Park power resource dispatching method and device
By obtaining current power consumption influencing factors and historical databases to generate power consumption forecast information, dispatch reserve power resources in agricultural parks, solve the problem of power supply and demand imbalance, improve production efficiency and reduce costs.
Patent Information
- Application Number
- CN202410725558.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-06-06
AI Technical Summary
Modern agricultural parks are prone to imbalances in power supply and demand when power consumption fluctuates greatly, affecting production activities, reducing production efficiency and increasing production costs.
By obtaining information on factors affecting current power consumption and historical power consumption database, power consumption prediction information is generated, and the reserve power resources of the park are dispatched to ensure the balance of power supply.
It effectively reduces the impact of the imbalance of power supply and demand on production activities, improves production efficiency and reduces production costs.
Smart Images

Figure CN118316127B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power control technology, and in particular to a park power resource scheduling method and device. Background Art
[0002] With the rapid development of science and technology, modern agricultural parks have also emerged. Modern agricultural parks promote regional agricultural structural adjustment and industrial upgrading through scientific and technological development, standard demonstration, regional radiation and model promotion in a certain area.
[0003] With the development of modern agricultural parks, some problems have also emerged. One of them is that when the power consumption of modern agricultural parks fluctuates greatly, there will be an imbalance in power supply and demand. When the type of production work, weather conditions and the number of electricity users in the modern agricultural park change, the power consumption of the park will also change. When the power production on the source side is much greater than the power consumption on the load side, the storage side needs to consume more resources to store the power; when the power production on the source side is less than the power consumption on the load side, there will be insufficient power supply, which will affect the production activities of the park.
[0004] Therefore, the regional power grid system within a modern agricultural park is prone to an imbalance in electricity supply and demand, which affects the park's production activities, thereby reducing production efficiency and increasing production costs. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] In a first aspect, the present invention provides a method for dispatching power resources in a park, comprising:
[0007] Obtain information on factors affecting the current electricity consumption in the park;
[0008] Generate electricity consumption forecast information based on the current electricity consumption influencing factor information and a preset historical electricity consumption database; wherein the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information;
[0009] Obtain the park's reserve power resource information;
[0010] The reserve power resources of the park are dispatched according to the power consumption forecast information and the reserve power resource information.
[0011] In a second aspect, the present invention provides a park power resource scheduling device, comprising:
[0012] A collection unit is used to obtain information on factors affecting the current power consumption of the park;
[0013] A prediction unit, configured to generate power consumption prediction information according to the current power consumption influencing factor information and a preset historical power consumption database; wherein the preset historical power consumption database is generated according to the historical power consumption influencing factor information and the historical power consumption information corresponding to the historical power consumption influencing factor information;
[0014] An acquisition unit, used to acquire the reserve power resource information of the park;
[0015] A scheduling unit is used to schedule the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information.
[0016] In a third aspect, the present invention provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the park power resource scheduling method when executing the program.
[0017] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the park power resource scheduling method.
[0018] The present invention provides a method, device, electronic device and readable storage medium for dispatching power resources in a park, which generates power consumption forecast information through current power consumption influencing factor information and a historical power consumption database, realizes the prediction of power consumption in the park, and reasonably dispatches the adjustable reserve power resources in the park when the power consumption in the park fluctuates greatly. The reserve power resources in the park are dispatched according to the power consumption forecast information and the reserve power resource information to ensure the normal operation of the regional power grid system in the park, so as to reduce the impact of the regional power grid system on the production activities of the park due to the imbalance of power supply and demand, thereby improving the production efficiency of the park and reducing production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a flow chart of the park power resource scheduling method in an embodiment of the present invention.
[0020] Figure 2 The present invention is a flow chart of generating a historical electricity consumption database in a park power resource scheduling method in an embodiment of the present invention.
[0021] Figure 3 It is a structural diagram of the park power resource scheduling method in an embodiment of the present invention.
[0022] Figure 4 Schematic diagram of the structure of an electronic device in an embodiment of the present invention. DETAILED DESCRIPTION
[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying any creative work.
[0024] The embodiment of the present invention provides a method for dispatching power resources in a park, see Figure 1 As shown, it specifically includes the following contents:
[0025] S101: Obtain information on factors affecting current electricity consumption in the park.
[0026] In this step, the park weather information, park production activity information and electricity user population information in the park (referring to the modern agricultural park, hereinafter referred to as the park) are obtained, and the park's electricity consumption influencing factor information is generated through the obtained park weather information, park production activity information and electricity user population information. Among them, the park weather information refers to temperature and humidity data information, the park production activity information refers to production quantity data information, and the electricity user population information refers to population quantity change data information.
[0027] The current power consumption influencing factor information of the park is obtained, that is, the current park weather information, the current park production activity information and the current power consumption population information are obtained, and the current power consumption influencing factor information is generated according to the current park weather information, the current park production activity information and the current power consumption population information.
[0028] This step reflects the power consumption of the park through the current power consumption influencing factor information of the park. Based on the established relationship between the power consumption information of the park and the power consumption influencing factor information (the historical power consumption database in step S102), the power consumption information of the park corresponding to the current power consumption influencing factor information can be obtained.
[0029] S102: Generate electricity consumption forecast information based on the current electricity consumption influencing factor information and a preset historical electricity consumption database; wherein the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information.
[0030] In this step, the power consumption forecast information can be obtained by performing real-time comparison processing based on the acquired current power consumption influencing factor information and the historical power consumption database. Specifically, when performing real-time comparison processing, the acquired current power consumption influencing factor information is compared with the historical power consumption influencing factor information in the historical power consumption database to obtain the comparison result. The purpose of the comparison processing is to determine whether the current power consumption influencing factor information is within the preset range of the historical power consumption database. If the current power consumption influencing factor information is within the preset range of the historical power consumption database, it indicates that the current regional power grid system can meet the current park usage needs and there is no need to dispatch the reserve power resources. If the current power consumption influencing factor information is outside the preset range of the historical power consumption database, it indicates that the current regional power grid system cannot meet the current park usage needs and it is necessary to dispatch the reserve power resources. Before the reserve power resources are dispatched, it is necessary to determine the reserve power resources that need to be dispatched. That is, it is necessary to conduct power consumption forecasting and generate power consumption forecasting information, and dispatch the reserve power resources according to the power consumption forecasting information.
[0031] It should be noted that the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information.
[0032] Obtain historical park weather information, historical park production activity information and historical electricity user population information, and generate historical electricity consumption influencing factor information based on historical park weather information, historical park production activity information and historical electricity user population information. Historical electricity consumption information includes: historical electricity consumption data information, electricity consumption time distribution information and electricity consumption type information. Establish a historical electricity consumption database based on historical electricity consumption information and historical electricity consumption influencing factor information. The historical electricity consumption database is a summary of the park's electricity consumption information, so as to summarize the park's electricity consumption rules from historical electricity consumption data, so as to facilitate subsequent prediction and early warning of the park's electricity consumption.
[0033] In one embodiment, the present invention provides a specific implementation of step S102, which specifically includes the following contents:
[0034] The historical electricity consumption influencing factor information in the historical electricity consumption database is compared with the current electricity consumption influencing factor information to obtain a comparison result. If the comparison result exceeds a preset error range, the electricity consumption of the park is predicted to obtain electricity consumption prediction information.
[0035] It should be noted that the present invention can pre-set an error range, which is a preset range of ±5% of the data in the historical electricity consumption database. The error range in the present invention is only for schematic illustration and not just as a limitation. The error range in the present invention can also be freely adjusted according to the needs of the corresponding park to ensure that the prediction sensitivity meets the needs of different parks.
[0036] In this embodiment, if the comparison result exceeds a preset error range, the power consumption prediction information is determined based on the current power consumption influencing factor information, the historical power consumption influencing factor information, the historical power consumption information and the preset power consumption prediction model.
[0037] The preset electricity consumption forecast model is:
[0038]
[0039] Among them, Y is the electricity consumption forecast information; X is i is the i-th factor information in the current electricity consumption influencing factor information; β i is the i-th factor information in the historical electricity consumption influencing factor information; represents the sum from i=0 to n, which is used to calculate the weighted sum of the independent variables; It is the historical electricity usage information.
[0040] S103: Obtain the reserve power resource information of the park.
[0041] In this step, the park's reserve power resource information includes: the park's internal power supply-side resource information and the park's internal power grid-side resource information, where the supply-side resource information includes: power plant information, biogas power generation information, wind turbine power generation information, photovoltaic cell information, adjustable load information, and battery energy storage system information; the power grid-side resource information includes: transmission line information and substation efficiency information. The supply-side resource information is used to provide power resources for the park, and the power grid-side resource information is used to transmit power resources.
[0042] It should be noted that power plant information includes the total installed capacity of the power plant and the energy conversion efficiency of the power plant, which indicates how much of the input energy is converted into electrical energy; photovoltaic cell information refers to the conversion efficiency of photovoltaic cells; wind turbine power generation information refers to the conversion efficiency of wind turbines; biogas power generation information refers to the conversion efficiency of biogas power generation; adjustable load information refers to the electricity demand information of various users in the power system; battery energy storage system information includes the total capacity of the battery energy storage system and the energy conversion efficiency of the battery system when charging and discharging; transmission line information refers to the power capacity that the line can transmit, and substation efficiency information includes the energy conversion efficiency of the transformer in the substation and the total capacity of the substation equipment. According to the specific information of the above resources, the subsequent power resources can be reasonably allocated.
[0043] S104: Dispatching the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information.
[0044] In this step, the reserve power resources that need to be dispatched are determined based on the power consumption forecast information that has been obtained, through the reserve power resource information and the power consumption forecast information. The reserve power resources that need to be dispatched are dispatched to ensure the normal use of electricity within the park. Among them, the reserve power resources that need to be dispatched are the additional power resources required to provide sufficient power consumption forecasted by the park. Appropriate power resources are allocated from the reserve power resources, and the appropriate power resources are aggregated with the currently operating park power resources, so that the regulated power resources meet the power demand of the park.
[0045] In one embodiment, the present invention provides a specific implementation of step S104, which specifically includes the following contents:
[0046] The scheduling mode of the reserve power resources is determined based on the electricity consumption forecast information. If the electricity consumption forecast information meets the preset judgment strategy of increasing the power generation strategy, the scheduling mode is determined to be the increase power generation mode; if the electricity consumption forecast information meets the preset judgment strategy of reducing the power generation strategy, the scheduling mode is determined to be the reduction power generation mode.
[0047] In this embodiment, the preset judgment strategy includes: the supply-demand difference between the predicted power consumption in the power consumption forecast information and the current predicted power generation of the park, and the duration of the supply-demand difference.
[0048] That is to say, if the predicted power consumption in the power consumption forecast information is higher than the current predicted power generation of the park, and the difference between the predicted power consumption and the predicted power generation is greater than 5% and lasts for 4 hours, the scheduling mode is determined to be the increase power generation mode. If the predicted power consumption in the power consumption forecast information is lower than the current predicted power generation of the park, and the difference between the predicted power consumption and the predicted power generation is greater than 5% and lasts for 4 hours, the scheduling mode is determined to be the decrease power generation mode.
[0049] It should be noted that the supply-demand difference = [(predicted power generation + predicted energy storage discharge power - predicted energy storage charging power - predicted power consumption) / predicted power consumption] x 100. The supply-demand difference and duration provided in the embodiments of the present invention are only for illustration and not for limitation. They can be freely adjusted according to the needs of the corresponding parks to ensure that the prediction sensitivity meets the needs of different parks.
[0050] A scheduling order of the reserve power resources is generated according to the scheduling mode and the reserve power resource information, and the reserve power resources are scheduled based on the scheduling order.
[0051] In this embodiment, if the dispatching mode is the power generation increase mode, the reserve power equipment that can increase the power generation in the reserve power resources and the power generation corresponding to the reserve power equipment are determined according to the reserve power resource information, and the power generation corresponding to the reserve power equipment is sorted according to the first preset order to obtain the dispatching order of the reserve power resources. The first preset order is sorted from low to high.
[0052] By sorting the power generation, when dispatching the reserve power resources, priority is given to dispatching the reserve power equipment with low power generation to generate power, so that the supply-demand difference between the predicted power consumption and the predicted power generation is less than 5%. When the supply-demand difference is less than 5%, the additional power resources required to meet the predicted power consumption of the park are provided, and the dispatch of the reserve power equipment is stopped.
[0053] If the dispatching mode is a power reduction mode, the power generation equipment that can be cut off and connected to the grid and the power generation corresponding to the power generation equipment in the reserve power resources are determined according to the reserve power resource information, and the power generation corresponding to the power generation equipment is sorted according to a second preset order to obtain a dispatching order of the reserve power resources. The second preset order is sorted from low to high.
[0054] By sorting the power generation corresponding to the power generation equipment, when dispatching the reserve power resources, the power generation equipment with low power generation connected to the grid is preferentially removed, so that the supply-demand difference between the predicted power consumption and the predicted power generation is less than 5%. When the supply-demand difference is less than 5%, the power generation has been reduced to meet the predicted power consumption of the park, and the removal of the power generation equipment connected to the grid is stopped.
[0055] From the above description, it can be seen that the present invention provides a method for dispatching power resources in a park, which generates power consumption forecast information through current power consumption influencing factor information and historical power consumption database, realizes the prediction of power consumption in the park, and reasonably dispatches the adjustable reserve power resources in the park when the power consumption in the park fluctuates greatly. The reserve power resources in the park are dispatched according to the power consumption forecast information and the reserve power resource information to ensure the normal operation of the regional power grid system in the park, so as to reduce the impact of the regional power grid system on the production activities of the park due to the imbalance of power supply and demand, thereby improving the production efficiency of the park and reducing production costs.
[0056] The embodiment of the present invention provides a method for generating a historical power consumption database in a park power resource scheduling method, see Figure 2 As shown, it specifically includes the following contents:
[0057] S201: Obtain historical electricity consumption information of the park and obtain information on factors affecting historical electricity consumption of the park.
[0058] In this step, the historical electricity consumption information includes: historical electricity consumption data information, electricity consumption time distribution information and electricity consumption type information. It should be noted that the historical electricity consumption data information in the historical electricity consumption information refers to the distribution of the park's electricity consumption in different time periods. It can be data divided by hours, days or other time granularities. It provides data on the overall electricity consumption of the park and the scale of electricity consumption, providing a basis for energy planning and budgeting. The electricity consumption time distribution information describes the pattern of electricity consumption within a day, including peak hours and trough hours, and displays the distribution of electricity consumption in different seasons, which is helpful for peak and valley electricity demand planning, avoiding overload during peak hours, and optimizing electricity costs. The electricity consumption type information describes the electricity consumption of each device and their proportion in the overall electricity consumption. Determining the electricity consumption of different devices and systems helps to carry out refined energy management and optimize equipment use and maintenance plans.
[0059] The historical electricity consumption influencing factor information is generated based on the park's historical park weather information, park production activity information and electricity user population information. Among them, the park weather information refers to temperature and humidity data information, the park production activity information refers to production quantity data information, and the electricity user population information refers to population quantity change data information.
[0060] Specifically, in this step, the temperature and humidity data information of the park, the production quantity data information of the park and the population change data information of the park are obtained, and the historical electricity consumption influencing factors of the park are determined based on the temperature and humidity data information, the production quantity data information, the population change data information and the preset relationship model.
[0061] In this embodiment, the preset relationship model is:
[0062] y=β0+β1x1+β2x2+β3x3+ε;
[0063] Among them, y represents the historical electricity consumption influencing factors, x1 represents the temperature and humidity data information, x2 represents the production quantity data information, x3 represents the population change data information, ε represents the random error term, β0 represents the constant term, β1, β2, β3 represent the regression coefficients. It should be noted that the random error term and the constant term are natural numbers, which can be set according to the usage requirements, and the regression coefficient is between 0 and 1.
[0064] In this step, the historical electricity consumption influencing factor information can be obtained based on the temperature and humidity data information of the park, the production quantity data information of the park, the population change data information of the park and the preset relationship model, and the relationship between the historical electricity consumption influencing factor information and the temperature and humidity data information, the production quantity data information and the population change data information can be intuitively displayed.
[0065] S202: Establishing a mapping between the historical electricity consumption information and the historical electricity consumption influencing factor information, and generating a historical electricity consumption database based on the mapping.
[0066] In this step, historical power consumption data information, historical power consumption time distribution information and historical power consumption type information are obtained, and historical power consumption influencing factor information, historical power consumption data information, historical power consumption time distribution information and historical power consumption type information are used as database fields. By connecting multiple database fields with data, a mapping between historical power consumption information and historical power consumption influencing factor information is established. The fields of the storage database and the mapping relationship between the fields form a historical power consumption database.
[0067] From the above description, it can be seen that this embodiment can establish a historical electricity consumption database based on historical electricity consumption information and historical electricity consumption influencing factor information. The historical electricity consumption database is a summary of the electricity consumption information of the park, so as to summarize the rules of electricity consumption in the park from the historical electricity consumption data, so as to facilitate subsequent prediction and early warning of the electricity consumption of the park.
[0068] The embodiment of the present invention provides a specific implementation of a park power resource scheduling device that can implement all the contents of the park power resource scheduling method, see Figure 3 The park power resource dispatching device specifically includes the following contents:
[0069] The collection unit 10 is used to obtain information on factors affecting the current electricity consumption in the park;
[0070] The prediction unit 20 is used to generate power consumption prediction information according to the current power consumption influencing factor information and a preset historical power consumption database; wherein the preset historical power consumption database is generated according to the historical power consumption influencing factor information and the historical power consumption information corresponding to the historical power consumption influencing factor information;
[0071] An acquisition unit 30 is used to acquire the reserve power resource information of the park;
[0072] The scheduling unit 40 is used to schedule the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information.
[0073] The prediction unit 20 includes:
[0074] A comparison subunit, configured to compare the historical electricity consumption influencing factor information in the historical electricity consumption database with the current electricity consumption influencing factor information to obtain a comparison result;
[0075] A judgment subunit is used to determine the power consumption prediction information according to the current power consumption influencing factor information, the historical power consumption influencing factor information, the historical power consumption information and a preset power consumption prediction model if the comparison result exceeds a preset error range.
[0076] The scheduling unit 40 includes:
[0077] A mode subunit, configured to determine a scheduling mode of the reserve power resource based on the power consumption forecast information;
[0078] A sequence subunit, configured to generate a scheduling sequence of the reserve power resources according to the scheduling mode and the reserve power resource information;
[0079] A scheduling subunit is used to schedule the reserve power resources based on the scheduling order.
[0080] The mode subunits include:
[0081] A first strategy module is used to determine that the scheduling mode is an increase power generation mode if the power consumption forecast information meets the increase power generation strategy in the preset judgment strategy;
[0082] The second strategy module is used to determine that the scheduling mode is a power generation reduction mode if the power consumption forecast information meets the power generation reduction strategy in the preset judgment strategy.
[0083] Among them, the sequential subunits include:
[0084] A first sequence module is used for determining, if the scheduling mode is a power generation increase mode, the reserve power equipment in the reserve power resources that can increase the power generation and the power generation corresponding to the reserve power equipment according to the reserve power resource information, and sorting the power generation corresponding to the reserve power equipment according to a first preset order to obtain the scheduling order of the reserve power resources;
[0085] The second sequence module is used to determine the power generation equipment that can be cut off and connected to the grid and the power generation corresponding to the power generation equipment in the reserve power resources according to the reserve power resource information if the scheduling mode is a power generation reduction mode, and sort the power generation corresponding to the power generation equipment according to a second preset order to obtain the scheduling order of the reserve power resources.
[0086] Furthermore, the above-mentioned park power resource dispatching device also includes:
[0087] A data unit is used to obtain the historical electricity consumption information of the park and the information of factors affecting the historical electricity consumption of the park;
[0088] The database unit is used to establish a mapping between the historical electricity consumption information and the historical electricity consumption influencing factor information, and generate a historical electricity consumption database based on the mapping.
[0089] The data unit includes:
[0090] The data subunit is used to obtain the temperature and humidity data information of the park, the production quantity data information of the park, and the population quantity change data information of the park;
[0091] The processing subunit is used to determine the historical electricity consumption influencing factor information of the park based on the temperature and humidity data information, the production quantity data information, the population change data information and a preset relationship model.
[0092] The embodiment of the park power resource scheduling device provided by the present invention can be specifically used to execute the processing flow of the embodiment of the park power resource scheduling method in the above embodiment. Its functions are not repeated here, and reference can be made to the detailed description of the above method embodiment.
[0093] From the above description, it can be seen that the park power resource scheduling device provided by the embodiment of the present invention generates power consumption forecast information through the current power consumption influencing factor information and the historical power consumption database, realizes the prediction of the park power consumption, and reasonably schedules the adjustable reserve power resources in the park when the park power consumption fluctuates greatly. The park reserve power resources are scheduled according to the power consumption forecast information and the reserve power resource information to ensure the normal operation of the park's regional power grid system, so as to reduce the impact of the regional power grid system on the park's production activities due to the imbalance of power supply and demand, thereby improving the park's production efficiency and reducing production costs.
[0094] The embodiment of the present invention provides an embodiment of an electronic device for implementing all or part of the contents of the park power resource scheduling method embodiment, see Figure 4 , the electronic device specifically includes the following contents:
[0095] Processor 810, communication interface 820, memory 830 and communication bus 840, wherein the processor 810, communication interface 820 and memory 830 communicate with each other through the communication bus 840. The processor 810 can call the computer instructions in the memory 830 to execute the following method:
[0096] Obtain information on factors affecting the current electricity consumption in the park;
[0097] Generate electricity consumption forecast information based on the current electricity consumption influencing factor information and a preset historical electricity consumption database; wherein the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information;
[0098] Obtain the park's reserve power resource information;
[0099] The reserve power resources of the park are dispatched according to the power consumption forecast information and the reserve power resource information.
[0100] An embodiment of the present invention provides a computer-readable storage medium for implementing all or part of the contents of the park power resource scheduling method embodiment. The computer-readable storage medium stores computer instructions. When the computer instructions are executed, the computer executes all the steps of the park power resource scheduling method in the above embodiment. For example, when the processor executes the computer instructions, the following steps are implemented:
[0101] Obtain information on factors affecting the current electricity consumption in the park;
[0102] Generate electricity consumption forecast information based on the current electricity consumption influencing factor information and a preset historical electricity consumption database; wherein the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information;
[0103] Obtain the park's reserve power resource information;
[0104] The reserve power resources of the park are dispatched according to the power consumption forecast information and the reserve power resource information.
[0105] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the methods described in various embodiments of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc., which can store program codes.
[0106] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, those skilled in the art should understand that any person skilled in the art can still modify the technical solutions described in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or perform equivalent replacements on some of the technical features thereof; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention. They should all be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A method for dispatching power resources in a park, characterized in that: include: Obtain information on factors affecting the current electricity consumption in the park; Generate electricity consumption forecast information based on the current electricity consumption influencing factor information and a preset historical electricity consumption database; wherein the preset historical electricity consumption database is generated based on the historical electricity consumption influencing factor information and the historical electricity consumption information corresponding to the historical electricity consumption influencing factor information; Obtain the park's reserve power resource information; Dispatching the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information; The generating of power consumption forecast information according to the current power consumption influencing factor information and a preset historical power consumption database includes: Comparing the historical electricity consumption influencing factor information in the historical electricity consumption database with the current electricity consumption influencing factor information to obtain a comparison result; If the comparison result exceeds a preset error range, the power consumption prediction information is determined according to the current power consumption influencing factor information, the historical power consumption influencing factor information, the historical power consumption information and a preset power consumption prediction model.
2. The park power resource scheduling method according to claim 1, characterized in that: Before obtaining the information of factors affecting the current power consumption of the park, the method further includes: Obtain the historical electricity consumption information of the park and the information on factors affecting the historical electricity consumption of the park; A mapping between the historical electricity consumption information and the historical electricity consumption influencing factor information is established, and a historical electricity consumption database is generated based on the mapping.
3. The park power resource scheduling method according to claim 2, characterized in that: The acquisition of historical information on factors affecting electricity consumption in the park includes: Obtain the temperature and humidity data information of the park, the production quantity data information of the park, and the population change data information of the park; The historical electricity consumption influencing factor information of the park is determined according to the temperature and humidity data information, the production quantity data information, the population quantity change data information and a preset relationship model.
4. The park power resource scheduling method according to claim 1, characterized in that: The dispatching of the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information includes: Determining a scheduling mode of the reserve power resources based on the power consumption forecast information; generating a scheduling order of the reserve power resources according to the scheduling mode and the reserve power resource information; The reserve power resources are scheduled based on the scheduling order.
5. The park power resource scheduling method according to claim 4, characterized in that: The determining the scheduling mode of the reserve power resource based on the power consumption forecast information includes: If the power consumption forecast information meets the strategy of increasing power generation in the preset judgment strategy, determining the scheduling mode to be a mode of increasing power generation; If the electricity consumption forecast information meets the strategy of reducing power generation in the preset judgment strategy, the scheduling mode is determined to be a mode of reducing power generation.
6. The park power resource scheduling method according to claim 5, characterized in that: The generating the scheduling order of the reserve power resources according to the scheduling mode and the reserve power resource information comprises: If the scheduling mode is a power generation increase mode, determining the reserve power equipment in the reserve power resources that can increase the power generation and the power generation corresponding to the reserve power equipment according to the reserve power resource information, and sorting the power generation corresponding to the reserve power equipment according to a first preset order to obtain a scheduling order for the reserve power resources; If the scheduling mode is a mode of reducing power generation, the power generation equipment that can be cut off and connected to the grid and the power generation corresponding to the power generation equipment in the reserve power resources are determined according to the reserve power resource information, and the power generation corresponding to the power generation equipment is sorted according to a second preset order to obtain the scheduling order of the reserve power resources.
7. A park power resource dispatching device, characterized in that: include: A collection unit is used to obtain information on factors affecting the current power consumption of the park; A prediction unit, configured to generate power consumption prediction information according to the current power consumption influencing factor information and a preset historical power consumption database; wherein the preset historical power consumption database is generated according to the historical power consumption influencing factor information and the historical power consumption information corresponding to the historical power consumption influencing factor information; An acquisition unit, used to acquire the reserve power resource information of the park; A dispatching unit, configured to dispatch the reserve power resources of the park according to the power consumption forecast information and the reserve power resource information; The prediction unit includes: A comparison subunit, configured to compare the historical electricity consumption influencing factor information in the historical electricity consumption database with the current electricity consumption influencing factor information to obtain a comparison result; A judgment subunit is used to determine the power consumption prediction information according to the current power consumption influencing factor information, the historical power consumption influencing factor information, the historical power consumption information and a preset power consumption prediction model if the comparison result exceeds a preset error range.
8. An electronic device, characterized in that: include: processor, memory, communication interface and communication bus; wherein, The processor, the communication interface and the memory communicate with each other via a communication bus; The processor is used to call computer instructions in the memory to execute the steps of the park power resource scheduling method described in any one of claims 1-6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and when the computer instructions are executed, the computer executes the steps of the park power resource scheduling method according to any one of claims 1 to 6.
Citation Information
Patent Citations
Comprehensive energy system scheduling method and device based on two-stage energy optimization
CN112418488A
Park power load prediction method and system
CN116526455A
Power consumer side load prediction method and system
CN116914747A
Electric power prediction and scheduling method and system based on artificial intelligence
CN116933929A
Method and device for improving day-ahead load prediction accuracy of power grid
CN117010553A
