Intelligent computing power call management system and method based on data characteristics

By performing feature extraction on historical task data and real-time matching of user demand task data, the task calculation amount is predicted, which solves the waste problem caused by unreasonable allocation of computing resources in the existing technology, and achieves efficient and real-time computing resource management.

CN118484313BActive Publication Date: 2024-10-11BEIJING ALLIANZ TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410946991.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-10-11
Estimated Expiration
2044-07-16

AI Technical Summary

Technical Problem

In the existing technology, computing power resources are wasted due to a single evaluation method in computing power allocation and scheduling.

Method used

By collecting historical task data, a standard sample set is constructed, and a convolutional neural network is used for data feature extraction, combined with real-time feature matching of user demand task data, to predict the amount of task data calculation, and then perform efficient computing resource scheduling.

Benefits of technology

It improves the efficiency and real-time performance of intelligent computing power call management, ensures the reasonable allocation of computing power resources, and avoids waste of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118484313B_ABST
    Figure CN118484313B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of scheduling management, and discloses an intelligent computing power call management system and method based on data features. The method collects historical task data, constructs a standard sample set, and preprocesses the historical task data in the standard sample set. Based on the preprocessed historical task data, data feature extraction is performed through a convolutional neural network. At the same time, user demand task data is collected, and feature data of the user demand task data is extracted in real time through a convolutional neural network and matched with the feature data of the preprocessed historical task data. The task data calculation amount of the user demand task data is predicted, and computing power resource scheduling is performed based on the predicted task data calculation amount of the user demand task data, thereby improving the efficiency and real-time performance of intelligent computing power call management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of scheduling management, and specifically to an intelligent computing power call management system and method based on data features. Background Art

[0002] Internet business has experienced explosive growth, and users' demand for transfer, computing, and storage has continued to grow, but there are still many problems in the deployment and scheduling of computing power. Many lightweight computing nodes have limited computing power, but due to the way computing power is allocated, they cannot meet user needs; and some large computing nodes have wasted computing resources due to the way computing power is allocated.

[0003] The existing Chinese patent application CN111507650A, the edge computing platform computing power allocation and scheduling method realizes computing power allocation and scheduling through the following steps: Step S1, sampling the business computing power consumption peak; Step S2, evaluating the business computing power demand level according to the sampled computing power consumption peak; Step S3, performing computing power allocation and scheduling according to the computing power demand level; However, since the business computing power demand level is only evaluated and scheduled according to the computing power consumption peak, the evaluation method is single and has great limitations. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the shortcomings of the prior art, the present invention provides an intelligent computing power call management system and method based on data features, which has the advantages of high efficiency, real-time and accuracy, and solves the problem of computing power resources being wasted due to the computing power allocation method of computing power nodes.

[0006] (II) Technical solution

[0007] In order to solve the technical problem that computing power resources are wasted due to the computing power allocation method of the above computing power nodes, the present invention provides the following technical solutions:

[0008] The present invention discloses a method for managing intelligent computing power invocation based on data features, which specifically includes the following steps:

[0009] S1. Collect historical task data, construct a standard sample set, and preprocess the historical task data in the standard sample set to obtain preprocessed historical task data;

[0010] The historical task data includes: task data calculation amount and task data storage capacity;

[0011] S2. Based on the obtained pre-processed historical task data, extract data features through a convolutional neural network to obtain feature data of the pre-processed historical task data;

[0012] S3, collect user demand task data, extract feature data of the user demand task data in real time through convolutional neural network, and perform similarity matching with feature data of preprocessed historical task data, to predict the task data calculation amount of the user demand task data;

[0013] The user demand task data includes: task data storage capacity;

[0014] S4. Scheduling computing resources based on the predicted amount of task data calculation of user demand task data.

[0015] The present invention collects historical task data, constructs a standard sample set, and preprocesses the historical task data in the standard sample set. Based on the preprocessed historical task data, data feature extraction is performed through a convolutional neural network. At the same time, user demand task data is collected, and feature data of the user demand task data is extracted in real time through a convolutional neural network and matched with the feature data of the preprocessed historical task data. The task data calculation amount of the user demand task data is predicted, and computing power resources are scheduled based on the predicted task data calculation amount of the user demand task data, thereby improving the efficiency and real-time performance of intelligent computing power call management.

[0016] Preferably, the preprocessing of the task data in the standard sample set comprises the following steps:

[0017] The collected historical task data are clustered by clustering algorithm. The clustering results include: various historical task data, number of clusters and cluster centers;

[0018] S11, setting the number of divided classes to K;

[0019] When the number of classes is less than K, the binary method is used for division;

[0020] S12, repeatedly performing binary division on the divided classes until the number of divided classes is equal to K;

[0021] S13, after the division is completed, the variance of the feature data in each class is calculated and the variance threshold is set;

[0022]

[0023] in, is the variance of the distance between historical task data in the current class, represents the distance between the jth task data in the current class, represents the calculated average distance value, and n represents the number of historical task data;

[0024] When the variance of the distance between historical task data in each divided class is less than or equal to the set variance threshold, it means that the current clustering result is the optimal result;

[0025] When the variance of the distance between historical task data in each divided class is greater than the set variance threshold, it means that the current clustering result is not the optimal result;

[0026] When the clustering result is not the optimal result, set K=K+1, repeat S11 and S12 until the value of K no longer increases, the iteration stops, and the optimal result after clustering is output, and the optimal result after clustering is set as the clustering result;

[0027] The clustered historical task data is set as the preprocessed historical task data.

[0028] Preferably, the binary division comprises the following steps:

[0029] Setting historical task data The quantized coordinates are , historical mission data The quantized coordinates are ;

[0030] The distance between the quantized coordinates of historical task data is calculated as follows:

[0031]

[0032] in, Represents historical task data and historical mission data The distance between

[0033] Based on the calculated distances between various historical task data, the average distance value is calculated as follows;

[0034]

[0035] in, represents the calculated average distance value, n represents the number of historical task data, Represents the i-th historical task data;

[0036] The average distance value calculated The cluster center is used to divide the classes, and the original class is evenly divided into two classes.

[0037] The present invention clusters the collected task data through a clustering algorithm, sets the number of divided classes, calculates the distance values ​​between historical task data, and divides the classes using the calculated average distance value as the clustering center. At the same time, the optimal clustering result is determined by setting a variance threshold, thereby improving the accuracy of task data processing.

[0038] Preferably, the process of extracting data features based on the obtained pre-processed historical task data by using a convolutional neural network to obtain feature data of the pre-processed historical task data comprises the following steps:

[0039] S21, inputting the preprocessed historical task data into the convolutional neural network in sequence according to the classification;

[0040] S22, after receiving the input preprocessed historical task data, the convolutional neural network convolution layer moves in the input preprocessed historical task data according to the set step size based on the convolution kernel, and multiplies and accumulates the eigenvalues ​​on the area corresponding to each step size with the eigenvalues ​​in the preprocessed historical task data through the convolution calculation formula;

[0041] The convolution calculation formula is as follows:

[0042]

[0043] in, Represents the input preprocessed historical task data, represents the weight of the corresponding convolution kernel, b represents the bias value, Represents the output historical task data features;

[0044] S23, for the extracted historical task data features, perform feature dimensionality reduction on them through the pooling layer of the convolutional neural network, and retain important information in the input pre-processed historical task data;

[0045] S24, after continuous stacking of convolutions and pooling, the data is passed to the fully connected layer;

[0046] S25, expanding and combining the feature data through the fully connected layer to obtain a feature array, and saving it in the database;

[0047] Set the feature array after convolutional neural network processing to the feature data of the preprocessed historical task data.

[0048] The present invention uses a convolutional neural network and a stacked combination of a convolutional layer, a pooling layer, and a fully connected layer in the convolutional neural network to extract data features of the processed task data, thereby improving the accuracy of task data extraction.

[0049] Preferably, the real-time extraction of feature data of user demand task data and the similarity matching with the feature data of pre-processed historical task data comprises the following steps:

[0050] The similarity matching formula is as follows:

[0051]

[0052] in, Indicates the degree of similarity between two sets of feature data. A vector representing the feature data of user demand task data, A vector representing the feature data of the preprocessed historical task data;

[0053] According to the calculated similarity, the value range is [-1,1];

[0054] When calculating the similarity When the value is in the range of (0,1], it means that the two sets of feature data are similar. When the similarity value is the largest, The task data calculation amount in the corresponding historical task data is used as the task data calculation amount of the predicted user demand task data;

[0055] When calculating the similarity When the value is in the range of [-1,0], it indicates that the two sets of feature data are not similar, and the task data storage capacity in the user demand task data is used as the task data calculation amount of the predicted user demand task data.

[0056] The present invention determines the task data calculation amount of the real-time extracted user demand task data by performing similarity matching on the feature data of the processed historical task data, and calculates the similarity value between the two groups of data, thereby improving the accuracy of the user demand task data calculation amount.

[0057] Preferably, the computing resource scheduling based on the predicted task data calculation amount of the user demand task data comprises the following steps:

[0058] S41, calculating the execution time of the user demand task data based on the predicted task data calculation amount of the user demand task data;

[0059] Set the computing power value s of each computing power node in the computing power system to a fixed value;

[0060] The formula for calculating the execution time of user demand task data is as follows:

[0061]

[0062] in, Indicates The execution time of each user's required task data, Indicates User demand task data, Represents the rth computing power node;

[0063] S42, sorting the received user demand task data based on the calculated execution time of the user demand task data, and determining the execution order of each user demand task data;

[0064] S43: Perform computing resource scheduling management based on the execution order and execution time of each user's required task data.

[0065] Preferably, the step of sorting the user demand task data based on the calculated execution time of the user demand task data and determining the execution order of each user demand task data comprises the following steps:

[0066] Real-time traversal of idle computing nodes in the computing system;

[0067] When the user demand task data arrives at the computing system, if there are idle computing nodes in the computing system, the arrived user demand task data does not need to wait and is directly transmitted to the idle computing nodes for execution;

[0068] When the user demand task data arrives at the computing power system, if there are no idle computing power nodes in the computing power system, the arrived user demand task data is stored in the waiting queue, and the execution order of the user demand task data in the waiting queue is updated in real time;

[0069] The execution sequence of real-time updating of user demand task data in the waiting queue includes the following steps:

[0070] Calculate the weight of user demand task data. The weight calculation formula of user demand task data is as follows;

[0071]

[0072] in, Indicates The weight of user demand task data, Indicates The waiting time for task data required by each user;

[0073] The task data is sorted in descending order based on the weight of user requirements, and the waiting queue is updated in real time.

[0074] Preferably, the computing resource scheduling management based on the determined execution order and execution time of each user demand task data includes the following steps:

[0075] Calculate the execution completion time of each computing power node based on the execution time of the user's required task data;

[0076] The execution completion time of the computing power node = the start execution time of the user's required task data + the execution time of the user's required task data;

[0077] Allocate user demand task data in the waiting queue based on the execution completion time of the computing power node;

[0078] Set the completion time of user required task data;

[0079] The computing power node will estimate the deadline of the user demand task data. When the estimated deadline of the user demand task data exceeds the set completion time of the user demand task data, the user demand task data will not be executed. When the estimated deadline of the user demand task data meets the set completion time of the user demand task data, the user demand task data will be executed.

[0080] The present invention calculates the execution time of user demand task data by predicting the task data calculation amount of user demand task data, and at the same time realizes user demand task data scheduling and computing power resource scheduling management based on the calculated execution time of user demand task data, thereby ensuring the real-time and accuracy of intelligent computing power call management.

[0081] The present invention discloses an intelligent computing power call management system based on data features, including a data acquisition module, a data processing module, a feature extraction module and a computing power resource management module;

[0082] The data collection module is used to collect user demand task data and historical task data;

[0083] The data processing module is used to pre-process the collected historical task data;

[0084] The feature extraction module is used to extract features from the collected user demand task data and the processed historical task data and perform similarity matching;

[0085] The computing power resource management module is used to determine the execution order and execution time of user demand task data, and perform computing power resource scheduling management based on the determined execution order and execution time of each user demand task data.

[0086] (III) Beneficial effects

[0087] Compared with the prior art, the present invention provides an intelligent computing power call management system and method based on data features, which has the following beneficial effects:

[0088] 1. The invention collects historical task data, constructs a standard sample set, and pre-processes the historical task data in the standard sample set. Based on the processed historical task data, data feature extraction is performed through a convolutional neural network. At the same time, user demand task data is collected, and feature data of the user demand task data is extracted in real time through a convolutional neural network and matched with the feature data of the processed historical task data. The task data calculation amount of the user demand task data is predicted, and computing power resources are scheduled based on the predicted task data calculation amount of the user demand task data, thereby improving the efficiency and real-time performance of intelligent computing power call management.

[0089] 2. The invention clusters the collected task data through a clustering algorithm, sets the number of divided classes, calculates the distance values ​​between historical task data, and divides the classes using the calculated average distance value as the clustering center. At the same time, the optimal clustering result is determined by setting a variance threshold, thereby improving the accuracy of task data processing.

[0090] 3. The invention uses a convolutional neural network and a stacked combination of convolutional layers, pooling layers, and fully connected layers in the convolutional neural network to extract data features of the processed task data, thereby improving the accuracy of task data extraction.

[0091] 4. The invention determines the amount of task data calculated for real-time extracted user demand task data by performing similarity matching on feature data of real-time extracted user demand task data and feature data of processed historical task data, and calculates the similarity value between the two sets of data, thereby improving the accuracy of the amount of task data calculated for user demand task data.

[0092] 5. The invention calculates the execution time of user demand task data by predicting the task data calculation amount of the user demand task data, and at the same time realizes user demand task data scheduling and computing power resource scheduling management based on the calculated execution time of the user demand task data, thereby ensuring the real-time and accuracy of intelligent computing power call management. BRIEF DESCRIPTION OF THE DRAWINGS

[0093] Figure 1 This is a schematic diagram of the flow structure of the intelligent computing power call management method based on data features of the present invention. DETAILED DESCRIPTION

[0094] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0095] The present invention discloses a method for managing intelligent computing power invocation based on data features, which specifically includes the following steps:

[0096] S1. Collect historical task data, construct a standard sample set, and preprocess the historical task data in the standard sample set to obtain preprocessed historical task data;

[0097] The historical task data includes: task data calculation amount and task data storage capacity;

[0098] The preprocessing of the task data in the standard sample set includes the following steps:

[0099] The collected historical task data are clustered by clustering algorithm. The clustering results include: various historical task data, number of clusters and cluster centers;

[0100] S11, setting the number of divided classes to K;

[0101] When the number of classes is less than K, the binary method is used for division;

[0102] The binary partitioning process includes the following steps:

[0103] Setting historical task data The quantized coordinates are , historical mission data The quantized coordinates are ;

[0104] The distance between the quantized coordinates of historical task data is calculated as follows:

[0105]

[0106] in, Represents historical task data and historical mission data The distance between

[0107] Based on the calculated distances between various historical task data, the average distance value is calculated as follows;

[0108]

[0109] in, represents the calculated average distance value, n represents the number of historical task data, Represents the i-th historical task data;

[0110] The average distance value calculated Use the cluster center to divide the class, and divide the original class into two classes evenly;

[0111] S12, repeatedly performing binary division on the divided classes until the number of divided classes is equal to K;

[0112] S13, after the division is completed, the variance of the feature data in each class is calculated and the variance threshold is set;

[0113]

[0114] in, is the variance of the distance between historical task data in the current class, represents the distance between the jth task data in the current class, represents the calculated average distance value, and n represents the number of historical task data;

[0115] When the variance of the distance between historical task data in each divided class is less than or equal to the set variance threshold, it means that the current clustering result is the optimal result;

[0116] When the variance of the distance between historical task data in each divided class is greater than the set variance threshold, it means that the current clustering result is not the optimal result;

[0117] When the clustering result is not the optimal result, set K=K+1, repeat S11 and S12 until the value of K no longer increases, the iteration stops, and the optimal result after clustering is output, and the optimal result after clustering is set as the clustering result;

[0118] Further, the clustered historical task data is set as the pre-processed historical task data;

[0119] S2. Based on the obtained pre-processed historical task data, extract data features through a convolutional neural network to obtain feature data of the pre-processed historical task data;

[0120] Based on the obtained preprocessed historical task data, data feature extraction through convolutional neural network includes the following steps:

[0121] S21, inputting the preprocessed historical task data into the convolutional neural network in sequence according to the classification;

[0122] S22, after receiving the input preprocessed historical task data, the convolutional neural network convolution layer moves in the input preprocessed historical task data according to the set step size based on the convolution kernel, and multiplies and accumulates the eigenvalues ​​on the area corresponding to each step size with the eigenvalues ​​in the preprocessed historical task data through the convolution calculation formula;

[0123] The convolution calculation formula is as follows:

[0124]

[0125] in, Represents the input preprocessed historical task data, represents the weight of the corresponding convolution kernel, b represents the bias value, Represents the output historical task data features;

[0126] S23, for the extracted historical task data features, perform feature dimensionality reduction on them through the pooling layer of the convolutional neural network, and retain important information in the input pre-processed historical task data;

[0127] S24, after continuous stacking of convolutions and pooling, the data is passed to the fully connected layer;

[0128] S25, expanding and combining the feature data through the fully connected layer to obtain a feature array, and saving it in the database;

[0129] Set the feature array after convolutional neural network processing to the feature data of the preprocessed historical task data;

[0130] S3, collect user demand task data, extract feature data of the user demand task data in real time through convolutional neural network, and perform similarity matching with feature data of preprocessed historical task data, to predict the task data calculation amount of the user demand task data;

[0131] The user demand task data includes: task data storage capacity;

[0132] Receiving user demand task data, extracting feature data of the user demand task data in real time through a convolutional neural network, and performing similarity matching with feature data of preprocessed historical task data includes the following steps:

[0133] The similarity matching formula is as follows:

[0134]

[0135] in, Indicates the degree of similarity between two sets of feature data. A vector representing the feature data of user demand task data, A vector representing the feature data of the preprocessed historical task data;

[0136] According to the calculated similarity, the value range is [-1,1];

[0137] When calculating the similarity When the value is in the range of (0,1], it means that the two sets of feature data are similar. When the similarity value is the largest, The task data calculation amount in the corresponding historical task data is used as the task data calculation amount of the predicted user demand task data;

[0138] When calculating the similarity When the value is in the range of [-1,0], it means that the two sets of feature data are not similar, and the task data storage capacity in the user demand task data is used as the task data calculation amount of the predicted user demand task data;

[0139] S4, scheduling computing resources based on the task data calculation amount of the predicted user demand task data;

[0140] Scheduling computing resources based on the task data calculation amount of predicted user demand task data includes the following steps:

[0141] S41, calculating the execution time of the user demand task data based on the predicted task data calculation amount of the user demand task data;

[0142] Set the computing power value s of each computing power node in the computing power system to a fixed value;

[0143] The formula for calculating the execution time of user demand task data is as follows:

[0144]

[0145] in, Indicates The execution time of each user's required task data, Indicates User demand task data, Represents the rth computing power node;

[0146] S42, sorting the user demand task data based on the calculated execution time of the user demand task data, and determining the execution order of each user demand task data;

[0147] Real-time traversal of idle computing nodes in the computing system;

[0148] When the user demand task data arrives at the computing system, if there are idle computing nodes in the computing system, the arrived user demand task data does not need to wait and is directly transmitted to the idle computing nodes for execution;

[0149] When the user demand task data arrives at the computing power system, if there are no idle computing power nodes in the computing power system, the arrived user demand task data is stored in the waiting queue, and the execution order of the user demand task data in the waiting queue is updated in real time;

[0150] The execution sequence of real-time updating of user demand task data in the waiting queue includes the following steps:

[0151] Calculate the weight of user demand task data. The weight calculation formula of user demand task data is as follows;

[0152]

[0153] in, Indicates The weight of user demand task data, Indicates The waiting time for task data required by each user;

[0154] Arrange the task data in descending order based on the weight of user requirements, and update the waiting queue in real time;

[0155] S43, performing computing resource scheduling management based on the execution order and execution time of each user demand task data;

[0156] Calculate the execution completion time of each computing power node based on the execution time of the user's required task data;

[0157] The execution completion time of the computing power node = the start execution time of the user's required task data + the execution time of the user's required task data;

[0158] Allocate user demand task data in the waiting queue based on the execution completion time of the computing power node;

[0159] Furthermore, the completion time of the task data required by the user is set;

[0160] The computing power node will estimate the deadline of the user demand task data. When the estimated deadline of the user demand task data exceeds the set completion time of the user demand task data, the user demand task data will not be executed. When the estimated deadline of the user demand task data meets the set completion time of the user demand task data, the user demand task data will be executed;

[0161] The present invention discloses an intelligent computing power call management system based on data features, including a data acquisition module, a data processing module, a feature extraction module and a computing power resource management module;

[0162] The data collection module is used to collect user demand task data and historical task data;

[0163] The data processing module is used to pre-process the collected historical task data;

[0164] The feature extraction module is used to extract features from the collected user demand task data and pre-processed historical task data and perform similarity matching;

[0165] The computing power resource management module is used to determine the execution order and execution time of user demand task data, and perform computing power resource scheduling management based on the determined execution order and execution time of each user demand task data.

[0166] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for managing intelligent computing power invocation based on data features, characterized in that: The following steps are involved: S1. Collect historical task data, construct a standard sample set, and preprocess the historical task data in the standard sample set to obtain preprocessed historical task data; The historical task data includes: task data calculation amount and task data storage capacity; S2. Based on the obtained pre-processed historical task data, extract data features through a convolutional neural network to obtain feature data of the pre-processed historical task data; S3, collect user demand task data, extract feature data of the user demand task data in real time through convolutional neural network, and perform similarity matching with feature data of preprocessed historical task data, to predict the task data calculation amount of the user demand task data; The user demand task data includes: task data storage capacity; S4, scheduling computing resources based on the task data calculation amount of the predicted user demand task data; The preprocessing of the task data in the standard sample set comprises the following steps: The collected historical task data are clustered by clustering algorithm. The clustering results include: various historical task data, number of clusters and cluster centers; S11, set the number of divided classes to K; When the number of classes is less than K, the binary method is used for division; S12, repeatedly performing binary division on the divided classes until the number of divided classes is equal to K; S13, after the division is completed, the variance of the feature data in each class is calculated and the variance threshold is set; ; in, is the variance of the distance between historical task data in the current class, represents the distance between the jth task data in the current class, represents the calculated average distance value, and n represents the number of historical task data; When the variance of the distance between historical task data in each divided class is less than or equal to the set variance threshold, it means that the current clustering result is the optimal result; When the variance of the distance between historical task data in each divided class is greater than the set variance threshold, it means that the current clustering result is not the optimal result; When the clustering result is not the optimal result, set K=K+1, repeat S11 and S12 until the value of K no longer increases, the iteration stops, and the optimal result after clustering is output, and the optimal result after clustering is set as the clustering result; Set the clustered historical task data as the preprocessed historical task data; The dichotomy partitioning includes the following steps: Setting historical task data The quantized coordinates are , historical mission data The quantized coordinates are ; The distance between the quantized coordinates of historical task data is calculated as follows: ; in, Represents historical task data and historical mission data The distance between Based on the calculated distances between various historical task data, the average distance value is calculated as follows; ; in, represents the calculated average distance value, n represents the number of historical task data, Represents the i-th historical task data; The average distance value calculated Use the cluster center to divide the class, and divide the original class into two classes evenly; The method of extracting data features based on the obtained pre-processed historical task data by using a convolutional neural network to obtain feature data of the pre-processed historical task data includes the following steps: S21, inputting the preprocessed historical task data into the convolutional neural network in sequence according to the classification; S22, after receiving the input preprocessed historical task data, the convolutional neural network convolution layer moves in the input preprocessed historical task data according to the set step size based on the convolution kernel, and multiplies and accumulates the eigenvalues ​​on the area corresponding to each step size with the eigenvalues ​​in the preprocessed historical task data through the convolution calculation formula; The convolution calculation formula is as follows: ; in, Represents the input preprocessed historical task data, represents the weight of the corresponding convolution kernel, b represents the bias value, Represents the output historical task data features; S23, for the extracted historical task data features, perform feature dimensionality reduction on them through the pooling layer of the convolutional neural network, and retain important information in the input pre-processed historical task data; S24, after continuous stacking of convolutions and pooling, the data is passed to the fully connected layer; S25, expanding and combining the feature data through the fully connected layer to obtain a feature array, and saving it in the database; Set the feature array after convolutional neural network processing to the feature data of the preprocessed historical task data; The real-time extraction of feature data of user demand task data and the similarity matching of feature data of pre-processed historical task data include the following steps: The similarity matching formula is as follows: ; in, Indicates the degree of similarity between two sets of feature data. A vector representing the feature data of the user's demand task data, A vector representing the feature data of the preprocessed historical task data; According to the calculated similarity, the value range is [-1,1]; When calculating the similarity When the value is in the range of (0,1], it means that the two sets of feature data are similar. When the similarity value is the largest, The task data calculation amount in the corresponding historical task data is used as the task data calculation amount of the predicted user demand task data; When calculating the similarity When the value is in the range of [-1,0], it means that the two sets of feature data are not similar, and the task data storage capacity in the user demand task data is used as the task data calculation amount of the predicted user demand task data; The computing resource scheduling based on the predicted task data calculation amount of the user demand task data includes the following steps: S41, calculating the execution time of the user demand task data based on the predicted task data calculation amount of the user demand task data; Set the computing power value s of each computing power node in the computing power system to a fixed value; The formula for calculating the execution time of user demand task data is as follows: ; in, Indicates The execution time of each user's required task data, Indicates User demand task data, Represents the rth computing power node; S42, sorting the user demand task data based on the calculated execution time of the user demand task data, and determining the execution order of each user demand task data; S43, performing computing resource scheduling management based on the execution order and execution time of each user's required task data; The step of sorting the user demand task data based on the calculated execution time of the user demand task data and determining the execution order of each user demand task data comprises the following steps: Real-time traversal of idle computing nodes in the computing system; When the user demand task data arrives at the computing system, if there are idle computing nodes in the computing system, the arrived user demand task data does not need to wait and is directly transmitted to the idle computing nodes for execution; When the user demand task data arrives at the computing power system, if there are no idle computing power nodes in the computing power system, the arrived user demand task data is stored in the waiting queue, and the execution order of the user demand task data in the waiting queue is updated in real time; The execution sequence of real-time updating of user demand task data in the waiting queue includes the following steps: Calculate the weight of user demand task data. The weight calculation formula of user demand task data is as follows; ; in, Indicates The weight of user demand task data, Indicates The waiting time for task data required by each user; Arrange the task data in descending order based on the weight of user requirements, and update the waiting queue in real time; The computing resource scheduling management based on the determined execution order and execution time of each user demand task data includes the following steps: Calculate the execution completion time of each computing power node based on the execution time of the user's required task data; The execution completion time of the computing power node = the start execution time of the user's required task data + the execution time of the user's required task data; Allocate user demand task data in the waiting queue based on the execution completion time of the computing power node; Set the completion time of user required task data; The computing power node will estimate the deadline of the user demand task data. When the estimated deadline of the user demand task data exceeds the set completion time of the user demand task data, the user demand task data will not be executed. When the estimated deadline of the user demand task data meets the set completion time of the user demand task data, the user demand task data will be executed.

2. A system for implementing the intelligent computing power call management method based on data features as described in claim 1, characterized in that: It includes data acquisition module, data processing module, feature extraction module and computing resource management module; The data collection module is used to collect user demand task data and historical task data; The data processing module is used to pre-process the collected historical task data; The feature extraction module is used to extract features from the collected user demand task data and pre-processed historical task data and perform similarity matching; The computing power resource management module is used to determine the execution order and execution time of user demand task data, and perform computing power resource scheduling management based on the determined execution order and execution time of each user demand task data.