A whole-process intelligent monitoring method and system for communication engineering

By deploying monitoring devices and personal video recording equipment at the communication engineering construction site, combining image recognition and equipment control technology, intelligent monitoring of the entire process of communication engineering construction is achieved, and the problem that existing technology cannot monitor the entire process is solved, and the construction standardization is improved and security.

CN118524189BActive Publication Date: 2025-02-14TIANJIN UNIV
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410814843.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-02-14
Estimated Expiration
2044-06-24

AI Technical Summary

Technical Problem

The existing communication engineering construction monitoring devices cannot achieve full-process monitoring, especially when construction personnel enter obstructed areas such as pipe wells, the monitoring effect is not good.

Method used

A full-process intelligent monitoring method and system for communication engineering is adopted, and the site image is obtained through the monitoring device and uploaded to the backend system. The construction specification is recognized based on the site image and the illegal content is marked. When the construction personnel enter the blocked area, the monitoring device uses the monitoring device to transfer and sends a start command to the personal video recording device to start shooting, and receives and uploads the first viewing image through the monitoring device, integrating the site image and the first viewing image for storage.

Benefits of technology

It realizes comprehensive monitoring of the entire process of communication engineering construction, ensures construction standardization and safety, records a more complete construction process, which is helpful for monitoring and management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118524189B_ABST
    Figure CN118524189B_ABST
Patent Text Reader

Abstract

The present invention is applicable to the field of engineering monitoring and management, and provides a method and system for intelligent monitoring of the entire process of a communication project, the method comprising the following steps: obtaining site images through a monitoring device and uploading them to a background system; identifying and judging construction standardization based on the site images, and marking the site images when violations occur; when construction personnel enter an area where the field of vision of the monitoring device is blocked, the monitoring device is used as a transfer to send a start instruction to a personal video recording device; receiving the first-person perspective image uploaded by the personal video recording device through the monitoring device and uploading it to the background system; integrating the marked site images and the first-person perspective images for storage. The present invention utilizes the monitoring device and the personal video recording device to work in coordination, and can record the entire process of communication construction, which is helpful for monitoring the entire process of communication engineering construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering monitoring management, and in particular to a whole-process intelligent monitoring method and system for a communication engineering. Background Art

[0002] Communication engineering not only involves people's daily life, but is also an important pillar of national informatization construction. Nowadays, people's very convenient communication method with each other is also due to the comprehensive construction of communication engineering infrastructure.

[0003] Due to the limitations of various conditions such as scene environment and construction content, the existing communication engineering construction process still relies on manpower. Human labor plays a major role in the construction of communication engineering, while some equipment and instruments are only used as auxiliary tools. Therefore, it is very necessary to standardize the construction during the communication engineering construction process. Standardized construction can greatly improve the safety of on-site construction personnel.

[0004] At present, monitoring devices are installed at construction sites to supervise the standardization of construction. Video is used to identify whether the current construction content meets the standards. However, in the actual construction process, since most communication projects are underground pipelines, construction workers are required to enter the pipe wells to operate. Due to the obstruction of the pipe wells, the existing monitoring devices cannot monitor the entire process. Therefore, a full-process intelligent monitoring method and system for communication projects are proposed to solve the above problems. Summary of the invention

[0005] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a method and system for full-process intelligent monitoring of communication engineering to solve the problems existing in the above-mentioned background technology.

[0006] The present invention is implemented as follows: a method for intelligent monitoring of the entire process of a communication project, the method comprising the following steps:

[0007] Acquire site images through a monitoring device and upload them to a backend system, wherein the monitoring device is located in the construction site and is arranged toward the construction site;

[0008] Identify and judge construction standardization based on site images, and mark site images when violations occur;

[0009] When a construction worker enters an area where the field of vision of the monitoring device is blocked, the monitoring device is used as a relay to send a start instruction to the personal video device, so that the personal video device is started and takes pictures. The personal video device is worn by the construction worker.

[0010] Receive the first-person perspective image uploaded by the personal video recording device through the monitoring device and upload it to the background system;

[0011] Integrate the marked site images and first-person perspective images for saving.

[0012] As a further solution of the present invention: the step of identifying and judging the construction standardization based on the site image specifically includes:

[0013] When the site image is obtained, the location information of the monitoring device is acquired and a corresponding relationship with the site image is established;

[0014] Based on the site image, the warning facilities of the construction site and the safety equipment of the construction workers are identified and processed to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment;

[0015] The first image, the second image and the location information are integrated to mark the site image.

[0016] As a further solution of the present invention: the step of identifying and processing the site image based on the warning facilities of the construction site and the safety equipment of the construction workers specifically includes:

[0017] The construction workers' area is framed and marked using the site image to obtain the area marking line;

[0018] Based on the range marking line, objects outside the range marking line are identified and determined to identify whether there are warning facilities in the construction site. When no warning facilities are included, the site image screen is intercepted to obtain a first image;

[0019] Based on the range marking line, the appearance of the construction workers inside is identified and judged to identify whether the construction workers are wearing installation accessories. When the construction workers are wearing accessories, the site image is intercepted to obtain a second image.

[0020] As a further solution of the present invention: when the construction workers enter the area where the field of vision of the monitoring device is blocked, the step of sending the start instruction to the personal video recording device through the monitoring device as a transfer specifically includes:

[0021] Based on the site image, the specific location of the communication construction is identified to obtain the construction mark range;

[0022] Selecting a construction worker according to the site image, wherein the selected construction worker is the one closest to the construction mark range;

[0023] The scene images after the construction personnel are selected are traversed and processed again. When the selected construction personnel enter the construction mark range and the appearance of the construction personnel cannot be fully identified, the start command is sent to the monitoring device through the background system, and the monitoring device forwards the start command to the personal video recording device as a control relay.

[0024] As a further solution of the present invention: the method further comprises:

[0025] The construction workers are identified through the monitoring device according to the construction mark range. When the construction workers reappear and their appearance can be completely identified, the monitoring device sends a closing command to the personal video recording device, so that the monitoring device and the personal video recording device work together according to the location of the construction workers.

[0026] Another object of the present invention is to provide a full-process intelligent monitoring system for communication engineering, the system comprising:

[0027] An image acquisition module, which acquires site images through a monitoring device and uploads them to a backend system, wherein the monitoring device is located in the construction site and is arranged toward the construction site;

[0028] The image recognition module identifies and judges the construction standardization based on the site images, and marks the site images when any violations occur;

[0029] The device control module, when the construction worker enters the area where the field of vision of the monitoring device is blocked, sends a start instruction to the personal video device through the monitoring device, so that the personal video device starts and takes pictures. The personal video device is worn by the construction worker;

[0030] The transmission module receives the first-person perspective images uploaded by the personal video recording device through the monitoring device and uploads them to the background system;

[0031] The image processing module integrates the marked site images and first-person perspective images for storage.

[0032] As a further solution of the present invention: the image recognition module includes:

[0033] a data association unit, which, when obtaining the site image, obtains the location information of the monitoring device and establishes a corresponding relationship with the site image;

[0034] an identification and processing unit, which identifies and processes the site image based on the warning facilities of the construction site and the safety equipment of the construction workers to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment;

[0035] The data integration unit integrates the first image, the second image and the position information to mark the site image.

[0036] As a further solution of the present invention: the device control module includes:

[0037] A range recognition unit identifies the specific location of the communication construction based on the site image to obtain the construction mark range;

[0038] A personnel selection unit selects construction personnel according to the site image, wherein the selected construction personnel are the ones closest to the construction mark range;

[0039] The image traversal unit performs traversal processing based on the scene image after the construction personnel are selected. When the selected construction personnel enter the construction mark range and the appearance of the construction personnel cannot be fully identified, the start instruction is sent to the monitoring device through the background system, and the monitoring device forwards the start instruction to the personal video recording device as a control relay.

[0040] As a further solution of the present invention: the device control module also includes:

[0041] The equipment coordination unit identifies the construction personnel through the monitoring device and according to the construction marking range. When the construction personnel reappear and their appearance can be fully identified, the monitoring device sends a shutdown command to the personal video recording device, so that the monitoring device and the personal video recording device cooperate and work together according to the location of the construction personnel.

[0042] Compared with the prior art, the present invention has the following beneficial effects:

[0043] The present invention utilizes the monitoring device and the personal video recording equipment to work together to record a more complete communication construction process. First, the monitoring device is used to obtain the site image. Through the site image, some site preparation work contents during construction can be identified, which is mainly used to determine whether the warning facilities necessary for construction are set up. After the construction personnel enter the area that the monitoring device cannot shoot, the monitoring device is used as a relay to control the personal video recording equipment to obtain the construction personnel's first-person perspective operation video, that is, the first-person perspective image. The site image and the first-person perspective image can contribute to all-round standardized construction monitoring. In summary, the present invention utilizes the monitoring device and the personal video recording equipment to work together to record the entire process of communication construction, which is helpful for monitoring the entire process of communication engineering construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 The present invention is a flow chart of a whole-process intelligent monitoring method for a communication engineering.

[0045] Figure 2The present invention is a flow chart for identifying and judging construction standardization based on site images in a full-process intelligent monitoring method for communication engineering.

[0046] Figure 3 The present invention is a flow chart of a method for full-process intelligent monitoring of a communication project, which is based on site images and identifies and processes them according to warning facilities at the construction site and safety equipment for construction workers.

[0047] Figure 4 The present invention is a flow chart of a method for full-process intelligent monitoring of a communication project, in which when a construction worker enters an area where the field of vision of a monitoring device is blocked, a start instruction is sent to a personal video recording device via the monitoring device as a relay.

[0048] Figure 5 The figure is a structural diagram of a full-process intelligent monitoring system for a communication project.

[0049] Figure 6 The figure is a schematic diagram of the structure of an image recognition module in a full-process intelligent monitoring system of a communication project.

[0050] Figure 7 The schematic diagram is a structural diagram of a device control module in a full-process intelligent monitoring system of a communication project. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0052] The specific implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0053] like Figure 1 As shown, an embodiment of the present invention provides a method for intelligent monitoring of the entire process of a communication project, the method comprising the following steps:

[0054] S100, obtaining a site image through a monitoring device and uploading it to a background system, wherein the monitoring device is located in the construction site and is arranged toward the construction site;

[0055] S200, identifying and judging the construction standardization based on the site image, and marking the site image when any violation occurs;

[0056] S300, when a construction worker enters an area where the field of vision of the monitoring device is blocked, the monitoring device is used as a relay to send a start instruction to the personal video recording device, so that the personal video recording device is started and takes pictures, and the personal video recording device is worn by the construction worker;

[0057] S400, receiving the first-person perspective image uploaded by the personal video recording device through the monitoring device and uploading it to the background system;

[0058] S500: Integrate the marked site image and the first-person perspective image for storage.

[0059] It should be noted that the identification and judgment of construction standardization based on site images is mainly divided into two aspects. The first aspect is mainly the identification and judgment of the construction site, such as whether there are warning signs, cordons and warning pile barrels in the construction site, so as to judge whether the preparation work for communication construction complies with the construction specifications. The second aspect is mainly to judge whether the construction personnel are wearing safety equipment, such as whether the construction personnel are wearing work clothes, safety helmets, etc. The above method can effectively monitor the construction process. The site image can help supervisors to supervise the construction site on a large scale, and the first-person perspective image can help supervisors to judge the details of the construction personnel's operations, mainly to judge whether the construction personnel's operations are standardized.

[0060] In the embodiment of the present invention, the present invention utilizes the monitoring device and the personal video recording equipment to work together to record a more complete communication construction process. First, the monitoring device is used to obtain the site image. Through the site image, some site preparation work contents during construction can be identified, which is mainly used to determine whether the warning facilities necessary for construction are set up. After the construction personnel enter the area that the monitoring device cannot shoot, the monitoring device is used as a relay to control the personal video recording equipment to obtain the construction personnel's first-person perspective operation video, that is, the first-person perspective image. The site image and the first-person perspective image can contribute to all-round standardized construction monitoring. In summary, the present invention utilizes the monitoring device and the personal video recording equipment to work together to record the entire process of communication construction, which is helpful for monitoring the entire process of communication engineering construction.

[0061] like Figure 2 As shown, as a preferred embodiment of the present invention, the step of identifying and judging the construction standardization based on the site image specifically includes:

[0062] S201, when the site image is obtained, obtaining the location information of the monitoring device and establishing a corresponding relationship with the site image;

[0063] S202, based on the site image, the warning facilities of the construction site and the safety equipment of the construction workers are identified and processed to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment;

[0064] S203, integrating the first image, the second image and the location information to mark the site image.

[0065] In an embodiment of the present invention, after establishing a correspondence between location information and site images, it can help supervisors to distinguish the construction content corresponding to the site images. Otherwise, it is difficult to judge the construction only from the content of the site images. The first image and the second image are respectively screenshots of the construction site and whether the construction workers are in compliance with regulations. Of course, the first image and the second image can be single or multiple. Marking the site image with the first image and the second image can help supervisors to quickly identify it, and can also establish an association between the first image and the second image and the site image. After the supervisor clicks on the first image or the second image, the site image can be directly adjusted to the corresponding screen.

[0066] like Figure 3 As shown, as a preferred embodiment of the present invention, the step of identifying and processing the site image based on the warning facilities of the construction site and the safety equipment of the construction workers specifically includes:

[0067] S2021, select the area where the construction workers are located through the site image to obtain the area marking line;

[0068] S2022, identifying and determining objects outside the range marking line based on the range marking line to identify and determine whether there are warning facilities in the construction site, and when there are no warning facilities, intercepting the site image to obtain a first image;

[0069] S2023, based on the range marking line, the appearance of the construction workers inside is identified and judged to identify whether the construction workers are wearing installation accessories. When the construction workers are wearing accessories, the site image is intercepted to obtain a second image.

[0070] In the embodiments of the present invention, during the actual construction process, the construction workers are basically gathered around the construction location. For example, in the wire threading operation of a communication project, the construction workers will be located around the pipe shaft. Due to the space limitation of the pipe shaft, only one construction worker can enter it to perform wiring work. The range marking line can be obtained through the gathered construction workers. Generally speaking, warning signs, warning lines, warning pile barrels, etc. are basically set outside the range marking line, and the construction workers are generally located on the inside of the range marking line. By dividing the area of ​​the site image screen, the interference factors of video recognition can be reduced.

[0071] like Figure 4 As shown, as a preferred embodiment of the present invention, when the construction personnel enter the area where the field of vision of the monitoring device is blocked, the step of sending the start instruction to the personal video recording device through the monitoring device as a transfer specifically includes:

[0072] S301, identifying the specific location of the communication construction based on the site image to obtain a construction mark range;

[0073] S302, selecting a construction worker according to the site image, wherein the selected construction worker is the one closest to the construction mark range;

[0074] S303, based on the scene image after the construction personnel are selected, traversal processing is performed again. When the selected construction personnel enters the construction mark range and the appearance of the construction personnel cannot be completely identified, a start instruction is sent to the monitoring device through the background system, and the monitoring device forwards the start instruction to the personal video recording device as a control transfer;

[0075] S304, the construction workers are identified through the monitoring device and according to the construction mark range. When the construction workers reappear and their appearance can be completely identified, the monitoring device sends a closing instruction to the personal video recording device, so that the monitoring device and the personal video recording device cooperate and work together according to the location of the construction workers.

[0076] In the embodiments of the present invention, generally speaking, the site of communication construction is much larger than the specific construction location. The specific construction location can be identified through the site image, such as a pipe well, a communication distribution cabinet, etc. These objects have distinct characteristics, so it is easy to obtain the construction mark range. After the construction personnel are selected, they are monitored. When they enter the range, it means that the construction personnel are performing construction operations, so the content of the first-person perspective image is of reference significance. Of course, after the construction personnel are replaced, the selected target will also be replaced. In this process, the monitoring device plays a role in control transfer, which can effectively ensure the stability of data transmission. At the same time, the status of the selected construction personnel can be identified through the monitoring device. When the construction personnel are not performing construction, the personal video recording device will be turned off accordingly, and when the construction is in progress, the personal video recording device will be started. As for how to identify and determine which personal video recording device is started, it is only necessary to start each personal video recording device synchronously, and identify after obtaining the corresponding image, so as to determine which personal video recording device is the corresponding construction personnel performing work.

[0077] like Figure 5 As shown, an embodiment of the present invention further provides a full-process intelligent monitoring system for a communication project, the system comprising:

[0078] An image acquisition module 100 acquires site images through a monitoring device and uploads them to a backend system. The monitoring device is located in the construction site and is arranged toward the construction site.

[0079] Image recognition module 200, which identifies and judges the construction standardization based on the site image, and marks the site image when there is any violation content;

[0080] The device control module 300, when a construction worker enters an area where the field of vision of the monitoring device is blocked, sends a start instruction to the personal video device through the monitoring device, so that the personal video device is started and takes pictures. The personal video device is worn by the construction worker;

[0081] The transmission module 400 receives the first-person perspective image uploaded by the personal video recording device through the monitoring device and uploads it to the background system;

[0082] The image processing module 500 integrates the marked site image and the first-person perspective image for storage.

[0083] In the embodiment of the present invention, the present invention utilizes the monitoring device and the personal video recording equipment to work together to record a more complete communication construction process. First, the monitoring device is used to obtain the site image. Through the site image, some site preparation work contents during construction can be identified, which is mainly used to determine whether the warning facilities necessary for construction are set up. After the construction personnel enter the area that the monitoring device cannot shoot, the monitoring device is used as a relay to control the personal video recording equipment to obtain the construction personnel's first-person perspective operation video, that is, the first-person perspective image. The site image and the first-person perspective image can contribute to all-round standardized construction monitoring. In summary, the present invention utilizes the monitoring device and the personal video recording equipment to work together to record the entire process of communication construction, which is helpful for monitoring the entire process of communication engineering construction.

[0084] like Figure 6 As shown, as a preferred embodiment of the present invention, the image recognition module 200 includes:

[0085] The data association unit 201, when obtaining the site image, obtains the location information of the monitoring device and establishes a corresponding relationship with the site image;

[0086] The recognition processing unit 202 recognizes and processes the site image based on the warning facilities of the construction site and the safety equipment of the construction workers to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment;

[0087] The data integration unit 203 integrates the first image, the second image and the position information to mark the site image.

[0088] like Figure 7 As shown, as a preferred embodiment of the present invention, the device control module 300 includes:

[0089] A range recognition unit 301 recognizes the specific location of the communication construction based on the site image to obtain a construction mark range;

[0090] A personnel selection unit 302 selects a construction personnel according to the site image, wherein the selected construction personnel is the one closest to the construction mark range;

[0091] The image traversal unit 303 performs traversal processing based on the scene image selected by the construction personnel. When the selected construction personnel enters the construction mark range and the appearance of the construction personnel cannot be fully identified, the background system sends a start instruction to the monitoring device, and the monitoring device forwards the start instruction to the personal video recording device as a control transfer;

[0092] The equipment coordination unit 304 identifies the construction workers through the monitoring device and according to the construction mark range. When the construction workers reappear and their appearance can be fully identified, the monitoring device sends a closing command to the personal video recording device, so that the monitoring device and the personal video recording device cooperate and work together according to the location of the construction workers.

[0093] The above only describes in detail the preferred embodiments of the present invention, which is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0094] It should be understood that, although each step in the flow chart of each embodiment of the present invention is shown in sequence according to the indication of the arrow, these steps are not necessarily performed in sequence according to the order indicated by the arrow. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be performed in other orders. Moreover, at least a portion of the steps in each embodiment may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily performed at the same time, but can be performed at different times, and the execution order of these sub-steps or stages is not necessarily performed in sequence, but can be performed in turn or alternately with at least a portion of other steps or sub-steps or stages of other steps.

[0095] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0096] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the disclosure in the specification and examples. This application is intended to cover any variations, uses or adaptations of the present disclosure, which follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the claims.

Claims

1. A whole-process intelligent monitoring method for communication engineering, characterized in that: The method comprises the following steps: Acquire site images through a monitoring device and upload them to a backend system, wherein the monitoring device is located in the construction site and is arranged toward the construction site; Identify and judge construction standardization based on site images, and mark site images when violations occur; When a construction worker enters an area where the field of vision of the monitoring device is blocked, the monitoring device is used as a relay to send a start instruction to the personal video device, so that the personal video device is started and takes pictures. The personal video device is worn by the construction worker. Receive the first-person perspective image uploaded by the personal video recording device through the monitoring device and upload it to the background system; Integrate the marked site images and first-person perspective images for saving; The step of identifying and judging the construction standardization based on the site image specifically includes: When the site image is obtained, the location information of the monitoring device is acquired and a corresponding relationship with the site image is established; Based on the site image, the warning facilities of the construction site and the safety equipment of the construction workers are identified and processed to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment; Integrate the first image, the second image, and the location information to mark the site image; The step of identifying and processing the site image based on the warning facilities of the construction site and the safety equipment of the construction workers specifically includes: The construction workers' area is framed and marked using the site image to obtain the area marking line; Based on the range marking line, objects outside the range marking line are identified and determined to identify whether there are warning facilities in the construction site. When no warning facilities are included, the site image screen is intercepted to obtain a first image; Based on the range marking line, the appearance of the construction workers inside is identified and judged to identify whether the construction workers are wearing the installation accessories. When the construction workers are wearing the accessories, the site image is intercepted to obtain a second image; When the construction worker enters the area where the field of vision of the monitoring device is blocked, the step of sending the start instruction to the personal video recording device through the monitoring device specifically includes: Based on the site image, the specific location of the communication construction is identified to obtain the construction mark range; Selecting a construction worker according to the site image, wherein the selected construction worker is the one closest to the construction mark range; The scene image after the construction personnel selection is traversed and processed again. When the selected construction personnel enters the construction mark range and the appearance of the construction personnel cannot be fully identified, the background system sends a start instruction to the monitoring device, and the monitoring device forwards the start instruction to the personal video recording device as a control transfer; The method further comprises: The construction workers are identified through the monitoring device according to the construction mark range. When the construction workers reappear and their appearance can be completely identified, the monitoring device sends a closing command to the personal video recording device, so that the monitoring device and the personal video recording device work together according to the location of the construction workers.

2. A full-process intelligent monitoring system for communication engineering, used to implement the method described in claim 1, characterized in that: The system comprises: An image acquisition module, which acquires site images through a monitoring device and uploads them to a backend system, wherein the monitoring device is located in the construction site and is arranged toward the construction site; The image recognition module identifies and judges the construction standardization based on the site images, and marks the site images when any violations occur; The device control module, when the construction worker enters the area where the field of vision of the monitoring device is blocked, sends a start instruction to the personal video device through the monitoring device, so that the personal video device starts and takes pictures. The personal video device is worn by the construction worker; The transmission module receives the first-person perspective images uploaded by the personal video recording device through the monitoring device and uploads them to the background system; The image processing module integrates the marked site images and first-person perspective images for storage.

3. The whole process intelligent monitoring system of communication engineering according to claim 2 is characterized in that: The image recognition module comprises: a data association unit, which, when obtaining the site image, obtains the location information of the monitoring device and establishes a corresponding relationship with the site image; an identification and processing unit, which identifies and processes the site image based on the warning facilities of the construction site and the safety equipment of the construction workers to obtain a first image and a second image, wherein the first image is a screenshot of the site image without the warning facilities, and the second image is a screenshot of the construction workers without wearing the installation equipment; The data integration unit integrates the first image, the second image and the position information to mark the site image.

4. The whole process intelligent monitoring system of communication engineering according to claim 3 is characterized in that: The device control module comprises: A range recognition unit identifies the specific location of the communication construction based on the site image to obtain the construction mark range; A personnel selection unit selects construction personnel according to the site image, wherein the selected construction personnel are the ones closest to the construction mark range; The image traversal unit performs traversal processing based on the scene image after the construction personnel are selected. When the selected construction personnel enter the construction mark range and the appearance of the construction personnel cannot be fully identified, the start instruction is sent to the monitoring device through the background system, and the monitoring device forwards the start instruction to the personal video recording device as a control relay.

5. The whole process intelligent monitoring system of communication engineering according to claim 4 is characterized in that: The device control module also includes: The equipment coordination unit identifies the construction personnel through the monitoring device and according to the construction marking range. When the construction personnel reappear and their appearance can be fully identified, the monitoring device sends a shutdown command to the personal video recording device, so that the monitoring device and the personal video recording device cooperate and work together according to the location of the construction personnel.

Citation Information

Patent Citations

  • Construction site monitoring method and device, computer equipment and storage medium

    CN116934091A