Wind power speed increaser gearbox flexible pin shaft assembly processing method
By performing multi-step processing on the flexible pin shaft assembly of the wind turbine speed-increasing gearbox, including pretreatment, turning, rolling, hole machining, and grinding, the problem of high processing difficulty of flexible pin shafts has been solved, fatigue strength and grinding efficiency have been improved, and surface quality and cleaning difficulty have been reduced.
Patent Information
- Application Number
- CN202311733230.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-15
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-12-15
AI Technical Summary
The machining of flexible pins in wind turbine speed-increasing gearboxes is quite difficult, mainly due to the high requirements for the roughness of the stress-concentrated arc surface, the strict requirements for axial polishing, the low efficiency of rigid insert grinding of components caused by structural characteristics, and the difficulty in protecting against and cleaning impurities.
A multi-step processing method is adopted, including pretreatment of raw materials, turning, rolling, hole machining, grinding, burn detection, and finishing, combined with forging, carburizing and quenching, precision turning, rolling and finishing processes to improve the surface quality and sealing performance of flexible pins and bushings.
It effectively improves the fatigue strength and fatigue life of flexible pins, enhances grinding efficiency and surface quality, and simplifies the impurity protection and cleaning process.
Smart Images

Figure CN118513785B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pin shaft processing technology, and in particular to a processing method for a flexible pin shaft assembly of a wind turbine speed-increasing gearbox. Background Technology
[0002] As the power density of wind turbine gearboxes increases and their structures become more compact, using flexible pins instead of ordinary planetary shafts can reduce axial dimensions and effectively improve load-sharing performance. However, the manufacturing difficulty is significantly higher than that of ordinary planetary shafts, mainly in the following aspects: ① High surface roughness requirements for stress concentration arc surfaces (which can be of variable curvature) and axial polishing requirements; ② Rigid insertion of components due to structural characteristics, resulting in low grinding efficiency and uncontrolled surface quality; ③ Greater difficulty in impurity protection and cleaning. Summary of the Invention
[0003] The embodiments of the present invention provide a method for processing a flexible pin shaft assembly for a wind power speed-increasing gearbox, which can effectively improve the fatigue strength and fatigue life of the flexible pin shaft.
[0004] In a first aspect, embodiments of the present invention provide a method for processing a flexible pin shaft assembly for a wind turbine speed-increasing gearbox. The method includes: pre-treating a blank material for manufacturing the flexible pin shaft; turning the pre-treated flexible pin shaft material; rolling the surface of the turned flexible pin shaft material; machining holes in the rolled flexible pin shaft material; grinding the hole-machined flexible pin shaft material; performing burn detection on the ground flexible pin shaft material; and finishing the surface of the burn-detected flexible pin shaft material to obtain the flexible pin shaft. The method also includes pre-treating a blank material for manufacturing a flexible bushing; turning the pre-treated flexible bushing material; machining holes in the turned flexible bushing material; assembling the flexible pin shaft and flexible bushing; sealing the assembled flexible pin shaft and flexible bushing; grinding the sealed flexible pin shaft and flexible bushing; and cleaning the ground flexible pin shaft and flexible bushing.
[0005] In some embodiments, the step of pre-treating the blank material for making the flexible pin includes forging the blank material for making the flexible pin.
[0006] In some embodiments, the step of turning the pretreated flexible pin material includes: rough turning the forged flexible pin material; carburizing and quenching the rough-turned flexible pin material; and finish turning the carburized and quenched flexible pin material.
[0007] In some embodiments, the step of carburizing and quenching the rough-turned flexible pin material includes carburizing and quenching the cylindrical surfaces at both ends of the rough-turned flexible pin material.
[0008] In some embodiments, the step of precision turning the carburized and quenched flexible pin material includes machining the arc surface region of the flexible pin material where stress is concentrated with a roughness of 1.6 to 3.2, and retaining a preset grinding amount on the cylindrical surfaces at both ends of the axial direction of the flexible pin material.
[0009] In some embodiments, the step of grinding the flexible pin material after hole machining includes retaining a grinding allowance of 0.1-0.2 mm on the cylindrical surface of the flexible pin material used to mount the planetary carrier.
[0010] In some embodiments, the step of finishing the surface of the flexible pin material after burn detection to obtain a flexible pin includes finishing the surface of the flexible pin material by tumbling in the axial direction of the flexible pin material to form an axial polishing treatment.
[0011] In some embodiments, the step of pre-treating the blank material for making the flexible bushing includes forging the steel ingot for making the flexible bushing.
[0012] In some embodiments, the step of turning the pretreated flexible bushing material includes: rough turning the forged flexible bushing material; quenching and tempering the rough-turned flexible bushing material; and finish turning the quenched and tempered flexible pin material.
[0013] In some embodiments, the step of grinding the flexible pin and flexible bushing under sealing treatment includes placing a dial indicator on the outer circle of the flexible pin and bushing; and placing a contouring fixture in the gap between the flexible pin and the flexible bushing, wherein the contact surfaces of the contouring fixture with the flexible pin and the flexible bushing are arc surfaces.
[0014] Compared with the prior art, the present invention has the following technical advantages:
[0015] This invention provides a method for processing a flexible pin shaft assembly in a wind turbine speed-increasing gearbox, which can effectively improve the fatigue strength and fatigue life of the flexible pin shaft. The method includes: pre-treating the blank material for the flexible pin shaft; turning the pre-treated flexible pin shaft material; rolling the surface of the turned flexible pin shaft material; machining holes in the rolled flexible pin shaft material; grinding the hole-machined flexible pin shaft material; performing burn detection on the ground flexible pin shaft material; and surface finishing on the burn-detected flexible pin shaft material to obtain the flexible pin shaft. The invention also includes pre-treating the blank material for the flexible bushing; turning the pre-treated flexible bushing material; machining holes in the turned flexible bushing material; assembling the flexible pin shaft and flexible bushing; sealing the assembled flexible pin shaft and flexible bushing; grinding the sealed flexible pin shaft and flexible bushing; and finishing the grinding process. Attached Figure Description
[0016] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0017] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0018] Figure 1 A schematic flowchart illustrating the processing method for the flexible pin shaft assembly of an electric speed-increasing gearbox provided in an embodiment of the present invention;
[0019] Figure 2 A schematic diagram of an assembly structure of a flexible pin and a flexible bushing provided in an embodiment of the present invention;
[0020] Figure 3 A schematic diagram of an assembly structure for a flexible pin provided in an embodiment of the present invention;
[0021] Figure 4 This is a schematic diagram of a flexible pin undergoing tumbling treatment according to an embodiment of the present invention;
[0022] Figure 5 This is a schematic diagram of a contouring tooling placed between a flexible pin and a flexible bushing, provided by an embodiment of the present invention.
[0023] Figure 6 This is a schematic diagram of the contouring tooling provided in an embodiment of the present invention.
[0024] Attachment Number: Figures 1-6 The correspondence between the reference numerals and component names in the attached drawings is as follows:
[0025] 1-Flexible pin; 2-Flexible bushing; 3-Following tool; 31-Inner ring; 32-Outer ring; 33-Internal hex screw. Detailed Implementation
[0026] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0027] As the power density of wind turbine gearboxes increases and their structures become more compact, using flexible pins instead of ordinary planetary shafts can reduce axial dimensions and effectively improve load-sharing performance. However, the manufacturing difficulty is significantly higher than that of ordinary planetary shafts, mainly in the following aspects: ① High surface roughness requirements for stress concentration arc surfaces (which can be of variable curvature) and axial polishing requirements; ② Rigid insertion of components due to structural characteristics, resulting in low grinding efficiency and uncontrolled surface quality; ③ Greater difficulty in impurity protection and cleaning.
[0028] This invention provides a method for processing a flexible pin shaft assembly for a wind turbine speed-increasing gearbox. Please refer to [the relevant documentation]. Figures 1-6 The processing method for the flexible pin shaft assembly of a wind turbine speed-increasing gearbox includes: pre-treating the blank material for making the flexible pin shaft; turning the pre-treated flexible pin shaft material; rolling the surface of the turned flexible pin shaft material; machining holes in the rolled flexible pin shaft material; grinding the hole-machined flexible pin shaft material; performing burn detection on the ground flexible pin shaft material; and surface finishing on the burn-detected flexible pin shaft material to obtain the flexible pin shaft. The method also includes: pre-treating the blank material for making the flexible bushing; turning the pre-treated flexible bushing material; machining holes in the turned flexible bushing material; assembling the flexible pin shaft and flexible bushing; sealing the assembled flexible pin shaft and flexible bushing; grinding the sealed flexible pin shaft and flexible bushing; and cleaning the ground flexible pin shaft and flexible bushing.
[0029] Specifically, the pretreatment steps for the blank material used to manufacture the flexible pin include forging the blank material. Further, the forging methods for the blank material include, for example, blanking, forging ratio adjustment, utilization rate adjustment, and heat treatment.
[0030] In some alternative embodiments, please refer to Figures 1-6 The steps for machining the pretreated flexible pin material include: rough machining the forged flexible pin material; carburizing and quenching the rough-machined flexible pin material; and finish machining the carburized and quenched flexible pin material.
[0031] Specifically, the steps for rough turning the forged flexible pin material include: rough turning the forged flexible pin material according to the heat treatment deformation law, which includes expansion, ellipticity, warping, etc.; and removing excess material according to the allowance requirements for finishing after heat treatment.
[0032] In some optional embodiments, the step of carburizing and quenching the rough-turned flexible pin material includes carburizing and quenching the cylindrical surfaces at both ends of the axial direction of the rough-turned flexible pin material.
[0033] Specifically, the cylindrical surfaces at both ends of the flexible pin material are subjected to carburizing and quenching treatment. The cylindrical surfaces at both ends of the flexible pin material are the mounting surfaces for the planetary carrier and the flexible pin bushing, respectively, to achieve the required hardness and hardened layer depth. The hardness and hardened layer depth are determined by the finished part requirements and the theoretical allowance for finishing after heat treatment.
[0034] Furthermore, the steps for precision turning of the carburized and quenched flexible pin material include turning the stress-concentrated arc surface area according to Ra1.6-Ra3.2, machining the dimensions and form and position tolerances to meet the design requirements, and leaving a grinding allowance of 0.3-0.4mm on the cylindrical surfaces at both ends of the flexible pin material for mounting to the planetary carrier and the flexible pin bushing, respectively.
[0035] In some alternative embodiments, please refer to Figures 1-6 The steps for precision turning of the carburized and quenched flexible pin material include machining the arc surface area of the flexible pin material with stress concentration at a roughness of 1.6 to 3.2, and retaining the preset grinding amount on the cylindrical surfaces at both ends of the axial direction of the flexible pin material.
[0036] In some optional embodiments, the step of rolling the surface of the machined flexible pin material includes using a rolling process to create a compressive stress layer on the surface, which serves to smooth and strengthen the surface.
[0037] In some optional embodiments, the step of grinding the flexible pin material after hole machining includes leaving a grinding allowance of 0.1-0.2 mm on the cylindrical surface of the flexible pin material used to mount the planetary carrier.
[0038] In some alternative embodiments, please refer to Figures 1-6 The steps for performing a surface finishing treatment on the flexible pin material after burn detection to obtain a flexible pin include: performing a tumbling finishing treatment on the surface of the flexible pin material in the axial direction to form an axial polishing treatment.
[0039] Specifically, according to process requirements or standard requirements, such as ISO14104 or GB / T17897, the grinding surface is subjected to immersion grinding burn detection. Surface finishing is performed on a horizontal finishing machine using a rolling grinding method. The main motion direction of the finishing process is in the axial direction of the flexible pin material to eliminate circumferential cutting marks and rolling textures, forming axial polishing textures.
[0040] In some alternative embodiments, please refer to Figures 1-6 The steps for pre-treating the blank material for making the flexible bushing include forging the steel ingot for making the flexible bushing.
[0041] Specifically, the forging process for the blank material used to make flexible pins includes methods such as blanking, forging ratio, utilization rate, and heat treatment.
[0042] In some optional embodiments, the step of turning the pretreated flexible bushing material includes rough turning the forged flexible bushing material; quenching and tempering the rough-turned flexible bushing material; and finish turning the quenched and tempered flexible pin material.
[0043] Specifically, the rough turning process for the forged flexible bushing material, based on the heat treatment deformation characteristics, includes removing excess material according to the required allowance for finishing after heat treatment, as the heat treatment deformation characteristics include expansion, ellipticity, and warping. Then, the flexible pin material after heat treatment is finished by precision turning to ensure that the finished flexible pin bushing meets the required hardness and mechanical properties.
[0044] Furthermore, the steps for precision turning of the flexible pin material after heat treatment include grinding the outer cylindrical surface according to the roughness requirement of 0.8 and the cutting allowance of 0.1-0.2mm.
[0045] In some alternative embodiments, please refer to Figures 1-6 The steps for assembling the flexible pin and flexible bushing include: baking the flexible pin and flexible bushing; heating the flexible pin and bushing in a heating box according to process requirements; controlling the heating temperature and heating time according to the interference fit of the product design; and baking the flexible pin and flexible bushing into place.
[0046] In some optional embodiments, the step of sealing the assembled flexible pin and flexible bushing includes cleaning the outer surfaces of the flexible pin and flexible bushing, cleaning the gap between the flexible pin and the flexible pin bushing, and sealing the oil hole with a plug or plug.
[0047] In some alternative embodiments, please refer to Figures 1-6 The grinding process for the sealed flexible pin and flexible bushing includes the following steps: After grinding and alignment, the dial indicator is still placed on the outer circle of the flexible pin and bushing. A special contouring fixture, designed according to the actual structure, supports the gap between the flexible pin and the flexible pin and bushing. The special contouring fixture is made of polytetrafluoroethylene (PTFE) or copper. The dial indicator's runout needs to be controlled during the installation of the special contouring fixture. The special contouring fixture consists of an inner ring and an outer ring. The outer ring can be assembled from 2-4 circumferential segments depending on the actual structure. The special contouring fixture is made of a material with a certain degree of ductility, such as copper. The contact surface between the special contouring fixture and the flexible pin and bushing is an arc surface, while the inner ring is a complete circular ring. After the outer ring is fixed to the end face of the bushing, the inner and outer rings are tightened circumferentially with 4-8 hexagonal socket head cap screws, depending on the size of the parts. Axial force deforms the outer ring, thus providing support.
[0048] It should be noted that, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0049] The above description is merely a specific embodiment of the present invention, enabling those skilled in the art to understand or implement the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the present invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.
Claims
1. A method for processing a flexible pin shaft assembly for a wind turbine speed-increasing gearbox, characterized in that, include: Pre-treatment is performed on the blank material for making flexible pins; The pre-treated flexible pin material is turned, including rough turning of the forged flexible pin material; carburizing and quenching treatment of the cylindrical surfaces at both ends of the axial direction of the rough-turned flexible pin material; and fine turning of the carburized and quenched flexible pin material, including machining the arc surface area of the flexible pin material where stress is concentrated with a roughness of 1.6 to 3.2, and retaining the preset grinding amount on the cylindrical surfaces at both ends of the axial direction of the flexible pin material. The surface of the flexible pin material after turning is subjected to roll forming treatment. Hole machining is performed on the flexible pin material after roll forming. Grinding is performed on the flexible pin material after hole machining. Burn detection was performed on the flexible pin material after grinding. The surface of the flexible pin material after burn testing is smoothed to obtain the flexible pin. Pre-treatment is performed on the blank material for making flexible bushings; The pretreated flexible bushing material is then machined. Hole machining is performed on the flexible bushing material after turning; For the assembly of flexible pins and flexible shaft sets; The assembled flexible pin and flexible bushing are then sealed. Grinding the sealed flexible pin and flexible bushing includes placing a dial indicator on the outer circle of the flexible pin and bushing; setting a contouring fixture in the gap between the flexible pin and the flexible bushing to support the flexible pin and the bushing, wherein the contact surfaces of the contouring fixture with the flexible pin and the bushing are arc surfaces respectively. Cleaning of the grinding-processed flexible pins and flexible bushings.
2. The processing method for the flexible pin shaft assembly of the wind power speed-increasing gearbox according to claim 1, characterized in that, The step of pre-treating the blank material for making the flexible pin includes forging the blank material for making the flexible pin.
3. The method for processing the flexible pin shaft assembly of the wind power speed-increasing gearbox according to claim 1, characterized in that, The step of grinding the flexible pin material after hole machining includes: The flexible pin material used for mounting planetary carriers has a grinding allowance of 0.1-0.2 mm on the cylindrical surface.
4. The processing method for the flexible pin shaft assembly of the wind power speed-increasing gearbox according to claim 1, characterized in that, The step of performing a surface finishing treatment on the flexible pin material after burn detection to obtain the flexible pin includes: In the axial direction of the flexible pin material, the surface of the flexible pin material is polished by tumbling to form an axial polishing treatment.
5. The processing method for the flexible pin shaft assembly of the wind power speed-increasing gearbox according to claim 1, characterized in that, The step of pre-treating the blank material for making the flexible bushing includes forging the steel ingot for making the flexible bushing.
6. The method for processing the flexible pin shaft assembly of a wind power speed-increasing gearbox according to claim 5, characterized in that, The step of turning the pretreated flexible bushing material includes: Rough turning is performed on the forged flexible bushing material; The flexible bushing material after rough turning is subjected to quenching and tempering heat treatment. The flexible pin material after heat treatment was precision turned.
Citation Information