a direction away from the support portion 2 .

[0121] By providing the guide portion 6 at one end of the support portion 2 away from the sealing portion 1 , the guide portion 6 can play a guiding role when the blocking element 10 is installed into the liquid injection hole 21 , thereby improving the smoothness of assembly.

[0122] In some embodiments, the material of the blocking element 10 includes fluororubber or ethylene propylene diene monomer (EPDM).

[0123] The use of elastic material can improve the sealing effect between the blocking element 10 and the injection hole 21 , ensure good sealing, and facilitate the processing and manufacturing of the blocking element 10 .

[0124] According to an embodiment of the present invention, on the other hand, a battery is provided, comprising: the cover plate assembly as described above.

[0125] Obviously, the above embodiments are only examples for clear explanation, and are not intended to limit the implementation methods. Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations all fall within the scope defined by the present invention.

Claims

1. A cover plate assembly, characterized in that: include: A cover plate (20) having a liquid injection hole (21) formed thereon; The blocking element (10) has a sealing state in which the liquid injection hole (21) is blocked, and a conducting state in which the liquid injection hole (21) is at least partially extended into the liquid injection hole (21) to make the liquid injection hole (21) partially conductive; The blocking element (10) comprises a sealing portion (1), and in the sealed state, the sealing portion (1) is tightly sealed against the inner wall of the injection hole (21); The blocking element (10) further comprises at least two support portions (2) located on one side of the sealing portion (1) along the axial direction, and an avoidance portion (3) located between two adjacent support portions (2) along the circumferential direction, wherein in the conducting state, the support portion (2) is tightly fitted against the inner wall of the injection hole (21), and the avoidance portion (3) is spaced apart from the inner wall of the injection hole (21); In the conducting state, the area where the support portion (2) abuts against the inner wall of the injection hole (21) is defined as a pre-pressing abutment portion; along the circumference of the blocking element (10), the size of the contact area between the pre-pressing abutment portion and the inner wall of the injection hole (21) is a pre-pressing width L, wherein L satisfies 0.2 mm ≤ L ≤ 1.0 mm; Along the circumference of the blocking element (10), the circumferential dimension of the end of the support portion (2) connected to the sealing portion (1) is defined as d1, and the circumferential dimension of the end of the support portion (2) away from the sealing portion (1) is defined as d2, wherein d2>d1; The pre-compression width L satisfies: 1 / 2(d1+d2)·80%≤L≤1 / 2(d1+d2)·120%.

2. The cover plate assembly according to claim 1, characterized in that: In the radial direction, the outer edge of the support portion (2) is flush with the outer edge of the sealing portion (1); The pre-compression width L also satisfies: 1 / 120πC≤L≤1 / 6πC; wherein C is the diameter of the sealing portion (1) along the radial direction.

3. The cover plate assembly according to claim 1, characterized in that: From the sealing portion (1) towards the axial direction away from the sealing portion (1), the circumferential dimension of the support portion (2) gradually increases, and the growth amount of the support portion (2) satisfies: 1 / 6d1≤d2-d1≤1 / 2d1.

4. The cover plate assembly according to any one of claims 1 to 3, characterized in that: The blocking element (10) is extruded; the blocking element (10) is provided with a preparation pressing portion (5) and a preparation reserved portion (4) on an end surface away from the support portion (2), and the preparation pressing portion (5) surrounds the outer peripheral side of the preparation reserved portion (4); The preparation pressing portion (5) is suitable for abutting against the extrusion molding equipment, and the preparation reserved portion (4) has no contact with the extrusion molding equipment.

5. The cover plate assembly according to claim 4, characterized in that: The diameter D of the preparation reserved portion (4) along the radial direction satisfies: 0.3 mm≤D≤2.3 mm.

6. The cover plate assembly according to any one of claims 1 to 3, characterized in that: Along the circumference of the blocking element (10), the area where the support portion (2) contacts the avoidance portion (3) forms a transition portion (7) with an R angle or a chamfer.

7. The cover plate assembly according to any one of claims 1 to 3, characterized in that: The blocking element (10) further comprises: a guide portion (6), the guide portion (6) being connected to an end of the support portion (2) away from the sealing portion (1); the diameter of the guide portion (6) gradually decreasing in a direction away from the support portion (2).

8. The cover plate assembly according to any one of claims 1 to 3, characterized in that: The material of the blocking element (10) includes fluororubber or ethylene propylene diene monomer (EPDM).

9. A battery, characterized in that: It comprises the cover plate assembly as claimed in any one of claims 1 to 8.