A method for generating chiller chilled water outlet temperature setting strategy based on demand response

By constructing a predictive decision tree and extracting the chilled water outlet temperature setting strategy of the chiller, the problem of load rebound effect of the HVAC system in demand response is solved, rapid response and efficient regulation are achieved, and the system flexibility and response efficiency are improved.

CN118466641BActive Publication Date: 2024-10-15SHENZHEN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410925586.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-15
Estimated Expiration
2044-07-11

AI Technical Summary

Technical Problem

Existing HVAC systems have load rebound effects when executing demand response strategies, resulting in grid instability. Existing solutions are complex and unable to achieve precise regulation, especially in terms of rapid response and fine-grained regulation.

Method used

By obtaining original data to eliminate time delays, establish a power response model and a temperature response model, perform parameter fitting, and build a prediction decision tree, extract control rules to generate a chiller chilled water outlet temperature setting strategy, simplify the demand response process, and improve Response speed and control accuracy.

Benefits of technology

It effectively avoids complex calculations, improves the effectiveness of fine-grained control of the chilled water outlet temperature set value of the chiller, enhances the flexibility and response efficiency of the system in demand response events, and solves the problem of load fluctuations in the load rebound effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118466641B_ABST
    Figure CN118466641B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for generating a chiller chilled water outlet temperature setting strategy for demand response, the method comprising: obtaining raw data, eliminating time delays thereof; establishing a power response model and a temperature response model, inputting raw data into the model for parameter fitting; establishing multiple sets of custom chiller chilled water outlet temperature setting values ​​and power target values, inputting them into the model for data optimization, and constructing a training data set; extracting characteristic variables from the data set to obtain target power characteristic variables, and constructing a prediction decision tree based on the target power characteristic variables; then extracting rules from the data set to obtain control rules; obtaining a demand response command, and inputting it into the prediction decision tree to obtain a chiller chilled water outlet temperature setting strategy. The present invention outputs a chiller chilled water outlet temperature setting strategy through a prediction decision tree, actively adjusts the system chiller chilled water outlet temperature setting value to flexibly change the air conditioning load, and effectively realizes flexible energy use of buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of chiller chilled water outlet temperature setting, and in particular to a method for generating a chiller chilled water outlet temperature setting strategy oriented to demand response. Background Art

[0002] Nowadays, HVAC (heating, ventilation and air conditioning) systems have become the best choice as a flexible demand response resource. The main reasons are: (1) Air conditioning energy consumption accounts for a large proportion of the total energy consumption of buildings, up to 70% in summer; (2) The building's own energy storage and air conditioning thermal inertia allow short-term load reduction, with little impact on human thermal comfort; (3) Most HVAC systems are monitored and controlled by energy management and control systems (EMCS), providing a convenient hardware platform for implementing demand response.

[0003] When executing the HVAC demand response strategy, due to the change in the original HVAC system operating conditions, the load fluctuations at the beginning and end of the DR strategy are significant. This phenomenon is not conducive to the stability of the power grid and is called the load rebound effect. To solve this problem, several existing solutions include slow recovery strategy, sequential equipment recovery and demand response control cycle extension strategy, as follows:

[0004] (1) Slow recovery strategy: When DR starts and ends, if the system control parameters are immediately adjusted to the response value or restored to the normal operating value, instantaneous load fluctuations may occur, resulting in grid instability or even collapse. Therefore, its operating parameters, such as temperature set point, wind speed, etc., are gradually adjusted until the system reaches the response state or returns to the normal operating state smoothly. The slow recovery strategy avoids sharp fluctuations in grid load and violent reactions of the system by controlling the speed of the operating parameter recovery process. However, the implementation of the slow recovery strategy requires a more complex control system and precise scheduling plan, and existing technologies cannot achieve precise control of operating parameters. Although building automation systems (BAS) or energy management systems (EMS) can provide basic scheduling and control functions, they still lack the ability to perform complex and precise calculations, or do not support real-time data processing and rapid response, thereby limiting the effectiveness of parameters in fine-grained control.

[0005] (2) Sequential equipment recovery: This strategy means that after the demand response event ends, instead of restoring all affected systems and equipment to normal operation at the same time, they are gradually restored one by one or in groups in a certain order. This strategy controls the time and order of equipment recovery to reduce the instantaneous impact on the power grid and load fluctuations within the system. However, the sequential equipment recovery strategy requires careful planning of the equipment startup sequence and precise control of the startup time of each stage, which greatly increases the complexity of system operation. In addition, the equipment is not started at the same time, and the recovery of certain areas or functions may be delayed, which is not conducive to situations where rapid recovery to normal operation is required.

[0006] (3) Extending the demand response control period: This strategy refers to extending the DR period until the cooling / heating load drops significantly. For example, in office buildings or retail stores, the drop usually occurs after work or business hours. Extending the demand response to off-get off work hours prevents the rebound load from exceeding the baseline load before the demand response. This strategy is usually used to smooth the transition of grid load, or to continue to maintain a certain load reduction during non-peak hours to support the overall demand and supply balance of the grid. Although the demand response control period extension strategy is relatively easy to operate in most actual building demand response processes, this strategy will continue to affect human thermal comfort and is not suitable for all types of buildings or businesses, such as facilities that operate 24 hours a day or places that need to maintain a specific temperature around the clock.

[0007] Therefore, the existing technology still needs to be improved and developed. Summary of the invention

[0008] The technical problem to be solved by the present invention is that, in view of the above-mentioned defects of the prior art, a method for generating a chiller chilled water outlet temperature setting strategy for demand response is provided, aiming to solve the problem of load rebound effect existing in the demand response strategy in the prior art.

[0009] The technical solution adopted by the present invention to solve the problem is as follows:

[0010] In a first aspect, an embodiment of the present invention provides a method for generating a chiller chilled water outlet temperature setting strategy for demand response, wherein the method comprises:

[0011] Acquire original data and eliminate time delay of the original data, wherein the original data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value;

[0012] Establishing a power response model and a temperature response model, and inputting the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters;

[0013] Setting the model parameters in the power response model and the temperature response model;

[0014] Establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and construct a training data set based on the data optimization results;

[0015] Extracting characteristic variables from the training data set to obtain target power characteristic variables, and constructing a prediction decision tree based on the target power characteristic variables;

[0016] Extracting rules from the prediction decision tree to obtain a control rule, wherein the control rule represents a change trend of a chilled water outlet temperature setting value of a chiller;

[0017] A demand response command is obtained, and the demand response command is input into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule.

[0018] In one implementation, the eliminating time delay of the original data includes:

[0019] determining a time delay amount based on the raw data;

[0020] Based on the time delay amount, time delay elimination is performed on the chiller chilled water outlet temperature and the chiller power value in the original data.

[0021] In one implementation, the model parameters include fitting parameters and time constants, and the step of establishing a power response model and a temperature response model, and inputting the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine the model parameters includes:

[0022] Establishing a power response model, inputting the original data after time delay elimination into the power response model for parameter fitting, and determining the fitting parameters of the power response model, wherein the fitting parameters include a proportional coefficient, an integral coefficient, and a differential coefficient;

[0023] A temperature response model is established, and the original data after time delay elimination is input into the temperature response model for parameter fitting to determine the time constant of the temperature response model.

[0024] In one implementation, the establishing of multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and inputting the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and constructing a training data set based on the data optimization results, includes:

[0025] Establish multiple groups of custom chiller chilled water outlet temperature setting values, and input each group of custom chiller chilled water outlet temperature setting values ​​into the temperature response model in turn to predict the chiller chilled water outlet temperature, and obtain each group of custom chiller chilled water outlet temperature prediction values;

[0026] Calculate the difference between each set of the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value, and input the difference between the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value into the power response model to obtain the chiller power prediction value corresponding to each set of the custom chiller chilled water outlet temperature setting values;

[0027] Establishing multiple sets of custom chiller power target values, and optimizing the multiple sets of custom chiller chilled water outlet temperature setting values ​​using a differential evolution method based on the multiple sets of custom chiller power target values, to obtain multiple sets of chiller chilled water outlet temperature optimization setting values;

[0028] A training data set is constructed based on the custom chiller chilled water outlet temperature prediction value, the chiller power prediction value and the chiller chilled water outlet temperature optimization setting value.

[0029] In one implementation, extracting characteristic variables from the training data set to obtain target power characteristic variables, and constructing a prediction decision tree based on the target power characteristic variables includes:

[0030] Extracting characteristic variables from the predicted power values ​​of the chiller in the training data set to obtain target power characteristic variables, wherein the target power characteristic variables include response time, power change depth, and target power duration;

[0031] Calculate the relative value of the optimal setting value of the chilled water outlet temperature of the chiller relative to the custom setting value of the chilled water outlet temperature of the chiller to obtain the optimal relative value;

[0032] A prediction decision tree is constructed based on the target power characteristic variable and the optimized relative value.

[0033] In one implementation, a genetic algorithm is used to perform parameter fitting on the power response model, and a fitness function of the genetic algorithm is defined as a total square error between the refrigerator power value and a refrigerator power prediction value output by the power response model.

[0034] In one implementation, a grid search method is used to perform parameter fitting on the temperature response model, and the optimization goal of the grid search method is to minimize the mean square error.

[0035] In a second aspect, an embodiment of the present invention further provides a demand-responsive chiller chilled water outlet temperature setting strategy generation system, wherein the system comprises:

[0036] A data acquisition module, used to acquire raw data and eliminate time delays of the raw data, wherein the raw data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value;

[0037] A model building module, used to build a power response model and a temperature response model, and input the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters;

[0038] A parameter setting module, used for setting the model parameters in the power response model and the temperature response model;

[0039] A model training module is used to establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and construct a training data set based on the data optimization results;

[0040] A feature extraction module, used to extract feature variables from the training data set to obtain target power feature variables, and to construct a prediction decision tree based on the target power feature variables;

[0041] A rule extraction module is used to extract rules from the prediction decision tree to obtain a control rule, wherein the control rule represents a change trend of a chiller chilled water outlet temperature setting value;

[0042] The strategy output module is used to obtain a demand response command, input the demand response command into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule.

[0043] In one implementation, the data acquisition module includes:

[0044] A time delay determination unit, configured to determine a time delay amount based on the original data;

[0045] The time delay elimination unit is used to eliminate the time delay of the chiller chilled water outlet temperature and the chiller power value in the original data based on the time delay amount.

[0046] In one implementation, the model building module includes:

[0047] A power response model building unit, used to build a power response model, input the original data after time delay elimination into the power response model for parameter fitting, and determine the fitting parameters of the power response model, wherein the fitting parameters include a proportional coefficient, an integral coefficient, and a differential coefficient;

[0048] The temperature response model building unit is used to build a temperature response model, input the original data after time delay elimination into the temperature response model for parameter fitting, and determine the time constant of the temperature response model.

[0049] In one implementation, the model training module includes:

[0050] The outlet water temperature prediction unit is used to establish multiple groups of custom chiller chilled water outlet water temperature setting values, and input each group of custom chiller chilled water outlet water temperature setting values ​​into the temperature response model in turn to predict the chiller chilled water outlet water temperature, so as to obtain each group of custom chiller chilled water outlet water temperature prediction values;

[0051] A chiller power prediction unit, used for calculating the difference between each group of the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value, and inputting the difference between the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value into the power response model to obtain the chiller power prediction value corresponding to each group of the custom chiller chilled water outlet temperature setting values;

[0052] An outlet water temperature setting value optimization unit is used to establish multiple sets of custom chiller power target values, and optimize the multiple sets of custom chiller chilled water outlet water temperature setting values ​​using a differential evolution method based on the multiple sets of custom chiller power target values ​​to obtain multiple sets of chiller chilled water outlet water temperature optimization setting values;

[0053] The training data set construction unit is used to construct a training data set based on the user-defined chiller chilled water outlet temperature prediction value, the chiller power prediction value and the chiller chilled water outlet temperature optimization setting value.

[0054] In one implementation, the feature extraction module includes:

[0055] A characteristic variable extraction unit is used to extract characteristic variables from the chiller power prediction value in the training data set to obtain target power characteristic variables, wherein the target power characteristic variables include response time, power change depth and target power duration;

[0056] An optimized relative value calculation unit, used to calculate the relative value of the optimized setting value of the chilled water outlet temperature of the chiller relative to the custom chilled water outlet temperature setting value of the chiller to obtain an optimized relative value;

[0057] A prediction decision tree construction unit is used to construct a prediction decision tree based on the target power characteristic variable and the optimized relative value.

[0058] In a third aspect, the present invention also provides a terminal device comprising a memory and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by one or more processors, wherein the one or more programs include a method for generating a demand-responsive chiller chilled water outlet temperature setting strategy as described in any one of the above.

[0059] In a fourth aspect, an embodiment of the present invention further provides a non-temporary computer-readable storage medium, which, when the instructions in the storage medium are executed by a processor of an electronic device, enables the electronic device to execute a demand-responsive chiller chilled water outlet temperature setting strategy generation method as described in any one of the above.

[0060] Beneficial effects of the invention: Compared with the prior art, the invention provides a demand-responsive chiller chilled water outlet temperature setting strategy generation method, the invention first obtains original data and performs time delay elimination on the original data, the original data including chiller chilled water outlet temperature setting value, chiller chilled water outlet temperature and chiller power value; then establishes a power response model and a temperature response model, and inputs the original data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters; further sets the model parameters in the power response model and the temperature response model; then establishes multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power targets The target value is obtained by extracting characteristic variables from the training data set to obtain target power characteristic variables, and a prediction decision tree is constructed based on the target power characteristic variables; then the prediction decision tree is subjected to rule extraction to obtain a control rule, which indicates the change trend of the chiller chilled water outlet temperature setting value; finally, a demand response command is obtained, and the demand response command is input into the prediction decision tree, which outputs a chiller chilled water outlet temperature setting strategy based on the control rule. The present invention extracts a simple chiller chilled water outlet temperature setting value optimization rule through a prediction decision tree structure, avoids repeated and complex calculations of a building automation system (BAS) in the process of implementing demand response, improves the response speed, increases the effectiveness of the chiller chilled water outlet temperature setting value in fine-grained regulation, and meets the internal comfort requirements while enhancing the flexibility and response efficiency of the system in demand response events, thereby solving the problem of significant load fluctuations in a short period of time due to the load rebound effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0062] Figure 1 It is a flow chart of a method for generating a chiller chilled water outlet temperature setting strategy for demand response provided in an embodiment of the present invention.

[0063] Figure 2 It is a comparison diagram of the predicted power output by the predictive PID controller provided in an embodiment of the present invention and the actual power.

[0064] Figure 3 It is a comparison chart of a chiller chilled water outlet temperature set value, a chiller chilled water outlet temperature actual value and a chiller chilled water outlet temperature predicted value provided by an embodiment of the present invention.

[0065] Figure 4 It is a comparison chart of the optimized outlet water temperature setting value and the outlet water temperature prediction value provided by the embodiment of the present invention.

[0066] Figure 5 It is an optimized predicted power trend diagram under a demand response command provided by an embodiment of the present invention.

[0067] Figure 6 It is a technical roadmap for a method for generating a chiller chilled water outlet temperature setting strategy for demand response provided by an embodiment of the present invention.

[0068] Figure 7 The present invention is a block diagram of a chiller chilled water outlet temperature setting strategy generation system for demand response provided by an embodiment of the present invention.

[0069] Figure 8 It is a block diagram of the internal structure principle of the terminal device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0070] In order to make the purpose, technical solution and advantages of the present invention clearer and more specific, the present invention is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0071] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0072] In the prior art, due to changes in the operating conditions of the HVAC system, the DR strategy experiences significant load fluctuations at the beginning and end, which is not conducive to the stability of the power grid.

[0073] In order to solve the problems of the prior art, the present embodiment provides a demand-responsive chiller chilled water outlet temperature setting strategy generation method, through which the chiller chilled water outlet temperature setting value can be actively adjusted to meet the load, effectively realizing flexible energy use of the building. In specific implementation, first, the original data is acquired, and the time delay of the original data is eliminated, the original data includes the chiller chilled water outlet temperature setting value, the chiller chilled water outlet temperature and the chiller power value; then a power response model and a temperature response model are established, and the original data after the time delay is eliminated is input into the power response model and the temperature response model for parameter fitting to determine the model parameters; the model parameters are further set in the power response model and the temperature response model; then multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values ​​are established, and the multiple sets of custom chiller chilled water outlet temperature setting values ​​are input into the power response model and the temperature response model for parameter fitting to determine the model parameters; The fixed value and multiple groups of customized chiller power target values ​​are input into the power response model and the temperature response model for data optimization, and a training data set is constructed based on the data optimization result; further, the training data set is subjected to feature variable extraction to obtain the target power feature variable, and a prediction decision tree is constructed based on the target power feature variable; then, the prediction decision tree is subjected to rule extraction to obtain a control rule, and the control rule represents the change trend of the chiller chilled water outlet temperature setting value; finally, a demand response command is obtained, and the demand response command is input into the prediction decision tree, and the prediction decision tree outputs the chiller chilled water outlet temperature setting strategy based on the control rule. Therefore, the present invention extracts a simple chiller chilled water outlet temperature setting value optimization rule through a prediction decision tree structure, avoids repeated and complex calculations of the building automation system (BAS) in the process of implementing demand response, improves the response speed, increases the effectiveness of the chiller chilled water outlet temperature setting value in fine-grained regulation, and meets the internal comfort requirements while also enhancing the flexibility and response efficiency of the system in demand response events, solving the problem of significant load fluctuations in a short period of time due to the load rebound effect.

[0074] For example, if a certain air-conditioning system needs to be regulated in response to demand, the original data of the system to be regulated is first obtained, and the time delay of the original data is eliminated; then a power response model and a temperature response model are established, and the original data after the time delay is eliminated is input into the power response model and the temperature response model for parameter fitting to determine the model parameters; the model parameters are set in the power response model and the temperature response model; multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values ​​are established, and the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​are input into the power response model and the temperature response model in turn for data optimization, and a training data set is constructed according to the data optimization results; then feature variables are extracted from the training data set to obtain target power feature variables, and a prediction decision tree is constructed; then rule extraction is performed on the prediction decision tree to obtain a control rule, which represents the change trend of the chiller chilled water outlet temperature setting value; after the prediction decision tree is constructed, the demand response command can be obtained and input into the prediction decision tree, and the prediction decision tree outputs the chiller chilled water outlet temperature setting strategy according to the control rule. The present invention extracts simple optimization rules for chilled water outlet temperature setting values ​​of chillers through a predictive decision tree structure, thereby avoiding repeated and complex calculations by the building automation system (BAS) in the process of implementing demand response, improving the response speed, and increasing the effectiveness of chilled water outlet temperature setting values ​​of chillers in fine-grained regulation. While meeting internal comfort needs, it also enhances the flexibility and response efficiency of the system in demand response events, and solves the problem of significant load fluctuations in a short period of time due to the load rebound effect.

[0075] Exemplary Methods

[0076] The embodiment of the present invention provides a method for generating a chiller chilled water outlet temperature setting strategy for demand response, which can be applied to terminal devices. Figure 1 As shown, the method includes:

[0077] Step S100, obtaining original data and eliminating time delay of the original data, wherein the original data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value.

[0078] In this embodiment, the original data is obtained, and the time delay of the original data is eliminated. The time delay elimination of the original data includes: determining the time delay amount based on the original data; and eliminating the time delay of the chiller chilled water outlet temperature and the chiller power value in the original data based on the time delay amount. Specifically, the original data of a central air-conditioning system of a building within a period of time is obtained, wherein the original data includes: the chiller chilled water outlet temperature setting value, the chiller chilled water outlet temperature and the chiller power value, and it is required that the chiller chilled water outlet temperature setting value must change in the time period to which the original data obtained belongs. The time delay amount N of the central air-conditioning system is obtained according to the analysis of the obtained original data, and the chiller chilled water outlet temperature setting value and the chiller power value in the original data are moved upward by N time points to eliminate the time delay phenomenon in the data. Time delay analysis helps to accurately understand the response speed of the system to external control instructions and the time characteristics of the internal adjustment process, more accurately simulate the response of the real system to environmental changes or control inputs, and provide important support for the subsequent design of fine control strategies.

[0079] In the specific implementation, in the field experiment of a central air-conditioning system, the chiller water outlet temperature set value, chiller water outlet temperature and chiller power value within one hour were first collected, and the data recording frequency was once per minute. The collected raw data were processed and analyzed, and it was found that the time delay of the central air-conditioning system was 5 minutes. Therefore, the chiller water outlet temperature and chiller power value in this group of raw data were moved upward by 5 time units to eliminate the time delay phenomenon.

[0080] Step S200: Establish a power response model and a temperature response model, and input the original data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters.

[0081] In this embodiment, the power response model and the temperature response model are established, and the original data after time delay elimination is input into the power response model and the temperature response model for parameter fitting to determine the model parameters, including: establishing a power response model, inputting the original data after time delay elimination into the power response model for parameter fitting, and determining the fitting parameters of the power response model, wherein the fitting parameters include proportional coefficient, integral coefficient and differential coefficient; establishing a temperature response model, inputting the original data after time delay elimination into the temperature response model for parameter fitting, and determining the time constant of the temperature response model. By constructing a power and temperature response model to reflect in detail the sensitivity of the system to external changes and the dynamic process of internal regulation, accurate parameter fitting ensures that the model can truly reproduce the performance of the system in actual operation, improve operating efficiency, and thus provide reliable data support and decision-making basis for the design of subsequent control strategies.

[0082] In the specific implementation, the power response model is first established, that is, the predictive PID controller (proportional integral differential controller) of the air conditioning system is created. The PID control principle in the continuous control system is shown in formula (1):

[0083] (1),

[0084] Among them, in this application is the control quantity, which represents the power after the feedback from the predictive PID controller. is the proportionality coefficient, Indicates the difference between the chilled water outlet temperature setting value and the chilled water outlet temperature of the chiller at that time point. is the integration coefficient; is the differential coefficient, the integral term The initial value is set as the initial value of the original data refrigerator power. After the power response model is established, it is necessary to fit and determine the parameters in the power response model, wherein the fitting parameters in the power response model include proportional coefficients, integral coefficients and differential coefficients. In the specific parameter fitting, the original data after time delay elimination is input into the power response model, and a genetic algorithm can be used to perform parameter fitting on the power response model. The fitness function of the genetic algorithm is defined as the total square error between the refrigerator power value and the refrigerator power prediction value output by the power response model. After multiple iterations of optimization, the data with excellent performance is selected, and finally the fitting parameters that best fit the real system are determined, that is, the proportional coefficient , integral coefficient and differential coefficient In the specific central air conditioning system experiment of this application, after multiple iterations of optimization, the PID parameters that best fit the actual system are: =-18.880, =-1.721, =5.948, the system predicts the power output by the PID controller and the actual power is compared Figure 2 As shown in the figure, the evaluation index of PID parameter fitting degree is the mean square error MSE between the predicted power and the actual power, MSE=38.011.

[0085] In the specific implementation, a temperature response model is constructed. Since the first-order linear system exhibits a certain inertia when responding to input changes, that is, the output will not immediately follow the input changes, but gradually approach the new steady-state value. This feature can better reflect the relationship between the chiller outlet temperature setting value and the chiller outlet temperature. Therefore, a first-order linear system is selected as the temperature response model between the chiller outlet temperature setting value and the chiller outlet temperature. The mapping relationship between the chiller outlet temperature setting value and the chiller outlet temperature is approximated as a simple first-order linear differential equation relationship. The temperature response model formula is shown as follows (2)-(3):

[0086] (2),

[0087] (3),

[0088] In the formula, It indicates the slope of the predicted chiller chilled water outlet temperature change. Indicates at time The chiller chilled water outlet temperature setting value at the moment, Indicates at time The predicted value of chilled water outlet temperature of the chiller at time is the time constant of the system, Indicates at time The predicted value of chilled water outlet temperature of the chiller at time Indicates the time interval. In the specific parameter fitting, due to the time constant in the air conditioning system Since the temperature is unknown, the chiller outlet temperature set value and the chiller outlet temperature (as the chiller outlet temperature prediction value) in the original data are substituted into the first-order linear system temperature response model, and the grid search method is used to minimize the mean square error (MSE) as the optimization goal to obtain the time constant. In the specific central air-conditioning system experiment of this application, a first-order linear system is selected as the temperature response model to predict the mapping relationship between the chiller outlet water temperature setting value, time and the chiller outlet water temperature. The original data after time delay elimination is substituted into the temperature response model, and the grid search method is used to minimize the mean square error MSE as the optimization goal to obtain the time constant =430, where MSE=0.018. The chiller chilled water outlet temperature set value, actual outlet temperature value and outlet temperature prediction value are as follows Figure 3 shown.

[0089] Step S300: setting the model parameters in the power response model and the temperature response model.

[0090] In this embodiment, the model parameters of the power response model and the temperature response model obtained in step S200 are respectively set on the corresponding models, that is, the proportional coefficient, integral coefficient and differential coefficient are set on the power response model, and the time constant is set on the temperature response model.

[0091] Step S400, establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and construct a training data set based on the data optimization results.

[0092] In this embodiment, a plurality of sets of custom chiller chilled water outlet temperature setting values ​​and a custom chiller power target value are established, and the plurality of sets of custom chiller chilled water outlet temperature setting values ​​and the plurality of sets of custom chiller power target values ​​are input into the power response model and the temperature response model for data optimization, and a training data set is constructed based on the data optimization results, including: establishing a plurality of sets of custom chiller chilled water outlet temperature setting values, and inputting each set of custom chiller chilled water outlet temperature setting values ​​into the temperature response model in turn for chiller chilled water outlet temperature prediction, and obtaining each set of custom chiller chilled water outlet temperature prediction values; calculating each set of the custom chiller chilled water outlet temperature setting values ​​and the custom chiller The difference between the predicted values ​​of the chilled water outlet temperature and the predicted value of the chilled water outlet temperature of the custom chiller is input into the power response model to obtain the predicted value of chiller power corresponding to each group of the custom chiller chilled water outlet temperature setting values; multiple groups of custom chiller power target values ​​are established, and the multiple groups of custom chiller chilled water outlet temperature setting values ​​are optimized by using the differential evolution method based on the multiple groups of custom chiller power target values ​​to obtain multiple groups of chiller chilled water outlet temperature optimized setting values; a training data set is constructed based on the predicted value of the chilled water outlet temperature of the custom chiller, the predicted value of the chiller power and the optimized setting value of the chiller chilled water outlet temperature.

[0093] In the specific implementation, multiple groups of custom chiller chilled water outlet temperature setting values ​​are established, and each group of custom chiller chilled water outlet temperature setting values ​​is input into the temperature response model in turn to predict the chiller chilled water outlet temperature, and the custom chiller chilled water outlet temperature prediction values ​​corresponding to each group of custom chiller chilled water outlet temperature setting values ​​are obtained. Then, the difference between each group of custom chiller chilled water outlet temperature setting values ​​and the corresponding custom chiller chilled water outlet temperature prediction values ​​is calculated, and the difference is input into the power response model for calculation, so as to obtain the chiller power prediction values ​​corresponding to each group of custom chiller chilled water outlet temperature setting values. Establish multiple sets of custom chiller power target values, input each set of custom chiller power target values ​​in turn when the air conditioning system in the experiment in this application is in a stable state, use the differential evolution method to optimize the custom chiller chilled water outlet temperature setting value, and obtain the chiller chilled water outlet temperature optimization setting value. The differential evolution method uses the minimum mean square error between the target power and the chiller power prediction value calculated by the power response model as the objective function, and the constraint condition considers the impact of the chiller chilled water outlet temperature prediction value on human comfort; construct a training data set based on the custom chiller chilled water outlet temperature prediction value, chiller power prediction value and chiller chilled water outlet temperature optimization setting value. In the specific central air conditioning system experiment, set the system time delay delay=5, the PID control system (power response model) parameters, =-18.880, =-1.721, =5.948, time constant of temperature response model =430, a data set of 50 sets of customized chiller chilled water outlet temperature set values ​​and chiller power target values ​​is prepared, and the chiller chilled water outlet temperature set values ​​are optimized by differential evolution method to make its chiller power prediction value approach the chiller power target value. Finally, the optimized chiller chilled water outlet temperature set values ​​are updated and saved, that is, the chiller chilled water outlet temperature optimization set values. Based on these 50 sets of customized chiller chilled water outlet temperature set values ​​and customized chiller power, the customized chiller chilled water outlet temperature prediction values, chiller power prediction values ​​and chiller chilled water outlet temperature optimization set values ​​are constructed to build a training data set, in preparation for the subsequent construction of a prediction decision tree.

[0094] Step S500: extract characteristic variables from the training data set to obtain target power characteristic variables, and construct a prediction decision tree based on the target power characteristic variables.

[0095] In this embodiment, the feature variable extraction of the training data set is performed to obtain the target power feature variable, and a prediction decision tree is constructed based on the target power feature variable, including: feature variable extraction of the chiller power prediction value in the training data set is performed to obtain the target power feature variable, and the target power feature variable includes response time, power change depth and target power duration; the relative value of the optimized setting value of the chiller chilled water outlet temperature relative to the custom chiller chilled water outlet temperature setting value is calculated to obtain the optimized relative value; and a prediction decision tree is constructed based on the target power feature variable and the optimized relative value.

[0096] In the specific implementation, feature variables are extracted from the training data set, that is, three feature variables, namely, response time Time (unit: minute), power change depth d (unit: KW), and target power duration b (unit: minute), are extracted from the training data set and used as target power feature variables. Then, the relative value of the optimized setting value of the chilled water outlet temperature of the chiller relative to the custom chilled water outlet temperature setting value of the chiller is calculated to obtain the optimized relative value. The above three target power feature variables are used as input and the optimized relative value is used as output to form multiple groups of prediction model training data, and a prediction decision tree between the target power feature variable and the optimized relative value of the chilled water outlet temperature of the chiller is generated. In the central air-conditioning system of the present application, 50 groups of input data sets are read and processed, and the three feature variables of response time (Time), power change depth (d) and target power duration (b) are extracted therefrom, and the relative value of the optimized setting value of the chilled water outlet temperature of the chiller relative to the custom chilled water outlet temperature setting value of the chiller is calculated to obtain the optimized relative value. The feature variable of the chiller power target value is used as input and the optimized relative value is used as output to establish a prediction decision tree. The maximum depth of the tree is set to 9. After training, the optimal prediction tree structure is obtained, see Figure 4 As shown, the mean square error (MSE) on the test set is 0.036. Save the prediction decision tree file for subsequent regulation.

[0097] Step S600: extracting rules from the prediction decision tree to obtain control rules, wherein the control rules represent a change trend of a chilled water outlet temperature setting value of a refrigerator.

[0098] In the specific implementation, the prediction decision tree is subjected to rule extraction to obtain the control rules, that is, the rule extraction of the temperature setting value change trend under the stable power control is performed through the prediction decision tree structure, so as to realize the control mode of accurately calculating the chilled water outlet temperature setting value of the chiller after system optimization based on the power control characteristic variables, so as to facilitate the subsequent direct response to the needs of the power grid by controlling the chilled water outlet temperature setting value of the chiller.

[0099] Step S700: Obtain a demand response command, input the demand response command into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule.

[0100] In specific implementation, in order to achieve precise control of system load, the power grid determines a reasonable demand response target and sends a demand response command for a certain period of time. The air-conditioning system receives the load control signal and uses the control rules of the prediction decision tree to output the corresponding chiller chilled water outlet temperature setting strategy, and applies this control strategy to the central air-conditioning system so that the performance of the building accurately meets the grid response requirements. In the central air-conditioning system experiment of the present application, it is assumed that the power sent by the power grid drops by 40KW at a certain moment, and the desired duration is 30 minutes. Then the input power change depth d=-40KW, the target power duration b=30min, and the temperature setting value before the control action T0=7.308℃. The prediction decision tree model obtained in step S600 outputs a set of optimized setting values ​​for the chiller chilled water outlet temperature within the control time period. The optimized outlet temperature setting value (i.e., the chiller outlet optimized setting value) is predicted by the temperature response model obtained in step S300. The outlet temperature prediction value, such as Figure 4 As shown, the obtained power response model output is used to obtain the optimized power prediction value to observe whether it accurately responds to the control instructions issued by the power grid. Figure 5 Finally, when the power grid sends a demand response command, which includes the power change depth and the target power duration, the corresponding chiller chilled water outlet temperature set value strategy is output through the prediction decision tree rule, and this control strategy is applied to the central air-conditioning system so that the performance of the building accurately meets the demand response requirements.

[0101] Aiming at the shortcoming of the existing slow recovery strategy technology that cannot accurately control the operating parameters, the present invention innovatively proposes a three-step strategy of "model construction + optimization control + rule extraction" to accurately control the energy consumption of the central air-conditioning system. By actively adjusting the set value of the chilled water outlet temperature of the central air-conditioning system, the air-conditioning load can be flexibly changed, effectively realizing flexible energy use of buildings, such as Figure 6 As shown, it is a technical roadmap of the method for generating a chiller chilled water outlet temperature setting strategy for demand response.

[0102] Compared with the prior art, the technical solution of the present invention has the following beneficial effects:

[0103] (1) Efficient optimization. The present invention uses a predictive decision tree structure to extract simple rules for optimizing the outlet water temperature setting value, effectively simplifying the air conditioning system demand response process, avoiding the building automation system (BAS) from performing repeated and complex calculations during each demand response process, and enabling the system to quickly adjust the chiller chilled water outlet temperature setting value to adapt to grid load changes. This simplified control process not only improves the operating speed, but also enhances the system's flexibility and response efficiency in demand response events.

[0104] (2) Fine-grained control. The present invention obtains a fine-grained control scheme for the outlet water temperature set point under each demand response target by predicting decision tree rules. The quantitative control of parameters makes the power curve in the demand response stage step-shaped, ensuring a smooth transition of system power when implementing demand response, increasing the effectiveness of the temperature set point in fine-grained control, and enhancing the accuracy and reliability of the system response while meeting internal comfort needs, solving the problem of significant load fluctuations in a short period of time due to the load rebound effect.

[0105] (3) The present invention dynamically adjusts the chilled water outlet temperature setting value of the chiller to quickly reduce or increase the cooling capacity without sacrificing user comfort, responding to the grid load adjustment demand. Compared with the delay of the traditional terminal control strategy, the cold source side control can achieve a fast response and reduce the demand. Since the chilled water outlet temperature of the chiller is one of the important parameters that determine the cooling capacity of the central air-conditioning chiller, the present invention selects the chilled water outlet temperature of the chiller as the control parameter, thereby effectively controlling the cooling efficiency and energy consumption of the entire system.

[0106] (4) The present invention uses a predictive decision tree model to provide data-driven support for the demand response decision of the central air-conditioning system. The rule can learn from historical data and identify the optimal chiller chilled water outlet temperature control strategy that the system should adopt when the grid demand changes. It effectively simplifies the calculation process of the air-conditioning system demand response and speeds up the response. It enables the system to quickly adjust the chiller chilled water outlet temperature set value to adapt to changes in the grid load, solving the problem of significant load fluctuations in a short period of time due to the load rebound effect.

[0107] Exemplary Systems

[0108] Based on the above embodiments, the present invention also provides a demand-responsive chiller chilled water outlet temperature setting strategy generation system, such as Figure 7As shown, the system in this embodiment includes a data acquisition module 10, a model building module 20, a parameter setting module 30, a model training module 40, a feature extraction module 50, a rule extraction module 60, and a strategy output module 70. The data acquisition module 10 is used to acquire raw data and eliminate time delays for the raw data, and the raw data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature, and a chiller power value; the model building module 20 is used to establish a power response model and a temperature response model, and input the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters; the parameter setting module 30 is used to set the model parameters in the power response model and the temperature response model; the model training module 40 is used to establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values ​​into the power response model and the temperature response model for parameter fitting to determine model parameters; The water temperature set value and multiple groups of customized chiller power target values ​​are input into the power response model and the temperature response model for data optimization, and a training data set is constructed based on the data optimization results; the feature extraction module 50 is used to extract feature variables from the training data set to obtain target power feature variables, and to construct a prediction decision tree based on the target power feature variables; the rule extraction module 60 is used to extract rules from the prediction decision tree to obtain control rules, and the control rules represent the change trend of the chilled water outlet temperature set value of the chiller; the strategy output module 70 is used to obtain a demand response command, and the demand response command is input into the prediction decision tree, and the prediction decision tree outputs a chilled water outlet temperature setting strategy for the chiller based on the control rules.

[0109] In one implementation, the data acquisition module includes:

[0110] A time delay determination unit, configured to determine a time delay amount based on the original data;

[0111] The time delay elimination unit is used to eliminate the time delay of the chiller chilled water outlet temperature and the chiller power value in the original data based on the time delay amount.

[0112] In one implementation, the model building module includes:

[0113] A power response model building unit, used to build a power response model, input the original data after time delay elimination into the power response model for parameter fitting, and determine the fitting parameters of the power response model, wherein the fitting parameters include a proportional coefficient, an integral coefficient, and a differential coefficient;

[0114] The temperature response model building unit is used to build a temperature response model, input the original data after time delay elimination into the temperature response model for parameter fitting, and determine the time constant of the temperature response model.

[0115] In one implementation, the model training module includes:

[0116] The outlet water temperature prediction unit is used to establish multiple groups of custom chiller chilled water outlet water temperature setting values, and input each group of custom chiller chilled water outlet water temperature setting values ​​into the temperature response model in turn to predict the chiller chilled water outlet water temperature, so as to obtain each group of custom chiller chilled water outlet water temperature prediction values;

[0117] A chiller power prediction unit, used for calculating the difference between each group of the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value, and inputting the difference between the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value into the power response model to obtain the chiller power prediction value corresponding to each group of the custom chiller chilled water outlet temperature setting values;

[0118] An outlet water temperature setting value optimization unit is used to establish multiple sets of custom chiller power target values, and optimize the multiple sets of custom chiller chilled water outlet water temperature setting values ​​using a differential evolution method based on the multiple sets of custom chiller power target values ​​to obtain multiple sets of chiller chilled water outlet water temperature optimization setting values;

[0119] The training data set construction unit is used to construct a training data set based on the chiller chilled water outlet temperature prediction value, the chiller power prediction value and the chiller chilled water outlet temperature optimization setting value.

[0120] In one implementation, the feature extraction module includes:

[0121] A characteristic variable extraction unit is used to extract characteristic variables from the chiller power prediction value in the training data set to obtain target power characteristic variables, wherein the target power characteristic variables include response time, power change depth and target power duration;

[0122] An optimized relative value calculation unit, used to calculate the relative value of the optimized setting value of the chilled water outlet temperature of the chiller relative to the setting value of the chilled water outlet temperature of the chiller to obtain an optimized relative value;

[0123] A prediction decision tree construction unit is used to construct a prediction decision tree based on the target power characteristic variable and the optimized relative value.

[0124] Based on the above embodiments, the present invention further provides a terminal device, the principle block diagram of the terminal device can be as follows: Figure 8The terminal device is the host computer in the above embodiment, such as an ATM machine. The terminal device may include one or more processors 100 ( Figure 8 Only one is shown in the figure), a memory 101 and a computer program 102 stored in the memory 101 and executable on one or more processors 100, for example, a program for a method for generating a chiller outlet temperature setting strategy for demand response. When one or more processors 100 execute the computer program 102, each step in the embodiment of the method for generating a chiller outlet temperature setting strategy for demand response can be implemented. Alternatively, when one or more processors 100 execute the computer program 102, the functions of each template / unit in the embodiment of the chiller outlet temperature setting strategy generation system for demand response can be implemented, which is not limited here.

[0125] In one embodiment, the processor 100 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0126] In one embodiment, the memory 101 may be an internal storage unit of an electronic device, such as a hard disk or memory of the electronic device. The memory 101 may also be an external storage device of the electronic device, such as a plug-in hard disk, a smart memory card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the electronic device. Further, the memory 101 may also include both an internal storage unit of the electronic device and an external storage device. The memory 101 is used to store computer programs and other programs and data required by the terminal device. The memory 101 may also be used to temporarily store data that has been output or is to be output.

[0127] Those skilled in the art will understand that Figure 8 The principle block diagram shown in the figure is only a block diagram of a partial structure related to the scheme of the present invention, and does not constitute a limitation on the terminal device to which the scheme of the present invention is applied. The specific terminal device may include more or less components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0128] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program. The computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods, wherein any reference to memory, storage, operating database or other media used in the embodiments provided by the present invention can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0129] In summary, the present invention discloses a method for generating a chiller chilled water outlet temperature setting strategy for demand response, the method comprising: firstly acquiring original data and performing time delay elimination on the original data, the original data comprising a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value; then establishing a power response model and a temperature response model, and inputting the original data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters; further setting the model parameters in the power response model and the temperature response model; and then establishing multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, The plurality of groups of user-defined chiller chilled water outlet temperature setting values ​​and the plurality of groups of user-defined chiller power target values ​​are input into the power response model and the temperature response model for data optimization, and a training data set is constructed based on the data optimization result; further, the training data set is subjected to feature variable extraction to obtain target power feature variables, and a prediction decision tree is constructed based on the target power feature variables; then, the prediction decision tree is subjected to rule extraction to obtain a control rule, and the control rule represents the change trend of the chiller chilled water outlet temperature setting value; finally, a demand response command is obtained, and the demand response command is input into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule. The present invention extracts a simple chiller chilled water outlet temperature setting value optimization rule through a prediction decision tree structure, avoids repeated and complex calculations of a building automation system (BAS) in the process of implementing demand response, improves the response speed, increases the effectiveness of the chiller chilled water outlet temperature setting value in fine-grained control, and meets the internal comfort requirements while also enhancing the flexibility and response efficiency of the system in demand response events, and solves the problem of significant load fluctuations in a short period of time due to the load rebound effect.

[0130] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for generating a chiller chilled water outlet temperature setting strategy for demand response, characterized in that: The method comprises: Acquire original data and eliminate time delay of the original data, wherein the original data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value; Establishing a power response model and a temperature response model, and inputting the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters; Setting the model parameters in the power response model and the temperature response model; Establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and construct a training data set based on the data optimization results; Extracting characteristic variables from the training data set to obtain target power characteristic variables, and constructing a prediction decision tree based on the target power characteristic variables; Extracting rules from the prediction decision tree to obtain a control rule, wherein the control rule represents a change trend of a chilled water outlet temperature setting value of a chiller; A demand response command is obtained, and the demand response command is input into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule.

2. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 1, characterized in that: The eliminating time delay of the original data comprises: determining a time delay amount based on the raw data; Based on the time delay amount, time delay elimination is performed on the chiller chilled water outlet temperature and the chiller power value in the original data.

3. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 1, characterized in that: The model parameters include fitting parameters and time constants. The power response model and the temperature response model are established, and the raw data after time delay elimination is input into the power response model and the temperature response model for parameter fitting to determine the model parameters, including: Establishing a power response model, inputting the original data after time delay elimination into the power response model for parameter fitting, and determining the fitting parameters of the power response model, wherein the fitting parameters include a proportional coefficient, an integral coefficient, and a differential coefficient; A temperature response model is established, and the original data after time delay elimination is input into the temperature response model for parameter fitting to determine the time constant of the temperature response model.

4. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 1, characterized in that: The method of establishing multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and inputting the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and constructing a training data set based on the data optimization results, includes: Establish multiple groups of custom chiller chilled water outlet temperature setting values, and input each group of custom chiller chilled water outlet temperature setting values ​​into the temperature response model in turn to predict the chiller chilled water outlet temperature, and obtain each group of custom chiller chilled water outlet temperature prediction values; Calculate the difference between each set of the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value, and input the difference between the custom chiller chilled water outlet temperature setting values ​​and the custom chiller chilled water outlet temperature prediction value into the power response model to obtain the chiller power prediction value corresponding to each set of the custom chiller chilled water outlet temperature setting values; Establishing multiple sets of custom chiller power target values, and optimizing the multiple sets of custom chiller chilled water outlet temperature setting values ​​using a differential evolution method based on the multiple sets of custom chiller power target values, to obtain multiple sets of chiller chilled water outlet temperature optimization setting values; A training data set is constructed based on the custom chiller chilled water outlet temperature prediction value, the chiller power prediction value and the chiller chilled water outlet temperature optimization setting value.

5. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 4, characterized in that: The extracting characteristic variables from the training data set to obtain target power characteristic variables, and constructing a prediction decision tree based on the target power characteristic variables, includes: Extracting characteristic variables from the predicted power values ​​of the chiller in the training data set to obtain target power characteristic variables, wherein the target power characteristic variables include response time, power change depth, and target power duration; Calculate the relative value of the optimal setting value of the chilled water outlet temperature of the chiller relative to the custom setting value of the chilled water outlet temperature of the chiller to obtain the optimal relative value; A prediction decision tree is constructed based on the target power characteristic variable and the optimized relative value.

6. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 4, characterized in that: A genetic algorithm is used to perform parameter fitting on the power response model, and a fitness function of the genetic algorithm is defined as a total square error between the refrigerator power value and a refrigerator power prediction value output by the power response model.

7. The method for generating a chiller chilled water outlet temperature setting strategy for demand response according to claim 1, characterized in that: The temperature response model is fitted with parameters using a grid search method, and the optimization goal of the grid search method is to minimize the mean square error.

8. A demand-responsive chiller chilled water outlet temperature setting strategy generation system, characterized in that: The system comprises: A data acquisition module, used to acquire raw data and eliminate time delays of the raw data, wherein the raw data includes a chiller chilled water outlet temperature setting value, a chiller chilled water outlet temperature and a chiller power value; A model building module, used to build a power response model and a temperature response model, and input the raw data after time delay elimination into the power response model and the temperature response model for parameter fitting to determine model parameters; A parameter setting module, used for setting the model parameters in the power response model and the temperature response model; A model training module is used to establish multiple sets of custom chiller chilled water outlet temperature setting values ​​and custom chiller power target values, and input the multiple sets of custom chiller chilled water outlet temperature setting values ​​and the multiple sets of custom chiller power target values ​​into the power response model and the temperature response model for data optimization, and construct a training data set based on the data optimization results; A feature extraction module, used to extract feature variables from the training data set to obtain target power feature variables, and to construct a prediction decision tree based on the target power feature variables; A rule extraction module is used to extract rules from the prediction decision tree to obtain a control rule, wherein the control rule represents a change trend of a chiller chilled water outlet temperature setting value; The strategy output module is used to obtain a demand response command, input the demand response command into the prediction decision tree, and the prediction decision tree outputs a chiller chilled water outlet temperature setting strategy based on the control rule.

9. A terminal device, characterized in that: The terminal device includes a memory, a processor, and a program of a method for generating a demand-responsive chilled water outlet temperature setting strategy for a refrigerator, which is stored in the memory and can be run on the processor. When the processor executes the program of the method for generating a demand-responsive chilled water outlet temperature setting strategy for a refrigerator, the steps of the method for generating a demand-responsive chilled water outlet temperature setting strategy for a refrigerator are implemented as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a program for a method for generating a demand-responsive chilled water outlet temperature setting strategy for a chiller. When the program for the method for generating a demand-responsive chilled water outlet temperature setting strategy for a chiller is executed by a processor, the steps of the method for generating a demand-responsive chilled water outlet temperature setting strategy for a chiller as described in any one of claims 1 to 7 are implemented.