A method for coordinated adjustment of train operation diagram and stop plan

By constructing a collaborative dispatching model and using the Lagrangian relaxation algorithm and CPLEX solver, the problem of slow interference response speed at railway marshalling stations on the same line for passengers and freight is solved, the robustness and efficiency of train operation adjustment are improved, and delay costs are reduced. .

CN118607894BActive Publication Date: 2024-10-18SHANDONG UNIV OF SCI & TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411082444.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-18
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

When passenger and freight co-located railways encounter interference at key hubs such as marshalling stations, their response speed is slow and their adjustment capabilities are weak, causing train operations to deviate from the plan, reducing transportation efficiency and increasing delay costs.

Method used

Construct a cooperative dispatching model, combine the Lagrangian relaxation algorithm and the CPLEX solver, and decompose the uplink and downlink sub-problems by setting track allocation, adjustment time, safety interval, interval time, stops and marshalling station capacity constraints, and generate adjusted train schedule and stop plans.

Benefits of technology

It improves the robustness of train operation adjustments, maximizes the use of station resources, reduces delay losses, balances the needs of passenger and cargo trains, and reduces the total cost of line operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118607894B_ABST
    Figure CN118607894B_ABST
Patent Text Reader

Abstract

The present invention provides a method for coordinated adjustment of a train operation diagram and a stop plan, which relates to the technical field of train operation plan adjustment, and specifically includes the following steps: constructing a coordinated scheduling model, and inputting the coordinated scheduling model into a Lagrangian relaxation algorithm; setting constraints; initializing the basic parameters of the Lagrangian relaxation algorithm; decomposing the coordinated scheduling model under constraints into an upward subproblem and a downward subproblem; using a solver to solve the upward and downward subproblems in parallel, combining the results of the upward and downward subproblems to generate a lower bound solution; fixing the activity sequence between trains running in the same direction, and using a solver to obtain a feasible solution that satisfies the relaxed coupling constraints, that is, generating an upper bound solution; using a subgradient descent method to update the Lagrangian multiplier, and updating the number of iterations; until the adjusted train operation diagram and stop plan are output. The technical solution of the present invention overcomes the problems of slow interference response speed and weak adjustment ability of passenger and freight co-line railways in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of train operation plan adjustment, and in particular to a method for coordinated adjustment of a train operation diagram and a stop plan. Background Art

[0002] Compared with freight-only railways, passenger-freight railways are more complex in their structural composition and transport organization mode. There are differences in the transport demands between passenger trains and freight trains, and train operations are more susceptible to external interference, resulting in deviations from the established operation plan. This vulnerability is more significant when interference occurs at key hubs of passenger-freight railways, such as marshaling yards. The marshaling yard undertakes important tasks such as disassembly, marshaling and inspection of freight trains in passenger-freight railways. It is located at a node with dense traffic flow and plays a decisive role in maintaining the operating efficiency of passenger-freight railways. Once the marshaling yard encounters interference and cannot perform its functions normally, the core of the railway hub is affected. If effective adjustment measures are not taken in time, the normal operation of trains on the line will be affected, the transportation efficiency of passenger-freight railways will be reduced, and the delay cost will be significantly increased.

[0003] Therefore, there is a need for a method for coordinated adjustment of train operation diagram and stop plan with fast interference response speed and strong adjustment capability. Summary of the invention

[0004] The main purpose of the present invention is to provide a method for coordinated adjustment of a train operation diagram and a stop plan, so as to solve the problems of slow interference response speed and weak adjustment ability of passenger and freight co-line railways in the prior art.

[0005] To achieve the above object, the present invention provides a method for coordinated adjustment of a train operation diagram and a stop plan, which specifically comprises the following steps:

[0006] S1, construct a collaborative scheduling model including: planned operation diagram, train priority, train running direction, marshaling yard restricted duration and marshaling yard restricted degree, and input the collaborative scheduling model into the Lagrangian relaxation algorithm.

[0007] S2, setting constraints, including: track allocation constraints, adjustment time constraints, safety interval constraints, interval time constraints, stop constraints, marshalling yard capacity constraints and delayed delivery constraints.

[0008] S3, initialize the basic parameters of the Lagrangian relaxation algorithm, including: the current number of iterations =0, maximum number of iterations , the initial Lagrange multiplier =0, relative gap and stop threshold .

[0009] S4, decompose the cooperative scheduling model under constraints into upstream subproblems and downstream subproblems.

[0010] S5, use the solver CPLEX to solve the uplink and downlink subproblems in parallel, combine the results of the uplink and downlink subproblems, and generate a lower bound solution; fix the activity order between trains running in the same direction, and use the solver CPLEX to obtain a feasible solution that satisfies the relaxed coupling constraints, that is, generate an upper bound solution .

[0011] S6, update the Lagrange multiplier using subgradient descent , and update the number of iterations, let .

[0012] S7, current iteration number Or the relative gap between the upper and lower bound solutions Otherwise, the process returns to S4 until the adjusted train operation diagram and stop plan are output.

[0013] Furthermore, the track allocation constraint in step S2 is:

[0014] Constraint (1) ensures that only one train can occupy a track at a time; constraint (2) prohibits trains from occupying the main line to stop; constraint (3) indicates that when the downlink train occupies the reverse track is 0, constraint (4) means that when the up train occupies the reverse track is 0; constraint (5) defines the variable When the variable is 1, when the down train and the up train do not use the stop track and the station route in the reverse direction, is set to 1:

[0015] (1);

[0016] (2);

[0017] (3);

[0018] (4);

[0019] (5);

[0020] in, For the station track, For the station The stop track collection, Representative train Whether to occupy the stop track , Gather for the train, Gather for the station, For the station The upward lateral line collection, For the station The main line collection, For the station The downward lateral line collection, Indicates whether the freight train is delayed in delivery, Representative train Whether to occupy the stop track ; Representative train Whether to occupy the stop track , Representative train or train Whether to use the reverse pit route and track, Assemble for the down train, Assemble at the intermediate station. Assemble for the up train.

[0021] Furthermore, the adjustment time constraint in step S2 is:

[0022] Constraint (6) stipulates that the arrival time of the adjusted train must be later than the planned arrival and departure time; constraint (7) stipulates that the departure time of the adjusted train must be later than the planned arrival and departure time; constraints (8) and (9) stipulate that when the train At the station Occupy stop track When, due to and is fixed, according to and Sure and ; Constraints (10) and (11) stipulate that when the train No stop track is occupied When , the arrival and departure times are set to 0, and according to constraints (8) and (9), and Also 0:

[0023] (6);

[0024] (7);

[0025] (8);

[0026] (9);

[0027] (10);

[0028] (11);

[0029] in, Represents a large positive number, Take 1000000, For trains At the station Stop track The arrival time on For trains At the station Stop track The planned arrival time on For trains At the station Stop track The departure time on For trains At the station Stop track The planned departure time on For trains at the station Occupy stop track The operation time of the inbound route at Train at the station Occupy stop track The outbound route operation time at For trains At the station Stop track The pit stop time, For trains At the station Stop track The departure time on.

[0030] Furthermore, the safety interval constraint in step S2 is:

[0031] Constraints (12), (13) and (14) specify the safe interval constraints between trains in the same direction; Constraint (12) means that if trains in the same direction and Occupancy of stations Stop track , then there must be a minimum interval between the arrival time of a train and the departure time of a train; constraints (13) and (14) define the required safety interval between the arrival time and departure time of trains in the same direction respectively:

[0032] (12);

[0033] (13);

[0034] (14).

[0035] Constraints (15) and (16) establish safe spacing constraints between trains in opposite directions; and only , indicating that the down train or up train enters the station in the opposite direction; constraint (15) ensures that two trains occupying different tracks in opposite directions will not cause a conflict in the throat area; constraint (16) stipulates that the train and Occupying the same stop track The order of priority and safety interval:

[0036] (15);

[0037] (16);

[0038] in, For trains in the same direction and At the station Occupying the same stop track The order of For reverse train and At the station Occupies the same track The order of , Trains travelling in the same direction and At the station The order of arrival and departure, It is the safe interval time for trains to move in stations.

[0039] Furthermore, the interval time constraint in step S2 is:

[0040] Constraints (17) and (18) respectively stipulate that trains cannot cross the line in the up and down sections; constraints (19) and (20) respectively ensure the minimum running time of up and down trains in each section; the following is an example, Indicates that the down train is in the section The actual running time is determined by Arrival time and station The difference in the departure time of the station is obtained:

[0041] (17);

[0042] (18);

[0043] (19);

[0044] (20).

[0045] in, Representative train At the station The minimum running time.

[0046] Furthermore, the stop constraint in step S2 is:

[0047] Constraint (21) requires that if the train is scheduled to stop at a station, the adjusted train must stop at the station; constraint (22) stipulates that if the train stops at an intermediate station, the minimum stop time should be ensured to facilitate passenger boarding and disembarking and cargo loading and unloading operations:

[0048] (twenty one);

[0049] (twenty two);

[0050] (twenty three);

[0051] in, is the minimum dwell time of a train at an intermediate station.

[0052] Furthermore, the marshalling station capacity constraint in step S2 is:

[0053] Constraint (24) determines whether the planned arrival time of the freight train is later than the end time of the interference. If so, , constraint (25) according to Determine whether the train departure is later than the interference start time, if so ; Constraints (26) and (27) represent or When the train is not affected by the interference; constraint (28) means that when the train is subject to the duration limit of the marshaling yard The impact of Indicates that the freight train is affected by the disturbance; constraint (29) indicates the impact on the down-going freight train's stay time at the arrival yard when the marshaling yard capacity is limited; constraint (30) indicates the impact on the arrival time of the up-going freight train at the departure yard:

[0054] (twenty four);

[0055] (25);

[0056] (26);

[0057] (27);

[0058] (28);

[0059] (29);

[0060] (30);

[0061] in, is the interference start time, is the interference end time, Representative train Is it earlier than arrive, Representative train Is it later than leave, Assemble for freight trains, Assemble at the marshaling yard. is the additional dwelling time of freight trains at marshaling yards, For trains Whether it is affected by the limited capacity of the marshaling yard, It is the minimum dwelling time of a train in a marshaling yard.

[0062] Furthermore, the delayed delivery constraint in step S2 is:

[0063] Constraint (31) states that if the arrival time of a freight train at the destination station exceeds the delivery deadline , then the train is penalized for late delivery:

[0064] (31);

[0065] in, Whether the freight train is delayed in delivery, Set as the target station.

[0066] Furthermore, the lower bound solution in step S5 is:

[0067] .

[0068] in, is the objective function, and min() is the minimum.

[0069] Furthermore, the upper bound solution in step S5 satisfies the relaxed coupling constraint, that is, satisfies the objective function of formula (5):

[0070] ;

[0071] in, For trains The priority of Penalty for late delivery of freight trains.

[0072] The present invention has the following beneficial effects:

[0073] The present invention takes into account the internal structure of intermediate stations and marshalling yards on a bidirectional passenger and freight shared railway, allows adjustment of time, overtaking at stations, additional stop plans, change of stop plans, and use of reverse routes and stop tracks by trains, and coordinates the adjustment of train timetables and stop plans, maximizing the use of station resources while minimizing the losses caused by delays, thereby improving the line recovery capability.

[0074] The present invention establishes the constraints on marshalling yard capacity limitation and freight train delayed delivery in view of the difference in the degree of capacity limitation of marshalling yards and the transportation demand of passenger and freight trains. During the adjustment process, the demands of passenger trains and freight trains are balanced, and the impact of different train priorities is taken into consideration. The robustness of the operation adjustment of passenger and freight co-line railway trains in the face of interference is comprehensively improved, thereby reducing the total cost of line operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0075] In order to more clearly illustrate the specific implementation of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings required for the specific implementation or the prior art description. Obviously, the drawings described below are some implementations of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0076] Figure 1 A flow chart of a method for coordinated adjustment of a train operation diagram and a stop plan of the present invention is shown. DETAILED DESCRIPTION

[0077] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0078] like Figure 1 A method for coordinated adjustment of a train operation diagram and a stop plan is shown, and specifically comprises the following steps:

[0079] S1, construct a collaborative scheduling model including: planned operation diagram, train priority, train running direction, marshaling yard restricted duration and marshaling yard restricted degree, and input the collaborative scheduling model into the Lagrangian relaxation algorithm.

[0080] S2, setting constraints, including: track allocation constraints, adjustment time constraints, safety interval constraints, interval time constraints, stop constraints, marshalling yard capacity constraints and delayed delivery constraints.

[0081] S3, initialize the basic parameters of the Lagrangian relaxation algorithm, including: the current number of iterations =0, maximum number of iterations , the initial Lagrange multiplier =0, relative gap and stop threshold ,in Is a positive number .

[0082] S4, by relaxing the coupling constraints, the cooperative scheduling model under the constraints is decomposed into an upstream sub-problem and a downstream sub-problem. The upstream sub-problem refers to the problem of coordinated adjustment of the upstream train operation diagram and the stop plan, and the downstream sub-problem is the same.

[0083] S5, use the solver CPLEX to solve the up-and-down subproblems in parallel to determine the activity sequence between trains traveling in the same direction, e.g. , and Combine the results of the uplink and downlink subproblems to generate a lower bound solution; fix the activity order between trains traveling in the same direction, and use the solver CPLEX to obtain a feasible solution that satisfies the relaxed coupling constraints to generate an upper bound solution .

[0084] S6, update the Lagrange multiplier using subgradient descent , and update the number of iterations, let .

[0085] S7, current iteration number Or the relative gap between the upper and lower bound solutions The process terminates when , otherwise returns to S4, and the solutions of the uplink and downlink subproblems of this iteration will be used as the input of the next iteration until the adjusted train operation diagram and stop plan are output.

[0086] Specifically, the track allocation constraint in step S2 is:

[0087] Constraint (1) ensures that only one train can occupy a track at a time; constraint (2) prohibits trains from occupying the main line to stop; constraint (3) indicates that when the downlink train occupies the reverse track is 0, constraint (4) means that when the up train occupies the reverse track is 0; constraint (5) defines the variable When the variable is 1, when the down train and the up train do not use the stop track and the station route in the reverse direction, is set to 1:

[0088] (1);

[0089] (2);

[0090] (3);

[0091] (4);

[0092] (5);

[0093] in, For the station track, For the station The stop track collection, Representative train Whether to occupy the stop track , Gather for the train, Gather for the station, For the station The upward lateral line collection, For the station The main line collection, For the station The downward lateral line collection, Indicates whether the freight train is delayed in delivery, Representative train Whether to occupy the stop track ; Representative train Whether to occupy the stop track , Representative train or train Whether to use the reverse pit route and track, Assemble for the down train, Assemble at the intermediate station. Assemble for the up train.

[0094] Specifically, the adjustment time constraint in step S2 is:

[0095] Constraint (6) stipulates that the arrival time of the adjusted train must be later than the planned arrival and departure time; constraint (7) stipulates that the departure time of the adjusted train must be later than the planned arrival and departure time; constraints (8) and (9) stipulate that when the train At the station Occupy stop track When, due to and is fixed, according to and Sure and ; Constraints (10) and (11) stipulate that when the train No stop track is occupied When , the arrival and departure times are set to 0, and according to constraints (8) and (9), and Also 0:

[0096] (6);

[0097] (7);

[0098] (8);

[0099] (9);

[0100] (10);

[0101] (11);

[0102] in, Represents a large positive number, Take 1000000, For trains At the station Stop track When the train arrives at No stop track is occupied hour, is 0, otherwise, Less than or equal to , not subject to constraints; For trains At the station Stop track The planned arrival time on For trains At the station Stop track The departure time on For trains At the station Stop track The planned departure time on For trains at the station Occupy stop track The operation time of the inbound route at Train at the station Occupy stop track The outbound route running time at For trains At the station Stop track The pit stop time, For trains At the station Stop track The departure time on.

[0103] Specifically, the safety interval constraint in step S2 is:

[0104] Constraints (12), (13) and (14) specify the safe interval constraints between trains in the same direction; Constraint (12) means that if trains in the same direction and Occupancy of stations Stop track , then there must be a minimum interval between the arrival time of a train and the departure time of a train; constraints (13) and (14) define the required safety interval between the arrival time and departure time of trains in the same direction, respectively, and , and This determines the order in which the above activities are carried out at the station between trains in the same direction:

[0105] (12);

[0106] (13);

[0107] (14).

[0108] Constraints (15) and (16) establish safe spacing constraints between trains in opposite directions; and only , indicating that the down train or up train enters the station in the opposite direction; constraint (15) ensures that two trains occupying different tracks in opposite directions will not cause conflict in the throat area, ensuring the minimum safe interval for their operation; constraint (16) stipulates that the train and Occupying the same stop track The order of priority and safety interval:

[0109] (15);

[0110] (16);

[0111] in, For trains in the same direction and At the station Occupying the same stop track The order of For reverse train and At the station Occupying the same stop track The order of , Trains travelling in the same direction and At the station The order of arrival and departure, It is the safe interval time for trains to move in stations.

[0112] Specifically, the interval time constraint in step S2 is:

[0113] Constraints (17) and (18) respectively stipulate that trains cannot cross the line in the up and down sections; constraints (19) and (20) respectively ensure the minimum running time of up and down trains in each section; the following is an example, Indicates that the down train is in the section The actual running time is determined by Arrival time and station The difference in the departure time of the station is obtained:

[0114] (17);

[0115] (18);

[0116] (19);

[0117] (20).

[0118] in, Representative train At the station The minimum running time.

[0119] Specifically, the stop constraint in step S2 is:

[0120] Constraint (21) requires that if the train is scheduled to stop at a station, the adjusted train must stop at the station; constraint (22) stipulates that if the train stops at an intermediate station, the minimum stop time should be ensured to facilitate passenger boarding and disembarking and cargo loading and unloading operations:

[0121] (twenty one);

[0122] (twenty two);

[0123] (twenty three);

[0124] in, is the minimum dwell time of a train at an intermediate station.

[0125] Specifically, the marshalling station capacity constraint in step S2 is:

[0126] Constraint (24) determines whether the planned arrival time of the freight train is later than the end time of the interference. If so, , constraint (25) according to Determine whether the train departure is later than the interference start time, if so ; Constraints (26) and (27) represent or When the train is not affected by the interference; constraint (28) means that when the train is subject to the duration limit of the marshaling yard The impact of Indicates that the freight train is affected by the disturbance; constraint (29) indicates the impact on the down-going freight train's stay time at the arrival yard when the marshaling yard capacity is limited; constraint (30) indicates the impact on the arrival time of the up-going freight train at the departure yard. In addition, trains that do not stop at the marshaling yard are not affected by the capacity limitation, such as passenger trains or some direct freight trains:

[0127] (twenty four);

[0128] (25);

[0129] (26);

[0130] (27);

[0131] (28);

[0132] (29);

[0133] (30);

[0134] in, is the interference start time, is the interference end time, Representative train Is it earlier than arrive, Representative train Is it later than leave, Assemble for freight trains, Assemble at the marshaling yard. is the additional dwelling time of freight trains at marshaling yards, For trains Whether it is affected by the limited capacity of the marshaling yard, It is the minimum dwelling time of a train in a marshaling yard.

[0135] Specifically, the delayed delivery constraint in step S2 is:

[0136] Constraint (31) states that if the arrival time of a freight train at the destination station exceeds the delivery deadline , then the train is penalized for late delivery:

[0137] (31);

[0138] in, Whether the freight train is delayed in delivery, Set as the target station.

[0139] Specifically, the lower bound solution in step S5 is:

[0140] .

[0141] in, is the objective function, and min() is the minimum.

[0142] Specifically, the upper bound solution in step S5 satisfies the relaxed coupling constraint, that is, satisfies the objective function constrained by formula (5):

[0143] ;

[0144] in, For trains The priority of Penalty for late delivery of freight trains.

[0145] The objective function is also an upper bound solution, which aims to minimize the priority-weighted train delays and freight train overdue penalties. and Represents trains At the station arrival and departure delays. For trains When a freight train fails to meet its delivery target, the penalty applied is determined by express.

[0146] According to the above objective function and constraints, the collaborative adjustment model can be obtained, as shown in formula (32):

[0147] (32).

[0148] In order to illustrate the beneficial effects of the present invention, data from a passenger-freight railway line and train operation data from 6:00 to 16:00 in a day are selected as examples for demonstration. There are 7 stations in total, and a railway station is used as a marshaling yard. There are 29 up and down trains running on the line (15 up and 14 down). It is set to 9:00 to 14:00, and the additional unmarshaling time of freight trains is 15 minutes. The information such as the train-related priority and direction is shown in Table 1. The operation diagram and stop plan diagram adjusted based on the collaborative adjustment model (32) of the present invention are obtained. When the marshaling yard capacity is limited and the passenger and freight co-line railway train deviates from the established operation plan, the train operation diagram and stop plan collaborative adjustment method proposed by the present invention is used to obtain the adjusted train operation diagram and stop plan, thereby reducing the efficiency and cost losses caused by the limited marshaling yard capacity and enhancing the robustness of the passenger and freight co-line railway dispatching system.

[0149] Table 1 Train related priority and direction information table

[0150] .

[0151] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.

Claims

1. A method for coordinated adjustment of a train operation diagram and a stop plan, characterized in that: The specific steps include: S1, constructing a collaborative scheduling model including: a planned operation diagram, train priority, train running direction, marshaling yard restricted duration and marshaling yard restricted degree, and inputting the collaborative scheduling model into the Lagrangian relaxation algorithm; S2, setting constraints, including: track allocation constraints, adjustment time constraints, safety interval constraints, interval time constraints, stop constraints, marshalling yard capacity constraints and delayed delivery constraints; S3, initialize the basic parameters of the Lagrangian relaxation algorithm, including: the current number of iterations =0, maximum number of iterations , the initial Lagrange multiplier =0, relative gap and stop threshold ; S4, decompose the cooperative scheduling model under constraints into upstream subproblems and downstream subproblems; S5, use the solver CPLEX to solve the up and down subproblems in parallel, combine the results of the up and down subproblems, and generate the lower bound solution; fix the activity order between trains running in the same direction, and use the solver CPLEX to obtain a feasible solution that satisfies the relaxed coupling constraints, that is, generate the upper bound solution ; S6, update the Lagrange multiplier using subgradient descent , and update the number of iterations, let ; S7, current iteration number Or the relative gap between the upper and lower bound solutions The process terminates when the output is 0, otherwise it returns to S4 until the adjusted train operation diagram and stop plan are output; The track allocation constraints in step S2 are: Constraint (1) ensures that only one train can occupy a track at a time; constraint (2) prohibits trains from occupying the main line to stop at a station; constraint (3) indicates that when the downlink train occupies the reverse track is 0, constraint (4) means that when the up train occupies the reverse track is 0; constraint (5) defines the variable When the variable is 1, when the down train and the up train do not use the stop track and the station route in the reverse direction, is set to 1: (1); (2); (3); (4); (5); in, For the station track, For the station The stop track collection, Representative train Whether to occupy the stop track , Gather for the train, Gather for the station, For the station The upward lateral line collection, For the station The main line collection, For the station The downward lateral line collection, Indicates whether the freight train is delayed in delivery, Representative train Whether to occupy the stop track ; Representative train Whether to occupy the stop track , Representative train or train Whether to use the reverse pit route and track, Assemble for the down train, Assemble at the intermediate station. Assemble for the up train; The adjustment time constraint in step S2 is: Constraint (6) stipulates that the arrival time of the adjusted train must be later than the planned arrival and departure time; constraint (7) stipulates that the departure time of the adjusted train must be later than the planned arrival and departure time; constraints (8) and (9) stipulate that when the train At the station Occupy stop track When, due to and is fixed, according to and Sure and ; Constraints (10) and (11) stipulate that when the train No track occupied When , the arrival and departure times are set to 0, and according to constraints (8) and (9), and Also 0: (6); (7); (8); (9); (10); (11); in, Represents a positive number, Take 1000000, For trains At the station Stop track The arrival time on For trains At the station Stop track The planned arrival time on For trains At the station Stop track The departure time on For trains At the station Stop track The planned departure time on For trains at the station Occupy stop track The operation time of the inbound route at Train at the station Occupy stop track The outbound route operation time at For trains At the station Stop track The pit stop time, For trains At the station Stop track The departure time on The safety interval constraint in step S2 is: Constraints (12), (13) and (14) specify the safe interval constraints between trains in the same direction; Constraint (12) means that if trains in the same direction and Occupancy of stations Stop track , then there must be a minimum interval between the arrival time of a train and the departure time of a train; constraints (13) and (14) define the required safety interval between the arrival time and departure time of trains in the same direction respectively: (12); (13); (14); Constraints (15) and (16) establish safe spacing constraints between trains in opposite directions; and only , indicating that the down train or up train enters the station in the opposite direction; constraint (15) ensures that two trains occupying different tracks in opposite directions will not cause a conflict in the throat area; constraint (16) stipulates that the train and Occupying the same stop track The order of priority and safety interval: (15); (16); in, For trains in the same direction and At the station Occupying the same stop track The order of For reverse train and At the station Occupies the same track The order of , Trains travelling in the same direction and At the station The order of arrival and departure, It is the safe interval time for trains to move in stations; The interval time constraint in step S2 is: Constraints (17) and (18) respectively stipulate that trains cannot cross the line in the up and down sections; constraints (19) and (20) respectively ensure the minimum running time of up and down trains in each section; the following is an example, Indicates that the down train is in the section The actual running time is determined by Arrival time and station The difference in the departure time of the station is obtained: (17); (18); (19); (20); in, Representative train At the station The minimum running time of The stop constraints in step S2 are: Constraint (21) requires that if the train is scheduled to stop at a station, the adjusted train must stop at the station; constraint (22) stipulates that if the train stops at an intermediate station, the minimum stop time should be ensured to facilitate passenger boarding and disembarking and cargo loading and unloading operations: (21); (22); (23); in, is the minimum dwelling time of the train at an intermediate station; The marshaling yard capacity constraint in step S2 is: Constraint (24) determines whether the planned arrival time of the freight train is later than the end time of the interference. If so, , constraint (25) according to Determine whether the train departure is later than the interference start time, if so ; Constraints (26) and (27) represent or When the train is not affected by the interference; constraint (28) means that when the train is subject to the duration limit of the marshaling yard The impact of Indicates that the freight train is affected by the disturbance; constraint (29) indicates the impact on the down-going freight train's stay time at the arrival yard when the marshaling yard capacity is limited; constraint (30) indicates the impact on the arrival time of the up-going freight train at the departure yard: (24); (25); (26); (27); (28); (29); (30); in, is the interference start time, is the end time of the interference, Representative train Is it earlier than arrive, Representative train Is it later than leave, Assemble for freight trains, Assemble at the marshaling yard. is the additional dwelling time of freight trains at marshaling yards, For trains Whether it is affected by the limited capacity of the marshaling yard, is the minimum dwelling time of the train at the marshaling yard; The delayed delivery constraint in step S2 is: Constraint (31) states that if the arrival time of a freight train at the destination station exceeds the delivery deadline , then the train is penalized for late delivery: (31); in, Whether the freight train is delayed in delivery, Assemble for the target station; The upper bound solution in step S5 satisfies the relaxed coupling constraint, that is, the objective function that satisfies the constraint of formula (5): ; in, For trains The priority of Penalty for late delivery of freight trains.

2. A method for coordinated adjustment of a train operation diagram and a stop plan according to claim 1, characterized in that: The lower bound solution in step S5 is: ; in, is the objective function, and min() is the minimum.

Citation Information

Patent Citations

  • Passenger and freight car collinear running diagram optimization method considering interval forbidding conditions

    CN115688974A

  • Multi-plan cooperative adjustment method and system for high-speed rail train

    CN117314048A