A method and system for detecting terminal fault data of a substation

By collecting and analyzing the substation's hardware, status and environmental monitoring data, combined with the safety prediction model and task bidding auction algorithm, the problem of insufficient monitoring coverage in substation terminal fault detection is solved, the quantitative assessment and risk analysis of system faults are realized, and the efficiency is improved Managerial productivity.

CN118539617BActive Publication Date: 2024-10-01南京南自四创电气有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410993187.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-01
Estimated Expiration
2044-07-24

Smart Images

  • Figure CN118539617B_ABST
    Figure CN118539617B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for detecting terminal fault data of a substation, and relates to the field of power transmission and transformation fault detection. The method comprises: collecting hardware monitoring data, state monitoring data, and environmental monitoring data in the historical self-check cycle of the substation, and outputting a hardware monitoring feature data set, a state monitoring feature data set, and an environmental monitoring feature data set; calculating the system safety value in the historical self-check cycle of the substation according to the hardware monitoring feature data, the state monitoring feature data, and the environmental monitoring feature data in the historical self-check cycle of the substation; inputting the number of cycles, the hardware monitoring feature data, the state monitoring feature data, and the environmental monitoring feature data into a pre-trained safety prediction model, and outputting the system safety value of this cycle; performing system risk analysis according to the system safety value in the historical self-check cycle of the substation and the system safety value of this cycle. Improving the work efficiency of managers is helpful to further solve system faults.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power transmission and transformation fault detection, and in particular to a method and system for detecting fault data of a transformer substation terminal. Background Art

[0002] Substation terminal fault detection is necessary to ensure the safe operation of equipment and stable operation of the power grid in the power system. Substation is an important part of the power system, used to convert the electric energy of the high-voltage transmission line into low-voltage electric energy suitable for transmission and distribution. Substation terminal refers to the part inside the substation that is connected to the external power grid, and it is also one of the places where faults frequently occur in the power system. The power system involves a large number of equipment and complex operating conditions. Various factors may cause equipment failures, such as electrical failures, mechanical failures, environmental factors, etc. Its safety and reliability are crucial to ensuring the quality of power supply and the stability of the power grid. As an important part of the power system, the safe operation of the substation terminal is crucial to the stability of the entire power grid. The occurrence of faults will cause power outages, equipment damage and other problems, causing economic losses to power grid operators and users. Therefore, through effective fault detection and prevention, the impact of faults on the economy can be reduced.

[0003] With the development of monitoring systems and sensor technology, a large amount of data has been collected, but how to effectively process and analyze this data is still a challenge. Traditional monitoring systems have limited coverage and can only monitor some equipment or local areas, but the monitoring coverage of the entire substation terminal is insufficient; when a fault occurs, there is a lack of assessment of the difficulty of troubleshooting the fault itself and the difficulty of system safe recovery, which lacks guidance for managers to troubleshoot the fault. Summary of the invention

[0004] Purpose of the invention: To propose a method for detecting fault data of a substation terminal, and further propose a system for implementing the method, so as to solve the above problems existing in the prior art.

[0005] In a first aspect, a method for detecting substation terminal fault data is proposed, the method comprising the following steps:

[0006] S1. Collect hardware monitoring data, state monitoring data, and environmental monitoring data in the historical self-inspection cycle of the substation, and output hardware monitoring feature data set, state monitoring feature data set, and environmental monitoring feature data set;

[0007] S2. Calculate the system safety value in the historical self-check cycle of the substation based on the hardware monitoring characteristic data, state monitoring characteristic data, and environmental monitoring characteristic data in the historical self-check cycle of the substation;

[0008] S3, input the cycle number, hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data into a pre-trained safety prediction model, and output the system safety value of this cycle;

[0009] S4. Perform system risk analysis based on the system safety value in the substation's historical self-inspection cycle and the system safety value in this cycle.

[0010] A further improvement of the present invention is that the hardware monitoring data in S1 includes voltage monitoring data, current monitoring data, power monitoring data, grid frequency data, and harmonic data; the status monitoring data includes transformer status monitoring data, switch status monitoring data, protection device status monitoring data, and capacitor status monitoring data; the environmental monitoring data includes indoor temperature monitoring data, outdoor temperature monitoring data, indoor humidity monitoring data, outdoor temperature monitoring data, and meteorological monitoring data.

[0011] A further improvement of the present invention is that S1 comprises the following specific steps:

[0012] S11: Collect hardware monitoring data, status monitoring data, and environmental monitoring data in each historical self-test cycle of the substation in chronological order;

[0013] S12: Extract data features from hardware monitoring data, status monitoring data, and environmental monitoring data, and output hardware monitoring feature data set , condition monitoring feature dataset , Environmental Monitoring Feature Dataset ;in is the hardware monitoring characteristic data of the substation’s nth historical self-test cycle, is the status monitoring characteristic data of the nth historical self-test cycle of the substation, It is the environmental monitoring characteristic data of the nth historical self-inspection cycle of the substation, and n is the number of historical self-inspection cycles.

[0014] A further improvement of the present invention is that the calculation formula of the system safety value in S2 is:

[0015]

[0016] in, is the system safety value of the substation in the nth historical self-test cycle, , , are the weight factors of hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data, respectively. .

[0017] A further improvement of the present invention is that the training method of the safety prediction model in S3 is: combining the number of cycles, hardware monitoring feature data, state monitoring feature data, and environmental monitoring feature data into the form of feature vectors, and taking the set of all feature vectors as the input of the safety prediction model. The safety prediction model uses the system safety value predicted by each group of feature vectors as output, and the actual system safety value corresponding to each group of feature vectors as the prediction target, and minimizing the sum of the prediction accuracies of all predicted system safety values ​​as the training target, and stopping the training when the sum of the prediction accuracies converges.

[0018] A further improvement of the present invention is that the calculation formula of the prediction accuracy is: ; is the system safety value predicted by the i-th group of feature vectors, is the actual system safety value of the ith group of eigenvectors, It is the prediction accuracy between the system safety value predicted by the i-th group of feature vectors and the actual system safety value.

[0019] A further improvement of the present invention is that the security prediction model is any one of a deep neural network model or a deep belief network model.

[0020] A further improvement of the present invention is that S4 comprises the following specific steps:

[0021] The average value of the system safety value in the historical self-test cycle of the substation is recorded as the safety threshold. When the system safety value of this cycle is greater than the safety threshold, a system safety signal is issued. When the system safety value of this cycle is less than or equal to the safety threshold, the expected value of system safety recovery of the substation in this cycle is calculated. The calculation formula is: , where H is the expected value of system safety recovery in the current cycle of the substation, c is the number of times the system safety value is greater than the safety threshold in the historical self-check cycle of the substation, and n is the number of historical self-check cycles.

[0022] A further improvement of the present invention is that step S4 further includes the following specific steps:

[0023] Set the system safety value of this cycle and the system safety value of the historical substation self-test cycle They are regarded as bidders and commodities respectively, and the task bidding auction algorithm is used to solve the substation terminal fault analysis result:

[0024] S41, the system safety value of the historical substation self-test cycle To conduct an auction, first generate the auction order , tasks are auctioned one by one from the first round until the auction order , k ≥ 1 and is an integer;

[0025] S42: System safety value of historical substation self-test cycles during this round of bidding Participate in the auction, the system security value of this cycle Give a quote :

[0026]

[0027] In the formula, is the system safety value for this cycle Reach the system safety value of the historical substation self-inspection cycle The profit function, is the load, i.e. the system safety value for this cycle The sum of the winning bids, , is the weight coefficient;

[0028] S43, the system safety value of this cycle with the highest bid Obtain the system safety value of the historical substation self-test cycle the right of execution;

[0029] S44, when there is still a system safety value for this cycle If there is no winning bid, the bid will be repurchased according to the auction order. The next round of bidding starts, and steps S42 to S43 are repeated until all tasks have won the bid and the auction ends. The system security value of this cycle is output. .

[0030] As a second aspect of the present invention, a substation terminal fault data detection system is proposed, which includes an information collection module, a system safety assessment module, a safety prediction module, and a safety expectation calculation module.

[0031] The information collection module is used to collect hardware monitoring data, state monitoring data, and environmental monitoring data in the historical self-test cycle of the substation, and output hardware monitoring feature data set, state monitoring feature data set, and environmental monitoring feature data set;

[0032] The system safety assessment module is used to calculate the system safety value in the historical self-check cycle of the substation based on the hardware monitoring feature data, state monitoring feature data, and environmental monitoring feature data in the historical self-check cycle of the substation;

[0033] The safety prediction module is used to input the cycle number, hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data into a pre-trained safety prediction model, and output the system safety value of the current cycle;

[0034] The safety expectation calculation module is used to perform system risk analysis based on the system safety value in the historical self-check cycle of the substation and the system safety value in the current cycle.

[0035] As a third aspect of the present invention, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the substation terminal fault data detection method disclosed in the above embodiment is implemented.

[0036] Beneficial effects: The present invention constructs a substation terminal fault data detection method, which quantitatively evaluates the system fault detection process of the substation, making the detection result more intuitive. The monitoring data covers hardware, system status and objective environment, and comprehensively evaluates the overall safety status of the substation system. By calculating the expected value of system safety recovery, the maintenance difficulty of the current system is evaluated, the work efficiency of managers is improved, and it is helpful to further solve system faults. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 The figure is a flow chart of a method for detecting substation terminal fault data in an embodiment of the present invention.

[0038] Figure 2 This is a topological diagram of the flow of data in an embodiment of the present invention.

[0039] Figure 3 It is a structural schematic diagram of a substation terminal fault data detection system in an embodiment of the present invention. DETAILED DESCRIPTION

[0040] In the following description, a large number of specific details are provided to provide a more thorough understanding of the present invention. However, it is apparent to those skilled in the art that the present invention can be implemented without one or more of these details. In other examples, in order to avoid confusion with the present invention, some technical features known in the art are not described.

[0041] Combination Figure 1 This embodiment discloses a method for detecting substation terminal fault data, wherein the internal data flow is shown in Figure 2 The substation terminal fault data detection method includes the following specific steps:

[0042] Step S1, collecting hardware monitoring data, state monitoring data, and environmental monitoring data in the historical self-test cycle of the substation, and outputting a hardware monitoring feature data set, a state monitoring feature data set, and an environmental monitoring feature data set;

[0043] Step S2, calculating the system safety value in the historical self-check cycle of the substation according to the hardware monitoring characteristic data, the state monitoring characteristic data, and the environmental monitoring characteristic data in the historical self-check cycle of the substation;

[0044] Step S3: Input the cycle number, hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data into a pre-trained safety prediction model, and output the system safety value of this cycle;

[0045] Step S4: Perform system risk analysis based on the system safety value in the historical self-check cycle of the substation and the system safety value in the current cycle.

[0046] In this embodiment, the hardware monitoring data in step S1 includes voltage monitoring data, current monitoring data, power monitoring data, grid frequency data, and harmonic data; the status monitoring data includes transformer status monitoring data, switch status monitoring data, protection device status monitoring data, and capacitor status monitoring data; the environmental monitoring data includes indoor temperature monitoring data, outdoor temperature monitoring data, indoor humidity monitoring data, outdoor temperature monitoring data, and meteorological monitoring data.

[0047] In this embodiment, step S1 includes the following specific steps:

[0048] Step S11: collecting hardware monitoring data, status monitoring data, and environmental monitoring data in each historical self-test cycle of the substation in chronological order;

[0049] Step S12: Extract data features from hardware monitoring data, status monitoring data, and environmental monitoring data, and output a hardware monitoring feature data set , condition monitoring feature dataset , Environmental Monitoring Feature Dataset ;in is the hardware monitoring characteristic data of the substation’s nth historical self-test cycle, is the status monitoring characteristic data of the nth historical self-test cycle of the substation, It is the environmental monitoring characteristic data of the nth historical self-inspection cycle of the substation, and n is the number of historical self-inspection cycles.

[0050] In this embodiment, the calculation formula of the system safety value in step S2 is: ;in, is the system safety value of the substation in the nth historical self-test cycle, , , are the weight factors of hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data, respectively. .

[0051] In this embodiment, the training method of the safety prediction model in S3 is: the number of cycles, hardware monitoring feature data, state monitoring feature data, and environmental monitoring feature data are combined into the form of feature vectors, and the set of all feature vectors is used as the input of the safety prediction model. The safety prediction model uses the system safety value predicted by each group of feature vectors as output, and the actual system safety value corresponding to each group of feature vectors as the prediction target, and minimizes the sum of the prediction accuracies of all predicted system safety values ​​as the training goal, and stops training when the sum of the prediction accuracies converges.

[0052] In this embodiment, the calculation formula for prediction accuracy is: ; is the system safety value predicted by the i-th group of feature vectors, is the actual system safety value of the ith group of eigenvectors, It is the prediction accuracy between the system safety value predicted by the i-th group of feature vectors and the actual system safety value.

[0053] In this embodiment, the security prediction model is any one of a deep neural network model or a deep belief network model.

[0054] In this embodiment, step S4 includes the following specific steps:

[0055] The average value of the system safety value in the historical self-test cycle of the substation is recorded as the safety threshold. When the system safety value of this cycle is greater than the safety threshold, a system safety signal is issued. When the system safety value of this cycle is less than or equal to the safety threshold, the expected value of system safety recovery of the substation in this cycle is calculated. The calculation formula is: , where H is the expected value of system safety recovery in the current cycle of the substation, c is the number of times the system safety value is greater than the safety threshold in the historical self-check cycle of the substation, and n is the number of historical self-check cycles.

[0056] In this embodiment, a feasible solution is additionally proposed to obtain the system security value of this cycle by using the task bidding auction algorithm. The specific principle is as follows:

[0057] The system safety value of the historical substation self-test cycle To conduct an auction, first generate the auction order , tasks are auctioned one by one from the first round until the auction order , k ≥ 1 and is an integer;

[0058] During this round of bidding, the system safety value of the historical substation self-inspection cycle Participate in the auction, the system security value of this cycle Give a quote .

[0059] is the system safety value for this cycle Reach the system safety value of the historical substation self-inspection cycle The profit function, is the load, i.e. the system safety value for this cycle The sum of the winning bids, , is the weight coefficient;

[0060] The system safety value of this cycle with the highest bid Obtain the system safety value of the historical substation self-test cycle the right of execution;

[0061] When there is still a system safety value for this cycle If there is no winning bid, the bid will be repurchased according to the auction order. The next round of bidding starts, and the above bidding process is repeated until all tasks have won the bid and the auction ends. The system security value of this cycle is output. .

[0062] Figure 3 The structure diagram of a substation terminal fault data detection system 500 disclosed in another embodiment is shown. The system includes an information collection module 501, a system safety assessment module 502, a safety prediction module 503, and a safety expectation calculation module 504.

[0063] The information collection module 501 is used to collect hardware monitoring data, state monitoring data, and environmental monitoring data in the historical self-inspection cycle of the substation, and output a hardware monitoring feature data set, a state monitoring feature data set, and an environmental monitoring feature data set.

[0064] The system safety assessment module 502 is used to calculate the system safety value in the historical self-check cycle of the substation according to the hardware monitoring characteristic data, the state monitoring characteristic data and the environment monitoring characteristic data in the historical self-check cycle of the substation.

[0065] The safety prediction module 503 is used to input the cycle number, hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data into a pre-trained safety prediction model, and output the system safety value of the current cycle.

[0066] The safety expectation calculation module 504 is used to perform system risk analysis based on the system safety value in the historical self-check cycle of the substation and the system safety value in the current cycle.

[0067] In this embodiment, the hardware monitoring data includes voltage monitoring data, current monitoring data, power monitoring data, grid frequency data, and harmonic data; the status monitoring data includes transformer status monitoring data, switch status monitoring data, protection device status monitoring data, and capacitor status monitoring data; the environmental monitoring data includes indoor temperature monitoring data, outdoor temperature monitoring data, indoor humidity monitoring data, outdoor temperature monitoring data, and meteorological monitoring data.

[0068] In this embodiment, the operation of the information acquisition module 501 includes the following specific steps: first, the hardware monitoring data, status monitoring data, and environmental monitoring data in each historical self-test cycle of the substation are collected in chronological order; then, the data features in the hardware monitoring data, status monitoring data, and environmental monitoring data are extracted, and the hardware monitoring feature data set is output. , condition monitoring feature dataset , Environmental Monitoring Feature Dataset ,in is the hardware monitoring characteristic data of the substation’s nth historical self-test cycle, is the status monitoring characteristic data of the nth historical self-test cycle of the substation, It is the environmental monitoring characteristic data of the nth historical self-inspection cycle of the substation, and n is the number of historical self-inspection cycles.

[0069] In this embodiment, the calculation formula of the system safety value is: ;in, is the system safety value of the substation in the nth historical self-test cycle, , , are the weight factors of hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data, respectively. .

[0070] In this embodiment, the training method of the safety prediction model is: the number of cycles, hardware monitoring feature data, state monitoring feature data, and environmental monitoring feature data are combined into the form of feature vectors, and the set of all feature vectors is used as the input of the safety prediction model. The safety prediction model uses the system safety value predicted by each group of feature vectors as output, and the actual system safety value corresponding to each group of feature vectors as the prediction target. Minimizing the sum of the prediction accuracies of all predicted system safety values ​​is used as the training goal, and training is stopped when the sum of the prediction accuracies converges.

[0071] In this embodiment, the calculation formula for prediction accuracy is: .

[0072] is the system safety value predicted by the i-th group of feature vectors, is the actual system safety value of the ith group of eigenvectors, It is the prediction accuracy between the system safety value predicted by the i-th group of feature vectors and the actual system safety value.

[0073] In this embodiment, the security prediction model is any one of a deep neural network model or a deep belief network model.

[0074] In this embodiment, the system risk analysis includes the following specific implementation steps: first, the average value of the system safety value in the historical self-check cycle of the substation is recorded as the safety threshold, and when the system safety value of the current cycle is greater than the safety threshold, a system safety signal is issued; when the system safety value of the current cycle is less than or equal to the safety threshold, the expected value of the system safety recovery of the substation in the current cycle is calculated, and the calculation formula is: , where H is the expected value of system safety recovery in the current cycle of the substation, c is the number of times the system safety value is greater than the safety threshold in the historical self-check cycle of the substation, and n is the number of historical self-check cycles.

[0075] The above parameters and steps of each unit module implementing corresponding functions in the substation terminal fault data detection system 500 of the present invention can refer to the parameters and steps in the embodiment of the substation terminal fault data detection method in the above embodiment.

[0076] The substation terminal fault data detection method disclosed in the above embodiment can be written into a set of executable instructions in the actual application process, and the executable instructions are written into the storage medium and run on the electronic device. More specific examples of the computer-readable storage medium mentioned in this embodiment may include but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. The computer-readable storage medium may include a data signal propagated in the baseband or as part of a carrier, which carries a readable program code. This propagated data signal can take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The readable signal medium can also be any readable medium other than a readable storage medium, which can send, propagate or transmit a program used by or in combination with an instruction execution system, device or device. When the above electronic device is running, it can automatically execute the complete substation terminal fault data detection method disclosed in any of the above embodiments, and the specific method is not repeated here.

[0077] As described above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as limiting the present invention itself. Various changes may be made to it in form and detail without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims

1. A method for detecting substation terminal fault data, characterized in that: The steps include: S1. Collect hardware monitoring feature data, status monitoring feature data, and environmental monitoring feature data in the historical self-inspection cycle of the substation; S2. Calculate the system safety value in the historical self-test cycle of the substation according to the hardware monitoring characteristic data, the state monitoring characteristic data, and the environmental monitoring characteristic data; S3, input the hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data into the pre-trained safety prediction model, and integrate the historical self-check cycle number to output the system safety value of this cycle; S4. Perform system risk analysis based on the system safety value in the historical self-check cycle of the substation obtained in step S2 and the system safety value of the current cycle obtained in step S3, and output the substation terminal fault analysis result; The hardware monitoring characteristic data is collected from the hardware monitoring data in the historical self-check cycle of the substation; The condition monitoring characteristic data is collected from the condition monitoring data in the historical self-inspection cycle of the substation; The environmental monitoring characteristic data is collected from the environmental monitoring data in the historical self-inspection cycle of the substation; The hardware monitoring data includes voltage monitoring data, current monitoring data, power monitoring data, grid frequency data, and harmonic data; The state monitoring data includes transformer state monitoring data, switch state monitoring data, protection device state monitoring data, and capacitor state monitoring data; The environmental monitoring data includes indoor temperature monitoring data, outdoor temperature monitoring data, indoor humidity monitoring data, outdoor temperature monitoring data, and meteorological monitoring data; Step S1 includes the following specific steps: S11: Collect hardware monitoring data, status monitoring data, and environmental monitoring data in each historical self-test cycle of the substation in chronological order; S12: Extract data features from hardware monitoring data, status monitoring data, and environmental monitoring data, and output hardware monitoring feature data set , Condition Monitoring Feature Dataset , Environmental Monitoring Feature Dataset ; In the formula, is the hardware monitoring characteristic data of the substation’s nth historical self-test cycle, is the status monitoring characteristic data of the nth historical self-test cycle of the substation, is the environmental monitoring characteristic data of the nth historical self-inspection cycle of the substation, where n is the number of historical self-inspection cycles; The training method of the security prediction model in step S3 includes: The historical self-check cycle number n, hardware monitoring feature data , condition monitoring characteristic data , Environmental monitoring characteristic data The system is combined into a feature vector, and the set of all feature vectors is used as the input of the safety prediction model. The safety prediction model uses the system safety value predicted by each set of feature vectors as the output, and the actual system safety value corresponding to each set of feature vectors as the prediction target. The training goal is to minimize the sum of the prediction accuracy of all predicted system safety values, and stop training when the sum of the prediction accuracy reaches convergence. The system risk analysis is performed based on the system safety value in the historical self-check cycle of the substation obtained in step S2 and the system safety value of the current cycle obtained in step S3, including: The average value of the system safety value in the historical self-test cycle of the substation is recorded as the safety threshold, and the safety threshold is compared with the system safety value of this cycle: When the system safety value of this cycle is greater than the safety threshold, a system safety signal is issued; When the system safety value of this cycle is less than or equal to the safety threshold, calculate the expected value of system safety recovery of the substation in this cycle: ; Where H is the expected value of system safety recovery in the current cycle of the substation, c is the number of times the system safety value is greater than the safety threshold in the historical self-check cycle of the substation, and n is the number of historical self-check cycles.

2. The substation terminal fault data detection method according to claim 1, characterized in that: The calculation formula of the system safety value in the historical self-test cycle of the substation in step S2 is: ; In the formula, is the system safety value of the substation in the nth historical self-test cycle, , , are the weight factors of hardware monitoring feature data, state monitoring feature data, and environment monitoring feature data, respectively. .

3. The substation terminal fault data detection method according to claim 2, characterized in that: The calculation formula for the prediction accuracy is: ; In the formula, is the system safety value predicted by the i-th group of feature vectors, is the actual system safety value of the ith group of eigenvectors, It is the prediction accuracy between the system safety value predicted by the i-th group of feature vectors and the actual system safety value.

4. The method for detecting substation terminal fault data according to claim 1, characterized in that: The security prediction model is any one of a deep neural network model or a deep belief network model.

5. The method for detecting substation terminal fault data according to claim 3, characterized in that: The system risk analysis is performed based on the system safety value in the historical self-check cycle of the substation obtained in step S2 and the system safety value of the current cycle obtained in step S3, and further includes: Set the system safety value of this cycle and the system safety value of the historical substation self-test cycle They are regarded as bidders and commodities respectively, and the task bidding auction algorithm is used to solve the substation terminal fault analysis result: S41, the system safety value of the historical substation self-test cycle To conduct an auction, first generate the auction order , tasks are auctioned one by one from the first round until the auction order , k ≥ 1 and is an integer; S42: System safety value of historical substation self-test cycles during this round of bidding Participate in the auction, the system security value of this cycle Give a quote : ; In the formula, is the system safety value for this cycle Reach the system safety value of the historical substation self-inspection cycle The profit function, is the load, i.e. the system safety value for this cycle The sum of the winning bids, , is the weight coefficient; S43, the system safety value of this cycle with the highest bid Obtain the system safety value of the historical substation self-test cycle the right of execution; S44, when there is still a system safety value for this cycle If there is no winning bid, the bid will be repurchased according to the auction order. The next round of bidding starts, and steps S42 to S43 are repeated until all tasks have won the bid and the auction ends. The system security value of this cycle is output. .

6. A substation terminal fault data detection system, used to implement the substation terminal fault data detection method according to any one of claims 1 to 5, characterized in that: The substation terminal fault data detection system comprises: Information collection module, used to collect hardware monitoring feature data, status monitoring feature data, and environmental monitoring feature data in the historical self-inspection cycle of the substation; A system safety assessment module, used to calculate the system safety value in the historical self-check cycle of the substation based on the hardware monitoring characteristic data, the state monitoring characteristic data, and the environmental monitoring characteristic data; The safety prediction module is used to input the hardware monitoring feature data, the state monitoring feature data, and the environment monitoring feature data into the pre-trained safety prediction model, and integrate the historical self-check cycle number to output the system safety value of the current cycle; The safety expectation calculation module is used to perform system risk analysis based on the system safety value in the substation's historical self-check cycle and the system safety value in this cycle, and output the substation terminal fault analysis results.