A method and device for constructing a multi-physics digital twin simulation model of electric power equipment
By constructing and improving the target neural network model and combining U-Net and U-Net++ technologies, the problem of time consumption and detailed information processing limitations of the data set relying on conventional multi-physics simulation in the construction of digital twin simulation models of power equipment has been solved, and the More efficient and accurate simulation model construction supports real-time health status monitoring.
Patent Information
- Application Number
- CN202410904634.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-08
AI Technical Summary
In the process of building a digital twin simulation model of power equipment, the early data set relies on conventional multi-physics simulation, which results in a long time consumption. In addition, the real-time simulation model has limitations in processing detailed information, making it difficult to improve real-time performance and accuracy. .
By obtaining parameter sets of power equipment under the same and different working conditions, a target neural network model is constructed, and the U-Net and U-Net++ models are used for training and improvement to generate an improved target neural network model to improve the accuracy and accuracy of the simulation model. Rapidity, and determine the final digital twin simulation model through correlation analysis.
It effectively solves the problem of long time-consuming construction of sample data sets and over-reliance on conventional multi-physics simulations, improves the ability of real-time simulation models in processing detailed information, achieves higher accuracy and speed, and supports the development of power equipment. Obtain real-time health status information.
Smart Images

Figure CN118468983B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of model construction, and in particular to a method and device for constructing a multi-physical field digital twin simulation model of electric power equipment. Background Art
[0002] The more complex the operating conditions of the unit equipment, the more complex the equipment structure, and the higher the accuracy requirements for the calculation results, the higher the requirements for the refinement of the corresponding mathematical simulation model construction, and the calculation time required for the corresponding simulation model in the analysis and solution process also increases exponentially. For the requirements of online real-time monitoring functions, the excessively long simulation calculation time brings great difficulties to the realization of real-time effects, and also limits the improvement of the safety assessment, fault analysis, and prediction functions of pumped storage unit equipment based on simulation models.
[0003] In the prior art, in the process of building a digital twin simulation model for power equipment, the early data set construction mostly relies on conventional multi-physics field simulation, and it takes a long time to train the network with large demand. At the same time, although the prior art has high segmentation accuracy when building a real-time simulation model, it still has some limitations in processing detailed information. Summary of the invention
[0004] In view of this, the present invention provides a method and device for constructing a multi-physics field digital twin simulation model of power equipment, so as to solve the problem that in the process of constructing the digital twin simulation model of power equipment, the early data set construction mostly relies on conventional multi-physics field simulation, and there are still some limitations in processing detailed information when building a real-time simulation model.
[0005] In a first aspect, the present invention provides a method for constructing a multi-physics field digital twin simulation model of an electric power device, the method comprising:
[0006] Obtain a first parameter set under the same operating conditions of the power equipment, and determine a target simulation model based on the first parameter set; obtain an actual operation data set of the power equipment, and construct a first sample data set based on the actual operation data set of the power equipment and the target simulation model; use the first sample data set to train and generate a target neural network model; construct a second sample data set based on the target neural network model and the first sample data set; establish an improved target neural network model based on the target neural network model and the second sample data set; obtain a second parameter set under different operating conditions of the power equipment, and determine a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set.
[0007] The method for constructing a multi-physics digital twin simulation model of power equipment provided by the present invention first determines the target simulation model used for subsequent simulation through the first parameter set under the same working conditions of the power equipment, and then constructs a first sample data set in combination with the actual operating data set of the power equipment and obtains the target neural network model through training. Secondly, by constructing a second sample data set in combination with the target neural network model and the original first parameter set and training to obtain an improved target neural network model, the accuracy and speed of constructing the improved target neural network model are improved. Finally, the final multi-physics digital twin simulation model of power equipment for multi-physics digital twin simulation of power equipment is determined in the obtained target neural network model and the improved target neural network model through the second parameter set under different working conditions of the power equipment. Therefore, by implementing the present invention, the problem that the sample data set construction is time-consuming and overly dependent on conventional multi-physics simulation is solved. Further, the problem that there are still some limitations in processing detailed information when constructing a real-time simulation model is solved through the improved target neural network model.
[0008] In an optional implementation, obtaining a first parameter set under the same operating condition of the power equipment, and determining a target simulation model based on the first parameter set includes:
[0009] Acquire a two-dimensional data set and a three-dimensional data set in a first parameter set; construct an initial two-dimensional physical field simulation model based on the two-dimensional data set, and construct an initial three-dimensional physical field simulation model based on the three-dimensional data set; calculate an average error value based on the two-dimensional data set and the three-dimensional data set; determine a target simulation model in the initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model based on the average error value.
[0010] The method for constructing a multi-physics field digital twin simulation model of power equipment provided by the present invention first constructs an initial two-dimensional physical field simulation model and an initial three-dimensional physical field simulation model respectively through a two-dimensional data set and a three-dimensional data set contained in a first parameter set under the same working condition of the power equipment. Secondly, by calculating the average error value of the two-dimensional data set and the three-dimensional data set, one of the constructed initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model is determined as the final target simulation model, which provides support for the subsequent sample data set construction.
[0011] In an optional implementation, using the first sample data set to train and generate a target neural network model includes:
[0012] The first sample data set is normalized to obtain a third sample data set; training is performed based on the third sample data set to generate an initial neural network model; a third parameter set of the power equipment under a new operating condition is obtained, and the third sample data set is input into the initial neural network model for calculation to obtain a feature quantity data set; the feature quantity data set is denormalized and validity verified, and a target neural network model is obtained when the validity verification result meets the requirements.
[0013] The method for constructing a multi-physics digital twin simulation model of power equipment provided by the present invention trains the first sample data set obtained by construction until the validity verification result of the characteristic quantity data set output by the model meets the requirements and generates a corresponding target neural network model, thereby providing support for subsequently solving the problem that the construction of the sample data set is time-consuming and over-dependent on conventional multi-physics field simulation.
[0014] In an optional implementation, based on the target neural network model and the second sample data set, an improved target neural network model is established, including:
[0015] Obtain a grid hyperparameter set of the target neural network model; perform training based on the grid hyperparameter set and the second sample data set to generate an improved target neural network model.
[0016] The method for constructing a multi-physics field digital twin simulation model of power equipment provided by the present invention migrates the grid hyperparameter set of the target neural network model to the training process of the improved target neural network model to generate rich sample data for training, thereby improving the accuracy and speed of constructing the improved target neural network model from two aspects: sample generation channel and neural network category.
[0017] In an optional implementation, obtaining a second parameter set under different operating conditions of the power equipment, and determining a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set, including:
[0018] Obtain a second parameter set under different operating conditions of the power equipment, and perform correlation analysis on the second parameter set with the target neural network model and the improved target neural network model, respectively, to obtain a first correlation coefficient and a second correlation coefficient; compare the first correlation coefficient and the second correlation coefficient; when the first correlation coefficient is greater than the second correlation coefficient, determine that the multi-physics field digital twin simulation model of the power equipment is the target neural network model; when the first correlation coefficient is less than the second correlation coefficient, determine that the multi-physics field digital twin simulation model of the power equipment is the improved target neural network model.
[0019] The method for constructing a multi-physics digital twin simulation model of power equipment provided by the present invention provides support for realizing the construction of a multi-physics digital twin simulation model of power equipment by performing correlation analysis on the second parameter sets under different operating conditions of the power equipment and the constructed target neural network model and the improved target neural network model, and taking the model with a high correlation coefficient as the final multi-physics digital twin simulation model of the power equipment.
[0020] In an optional embodiment, the method further includes:
[0021] Obtain health status information of power equipment based on the multi-physics field digital twin simulation model of power equipment.
[0022] The method for constructing a multi-physical field digital twin simulation model of electric power equipment provided by the present invention can obtain more accurate health status information of the electric power equipment in real time by determining the final multi-physical field digital twin simulation model of the electric power equipment.
[0023] In a second aspect, the present invention provides a device for constructing a multi-physical field digital twin simulation model of an electric power device, the device comprising:
[0024] The first acquisition and determination module is used to acquire the first parameter set under the same operating conditions of the power equipment, and determine the target simulation model based on the first parameter set; the acquisition and construction module is used to acquire the actual operation data set of the power equipment, and construct the first sample data set based on the actual operation data set of the power equipment and the target simulation model; the training module is used to train with the first sample data set and generate a target neural network model; the construction module is used to construct a second sample data set based on the target neural network model and the first sample data set; the establishment module is used to establish an improved target neural network model based on the target neural network model and the second sample data set; the second acquisition and determination module is used to acquire the second parameter set under different operating conditions of the power equipment, and based on the second parameter set, determine the multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model.
[0025] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, computer instructions being stored in the memory, and the processor executing the computer instructions to execute the method for constructing a multi-physical field digital twin simulation model of an electric power equipment according to the first aspect or any corresponding embodiment thereof.
[0026] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, and the computer instructions are used to enable a computer to execute the method for constructing a multi-physical field digital twin simulation model of power equipment according to the above-mentioned first aspect or any corresponding embodiment thereof.
[0027] In a fifth aspect, the present invention provides a computer program product, comprising computer instructions, which are used to enable a computer to execute the method for constructing a multi-physical field digital twin simulation model of power equipment according to the above-mentioned first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 It is a flowchart of a method for constructing a multi-physics field digital twin simulation model of electric power equipment according to an embodiment of the present invention;
[0030] Figure 2 is a flow chart of another method for constructing a multi-physics digital twin simulation model of electric power equipment according to an embodiment of the present invention;
[0031] Figure 3 is a flow chart of another method for constructing a multi-physics field digital twin simulation model of electric power equipment according to an embodiment of the present invention;
[0032] Figure 4 Schematic diagram of the generation process of the U-Net model and the U-net++ model according to an embodiment of the present invention;
[0033] Figure 5 is a schematic diagram of a process for determining a model for constructing a simulation data set according to an embodiment of the present invention;
[0034] Figure 6 is a structural block diagram of a device for constructing a multi-physical field digital twin simulation model of electric power equipment according to an embodiment of the present invention;
[0035] Figure 7 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0037] As the core of real-time calculation of digital twin power station, the proxy model can be combined with the data collected by field sensors to form an intelligent operation and maintenance system. As the preliminary work of building a digital twin system, the biggest problem of the proxy model is the accuracy of calculation and the time of building multiple sample sets. U-net neural network is an improvement of the full convolutional neural network in deep learning. It can be effectively trained and learned with only a small number of training samples. Its excellent data enhancement and segmentation capabilities have achieved good application results in image semantic segmentation, semantic segmentation of three-dimensional video data, and super-resolution image generation. U-Net++ can better handle detailed segmentation tasks, support multi-scale segmentation and category imbalance problems, and has superior performance. The U-Net++ model has strong interpretability and clear visualization results, which is helpful for further analysis and interpretation of detection results. At present, there are multi-physics field neural network calculations based on U-Net, but there are no cases of calculations based on U-Net++. The present invention can be used to generate a real-time simulation module for the temperature field of power equipment in a digital twin power station, with the data collected by the field sensor as input and the results of the simulation model as real-time output, to achieve real-time dynamic display of the temperature field and fluid field.
[0038] According to an embodiment of the present invention, an embodiment of a method for constructing a multi-physics field digital twin simulation model of an electric power equipment is provided. It should be noted that the steps shown in the flowchart in the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0039] In this embodiment, a method for constructing a multi-physics digital twin simulation model of power equipment is provided, which can be used in electronic devices such as computers, mobile phones, tablet computers, etc. Figure 1 is a flow chart of a method for constructing a multi-physics digital twin simulation model of an electric power device according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:
[0040] Step S101, obtaining a first parameter set under the same operating condition of the power equipment, and determining a target simulation model based on the first parameter set.
[0041] Specifically, the target simulation model may be a two-dimensional simulation model or a three-dimensional simulation model.
[0042] Step S102: acquiring a data set of actual operation of electric power equipment, and constructing a first sample data set based on the data set of actual operation of electric power equipment and a target simulation model.
[0043] Specifically, a certain number of corresponding simulation data sets can be generated through the target simulation model.
[0044] Furthermore, the simulation data set and the actual operation data set of the power equipment are combined to construct a first sample data set.
[0045] Step S103, using the first sample data set to perform training and generate a target neural network model.
[0046] Among them, the target neural network model is a U-Net model.
[0047] Specifically, the constructed first sample data set is used to perform U-Net model training until a U-Net model that meets the conditions is obtained.
[0048] Step S104, constructing a second sample data set based on the target neural network model and the first sample data set.
[0049] Specifically, a sufficient sample data set is generated using the target neural network model and combined with the originally constructed first sample data set to jointly form a multi-sample second sample data set.
[0050] Step S105, establishing an improved target neural network model based on the target neural network model and the second sample data set.
[0051] Among them, the improved target neural network model is a U-net++ model.
[0052] Specifically, in combination with the obtained target neural network model, the constructed second sample data set is used for training until a U-net++ model that meets the conditions is obtained.
[0053] Step S106, obtaining a second parameter set of the power equipment under different operating conditions, and based on the second parameter set, determining a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model.
[0054] Specifically, the second parameter sets obtained under different working conditions of the power equipment are input into the target neural network model and the improved target neural network model for calculation, and the errors of the multiple calculated results are compared. Finally, the model with the smallest error is selected from the target neural network model and the improved target neural network model as the final multi-physics field digital twin simulation model of the power equipment.
[0055] The method for constructing a multi-physics digital twin simulation model of power equipment provided in this embodiment first determines the target simulation model used for subsequent simulation through the first parameter set under the same working conditions of the power equipment, and then constructs a first sample data set in combination with the actual operating data set of the power equipment and obtains the target neural network model through training. Secondly, by constructing a second sample data set in combination with the target neural network model and the original first parameter set and training to obtain an improved target neural network model, the accuracy and speed of constructing the improved target neural network model are improved. Finally, the final multi-physics digital twin simulation model of power equipment for multi-physics digital twin simulation of power equipment is determined in the obtained target neural network model and the improved target neural network model through the second parameter set under different working conditions of the power equipment. Therefore, by implementing the present invention, the problem that the sample data set construction is time-consuming and overly dependent on conventional multi-physics simulation is solved. Further, the problem that there are still some limitations in processing detailed information when constructing a real-time simulation model is solved through the improved target neural network model.
[0056] In this embodiment, a method for constructing a multi-physics digital twin simulation model of power equipment is provided, which can be used in electronic devices such as computers, mobile phones, tablet computers, etc. Figure 2 is a flow chart of a method for constructing a multi-physics digital twin simulation model of an electric power device according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0057] Step S201, obtaining a first parameter set under the same operating condition of the power equipment, and determining a target simulation model based on the first parameter set.
[0058] Specifically, the above step S201 includes:
[0059] Step S2011, obtaining a two-dimensional data set and a three-dimensional data set in a first parameter set.
[0060] Specifically, the first parameter set of the power equipment under the same working condition includes a two-dimensional data set A and a three-dimensional data set B under the same working condition.
[0061] Step S2012: construct an initial two-dimensional physical field simulation model based on the two-dimensional data set, and construct an initial three-dimensional physical field simulation model based on the three-dimensional data set.
[0062] Specifically, an initial two-dimensional physical field simulation model corresponding to the power equipment is constructed using the two-dimensional data set A. At the same time, an initial three-dimensional physical field simulation model corresponding to the power equipment is constructed using the three-dimensional data set B.
[0063] Step S2013, calculating an average error value based on the two-dimensional data set and the three-dimensional data set.
[0064] Specifically, the error value of each three-dimensional data and each two-dimensional data is calculated using the following relationship (1):
[0065] (1)
[0066] Where: Indicates The average error value; Indicates Three-dimensional data; Indicates Two-dimensional data.
[0067] Furthermore, the final average error value is determined using the following relationship (2): :
[0068] (2)
[0069] Where: Indicates the number of data.
[0070] Step S2014: determining a target simulation model in the initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model based on the average error value.
[0071] Specifically, the average error value calculated by the above relationship (2) is Compare with the preset error value of 5%.
[0072] Furthermore, when the average error value When it is less than or equal to 5%, the initial two-dimensional physical field simulation model is selected as the final target simulation model.
[0073] Furthermore, when the average error value When it is greater than 5%, the initial three-dimensional physical field simulation model is selected as the final target simulation model.
[0074] Step S202: Obtain a data set of actual operation of the power equipment, and construct a first sample data set based on the data set of actual operation of the power equipment and the target simulation model. Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.
[0075] Step S203, using the first sample data set to perform training and generate a target neural network model.
[0076] Specifically, the above step S203 includes:
[0077] Step S2031, normalize the first sample data set to obtain a third sample data set.
[0078] Specifically, the normalization processing method can be determined according to different first sample data sets of different power equipment, such as a mean variance normalization method, etc. The embodiment of the present invention does not make specific limitations on this, as long as the requirements are met.
[0079] Among them, the mean variance normalization method is shown in the following relationship (3):
[0080] (3)
[0081] Where: represents the third sample data set after normalization; represents a first sample data set to be normalized; Indicates the average value of sample data; Represents the standard deviation of the sample data.
[0082] Step S2032: Perform training based on the third sample data set and generate an initial neural network model.
[0083] Specifically, the third sample data set is divided into a training set and a test set.
[0084] Furthermore, the training set is input into the U-Net neural network for training, and grid hyperparameters such as learning rate, batch size, and optimization algorithm are adjusted during the training process until the neural network reaches optimal convergence, and the corresponding initial neural network model is obtained.
[0085] Step S2033, obtaining a third parameter set of the power equipment under the new operating condition, and inputting the third sample data set into the initial neural network model for calculation to obtain a feature quantity data set.
[0086] Specifically, the parameters of the power equipment under the new working condition are input into the best converged initial neural network model for calculation, and the corresponding feature quantity data set is output.
[0087] Step S2034, denormalize and verify the validity of the feature data set, and obtain the target neural network model when the validity verification result meets the requirements.
[0088] Specifically, when the mean-variance normalization method is used for normalization, the output feature quantity data set is denormalized using the following equation (4):
[0089] (4)
[0090] Where: Represents the feature quantity dataset after denormalization.
[0091] Furthermore, multiple groups of data in the test set are randomly selected, and the error between the feature quantity data set after denormalization processing and the output of the initial neural network model is compared. If the error is less than or equal to 10%, it proves that the trained target neural network model is effective.
[0092] Furthermore, if the error is large, data with larger errors among multiple groups of data are selected and added to the training set from the test set, and the process returns to step S2031 for training until a target neural network model that meets the error requirements is generated.
[0093] Step S204: construct a second sample data set based on the target neural network model and the first sample data set. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0094] Step S205: Based on the target neural network model and the second sample data set, an improved target neural network model is established. Figure 1 Step S105 of the illustrated embodiment will not be described in detail here.
[0095] Step S206, obtaining a second parameter set under different working conditions of the power equipment, and determining a multi-physics digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set. Figure 1 Step S106 of the illustrated embodiment will not be described in detail here.
[0096] The method for constructing a multi-physics digital twin simulation model of power equipment provided in this embodiment first constructs an initial two-dimensional physical field simulation model and an initial three-dimensional physical field simulation model respectively through the two-dimensional data set and the three-dimensional data set contained in the first parameter set under the same working condition of the power equipment. Secondly, by calculating the average error value of the two-dimensional data set and the three-dimensional data set, one of the constructed initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model is determined as the final target simulation model, and then the first sample data set is constructed in combination with the actual operation data set of the power equipment for training, until the validity verification result of the feature quantity data set output by the model meets the requirements and the corresponding target neural network model is generated. Further, by combining the target neural network model and the original first parameter set to construct a second sample data set and train to obtain an improved target neural network model, the accuracy and speed of the construction of the improved target neural network model are improved. Finally, the final multi-physics digital twin simulation model of power equipment for multi-physics digital twin simulation of power equipment is determined in the obtained target neural network model and the improved target neural network model through the second parameter set under different working conditions of the power equipment. Therefore, by implementing the present invention, the problem of time-consuming sample data set construction and over-reliance on conventional multi-physics field simulation is solved. Furthermore, the problem of some limitations in processing detailed information when building a real-time simulation model is solved through an improved target neural network model.
[0097] In this embodiment, a method for constructing a multi-physics digital twin simulation model of power equipment is provided, which can be used in electronic devices such as computers, mobile phones, tablet computers, etc. Figure 3 is a flow chart of a method for constructing a multi-physics digital twin simulation model of an electric power device according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0098] Step S301, obtaining a first parameter set under the same working condition of the power equipment, and determining a target simulation model based on the first parameter set. Figure 2 Step S201 of the illustrated embodiment will not be described in detail here.
[0099] Step S302: Obtain the actual operation data set of the power equipment, and construct a first sample data set based on the actual operation data set of the power equipment and the target simulation model. Figure 1 Step S102 of the illustrated embodiment will not be described in detail here.
[0100] Step S303: Use the first sample data set to train and generate a target neural network model. Figure 2 Step S203 of the illustrated embodiment will not be described in detail here.
[0101] Step S304: construct a second sample data set based on the target neural network model and the first sample data set. Figure 1 Step S104 of the illustrated embodiment will not be described in detail here.
[0102] Step S305: establishing an improved target neural network model based on the target neural network model and the second sample data set.
[0103] Specifically, the above step S305 includes:
[0104] Step S3051, obtaining a grid hyperparameter set of the target neural network model.
[0105] Specifically, the grid hyperparameter set may include grid hyperparameters such as learning rate, batch size, optimization algorithm, etc. of the target neural network model.
[0106] Step S3052: Perform training based on the grid hyperparameter set and the second sample data set to generate an improved target neural network model.
[0107] Specifically, the second sample data set is normalized, and the normalized data is divided into a training set and a validation set.
[0108] Further, the grid hyperparameter set is transferred to the U-net++ model as the initial parameter for comparison and adjustment, and the training set is input into the U-net++ neural network for training until an improved target neural network model that meets the error condition is obtained. The specific process refers to the process from step S2032 to step S2034 above, which will not be repeated here.
[0109] Step S306, obtaining a second parameter set under different operating conditions of the power equipment, and based on the second parameter set, determining a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model.
[0110] Specifically, the above step S306 includes:
[0111] Step S3061, obtaining a second parameter set under different operating conditions of the power equipment, and performing correlation analysis on the second parameter set with the target neural network model and the improved target neural network model, to obtain a first correlation coefficient and a second correlation coefficient.
[0112] Specifically, correlation analysis is performed on the second parameter sets of the power equipment under different working conditions and the constructed target neural network model and the improved target neural network model respectively.
[0113] Furthermore, the Pearson correlation coefficient is selected as an indicator for correlation analysis, and the corresponding first correlation coefficient and second correlation coefficient are obtained.
[0114] Step S3062, comparing the first correlation coefficient and the second correlation coefficient.
[0115] Step S3063, when the first correlation coefficient is greater than the second correlation coefficient, the multi-physics field digital twin simulation model of the power equipment is determined as the target neural network model.
[0116] Specifically, if the first correlation coefficient is greater than the second correlation coefficient, it means that the correlation between the second parameter set and the target neural network model is stronger. At this time, the target neural network model is used as the final multi-physics field digital twin simulation model of the power equipment.
[0117] Step S3064: when the first correlation coefficient is less than the second correlation coefficient, the multi-physics field digital twin simulation model of the power equipment is determined to be an improved target neural network model.
[0118] Specifically, if the first correlation coefficient is smaller than the second correlation coefficient, it means that the correlation between the second parameter set and the improved target neural network model is stronger. At this time, the improved target neural network model is used as the final multi-physics field digital twin simulation model of the power equipment.
[0119] Step S307, obtaining health status information of the power equipment based on the multi-physical field digital twin simulation model of the power equipment.
[0120] Specifically, the finalized multi-physics digital twin simulation model of the power equipment is deployed to the online monitoring system of the power station. Through the online monitoring data feedback of the real equipment, the digital model can be evaluated in real time, so as to accurately obtain the health status information of the power equipment.
[0121] The method for constructing a multi-physics digital twin simulation model of power equipment provided in this embodiment first determines the target simulation model used for subsequent simulation by the first parameter set under the same working condition of the power equipment, and then constructs a first sample data set in combination with the actual operation data set of the power equipment and obtains the target neural network model through training. Secondly, by migrating the grid hyperparameter set of the target neural network model to the training process of the improved target neural network model to generate rich sample data for training to obtain the improved target neural network model, the accuracy and rapidity of the construction of the improved target neural network model are improved from the two aspects of sample generation channel and neural network category. Further, by respectively analyzing the correlation between the second parameter set under different working conditions of the power equipment and the constructed target neural network model and the improved target neural network model, the model with a high correlation coefficient is used as the final multi-physics digital twin simulation model of the power equipment. Finally, by determining the obtained multi-physics digital twin simulation model of the power equipment in the team, more accurate health status information of the power equipment can be obtained in real time. Therefore, by implementing the present invention, the problem that the sample data set construction is time-consuming and overly dependent on conventional multi-physics simulation is solved. Further, the problem that there are still some limitations in processing detailed information when constructing a real-time simulation model is solved by the improved target neural network model.
[0122] In one example, a method for rapidly simulating and constructing a multi-physics digital twin of an electric power device is provided, comprising:
[0123] 1. Two-dimensional and three-dimensional model calculation.
[0124] Based on the research object, select the same input and output variables for calculation. Compare the simulation data differences to determine whether the two-dimensional model can be used instead of the three-dimensional model.
[0125] 2. U-Net model generation, such as Figure 4 shown.
[0126] 2.1 Based on the field operation data, mine the values of independent variables and dependent variables that meet the selected model;
[0127] 2.2 Based on the simulation model, generate a certain amount of simulation data. Together with the historical operation data, construct a data set;
[0128] 2.3 Normalize the sample data set and divide the data set into a training set and a validation set;
[0129] 2.4 Perform U-Net model training and adjust grid hyperparameters such as learning rate, batch size, and optimization algorithm;
[0130] 2.5 Quickly calculate the validation set and training set, and output feature data;
[0131] 2.6 Denormalize and verify the validity of the data;
[0132] 2.7 Generate a neural network model.
[0133] 3. U-net++ model generation, such as Figure 4 shown.
[0134] 3.1 Generate sufficient data sets based on the U-Net neural network model and combine the original data sets to form a multi-sample data set;
[0135] 3.2 Normalize the sample set data and divide the data into training set and validation set;
[0136] 3.3 Migrate the grid hyperparameters such as learning rate, batch size, and optimization algorithm of the U-net model to the U-net++ model as the initial parameters for comparison and adjustment;
[0137] 3.4 Quickly calculate the validation set and training set, and output feature data;
[0138] 3.5 Denormalize and verify the validity of the data;
[0139] 3.6 Generate neural network model.
[0140] 4. Model comparison: Calculate multiple sets of data, compare errors, and select the model with the smallest error as the final model to be deployed in the on-site online digital twin monitoring system.
[0141] The method for constructing a multi-physics digital twin of power equipment provided in this example is based on the idea and current status of building a real-time simulation model of temperature field using existing neural networks. It is proposed that before model construction, two-dimensional and three-dimensional simulation models corresponding to the power equipment should be constructed respectively, and calculations should be performed based on the same operating parameters to determine whether the error is small; secondly, the grid hyperparameters are migrated based on the first basic neural network and rich samples are generated for the second neural network, so as to improve the accuracy and speed of the proxy model from two aspects: sample generation channels and neural network categories. This solution can be used to generate real-time simulation modules for temperature fields of power equipment in digital twin power stations, with data collected by field sensors as input and the results of the simulation model as real-time output, to achieve real-time dynamic display of temperature fields and fluid fields.
[0142] In an optional implementation, a specific example is provided based on the method for rapidly constructing a multi-physics digital twin of power equipment provided in the above example.
[0143] Specifically, two-dimensional oil-immersed transformers and three-dimensional oil-immersed transformers are taken as research objects. The model has two oil inlets, one oil outlet, and a multi-turn wire heat source. The inlet 1 flow velocity, inlet 2 flow velocity, heat source density, inlet 1 temperature, and inlet 2 temperature are selected as input feature quantities, and the maximum temperature of the heat source and the outlet temperature are selected as output feature quantities.
[0144] 1. Determine the two-dimensional and three-dimensional models of oil-immersed transformers.
[0145] Specifically, Figure 5 As shown in the figure, based on the research object, select the same input and output variable parameters and use ANSYS or other physical field simulation software for calculation. Select five sets of three-dimensional simulation temperature data at the same position and 2D simulation temperature data , and calculate its average error. If the average error is less than 5%, the two-dimensional model can be used to change different input quantities to generate simulation sample sets, where the average error is calculated using the following relationships (5) and (6):
[0146] (5)
[0147] (6)
[0148] 2. U-Net model generation.
[0149] 2.1 Based on the operation data measured by field sensors, combined with the simplified model of transformer simulation, with the help of inlet flow meter Get the data value at the same time as the temperature sensor , the power of the heat source The current value can be measured and resistance value Calculate and convert it into the heat flux density corresponding to multiple turns of wire , as shown in the following relations (7) and (8):
[0150] (7)
[0151] (8)
[0152] Furthermore, the values of independent and dependent variables that satisfy the selected model are mined to form the input and output variables outlet temperature , heat source temperature , quantitative field data set ;
[0153] 2.2 Generate a certain amount of simulation data based on the transformer multi-physics field simulation model ; Together with historical operation data, it is constructed into a data set ;
[0154] 2.3 The data set is divided into a training set of 70% and a test set of 30%. The sample data set is normalized. Since the heat flux density is large and has no obvious boundaries, the mean variance normalization method is used, as shown in the above relationship (3);
[0155] 2.4 Perform U-Net model training and adjust grid hyperparameters such as learning rate, batch size, and optimization algorithm;
[0156] 2.5 Perform quick calculations on the test set and training set, and output feature data;
[0157] 2.6 Denormalize the data, as shown in the above equation (4), and randomly select ten sets of data from the test set to compare the error between the actual data and the data generated by the neural network model. If the error is less than 10%, it proves that the neural network training is effective.
[0158] 2.7 If the error is large, select the data with larger errors from the ten sets of data and add them from the test set to the training set until a neural network model that meets the error requirements is generated.
[0159] 3. U-net++ model generation.
[0160] 3.1 Generate sufficient data set based on U-Net neural network model , and combine the original data set to form a multi-sample data set ;
[0161] 3.2 The data set is divided into 70% training set and 30% test set, and the sample data set is normalized. Since the heat flux density value increases and has no obvious boundaries, the mean variance normalization method is used, as shown in the above relationship (3);
[0162] 3.3 Migrate the grid hyperparameters such as learning rate, batch size, and optimization algorithm of the U-net model to the U-net++ model as the initial parameters for comparison and adjustment;
[0163] 3.4 Perform quick calculations on the test set and training set, and output feature data;
[0164] 3.5 Denormalize the data, as shown in the above equation (4), and randomly select ten sets of data from the test set to compare the error between the actual data and the data generated by the neural network model. If the error is less than 10%, it proves that the neural network training is effective.
[0165] 3.6 If the error is large, select the data with larger errors from the ten sets of data and add them from the test set to the training set until a neural network model that meets the error requirements is generated.
[0166] 4. Model comparison.
[0167] For the two models, sample data sets under multiple working conditions were selected, and correlation analysis was performed with the two models respectively. The Pearson correlation coefficient was selected as the indicator, and the model with the largest correlation coefficient was selected as the most accurate proxy model for the research object.
[0168] 5. On-site deployment.
[0169] The final generated proxy model is deployed to the power plant online monitoring system. Through the online monitoring data feedback of the real equipment, the digital model can be evaluated in real time, so as to accurately obtain the equipment health status information.
[0170] In this embodiment, a device for constructing a multi-physics digital twin simulation model of an electric power device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.
[0171] This embodiment provides a device for constructing a multi-physics digital twin simulation model of an electric power device. Figure 6 As shown, the device comprises:
[0172] The first acquisition and determination module 601 is used to acquire a first parameter set under the same working condition of the power equipment, and determine a target simulation model based on the first parameter set.
[0173] The acquisition and construction module 602 is used to acquire the actual operation data set of the power equipment and construct a first sample data set based on the actual operation data set of the power equipment and the target simulation model.
[0174] The training module 603 is used to perform training using the first sample data set and generate a target neural network model.
[0175] The construction module 604 is used to construct a second sample data set based on the target neural network model and the first sample data set.
[0176] Establishing module 605 is used to establish an improved target neural network model based on the target neural network model and the second sample data set.
[0177] The second acquisition and determination module 606 is used to acquire a second parameter set of the power equipment under different operating conditions, and based on the second parameter set, determine the multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model.
[0178] In some optional implementations, the first acquisition and determination module 601 includes:
[0179] The first acquisition unit is used to acquire the two-dimensional data set and the three-dimensional data set in the first parameter set.
[0180] The construction unit is used to construct an initial two-dimensional physical field simulation model based on the two-dimensional data set, and to construct an initial three-dimensional physical field simulation model based on the three-dimensional data set.
[0181] The calculation unit is used to calculate an average error value based on the two-dimensional data set and the three-dimensional data set.
[0182] The first determination unit is used to determine a target simulation model in an initial two-dimensional physical field simulation model and an initial three-dimensional physical field simulation model based on an average error value.
[0183] In some optional implementations, the training module 603 includes:
[0184] The processing unit is used to perform normalization processing on the first sample data set to obtain a third sample data set.
[0185] The first training unit is used to perform training based on the third sample data set and generate an initial neural network model.
[0186] The acquisition and calculation unit is used to acquire the third parameter set of the power equipment under the new working condition, and input the third parameter set into the initial neural network model for calculation to obtain the characteristic quantity data set.
[0187] The processing and verification unit is used to perform denormalization processing and validity verification on the feature quantity data set, and obtain the target neural network model when the validity verification result meets the requirements.
[0188] In some optional implementations, the establishment module 605 includes:
[0189] The second acquisition unit is used to acquire a grid hyperparameter set of the target neural network model.
[0190] The second training unit is used to train and generate an improved target neural network model based on the grid hyperparameter set and the second sample data set.
[0191] In some optional implementations, the second acquisition and determination module 606 includes:
[0192] The acquisition and analysis unit is used to acquire a second parameter set under different working conditions of the power equipment, and perform correlation analysis on the second parameter set with the target neural network model and the improved target neural network model to obtain a first correlation coefficient and a second correlation coefficient.
[0193] The comparison unit is used to compare the first correlation coefficient and the second correlation coefficient.
[0194] The second determination unit is used to determine that the multi-physical field digital twin simulation model of the power equipment is the target neural network model when the first correlation coefficient is greater than the second correlation coefficient.
[0195] The third determination unit is used to determine that the multi-physics field digital twin simulation model of the power equipment is an improved target neural network model when the first correlation coefficient is less than the second correlation coefficient.
[0196] In some optional embodiments, the device further comprises:
[0197] The acquisition module is used to obtain the health status information of the power equipment based on the multi-physical field digital twin simulation model of the power equipment.
[0198] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0199] The multi-physics field digital twin simulation model construction device of the power equipment in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.
[0200] The embodiment of the present invention also provides a computer device having the above Figure 6 The device for building a multi-physics digital twin simulation model of electric power equipment is shown.
[0201] See also Figure 7 , Figure 7 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 7 As shown, the computer device comprises: one or more processors 10, memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components utilize different buses to communicate with each other, and can be installed on a common mainboard or installed in other ways as required. The processor can process the instructions executed in the computer device, including instructions stored in the memory or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Equally, multiple computer devices can be connected, and each device provides part of the necessary operation (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 7 A processor 10 is taken as an example.
[0202] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0203] The memory 20 stores instructions executable by at least one processor 10, so that at least one processor 10 executes the method shown in the above embodiment.
[0204] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0205] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0206] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0207] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0208] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0209] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for constructing a multi-physics digital twin simulation model of power equipment, characterized in that: The method comprises: Acquire a first parameter set under the same operating condition of the electric power equipment, and determine a target simulation model based on the first parameter set; Acquire an actual operation data set of the electric power equipment, and construct a first sample data set based on the actual operation data set of the electric power equipment and the target simulation model; Using the first sample data set to train and generate a target neural network model; Based on the target neural network model and the first sample data set, construct a second sample data set; Based on the target neural network model and the second sample data set, establishing an improved target neural network model; Acquire a second parameter set under different operating conditions of the power equipment, and determine a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set; Wherein, obtaining a first parameter set under the same working condition of the power equipment, and determining a target simulation model based on the first parameter set, includes: Acquire a two-dimensional data set and a three-dimensional data set in the first parameter set; Constructing an initial two-dimensional physical field simulation model based on the two-dimensional data set, and constructing an initial three-dimensional physical field simulation model based on the three-dimensional data set; Calculating an average error value based on the two-dimensional data set and the three-dimensional data set; Based on the average error value, determining the target simulation model in the initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model; Acquiring a second parameter set under different working conditions of the power equipment, and determining a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set, including: Acquire the second parameter set under different working conditions of the power equipment, and perform correlation analysis on the second parameter set, the target neural network model and the improved target neural network model, respectively, to obtain a first correlation coefficient and a second correlation coefficient; Comparing the first correlation coefficient and the second correlation coefficient; When the first correlation coefficient is greater than the second correlation coefficient, determining that the multi-physics field digital twin simulation model of the power equipment is the target neural network model; When the first correlation coefficient is less than the second correlation coefficient, the multi-physics field digital twin simulation model of the power equipment is determined to be the improved target neural network model.
2. The method according to claim 1, characterized in that Using the first sample data set to train and generate a target neural network model includes: Normalizing the first sample data set to obtain a third sample data set; Perform training based on the third sample data set and generate an initial neural network model; Acquire a third parameter set of the electric power equipment under a new working condition, and input the third parameter set into the initial neural network model for calculation to obtain a feature quantity data set; The feature quantity data set is subjected to denormalization processing and validity verification, and when the validity verification result meets the requirements, the target neural network model is obtained.
3. The method according to claim 1, characterized in that Based on the target neural network model and the second sample data set, an improved target neural network model is established, including: Obtaining a grid hyperparameter set of the target neural network model; Training is performed based on the grid hyperparameter set and the second sample data set to generate the improved target neural network model.
4. The method according to claim 1, characterized in that: The method further comprises: The health status information of the power equipment is obtained based on the multi-physical field digital twin simulation model of the power equipment.
5. A device for constructing a multi-physics digital twin simulation model of electric power equipment, characterized in that: The device comprises: A first acquisition and determination module, used to acquire a first parameter set under the same working condition of the electric power equipment, and determine a target simulation model based on the first parameter set; An acquisition and construction module, used for acquiring an actual operation data set of the electric power equipment, and constructing a first sample data set based on the actual operation data set of the electric power equipment and the target simulation model; A training module, used to train and generate a target neural network model using the first sample data set; A construction module, used to construct a second sample data set based on the target neural network model and the first sample data set; An establishment module, used to establish an improved target neural network model based on the target neural network model and the second sample data set; A second acquisition and determination module, used to acquire a second parameter set under different operating conditions of the power equipment, and determine a multi-physics field digital twin simulation model of the power equipment in the target neural network model and the improved target neural network model based on the second parameter set; Wherein, the first acquisition and determination module includes: A first acquisition unit, used to acquire a two-dimensional data set and a three-dimensional data set in the first parameter set; A construction unit, configured to construct an initial two-dimensional physical field simulation model based on the two-dimensional data set, and to construct an initial three-dimensional physical field simulation model based on the three-dimensional data set; A calculation unit, configured to calculate an average error value based on the two-dimensional data set and the three-dimensional data set; A first determining unit, configured to determine the target simulation model in the initial two-dimensional physical field simulation model and the initial three-dimensional physical field simulation model based on the average error value; The second acquisition and determination module includes: an acquisition and analysis unit, configured to acquire the second parameter set under different operating conditions of the power equipment, and perform correlation analysis on the second parameter set with the target neural network model and the improved target neural network model, respectively, to obtain a first correlation coefficient and a second correlation coefficient; a comparing unit, configured to compare the first correlation coefficient with the second correlation coefficient; A second determination unit, configured to determine that the multi-physics field digital twin simulation model of the power equipment is the target neural network model when the first correlation coefficient is greater than the second correlation coefficient; The third determination unit is used to determine that the multi-physics field digital twin simulation model of the power equipment is the improved target neural network model when the first correlation coefficient is less than the second correlation coefficient.
6. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for constructing a multi-physical field digital twin simulation model of an electric power equipment according to any one of claims 1 to 4 by executing the computer instructions.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method for constructing a multi-physical field digital twin simulation model of an electric power equipment according to any one of claims 1 to 4.
8. A computer program product, characterized in that It includes computer instructions, which are used to enable a computer to execute the method for constructing a multi-physical field digital twin simulation model of an electric power equipment according to any one of claims 1 to 4.
Citation Information
Patent Citations
Equipment fault diagnosis model establishment method and equipment fault diagnosis method
CN115994323A
Equipment abnormity monitoring method, electronic equipment and storage medium
CN116380166A
Construction method of digital twin model for engineering equipment-level simulation process
CN117634316A
Method and device for constructing digital twinborn simulation model of power equipment, terminal and medium
CN117688767A