Line leakage current monitoring and leakage protection method based on wireless communication
By using wireless communication technology and a visual simulation platform on low-voltage distribution lines, we can establish a uniformly distributed leakage monitoring network topology, perform data deviation analysis and trend prediction, and solve the problem of insufficient accuracy and comprehensiveness of leakage monitoring data on low-voltage distribution lines. It improves the accuracy and efficiency of leakage protection and ensures the safe and stable operation of distribution lines.
Patent Information
- Application Number
- CN202410397260.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-04-03
AI Technical Summary
Due to the low data accuracy and comprehensiveness of the existing leakage monitoring methods for low-voltage distribution lines, effective measures cannot be taken for leakage protection in a timely manner, which affects the stability and safety of distribution lines.
Using wireless communication-based line leakage current monitoring and leakage protection methods, by determining the number of target low-voltage distribution lines and leakage current testers in the visual simulation platform, a leakage monitoring network topology that satisfies uniform distribution constraints is established, environmental parameters are collected, and data are collected Deviation analysis and trend prediction, generating standard monitoring data, identifying abnormal nodes, locating and protecting them.
It improves the accuracy and uniformity of leakage current tester layout, reduces interference from environmental factors, and improves the accuracy and comprehensiveness of leakage monitoring data, thereby improving the accuracy and efficiency of leakage protection and ensuring the safe and stable operation of distribution lines. .
Smart Images

Figure CN118330505B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of intelligent power distribution monitoring, and in particular to a line leakage current monitoring and leakage protection method based on wireless communication. Background Art
[0002] Leakage monitoring of low-voltage distribution lines is an important part of ensuring the safe and stable operation of the power system. Line leakage may not only lead to energy loss, but also cause serious safety problems such as electrical fires. Therefore, it is very important to conduct regular and accurate monitoring of leakage in low-voltage distribution lines.
[0003] At present, due to the limited number of leakage testing equipment and the interference of environmental parameters such as temperature and humidity in the monitoring environment on the leakage monitoring data, the existing methods are unable to accurately and comprehensively obtain the real-time leakage monitoring data of the distribution lines. Therefore, it is impossible to accurately locate the leakage line section in time, resulting in poor accuracy and efficiency of leakage protection, affecting the stability and safety of the distribution line operation.
[0004] To sum up, the existing low-voltage distribution line leakage monitoring method has low precision, accuracy and comprehensiveness of the leakage monitoring data collected, which makes it impossible to take effective measures in time to perform targeted leakage protection on the distribution line, resulting in technical problems such as poor accuracy and efficiency of leakage protection. Summary of the invention
[0005] The purpose of this application is to provide a line leakage current monitoring and leakage protection method based on wireless communication, so as to solve the technical problem that the existing low-voltage distribution line leakage monitoring method is unable to take effective measures in time to perform targeted leakage protection on the distribution line due to the low precision, accuracy and comprehensiveness of the leakage monitoring data collected, resulting in poor accuracy and efficiency of the leakage protection.
[0006] In view of the above problems, the present application provides a line leakage current monitoring and leakage protection method based on wireless communication.
[0007] In the first aspect, the present application provides a line leakage current monitoring and leakage protection method based on wireless communication, and the method is implemented by a line leakage current monitoring and leakage protection system based on wireless communication, wherein the method includes: determining the number of target low-voltage distribution lines and leakage current testers; in a visual simulation platform, taking the target low-voltage distribution line as the monitoring target, and performing simulation optimization of leakage monitoring nodes based on the number of leakage current testers to obtain a leakage monitoring network topology that satisfies a preset uniform distribution constraint; performing leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collecting leakage monitoring data and environmental parameters at preset time nodes, and obtaining a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; and converting the environmental parameters into a corresponding relationship. The set input deviation analysis unit is identified, and a data deviation set is output. Based on the data deviation set, the leakage monitoring data set is mapped and proofread to obtain a corrected monitoring data set; based on the environmental parameter set, leakage trend prediction within a preset time window is performed, and a trend prediction coefficient is generated to compensate the corrected monitoring data set to obtain a standard monitoring data set; whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold is judged in turn, and the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold are extracted for abnormal identification, and multiple abnormal leakage nodes are determined; abnormal positioning is performed on the multiple abnormal leakage nodes, and the associated leakage protector and the associated maintenance personnel are determined according to the abnormal positioning result, and leakage protection is performed based on the associated leakage protector and line maintenance is performed based on the associated maintenance personnel.
[0008] In the second aspect, the present application also provides a line leakage current monitoring and leakage protection system based on wireless communication, which is used to execute a line leakage current monitoring and leakage protection method based on wireless communication as described in the first aspect, wherein the system includes: a target distribution line determination module, the target distribution line determination module is used to determine the target low-voltage distribution line and the number of leakage current testers; a leakage monitoring network topology acquisition module, the leakage monitoring network topology acquisition module is used to simulate and optimize the leakage monitoring nodes based on the number of leakage current testers in a visual simulation platform, with the target low-voltage distribution line as the monitoring target, to obtain a leakage monitoring network topology that meets the preset uniform distribution constraint; a data acquisition module, the data acquisition module is used to perform leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; a correction monitoring data set acquisition module, the The correction monitoring data set acquisition module is used to input the environmental parameter set into the deviation analysis unit for identification, output the data deviation set, and map and proofread the leakage monitoring data set based on the data deviation set to obtain the correction monitoring data set; the leakage trend prediction module is used to perform leakage trend prediction within a preset time window based on the environmental parameter set, generate a trend prediction coefficient to compensate the correction monitoring data set, and obtain a standard monitoring data set; the abnormal leakage node determination module is used to determine in turn whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and extract the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold for abnormal identification, and determine multiple abnormal leakage nodes; the leakage protection module is used to abnormally locate the multiple abnormal leakage nodes, determine the associated leakage protector and the associated maintenance personnel according to the abnormal location result, and perform leakage protection based on the associated leakage protector and perform line maintenance based on the associated maintenance personnel.
[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0010] 1. By determining the target low-voltage distribution line and the number of leakage current testers; in a visual simulation platform, taking the target low-voltage distribution line as the monitoring target, based on the number of leakage current testers, simulate and optimize the leakage monitoring nodes, and obtain a leakage monitoring network topology that meets the preset uniform distribution constraint; based on the leakage monitoring network topology, perform leakage monitoring of the target low-voltage distribution line, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; input the environmental parameter set into a deviation analysis unit for identification, output a data deviation set, and analyze the leakage monitoring data based on the data deviation set. The measured data set is mapped and proofread to obtain a corrected monitoring data set; based on the environmental parameter set, leakage trend prediction is performed within a preset time window, and a trend prediction coefficient is generated to compensate the corrected monitoring data set to obtain a standard monitoring data set; it is judged in turn whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold are extracted for abnormal identification, and multiple abnormal leakage nodes are determined; the multiple abnormal leakage nodes are abnormally located, and the associated leakage protector and the associated maintenance personnel are determined according to the abnormal location results, and leakage protection is performed based on the associated leakage protector and line maintenance is performed based on the associated maintenance personnel. The accuracy and uniformity of the layout of the leakage current tester can be improved, and at the same time, the interference of environmental factors on the leakage monitoring data can be reduced or avoided, and the accuracy, accuracy and comprehensiveness of the leakage monitoring data can be improved, thereby improving the accuracy and efficiency of leakage monitoring and leakage protection of low-voltage distribution lines, and ensuring the safe and stable operation of distribution lines.
[0011] 2. By performing simulation optimization of leakage monitoring nodes based on the number of leakage current testers, a leakage monitoring network topology that meets the preset uniform distribution constraint can be obtained, which can improve the accuracy and uniformity of the leakage current tester deployment, thereby improving the precision, accuracy and comprehensiveness of the leakage monitoring data obtained.
[0012] 3. By mapping and checking the leakage monitoring data based on the environmental parameter impact analysis, the interference of environmental factors on the leakage monitoring data can be reduced or avoided, and the accuracy of the leakage monitoring data can be further improved.
[0013] 4. By performing leakage trend prediction within a preset time window based on the environmental parameter set and generating a trend prediction coefficient to compensate the correction monitoring data set, the potential leakage risk in the distribution line can be discovered in time based on actual conditions, and measures can be taken for targeted leakage protection, thereby further improving the accuracy and efficiency of leakage protection.
[0014] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented according to the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are specifically cited below. It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0016] Figure 1 A schematic diagram of a flow chart of a line leakage current monitoring and leakage protection method based on wireless communication in this application;
[0017] Figure 2 A schematic diagram of a flow chart of obtaining a leakage monitoring network topology that satisfies a preset uniform distribution constraint in a line leakage current monitoring and leakage protection method based on wireless communication in the present application;
[0018] Figure 3 This is a structural schematic diagram of a line leakage current monitoring and leakage protection system based on wireless communication in the present application.
[0019] Description of reference numerals:
[0020] Target distribution line determination module 11, leakage monitoring network topology acquisition module 12, data acquisition module 13, correction monitoring data set acquisition module 14, leakage trend prediction module 15, abnormal leakage node determination module 16, leakage protection module 17. DETAILED DESCRIPTION
[0021] The present application provides a line leakage current monitoring and leakage protection method based on wireless communication, which solves the technical problem that the existing low-voltage distribution line leakage monitoring method cannot take effective measures in time to perform targeted leakage protection on the distribution line due to the low precision, accuracy and comprehensiveness of the leakage monitoring data collected, resulting in poor accuracy and efficiency of the leakage protection. The application can improve the accuracy and uniformity of the layout of the leakage current tester, and at the same time reduce or avoid the interference of environmental factors on the leakage monitoring data, and improve the accuracy, accuracy and comprehensiveness of the leakage monitoring data, thereby achieving the technical effect of improving the accuracy and efficiency of leakage monitoring and leakage protection of low-voltage distribution lines and ensuring the safe and stable operation of the distribution lines.
[0022] Below, the technical solutions in the present application will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments of the present application. It should be understood that the present application is not limited to the example embodiments described herein. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. It should also be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, rather than all of them.
[0023] Embodiment 1
[0024] Please refer to the attached Figure 1 The present application provides a line leakage current monitoring and leakage protection method based on wireless communication, wherein the method is applied to a line leakage current monitoring and leakage protection system based on wireless communication, and the method specifically comprises the following steps:
[0025] Step 1: Determine the target low-voltage distribution lines and the number of leakage current testers;
[0026] Specifically, the method provided in the present application is used to use wireless communication technology to monitor leakage current of low-voltage distribution lines, and to perform leakage protection on the distribution lines based on the leakage current monitoring results, so as to achieve the technical effect of improving the accuracy and efficiency of leakage monitoring and leakage protection of low-voltage distribution lines, and ensuring the safe and stable operation of distribution lines. The method is specifically implemented in a line leakage current monitoring and leakage protection system based on wireless communication.
[0027] First, determine the target low-voltage distribution lines and the number of leakage current testers, where the target low-voltage distribution lines refer to the low-voltage distribution lines to be subjected to line leakage current monitoring and leakage protection, such as low-voltage cable lines, indoor distribution lines, etc. The target low-voltage distribution lines include line type, wiring method, connection equipment and other information; the number of leakage current testers can be set based on actual conditions. Due to the limited number of leakage current testers, it is impossible to monitor all key nodes in the low-voltage distribution lines. Therefore, how to accurately deploy a limited number of leakage current testers is very critical to the accuracy and comprehensiveness of line leakage monitoring. The leakage current tester is an instrument specifically used to measure the leakage current generated by the insulating material of electrical equipment during operation and is not related to the work. By simulating the impedance of the human body, the leakage current of the equipment is accurately measured. The main components include impedance transformation, range conversion, AC / DC conversion, amplification, indicating device, etc. Its working principle is based on the measurement and comparison of current. By applying a certain voltage, the leakage current of the equipment under normal working conditions is measured and compared with the set safety value.
[0028] By determining the number of target low-voltage distribution lines and leakage current testers, data support is provided for the next step of optimizing the simulated layout of leakage current testers and obtaining the leakage monitoring network topology.
[0029] Step 2: In a visual simulation platform, taking the target low-voltage distribution line as the monitoring target, performing simulation optimization of leakage monitoring nodes based on the number of leakage current testers, and obtaining a leakage monitoring network topology that meets the preset uniform distribution constraint;
[0030] Specifically, a visual simulation platform is a platform that uses a graphical user interface and simulation technology to display real-world scenes or systems in a visual form. It usually combines multiple technologies, such as 3D visualization, digital twins, instruction set-level simulation, etc., to achieve accurate simulation and simulation of the real world or complex systems. Common power grid visualization simulation platforms include the mms3D visualization simulation platform, the digital twin power grid platform, the GIS-based power grid visualization platform, etc.
[0031] In the power grid visualization simulation platform, the target low-voltage distribution line is taken as the leakage monitoring target, and the leakage monitoring node is simulated and optimized with the number of leakage current testers as a constraint, wherein each leakage monitoring node corresponds to a leakage current tester, and in the simulation optimization process, the optimization result is judged based on a preset uniform distribution constraint, and the preset uniform distribution constraint is used to ensure that the leakage current testers can be evenly distributed in the geographical space or logical structure of the low-voltage distribution line, thereby improving the comprehensiveness of the overall leakage monitoring of the distribution line. Technical personnel in this field can make settings based on actual conditions to obtain a leakage monitoring network topology that meets the preset uniform distribution constraint, and the leakage monitoring network topology includes multiple leakage monitoring nodes in the distribution line.
[0032] By generating the leakage monitoring network topology, it provides support for the next step of leakage monitoring of the target low-voltage distribution line, and at the same time improves the accuracy and comprehensiveness of leakage monitoring.
[0033] Step 3: Perform leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship;
[0034] Specifically, leakage monitoring is performed on the target low-voltage distribution line through the leakage monitoring network topology, and environmental parameter sensors are arranged at multiple leakage monitoring nodes in the leakage monitoring network topology, wherein the environmental parameter sensors include temperature sensors and humidity sensors. Under the preset time node, the preset time node can be set by a technician in this field according to actual needs, wherein the higher the required accuracy, the shorter the time interval between adjacent preset time nodes, for example: the time interval of the preset time node is set to 3 minutes, that is, data collection is performed every 3 minutes, leakage monitoring data is collected through the leakage monitoring network topology, and environmental parameters are collected through environmental parameter sensors, wherein the environmental parameters include ambient temperature and ambient humidity, to obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data, environmental parameters and leakage monitoring nodes have a corresponding relationship.
[0035] The environmental parameter set is obtained by collecting environmental parameters, which provides data support for the next step of data deviation correction of leakage monitoring data.
[0036] Step 4: input the environmental parameter set into the deviation analysis unit for identification, output a data deviation set, and perform mapping and calibration on the leakage monitoring data set based on the data deviation set to obtain a corrected monitoring data set;
[0037] Specifically, a deviation analysis unit is constructed based on a BP neural network, and the deviation of the environmental parameter set is calculated based on the rated temperature parameter and the rated humidity parameter to obtain an environmental parameter deviation set. The environmental parameter deviation set is then input into the deviation analysis unit for deviation identification to obtain a data deviation set. The leakage monitoring data set is then mapped and proofread using the data deviation set, that is, the leakage monitoring data under the same leakage monitoring node is proofread using the data deviation to obtain a corrected monitoring data set.
[0038] By obtaining data deviation based on environmental parameter impact analysis and performing deviation correction on the leakage monitoring data under the same leakage monitoring node according to the data deviation, the interference of environmental factors on the leakage monitoring data can be reduced or avoided, and the accuracy of the leakage monitoring data can be further improved.
[0039] Step 5: Execute leakage trend prediction within a preset time window based on the environmental parameter set, generate a trend prediction coefficient to compensate the correction monitoring data set, and obtain a standard monitoring data set;
[0040] Specifically, the environmental parameters include ambient temperature and ambient humidity, wherein an increase in ambient temperature will soften the insulating material of the electrical equipment, resulting in a decrease in insulation performance and an increase in leakage current; an increase in ambient humidity will also cause a decrease in the performance of the insulating material, resulting in an increase in leakage current. Then, according to the set of environmental parameters, a leakage trend prediction is performed on the distribution line section within a preset time window to obtain a plurality of trend prediction coefficients, wherein each environmental parameter corresponds to a trend prediction coefficient. Further, the correction monitoring data set is compensated according to the plurality of trend prediction coefficients to obtain a compensated standard monitoring data set.
[0041] By predicting the leakage trend based on the environmental parameter set and generating a trend prediction coefficient to compensate the correction monitoring data set, the potential leakage risk in the distribution line can be discovered in time based on the actual situation, and measures can be taken for targeted leakage protection, thereby further improving the accuracy and efficiency of leakage protection.
[0042] Step 6: determine in turn whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and extract the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold for abnormal identification, and determine multiple abnormal leakage nodes;
[0043] Specifically, a leakage warning threshold is obtained, and the leakage warning threshold can be dynamically adjusted based on the actual requirements of the distribution line leakage monitoring, wherein the higher the leakage monitoring requirements, the smaller the leakage warning threshold. Then, the standard monitoring data in the standard monitoring data set are judged in turn according to the leakage warning threshold, and the standard monitoring data greater than or equal to the leakage warning threshold is extracted and set as abnormal monitoring data, and the leakage monitoring nodes corresponding to the abnormal monitoring data are further abnormally marked to obtain multiple abnormal leakage nodes.
[0044] By identifying multiple abnormal leakage nodes, support is provided for the next step of targeted leakage protection of distribution lines.
[0045] Step seven: abnormally locate the multiple abnormal leakage nodes, determine the associated leakage protector and the associated maintenance personnel according to the abnormal location results, and perform leakage protection based on the associated leakage protector and perform line maintenance based on the associated maintenance personnel.
[0046] Specifically, based on the leakage monitoring network topology, the multiple abnormal leakage nodes are abnormally located, and the abnormal position coordinates of the multiple abnormal leakage nodes in the distribution line are determined. Further based on the abnormal position coordinates, associated leakage protectors and associated maintenance personnel are determined, wherein the associated leakage protector acts on the leakage protector closest to the abnormal position coordinates, and the associated maintenance personnel are the maintenance base station or operation and maintenance personnel closest to the abnormal position coordinates. Finally, leakage protection is performed based on the associated leakage protector, and the abnormal position coordinates are sent to the associated maintenance personnel for line maintenance.
[0047] The method for monitoring and protecting line leakage current based on wireless communication is applied to a system for monitoring and protecting line leakage current based on wireless communication, which can solve the technical problem that the existing method for monitoring leakage current of low-voltage distribution lines cannot take effective measures to carry out targeted leakage protection on distribution lines in time due to the low precision, accuracy and comprehensiveness of the leakage monitoring data collected, resulting in poor accuracy and efficiency of leakage protection. First, determine the number of target low-voltage distribution lines and leakage current testers; then, in a visual simulation platform, take the target low-voltage distribution line as the monitoring target, and simulate and optimize the leakage monitoring nodes based on the number of leakage current testers to obtain a leakage monitoring network topology that meets the preset uniform distribution constraint; then, based on the leakage monitoring network topology, perform leakage monitoring of the target low-voltage distribution line, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; next, input the environmental parameter set into the deviation analysis unit for identification, output the data deviation set, and optimize the leakage monitoring nodes based on the data deviation set. The measured data set is mapped and proofread to obtain a corrected monitoring data set; in addition, based on the environmental parameter set, leakage trend prediction is performed within a preset time window, and a trend prediction coefficient is generated to compensate the corrected monitoring data set to obtain a standard monitoring data set; further, it is judged in turn whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold are extracted for abnormal identification, and multiple abnormal leakage nodes are determined; finally, the multiple abnormal leakage nodes are abnormally located, and the associated leakage protector and the associated maintenance personnel are determined according to the abnormal location results, and leakage protection is performed based on the associated leakage protector and line maintenance is performed based on the associated maintenance personnel. The accuracy and uniformity of the layout of the leakage current tester can be improved, and at the same time, the interference of environmental factors on the leakage monitoring data can be reduced or avoided, and the accuracy, accuracy and comprehensiveness of the leakage monitoring data can be improved, so as to achieve the technical effect of improving the accuracy and efficiency of leakage monitoring and leakage protection of low-voltage distribution lines and ensuring the safe and stable operation of distribution lines.
[0048] Furthermore, in the visual simulation platform, the target low-voltage distribution line is used as the monitoring target, and the simulation optimization of the leakage monitoring node is performed based on the number of leakage current testers to obtain the leakage monitoring network topology that meets the preset uniform distribution constraint, as shown in the attached figure. Figure 2 As shown, step 2 of this application includes:
[0049] Reading the historical leakage records of the target low-voltage distribution line, and performing leakage analysis based on the historical leakage records to determine a plurality of frequent leakage nodes;
[0050] Dividing the target low-voltage distribution line into equal parts according to a preset distance to obtain a plurality of distribution line sections;
[0051] Acquire multiple line material attribute information of the multiple power distribution line sections;
[0052] Optimizing the initial selection probabilities of the multiple distribution line sections based on the multiple frequent leakage nodes and the multiple line material property information to obtain an optimized selection probability set;
[0053] Based on the optimized selection probability set, a simulation optimization search is performed for leakage monitoring nodes to obtain the leakage monitoring network topology that meets the preset uniform distribution constraint.
[0054] Specifically, first, the historical leakage record of the target low-voltage distribution line is read, the historical leakage record includes multiple historical leakage record data, and the historical leakage record data includes the coordinates of the leakage line node. Then, leakage analysis is performed according to the historical leakage record, and the leakage frequency of multiple leakage nodes in the distribution line is counted, and then the leakage nodes with leakage frequency greater than the preset frequency threshold are extracted and set as frequent leakage nodes, and multiple frequent leakage nodes are obtained.
[0055] Obtain a preset distance, which is obtained by calculating the ratio of the total length of the target low-voltage distribution line to the number of the leakage current testers. Then, the target low-voltage distribution line is equally divided according to the preset distance to obtain multiple distribution line sections. Further obtain multiple line material attribute information of the multiple distribution line sections, the line material attribute information includes information such as the material, durability, remaining service life, etc. of the lines and equipment in the distribution line section, and the importance of the distribution line section, for example: the more key nodes such as branch points and joints contained in the distribution line section, the greater the importance of the line section.
[0056] The initial selection probability is obtained, and the initial selection probability can be set to 1. Then, the initial selection probability of the multiple distribution line sections is optimized based on the multiple frequent leakage nodes and the multiple line material attribute information, wherein the frequency of the frequent leakage nodes is positively correlated with the optimization coefficient of the selection probability, that is, the greater the frequency, the greater the optimization coefficient; the greater the importance of the distribution line section corresponding to the line material attribute information, the greater the optimization coefficient; the optimization coefficient corresponding to each distribution line section is calculated to obtain multiple optimization coefficients. Then, the initial selection probability of the multiple distribution line sections is optimized and adjusted according to the multiple optimization coefficients to obtain an optimized selection probability set.
[0057] A simulated optimization search for leakage monitoring nodes is performed based on the optimization selection probability set, wherein the greater the optimization selection probability of the distribution line section, the greater the probability that the leakage monitoring node will fall randomly, and after each optimization search is completed, the optimization result obtained is judged according to the preset uniform distribution constraint until a leakage monitoring network topology that satisfies the preset uniform distribution constraint is obtained.
[0058] Furthermore, the simulation optimization of the leakage monitoring nodes is performed based on the optimized selection probability set to obtain the leakage monitoring network topology that satisfies the preset uniform distribution constraint. The present application also includes the following steps:
[0059] In a visual simulation platform, randomly distributing the leakage current testers based on the optimized selection probability set and the number of leakage current testers to generate an initial leakage monitoring network topology;
[0060] Determine whether the initial leakage monitoring network topology satisfies the preset uniform distribution constraint, and if so, use the initial leakage monitoring network topology as the leakage monitoring network topology;
[0061] If not, iterative random distribution is performed until the leakage monitoring network topology that satisfies the preset uniform distribution constraint is obtained.
[0062] Specifically, in the power grid visualization simulation platform, the leakage current testers are randomly distributed based on the optimization selection probability set and the number of leakage current testers. The greater the optimization selection probability corresponding to the distribution line section, the greater the probability that the leakage monitoring node falls randomly, until all the leakage current testers are randomly distributed, and the initial leakage monitoring network topology is obtained.
[0063] It is further determined whether the initial leakage monitoring network topology satisfies the preset uniform distribution constraint. If the initial leakage monitoring network topology satisfies the preset uniform distribution constraint, the initial leakage monitoring network topology is used as the leakage monitoring network topology; if the initial leakage monitoring network topology does not satisfy the preset uniform distribution constraint, iterative random distribution is performed within the power grid visualization simulation platform until a leakage monitoring network topology that satisfies the preset uniform distribution constraint is obtained.
[0064] Furthermore, before inputting the environmental parameter set into the deviation analysis unit for identification, step 4 of the present application also includes:
[0065] Obtaining the rated temperature parameters and the rated humidity parameters of the leakage current tester;
[0066] Based on the digital twin technology, the leakage current tester is simulated and modeled to generate a leakage test twin model;
[0067] Taking the preset temperature range and the preset humidity range as constraints, adjusting the rated temperature parameter and the rated humidity parameter according to the preset step length to obtain an adjusted temperature parameter and an adjusted humidity parameter;
[0068] Based on the rated temperature parameter and the rated humidity parameter, leakage data detection is performed through the leakage test twin model to determine standard leakage detection data;
[0069] Based on the adjustment temperature parameter and the adjustment humidity parameter, leakage data detection is performed through the leakage test twin model to determine the adjustment leakage detection data;
[0070] respectively calculating deviations between the rated temperature parameter and the adjusted temperature parameter, the rated humidity parameter and the adjusted humidity parameter, the standard leakage detection data and the adjusted leakage detection data, and determining a temperature deviation value, a humidity deviation value and a leakage detection data deviation value as first sample data;
[0071] Continue to iterate the comparison until the preset number threshold is met and output the sample data set;
[0072] The deviation analysis unit is subjected to supervised training through the sample data set to obtain a deviation analysis unit that meets expected training constraints.
[0073] Specifically, before the environmental parameter set is input into the deviation analysis unit for identification, it is necessary to first construct the deviation analysis unit, wherein the method for constructing the deviation analysis unit is as follows.
[0074] First, obtain the rated temperature parameters and rated humidity parameters of the leakage current tester. The rated temperature parameters and rated humidity parameters are the temperature parameters and humidity parameters corresponding to the minimum measurement deviation of the leakage current tester. Technical personnel in this field can set them based on the type of the leakage current tester.
[0075] Digital twin technology is a new type of technical means. It makes full use of data such as physical models and operation history, integrates multi-physical quantities and multi-scale simulation processes, and completes mapping in virtual space, thereby reflecting the entire life cycle of the corresponding physical equipment. It has many advantages such as simulation authenticity and accuracy. Based on digital twin technology, the leakage current tester is simulated and modeled to generate a leakage test twin model. By constructing a leakage test twin model, support is provided for the simulation leakage detection of the leakage current tester, and the accuracy of the simulated leakage detection can be improved.
[0076] The preset temperature range refers to the temperature range when the leakage current tester is working normally, and the preset humidity range refers to the humidity range when the leakage current tester is working normally. It can be set based on actual conditions, and then the preset temperature range and the preset humidity range are used as constraints. The rated temperature parameter and the rated humidity parameter are adjusted according to the preset step size to obtain the adjusted temperature parameter and the adjusted humidity parameter. The preset step size includes the temperature adjustment step size and the humidity adjustment step size, which can be set according to the required accuracy. The higher the required accuracy, the smaller the preset step size. For example: the temperature adjustment step size is set to 0.05 degrees Celsius; the adjustment direction includes two directions, positive and negative. The positive direction can be adjusted first, and then the rated parameters can be re-adjusted in the opposite direction when the interval constraint is reached.
[0077] The rated temperature parameter and the rated humidity parameter are used as detection environment constraints, and leakage data detection is performed through the leakage test twin model to obtain standard leakage detection data; based on the adjusted temperature parameter and the adjusted humidity parameter, leakage data detection is performed through the leakage test twin model to determine the adjusted leakage detection data; then the temperature deviation of the rated temperature parameter and the adjusted temperature parameter, the humidity deviation of the rated humidity parameter and the adjusted humidity parameter, the leakage detection data deviation of the standard leakage detection data and the adjusted leakage detection data are calculated respectively to obtain temperature deviation value, humidity deviation value and leakage detection data deviation value, wherein the temperature deviation value, the humidity deviation value and the leakage detection data deviation value have a corresponding relationship, and the temperature deviation value, the humidity deviation value and the leakage detection data deviation value are used as the first sample data. The same method as that for obtaining the first sample data is used to continuously perform iterative comparison until a preset number threshold is met, and the preset number threshold is less than or equal to the ratio of the preset interval to the preset step length, which can be set according to actual conditions, and multiple sample data are obtained to construct a sample data set.
[0078] The network structure of the deviation analysis unit is constructed based on the BP neural network. The deviation analysis unit is a neural network model that can be iteratively optimized in machine learning, and is obtained through supervised training of training data sets; the deviation analysis unit includes an input layer, a hidden layer, and an output layer, wherein the input data of the input layer are temperature deviation and humidity deviation, and the output data of the output layer is leakage detection data deviation. Then, the sample data set is used as training data for the deviation analysis unit until a deviation analysis unit that meets the expected training constraints is obtained. The expected training constraints are output accuracy indicators, which can be set according to actual needs.
[0079] Further, the environmental parameter set is input into the deviation analysis unit for identification, and a data deviation set is output. Step 4 of the present application includes:
[0080] The environmental parameters include temperature parameters and humidity parameters;
[0081] Respectively calculating deviations of the temperature parameter and humidity parameter in the environmental parameter set from the rated temperature parameter and the rated humidity parameter to obtain an environmental parameter deviation set;
[0082] The environmental parameter deviation set is input into the deviation analysis unit for identification to obtain the data deviation set.
[0083] Specifically, the environmental parameters include temperature parameters and humidity parameters, and then the temperature deviation between the temperature parameters in the environmental parameter set and the rated temperature parameters is calculated, and the humidity deviation between the humidity parameters in the environmental parameter set and the rated humidity parameters is calculated to obtain a temperature parameter deviation set and a humidity parameter deviation set; the temperature parameter deviation set and the humidity parameter deviation set are further input into the deviation analysis unit for identification, and the data deviation set is output.
[0084] By constructing a deviation analysis unit based on the BP neural network for deviation identification, the efficiency and accuracy of data deviation analysis can be improved, thereby indirectly improving the efficiency and accuracy of leakage monitoring.
[0085] Furthermore, before performing leakage trend prediction within a preset time window based on the environmental parameter set, step five of the present application further includes:
[0086] Determine a plurality of leakage monitoring nodes corresponding to the environmental parameters in the environmental parameter set;
[0087] Reading location information of multiple maintenance personnel of the target low-voltage distribution line;
[0088] Based on the location information of the multiple maintenance personnel, the multiple leakage monitoring nodes are respectively analyzed for the shortest maintenance time, and multiple shortest maintenance time periods are determined, wherein the shortest maintenance time periods correspond to the leakage monitoring nodes one by one;
[0089] Based on the preset time node, the shortest maintenance time period is set as the preset time window corresponding to the leakage monitoring node to obtain the preset time window.
[0090] Specifically, first, determine a plurality of leakage monitoring nodes corresponding to the environmental parameters in the environmental parameter set, wherein each environmental parameter corresponds to a leakage monitoring node. Then read the location information of multiple maintenance personnel of the target low-voltage distribution line, wherein the location information of the maintenance personnel includes a fixed maintenance base station location or a fixed maintenance personnel location. Further, according to the location information of the multiple maintenance personnel, the shortest maintenance time analysis is performed on the multiple leakage monitoring nodes respectively, wherein the shortest maintenance time refers to the maintenance time from the leakage monitoring node to the nearest maintenance personnel location information, and a plurality of shortest maintenance time periods are obtained, wherein each leakage monitoring node corresponds to a shortest maintenance time period, and the shortest maintenance time period represents the shortest maintenance time corresponding to the leakage monitoring node in the actual scenario.
[0091] Based on the preset time node, the sum of the shortest maintenance time period and the preset time node is used as the preset time window of the corresponding leakage monitoring node to obtain the preset time window, wherein each leakage monitoring node corresponds to a preset time window.
[0092] Further, the leakage trend prediction within the preset time window is performed based on the environmental parameter set, and step five of the present application includes:
[0093] Randomly selecting a first environmental parameter from the environmental parameter set, where the first environmental parameter includes a first temperature parameter and a first humidity parameter;
[0094] Acquire a first leakage monitoring node and a first preset time window corresponding to the first environmental parameter;
[0095] Input the first temperature parameter, the first leakage monitoring node, and the first preset time window into a temperature change prediction branch of an environmental prediction model, and input the first humidity parameter, the first leakage monitoring node, and the first preset time window into a humidity change prediction branch of an environmental prediction model to obtain a temperature change prediction trend and a humidity change prediction trend;
[0096] A leakage trend prediction is performed based on the temperature change prediction trend and the humidity change prediction trend to obtain a first trend prediction coefficient, and the first trend prediction coefficient is added to a plurality of trend prediction coefficients.
[0097] Specifically, first, a first environmental parameter is randomly selected from the environmental parameter set, where the first environmental parameter is any one of the environmental parameters in the environmental parameter set, including a first temperature parameter and a first humidity parameter, and a first leakage monitoring node and a first preset time window corresponding to the first environmental parameter are obtained.
[0098] An environmental prediction model is constructed based on a BP neural network, and the environmental prediction model includes a temperature change prediction branch and a humidity change prediction branch, wherein the temperature change prediction branch and the humidity change prediction branch are neural network models obtained through supervised training with historical data, wherein the input data of the temperature change prediction branch are temperature parameters, leakage monitoring nodes, and time windows, and the output data are temperature change prediction trends, wherein the temperature change prediction trend can be represented by a temperature change prediction coefficient, wherein the temperature change prediction trend is proportional to the temperature change prediction coefficient; the input data of the humidity change prediction branch are humidity parameters, leakage monitoring nodes, and time windows, and the output data are humidity change prediction trends.
[0099] Then, the first temperature parameter, the first leakage monitoring node and the first preset time window are input into the temperature change prediction branch of the environmental prediction model to predict the temperature change, and the first humidity parameter, the first leakage monitoring node and the first preset time window are input into the humidity change prediction branch of the environmental prediction model to predict the humidity change, and the temperature change prediction trend and the humidity change prediction trend are obtained. The temperature change prediction trend and the humidity change prediction trend are further weighted and summed, wherein the weight coefficients of the temperature change prediction trend and the humidity change prediction trend can be set based on the degree of influence of the indicator on the overall leakage trend, wherein the greater the influence of which indicator, the greater the corresponding weight coefficient, and the first trend prediction coefficient is obtained according to the weighted summation result, and the first trend prediction coefficient is added to multiple trend prediction coefficients to obtain multiple trend prediction coefficients, wherein each environmental parameter corresponds to a trend prediction coefficient.
[0100] In summary, the line leakage current monitoring and leakage protection method based on wireless communication provided by the present application has the following technical effects:
[0101] 1. It can improve the accuracy and uniformity of the layout of leakage current testers, and at the same time reduce or avoid the interference of environmental factors on leakage monitoring data, improve the accuracy, accuracy and comprehensiveness of leakage monitoring data, thereby achieving the technical effect of improving the accuracy and efficiency of leakage monitoring and leakage protection of low-voltage distribution lines and ensuring the safe and stable operation of distribution lines.
[0102] 2. By obtaining data deviation based on environmental parameter impact analysis and performing deviation correction on the leakage monitoring data under the same leakage monitoring node according to the data deviation, the interference of environmental factors on the leakage monitoring data can be reduced or avoided, and the accuracy of the leakage monitoring data can be further improved.
[0103] 3. By performing leakage trend prediction within a preset time window based on the environmental parameter set and generating a trend prediction coefficient to compensate the correction monitoring data set, the potential leakage risk in the distribution line can be discovered in time based on the actual situation, and measures can be taken for targeted leakage protection, thereby further improving the accuracy and efficiency of leakage protection.
[0104] Embodiment 2
[0105] Based on the same inventive concept as the line leakage current monitoring and leakage protection method based on wireless communication in the aforementioned embodiment, the present application also provides a line leakage current monitoring and leakage protection system based on wireless communication, please refer to the attached Figure 3 , the system comprising:
[0106] A target distribution line determination module 11, wherein the target distribution line determination module 11 is used to determine the number of target low-voltage distribution lines and leakage current testers;
[0107] A leakage monitoring network topology obtaining module 12 is used to simulate and optimize leakage monitoring nodes based on the number of leakage current testers in a visual simulation platform, taking the target low-voltage distribution line as the monitoring target, and obtaining a leakage monitoring network topology that satisfies a preset uniform distribution constraint;
[0108] A data acquisition module 13, wherein the data acquisition module 13 is used to perform leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship;
[0109] A correction monitoring data set obtaining module 14, wherein the correction monitoring data set obtaining module 14 is used to input the environmental parameter set into the deviation analysis unit for identification, output a data deviation set, and map and calibrate the leakage monitoring data set based on the data deviation set to obtain a correction monitoring data set;
[0110] A leakage trend prediction module 15, which is used to perform leakage trend prediction within a preset time window based on the environmental parameter set, generate a trend prediction coefficient to compensate the correction monitoring data set, and obtain a standard monitoring data set;
[0111] The abnormal leakage node determination module 16 is used to sequentially determine whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and extract the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold for abnormal identification, and determine multiple abnormal leakage nodes;
[0112] The leakage protection module 17 is used to locate the abnormalities of the multiple abnormal leakage nodes, determine the associated leakage protector and the associated maintenance personnel according to the abnormal location results, and perform leakage protection based on the associated leakage protector and perform line maintenance based on the associated maintenance personnel.
[0113] Further, the leakage monitoring network topology obtaining module 12 in the system is also used for:
[0114] Reading the historical leakage records of the target low-voltage distribution line, and performing leakage analysis based on the historical leakage records to determine a plurality of frequent leakage nodes;
[0115] Dividing the target low-voltage distribution line into equal parts according to a preset distance to obtain a plurality of distribution line sections;
[0116] Acquire multiple line material attribute information of the multiple power distribution line sections;
[0117] Optimizing the initial selection probabilities of the multiple distribution line sections based on the multiple frequent leakage nodes and the multiple line material property information to obtain an optimized selection probability set;
[0118] Based on the optimized selection probability set, a simulation optimization search is performed for leakage monitoring nodes to obtain the leakage monitoring network topology that meets the preset uniform distribution constraint.
[0119] Further, the leakage monitoring network topology obtaining module 12 in the system is also used for:
[0120] In a visual simulation platform, randomly distributing the leakage current testers based on the optimized selection probability set and the number of leakage current testers to generate an initial leakage monitoring network topology;
[0121] Determine whether the initial leakage monitoring network topology satisfies the preset uniform distribution constraint, and if so, use the initial leakage monitoring network topology as the leakage monitoring network topology;
[0122] If not, iterative random distribution is performed until the leakage monitoring network topology that satisfies the preset uniform distribution constraint is obtained.
[0123] Further, the correction monitoring data set obtaining module 14 in the system is also used for:
[0124] Obtaining the rated temperature parameters and the rated humidity parameters of the leakage current tester;
[0125] Based on the digital twin technology, the leakage current tester is simulated and modeled to generate a leakage test twin model;
[0126] Taking the preset temperature range and the preset humidity range as constraints, adjusting the rated temperature parameter and the rated humidity parameter according to the preset step length to obtain an adjusted temperature parameter and an adjusted humidity parameter;
[0127] Based on the rated temperature parameter and the rated humidity parameter, leakage data detection is performed through the leakage test twin model to determine standard leakage detection data;
[0128] Based on the adjustment temperature parameter and the adjustment humidity parameter, leakage data detection is performed through the leakage test twin model to determine the adjustment leakage detection data;
[0129] respectively calculating deviations between the rated temperature parameter and the adjusted temperature parameter, the rated humidity parameter and the adjusted humidity parameter, the standard leakage detection data and the adjusted leakage detection data, and determining a temperature deviation value, a humidity deviation value and a leakage detection data deviation value as first sample data;
[0130] Continue to iterate the comparison until the preset number threshold is met and output the sample data set;
[0131] The deviation analysis unit is subjected to supervised training through the sample data set to obtain a deviation analysis unit that meets expected training constraints.
[0132] Further, the correction monitoring data set obtaining module 14 in the system is also used for:
[0133] The environmental parameters include temperature parameters and humidity parameters;
[0134] Respectively calculating deviations of the temperature parameter and humidity parameter in the environmental parameter set from the rated temperature parameter and the rated humidity parameter to obtain an environmental parameter deviation set;
[0135] The environmental parameter deviation set is input into the deviation analysis unit for identification to obtain the data deviation set.
[0136] Furthermore, the leakage trend prediction module 15 in the system is also used for:
[0137] Determine a plurality of leakage monitoring nodes corresponding to the environmental parameters in the environmental parameter set;
[0138] Reading location information of multiple maintenance personnel of the target low-voltage distribution line;
[0139] Based on the location information of the multiple maintenance personnel, the multiple leakage monitoring nodes are respectively analyzed for the shortest maintenance time, and multiple shortest maintenance time periods are determined, wherein the shortest maintenance time periods correspond to the leakage monitoring nodes one by one;
[0140] Based on the preset time node, the shortest maintenance time period is set as the preset time window corresponding to the leakage monitoring node to obtain the preset time window.
[0141] Furthermore, the leakage trend prediction module 15 in the system is also used for:
[0142] Randomly selecting a first environmental parameter from the environmental parameter set, where the first environmental parameter includes a first temperature parameter and a first humidity parameter;
[0143] Acquire a first leakage monitoring node and a first preset time window corresponding to the first environmental parameter;
[0144] Input the first temperature parameter, the first leakage monitoring node and the first preset time window into the temperature change prediction branch of the environmental prediction model, and input the first humidity parameter, the first leakage monitoring node and the first preset time window into the humidity change prediction branch of the environmental prediction model to obtain a temperature change prediction trend and a humidity change prediction trend;
[0145] A leakage trend prediction is performed based on the temperature change prediction trend and the humidity change prediction trend to obtain a first trend prediction coefficient, and the first trend prediction coefficient is added to a plurality of trend prediction coefficients.
[0146] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The line leakage current monitoring and leakage protection method based on wireless communication and the specific examples in the aforementioned embodiment 1 are also applicable to the line leakage current monitoring and leakage protection system based on wireless communication in this embodiment. Through the aforementioned detailed description of the line leakage current monitoring and leakage protection method based on wireless communication, those skilled in the art can clearly know the line leakage current monitoring and leakage protection system based on wireless communication in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.
[0147] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
[0148] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.
Claims
1. A line leakage current monitoring and leakage protection method based on wireless communication, characterized in that: The method comprises: Determine the target low-voltage distribution lines and the number of leakage current testers; In a visual simulation platform, the target low-voltage distribution line is used as a monitoring target, and a simulation optimization of leakage monitoring nodes is performed based on the number of leakage current testers to obtain a leakage monitoring network topology that satisfies a preset uniform distribution constraint; Perform leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; Input the environmental parameter set into the deviation analysis unit for identification, output a data deviation set, and perform mapping and calibration on the leakage monitoring data set based on the data deviation set to obtain a corrected monitoring data set; Based on the environmental parameter set, leakage trend prediction is performed within a preset time window, and a trend prediction coefficient is generated to compensate the correction monitoring data set to obtain a standard monitoring data set; Determine in sequence whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and extract the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold for abnormal identification, and determine multiple abnormal leakage nodes; Perform abnormal location on the multiple abnormal leakage nodes, determine associated leakage protectors and associated maintenance personnel according to the abnormal location results, and perform leakage protection based on the associated leakage protectors and perform line maintenance based on the associated maintenance personnel; In the visual simulation platform, the target low-voltage distribution line is used as the monitoring target, and the simulation optimization of the leakage monitoring node is performed based on the number of the leakage current testers to obtain the leakage monitoring network topology that meets the preset uniform distribution constraint, including: Reading the historical leakage records of the target low-voltage distribution line, and performing leakage analysis based on the historical leakage records to determine a plurality of frequent leakage nodes; Dividing the target low-voltage distribution line into equal parts according to a preset distance to obtain a plurality of distribution line sections; Acquire multiple line material attribute information of the multiple power distribution line sections; Optimizing the initial selection probabilities of the multiple distribution line sections based on the multiple frequent leakage nodes and the multiple line material property information to obtain an optimized selection probability set; Based on the optimized selection probability set, a simulation optimization is performed on the leakage monitoring nodes to obtain the leakage monitoring network topology that satisfies the preset uniform distribution constraint; The simulation optimization of the leakage monitoring nodes is performed based on the optimization selection probability set to obtain the leakage monitoring network topology that satisfies the preset uniform distribution constraint, including: In a visual simulation platform, randomly distributing the leakage current testers based on the optimized selection probability set and the number of leakage current testers to generate an initial leakage monitoring network topology; Determine whether the initial leakage monitoring network topology satisfies the preset uniform distribution constraint, and if so, use the initial leakage monitoring network topology as the leakage monitoring network topology; If not, performing iterative random distribution until the leakage monitoring network topology that satisfies the preset uniform distribution constraint is obtained; The step of inputting the environmental parameter set into a deviation analysis unit for identification further includes: Obtaining the rated temperature parameters and the rated humidity parameters of the leakage current tester; Based on the digital twin technology, the leakage current tester is simulated and modeled to generate a leakage test twin model; Taking the preset temperature range and the preset humidity range as constraints, adjusting the rated temperature parameter and the rated humidity parameter according to the preset step length to obtain an adjusted temperature parameter and an adjusted humidity parameter; Based on the rated temperature parameter and the rated humidity parameter, leakage data detection is performed through the leakage test twin model to determine standard leakage detection data; Based on the adjustment temperature parameter and the adjustment humidity parameter, leakage data detection is performed through the leakage test twin model to determine the adjustment leakage detection data; Calculate the deviations of the rated temperature parameter and the adjusted temperature parameter, the rated humidity parameter and the adjusted humidity parameter, the standard leakage detection data and the adjusted leakage detection data respectively, and determine the temperature deviation value, the humidity deviation value and the leakage detection data deviation value as the first sample data; Continue to iterate the comparison until the preset number threshold is met and output the sample data set; Performing supervised training on the deviation analysis unit through the sample data set to obtain a deviation analysis unit that meets expected training constraints; The step of inputting the environmental parameter set into a deviation analysis unit for identification and outputting a data deviation set comprises: The environmental parameters include temperature parameters and humidity parameters; Respectively calculating deviations of the temperature parameter and humidity parameter in the environmental parameter set from the rated temperature parameter and the rated humidity parameter to obtain an environmental parameter deviation set; Inputting the environmental parameter deviation set into the deviation analysis unit for identification to obtain the data deviation set; The method further comprises: performing leakage trend prediction within a preset time window based on the environmental parameter set; Determine a plurality of leakage monitoring nodes corresponding to the environmental parameters in the environmental parameter set; Reading location information of multiple maintenance personnel of the target low-voltage distribution line; Based on the location information of the multiple maintenance personnel, the multiple leakage monitoring nodes are respectively analyzed for the shortest maintenance time, and multiple shortest maintenance time periods are determined, wherein the shortest maintenance time periods correspond to the leakage monitoring nodes one by one; Based on the preset time node, the shortest maintenance time period is set as the preset time window corresponding to the leakage monitoring node to obtain the preset time window.
2. The method according to claim 1, characterized in that The performing leakage trend prediction within a preset time window based on the environmental parameter set includes: Randomly selecting a first environmental parameter from the environmental parameter set, where the first environmental parameter includes a first temperature parameter and a first humidity parameter; Acquire a first leakage monitoring node and a first preset time window corresponding to the first environmental parameter; Input the first temperature parameter, the first leakage monitoring node, and the first preset time window into a temperature change prediction branch of an environmental prediction model, and input the first humidity parameter, the first leakage monitoring node, and the first preset time window into a humidity change prediction branch of an environmental prediction model to obtain a temperature change prediction trend and a humidity change prediction trend; A leakage trend prediction is performed based on the temperature change prediction trend and the humidity change prediction trend to obtain a first trend prediction coefficient, and the first trend prediction coefficient is added to a plurality of trend prediction coefficients.
3. A line leakage current monitoring and leakage protection system based on wireless communication, characterized in that: For implementing the steps of the method according to any one of claims 1 to 2, the system comprises: A target distribution line determination module, the target distribution line determination module is used to determine the number of target low-voltage distribution lines and leakage current testers; A leakage monitoring network topology obtaining module, wherein the leakage monitoring network topology obtaining module is used to simulate and optimize leakage monitoring nodes based on the number of leakage current testers in a visual simulation platform, taking the target low-voltage distribution line as the monitoring target, and obtaining a leakage monitoring network topology that satisfies a preset uniform distribution constraint; A data acquisition module, the data acquisition module is used to perform leakage monitoring of the target low-voltage distribution line based on the leakage monitoring network topology, collect leakage monitoring data and environmental parameters at preset time nodes, and obtain a leakage monitoring data set and an environmental parameter set, wherein the leakage monitoring data and the environmental parameters have a corresponding relationship; A correction monitoring data set obtaining module, wherein the correction monitoring data set obtaining module is used to input the environmental parameter set into the deviation analysis unit for identification, output a data deviation set, and map and calibrate the leakage monitoring data set based on the data deviation set to obtain a correction monitoring data set; A leakage trend prediction module, which is used to perform leakage trend prediction within a preset time window based on the environmental parameter set, generate a trend prediction coefficient to compensate the correction monitoring data set, and obtain a standard monitoring data set; An abnormal leakage node determination module, the abnormal leakage node determination module is used to sequentially determine whether the standard monitoring data in the standard monitoring data set meets the leakage warning threshold, and extract the leakage monitoring nodes corresponding to the standard monitoring data that meets the leakage warning threshold for abnormal identification, and determine multiple abnormal leakage nodes; A leakage protection module, the leakage protection module is used to locate the abnormalities of the multiple abnormal leakage nodes, determine the associated leakage protector and the associated maintenance personnel according to the abnormal location results, and perform leakage protection based on the associated leakage protector and perform line maintenance based on the associated maintenance personnel.
Citation Information
Patent Citations
Direct-current power grid electric leakage monitoring system
CN115980621A
Systems and methods for risk-adaptive security investment optimization
US20220366332A1