Energy management method for energy storage system

By predicting the power generation power and power consumption of photovoltaic power stations and judging the surplus power, the problem of reducing the life of the energy storage system caused by frequent charging of small and medium-sized photovoltaic power stations is solved, and a longer service life of the equipment is achieved.

CN118646040BActive Publication Date: 2024-11-01FAROE ELECTRIC POWER (ZHEJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411122800.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-01
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

The frequent charging caused by small and medium-sized photovoltaic power stations when the power generation power is close to the power used, reducing the life of the energy storage system.

Method used

By predicting the power generation and power consumption of photovoltaic power stations, a prediction curve is constructed to determine whether the surplus power in the current time is greater than the charging standard. If so, a charging signal will be sent to avoid frequent charging.

Benefits of technology

It effectively avoids data jumps when predicting the power generation is close to the power used, slows down the loss of the energy storage system and extends its service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118646040B_ABST
    Figure CN118646040B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of photovoltaic power generation, and specifically discloses an energy management method for an energy storage system. The energy management method for the energy storage system comprises the following steps: predicting the power generation of a photovoltaic power station to obtain a predicted power generation, and constructing a predicted power generation curve. Correcting the predicted power generation curve to obtain a corrected predicted curve. Predicting the power consumption of the photovoltaic power station and constructing a predicted power consumption curve. And judging whether the predicted power generation is less than the predicted power consumption within the current time, if not, judging whether the current energy storage system is in a charging state, if yes, continuing to charge, if not, judging whether the current surplus power is greater than a preset charging standard power, if yes, sending a charging signal, if not, not sending a charging signal. By calculating the current surplus power, the loss of the energy storage system can be slowed down, thereby extending the service life of the energy storage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to an energy management method for an energy storage system. Background Art

[0002] Photovoltaic power station is a facility that uses solar photovoltaic panels to convert sunlight into electrical energy. Here are some introductions to photovoltaic power stations: Principle: The working principle of photovoltaic power stations is based on the photoelectric effect. After absorbing sunlight, solar photovoltaic panels generate electron-hole pairs, and the electron-hole pairs are separated and recombined inside the battery. In this process, a weak current is generated, which can be processed by a power conversion device (such as an inverter) to output clean electrical energy. Structural composition: Photovoltaic power stations are mainly composed of the following parts: Ground or rooftop solar photovoltaic panels: used to receive and convert sunlight energy. Power conversion device: such as an inverter, which converts direct current into alternating current. Control system: monitors and controls the operation of photovoltaic power stations, including functions such as maximum power point tracking (MPPT). Bracket and mounting system: used to fix and install photovoltaic modules, as well as lines connected to the power grid. Monitoring system: real-time monitoring and control of the operating status of photovoltaic power stations, as well as collection and analysis of relevant data. Type: According to the different installation methods of photovoltaic modules, photovoltaic power stations can be divided into ground photovoltaic power stations and rooftop photovoltaic power stations. Scale: The scale of photovoltaic power stations can range from small to large. Common ones include large ground photovoltaic power stations, medium-sized rooftop photovoltaic power stations and small distributed photovoltaic power stations. Advantages: Photovoltaic power stations have obvious advantages in many aspects, such as environmental protection, renewable energy, and saving fossil fuels. With the continuous advancement of technology, the cost of photovoltaic power stations is gradually decreasing, making them more and more valued. In short, as a clean energy facility, photovoltaic power stations have broad development prospects.

[0003] Existing small and medium-sized photovoltaic power stations basically supply and sell their own electricity. They connect surplus electricity to the grid when their own needs are met. When the generated power is close to the power consumption, there will be two data jumps and interlacing, resulting in frequent charging and reducing the life of the energy storage system. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides an energy management method of an energy storage system, which is used for energy storage management of photovoltaic power stations, and is particularly suitable for small and medium-sized photovoltaic power stations. Small and medium-sized photovoltaic power stations generally have independent energy storage systems and power consumption systems. The energy management method of the energy storage system includes the following steps:

[0005] S1: Predict the power generation of the photovoltaic power station to obtain the predicted power generation P i', and construct a predicted power generation curve within a preset period, where i is the number of each time point within the preset period;

[0006] S2: Correcting the predicted power generation curve to obtain a corrected predicted curve;

[0007] S3: Predict the power consumption of the photovoltaic power station to obtain the predicted power consumption q i ', construct a predicted power consumption curve within the preset period;

[0008] S4: implant the corrected prediction curve and the predicted power consumption curve into a plane coordinate, and determine whether the predicted power generation power in the current time is less than the predicted power consumption power. If so, do not send a charging signal or disconnect the power supply of the energy storage system; if not, execute S5;

[0009] S5: Determine whether the current energy storage system is in a charging state. If yes, continue charging. If no, execute S6;

[0010] S6: Determine whether the current surplus power Q is greater than a preset charging standard power Q 标 If yes, a charging signal is sent, and if no, no charging signal is sent; the current surplus power Q calculation method includes: marking the intersection of the modified prediction curve and the predicted power consumption curve, defining the part surrounded by the curve where the predicted power generation power is greater than the predicted power consumption as a surplus area, and calculating the surplus area at the current time point to obtain the current surplus power , where a is the current time point, b is the end point of the surplus area, P is the ordinate electricity corresponding to the modified forecast curve, and q is the ordinate electricity corresponding to the forecast power curve.

[0011] Preferably, the preset period is one of year, quarter, month, ten days, week, day or hour.

[0012] Preferably, the preset period is a day.

[0013] Preferably: the preset period is hours.

[0014] Preferably, the method for correcting the predicted power generation curve includes: obtaining the actual power generation P of the current photovoltaic power station i ; Then calculate the deviation power generation based on the predicted power generation and the actual power generation , the deviation power generation , and then generate power according to the deviation , calculate the deviation power generation at the predicted time point , where k is the time period number from the current time point to the predicted time point; calculate and obtain the corrected power generation Then, the corrected power generation Pi+K'' is implanted into the coordinate system with the horizontal axis as the time point and the vertical axis as the electric power in chronological order to obtain the corrected prediction curve.

[0015] Preferably: the calculation method of the deviation power generation at the predicted time point includes: constructing a plane coordinate system, the plane coordinate system takes the time point of the preset period as the horizontal coordinate and the power generation power P as the vertical coordinate, implanting the deviation power generation according to time, connecting each point to form a deviation curve, and then obtaining the deviation power generation ,in is the derivative of the deviation curve at the current time point, T k is the length of the time period from the predicted time point to the current time point, and K is the number corresponding to the peak illumination time point.

[0016] Preferably: the predicted power consumption q i The calculation method of ' comprises: constructing a plane coordinate system, wherein the horizontal coordinate of the plane coordinate system is the time point of the preset period, and the vertical coordinate is the electric power; according to a pre-constructed power consumption schedule, obtaining the power consumption equipment and power P at each time point in the preset period m , loss P m ' and quantity; then calculate the power consumption q at the time point i '.

[0017] Preferably: the predicted power consumption , where m is the number of each electrical appliance type, M is the total number of electrical appliance types, m=1, 2, ┈, M; s is the type number of the electrical appliance used at the calculation time point. ε is the circuit adjustment coefficient, N s The number of electrical appliances currently in use.

[0018] Preferably: the predicted power consumption is implanted into a plane coordinate system according to time to obtain a power consumption curve, the horizontal coordinate of the plane coordinate system is each time point in the calculation period, the vertical coordinate is the power, and the power consumption curve is used as the predicted power consumption curve.

[0019] Preferably: the predicted electric power is implanted into a plane coordinate system according to time to obtain an electric power curve, the horizontal coordinate of the plane coordinate system is each time point within the calculation period, the vertical coordinate is the electric power, and the electric power curve is optimized to serve as the predicted electric power curve; the electric power curve optimization method includes: obtaining the actual electric power at the current time point, and vertically translating the electric power curve to the actual electric power to obtain the predicted electric power curve.

[0020] Preferred: The factors affecting the power generation of photovoltaic power stations mainly include: equipment performance factors and environmental performance factors. Environmental performance factors may include temperature factors, solar radiation factors, irradiation angle factors and dust coverage factors. These factors are changing every day or even every moment, but can be obtained based on the detection of the external environment. The data value of the temperature factor can be obtained through the weather forecast to obtain real-time data and real-time solar radiation to calculate the internal temperature of the solar panel. The solar radiation data value can also be obtained through the weather forecast. Specifically, it can be obtained by looking up the local meteorological bureau to obtain the weather forecast weekly report, etc., of course, it can also be directly detected and predicted, and the specific details are not repeated here. The irradiation angle data value can be calculated based on the local specific time and the solar irradiation angle and the installation angle of the solar panel. For the same location, with one year as a cycle, the solar irradiation angle is fixed every day, so we can calculate it. For the dust coverage factor data value, we can assume that its value will not change if there is no special weather between the current and the previous day. Of course, it can also be calculated, which is the dust count per unit area. By predicting the data values ​​of the above factors, it is easy for us to predict the power generation of the photovoltaic power station.

[0021] Preferably: the predicted power generation , where i is the number of each time point in the preset period; j is the number of the environmental performance factor, J is the total number of environmental performance factors, j=1, 2, ┈, J; ɑ j i is the data value corresponding to the environmental performance factor numbered j and the time point numbered i. S is the total effective area of ​​the photovoltaic panels of the photovoltaic power station, which can be calculated by the unit area and number of photovoltaic panels. β is the data value of the equipment performance factor, which can be obtained by calculating the equipment parameters or by experiments. Then construct a plane coordinate system with the time point of the preset period as the horizontal coordinate and the electric power as the vertical coordinate. The predicted power generation power we calculated is implanted into it according to time, and the various points are connected to form the predicted power generation power curve.

[0022] The technical effects and advantages of the present invention are as follows: by calculating the current surplus electricity, we can avoid frequent charging caused by the jump of two data when the predicted power generation power is close to the predicted power consumption, slow down the loss of the energy storage system, and extend the service life of the energy storage system. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic flow chart of an energy management method for an energy storage system proposed in the present invention.

[0024] Figure 2 A schematic diagram of a surplus area in an energy management method for an energy storage system proposed by the present invention. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0026] Example 1, reference Figure 1 In this embodiment, an energy management method of an energy storage system is proposed, which is used for energy storage management of photovoltaic power stations, and is particularly suitable for small and medium-sized photovoltaic power stations. Small and medium-sized photovoltaic power stations generally have independent energy storage systems and power consumption systems. The energy management method of the energy storage system may include the following steps:

[0027] S1: Predict the power generation of the photovoltaic power station to obtain the predicted power generation P i', and construct a predicted power generation curve within a preset period, where i is the number of each time point within the preset period. The preset period is a period for our management of photovoltaic power stations, which can be years, quarters, months, ten days, weeks, days or hours, among which it is most reasonable to use days as a preset period. The power generation of photovoltaic power stations in a day changes with the changes in the external environment. The power generation of power stations will cycle with days as a cycle, so it is more appropriate to use days as a preset period. When accurate calculations are required or the amount of calculations needs to be reduced, hours can also be used as preset periods, which will not be described in detail here. This embodiment takes days as a cycle as an example, and the power generation of photovoltaic power stations every day can be counted from the early morning as the starting point. The power generation starts at basically zero, gradually increases from the rise of the sun, and then slowly falls in the afternoon, and returns to a level close to zero at night. Therefore, it is relatively appropriate to use days as a preset period, with a small amount of calculation and a relatively accurate calculation result. The factors affecting the power generation of photovoltaic power stations mainly include: equipment performance factors and environmental performance factors, and equipment performance factors mainly include photovoltaic panel performance factors, relay performance factors and circuit performance factors. The performance factor of photovoltaic panels is mainly the efficiency of photovoltaic panels absorbing sunlight and converting it into electrical energy. It is the performance of the photovoltaic panels themselves. It will decrease slightly with the use of photovoltaic panels, but the change in a short period of time is not large, so it can be considered as a fixed value, and its specific value is generally 19%-21%. The relay performance factor is the relay conversion efficiency, and the circuit performance factor is the efficiency of electric power transmitted by the meter, circuit, etc. We also think that its value will not change, and we will not go into details here. In summary, we can think that the value of the equipment performance factor between the preset cycles is a fixed value. The factors that affect the power generation of photovoltaic power stations only need to consider environmental performance factors. Environmental performance factors can include temperature factors, solar radiation factors, irradiation angle factors, and dust coverage factors. These factors are changing every day or even every moment, but can be obtained based on the detection of the external environment. The data value of the temperature factor can be obtained through the weather forecast to obtain real-time data and real-time solar radiation to calculate the internal temperature of the solar panel. It is a prior art and will not be described here. The solar radiation data value can also be obtained through weather forecasts. Specifically, you can find the local meteorological bureau to obtain the weekly weather forecast, etc. Of course, you can also directly detect and predict it, which will not be described in detail here. The irradiation angle data value can be calculated based on the local specific time and the sun's irradiation angle and the installation angle of the solar panel. For the same location, the sun's irradiation angle is fixed every day with one year as a cycle, so we can calculate it, which will not be described in detail here. For the dust coverage factor data value, we can assume that its value will not change if there is no special weather between the current and the previous day. Of course, it can also be calculated, which is to count the dust per unit area, which will not be described in detail here.By predicting the data values ​​of the above factors, we can easily predict the power generation of the photovoltaic power station. , where i is the number of each time point in the preset period; j is the number of the environmental performance factor, J is the total number of environmental performance factors, j=1, 2, ┈, J; ɑ j i is the data value corresponding to the time point of the environmental performance factor numbered i of numbered j. S is the total effective area of ​​the photovoltaic panels of the photovoltaic power station, which can be calculated by the unit area and number of photovoltaic panels. β is the data value of the equipment performance factor, which can be obtained by calculating the equipment parameters or by experiments, and the details are not described here. For example, in the actual operation of a photovoltaic power station, the data is counted once an hour. The total effective area S of the photovoltaic power station is 100m 2 Through the experiment, we obtained the data value β of the equipment performance factor of the photovoltaic power station as 0.15. It is now 8 o'clock in the morning, and we predict the power generation at 9 o'clock in the morning. The environmental performance factors include temperature factor, solar radiation factor, irradiation angle factor and dust coverage factor. By querying the weather forecast, the temperature at 9 o'clock is 25 degrees and the solar radiation is 600W / m 2 , the data value of the irradiation angle factor is 0.5, and the data value of the dust coverage factor is 0.95. We calculate the internal temperature of the solar panel to be 28 degrees through the current temperature and solar radiation. This calculation method can be obtained by looking up a pre-made solar radiation-temperature information table. The solar radiation-temperature information table can be obtained through the photovoltaic panel lighting experiment. The details are not repeated here. Then, by looking up the temperature-data value information table, the temperature parameter factor is obtained to be 0.92. Of course, this example is not universal, and other specific situations are not repeated here. Then we calculate the predicted power generation at 9 points as P 9 = 100 × 0.15 × 600 × 0.92 × 0.5 × 0.95 = 3.9KW. The predicted power generation calculated by this method is accurate, the data acquisition method is simple, and real-time prediction can be performed. The closer the data is to the current time point, the more accurate the prediction is, which provides a calculation basis for subsequent energy management, reduces the impact of budget deviation, and ensures budget accuracy. Then construct a plane coordinate system. This plane coordinate system uses the time point of the preset cycle as the horizontal coordinate and the electric power as the vertical coordinate. The predicted power generation power we calculated is implanted according to time, and the various points are connected to form a predicted power generation curve. The specific values ​​are not given as examples here.

[0028] S2: Correct the predicted power generation curve to obtain a corrected predicted curve. In the actual operation of a photovoltaic panel power station, as time goes by, the previously predicted data can be replaced one by one by specific actual detection data. Since there will be a slight difference between the weather forecast and the actual situation, and there will be certain errors in the calculation, there will be a difference between the predicted power generation and the actual power generation. In general, this difference will be very small, but the predicted power generation curve also needs to be corrected. The method for correcting the predicted power generation curve may include: obtaining the actual power generation P of the current photovoltaic power station i The actual power generation can be obtained through meter detection. The specific detection method is the existing technology and will not be described here. i The data obtained from the existing detection cannot directly display the power generation at subsequent time points, but it can be used based on the actual power generation P i The predicted power generation curve is corrected. Then the deviation power generation is calculated based on the predicted power generation and the actual power generation. , the deviation power generation Then construct a plane coordinate system. The plane coordinate system still uses the time point of the preset cycle as the horizontal coordinate and the electric power P as the vertical coordinate. The deviation power generation is implanted according to time, and the various points are connected to form a deviation curve, and then the deviation power generation is obtained. , where k is the time period number from the current time point to the predicted time point, is the derivative of the deviation curve at the current time point, T k To predict the length of the time period from the predicted time point to the current time point, K is the number corresponding to the peak illumination time point, and its value can be 12 under normal circumstances. The correction made by this method can be distinguished according to the increase and decrease of illumination. When the time exceeds 12, we predict that the difference between the generated power and the actual generated power will become smaller and smaller, and the actual situation is indeed the case. The prediction made by this formula just conforms to the law of power generation, and the prediction is accurate. The details will not be elaborated here. For example, the current time is nine o'clock in the morning, so i is 9 at this time. If we correct it to 13 o'clock, then k is 4 at this time. Since 9+4=13 at this time is greater than 12, 2K-2i-k=24-18-4=2. We obtain the deviation power generation by calculation is 0.1, is 0.02, then we can get =0.14. If it is 13 o'clock, the calculation can be performed directly, and the details are not repeated here. Predict the power generation and calculate the corrected power generation , and then the corrected power generation Pi+K'' is implanted into the coordinate system of the horizontal axis time point and the vertical axis power according to the time number to obtain the corrected prediction curve. Of course, we can also directly translate the predicted power generation curve on the vertical axis to obtain the corrected prediction curve, but this correction cannot take into account the changing trend of light intensity and is not as accurate as the deviation power generation calculation.

[0029] S3: Predict the power consumption of the photovoltaic power station to obtain the predicted power consumption q i ', construct the predicted power consumption curve of the preset period; the photovoltaic power station has its own power consumption system, the power generated by the photovoltaic power station is first supplied to its own power consumption system, and the excess power is stored in the energy storage system. The predicted power consumption q i The calculation method of ' may include constructing a plane coordinate system, wherein the horizontal coordinate of the plane coordinate system is the time point of the preset period, and the vertical coordinate is the electric power. Then, we can count the electric equipment of the photovoltaic power station and construct a power consumption schedule in advance, which includes the electric equipment at each time point, the power P m , loss P m ' and quantity, the name and power of each electrical equipment can be obtained from the equipment parameters, and the loss P m 'It can be obtained through experiments. Generally speaking, we believe that its power remains unchanged. As the use time changes, its loss will change, so we need to test the loss at regular intervals. The detection method is to use the appliance alone, count its power consumption, and then remove the power to obtain it. The calculation method is an existing technology and will not be described in detail here. Then calculate the power consumption at the time point , where m is the number of each type of electrical appliance, M is the total number of electrical appliance types, m=1, 2, ┈, M; s is the type number of the electrical appliance used at the calculation time point. ε is the circuit adjustment coefficient, which is generally 0.95-1.05 and can be obtained through experiments. The specific details are not repeated here. N sis the number of electrical appliances currently in use. For example, at 9 o'clock in the evening, the electrical appliances we use are lighting and water pumps. The number of lighting lamps used is 10, the power of the lighting lamps is 3W, and the loss is -0.1W. The power of the water pump is 25W, and the loss is 1W. Its circuit adjustment coefficient ε is 1. At 10 o'clock, we plan to turn off 5 lighting lamps and water pumps, and turn on 2 20W exhaust fans, whose loss is 2W, and its circuit adjustment coefficient ε is 0.99. Then we can calculate that the power consumption at 9 o'clock is 1×[(3-0.1)×10+(25+1)×1]=55W, and the power consumption at 10 o'clock is 0.99×[(3-0.1)×5+(20+2)×2]=58.06W. The power consumption corresponding to each time point is implanted into the plane coordinate system to construct a power consumption curve. At this time, the power consumption curve can be used as a predicted power consumption curve. Of course, the power consumption curve can also be optimized. The specific optimization method may include: obtaining the actual power consumption at the current time point, and vertically translating the power consumption curve to the actual power consumption, so as to obtain a predicted power consumption curve. No specific data calculation is performed here.

[0030] S4: implant the corrected prediction curve and the predicted power consumption curve into a plane coordinate, and determine whether the predicted power generation is less than the predicted power consumption in the current time. If so, do not send a charging signal or disconnect the power supply of the energy storage system; if not, execute S5. The current corrected prediction curve and predicted power consumption curve have been corrected, so the current predicted power generation and predicted power consumption are closer to the actual detection values. We correct the predicted power generation and predicted power consumption in real time so that the corrected prediction curve and the predicted power consumption curve are close to a smooth curve. We make judgments based on the predicted power generation and predicted power consumption, which is more convenient for prediction and will not cause large jumps in data. The current time can be a time point. In order to avoid the instantaneous intersection of the corrected prediction curve and the predicted power consumption curve or the slow response of the computer, we can set the current time as a time period, generally 1-10s, which can be determined according to the actual situation. The predicted power generation is less than the predicted power consumption. At this time, the power consumption of the photovoltaic panels cannot be supplied by the photovoltaic power station alone, and the power grid needs to be coordinated for power supply. Therefore, when the actual power generation is less than the actual power consumption, this state does not need to be changed, so this state does not need to be processed. There is another situation where the predicted power generation curve drops rapidly and then is less than the predicted power consumption curve. In this case, it is necessary to disconnect the energy storage system and disconnect the charging, that is, the photovoltaic power station has no power to supply the power consumption system. Specifically, it can be determined whether the energy storage system is in a charging state. If so, the energy storage system power supply is disconnected. If not, no processing is performed. The specific details are not repeated here.

[0031] S5: Determine whether the current energy storage system is in a charging state. If yes, continue charging. If not, execute S6.

[0032] S6: Determine whether the current surplus power Q is greater than a preset charging standard power Q 标 If yes, a charging signal is sent, if no, no charging signal is sent. The current surplus power Q is the predicted power generation power P i 'Greater than the predicted power consumption q i The extra power surplus, P i '-q i 'The amount of accumulation over time. Its calculation method can be obtained by modifying the prediction curve and the power consumption curve. Figure 2 Specifically, the corrected prediction curve and the predicted power consumption curve are implanted into a plane coordinate system, and then the intersection of the two curves is marked. The part surrounded by the curve where the predicted power generation is greater than the predicted power consumption is defined as the surplus area, and the surplus area at the current time point is calculated to obtain the current surplus power. , where a is the current time point and b is the end point of the surplus area. By calculating the current surplus electricity, we can avoid predicting the power generation P i 'Predicted power consumption when approaching q i ', the frequent charging caused by the instantaneous jump of the two data slows down the reduction of the life of the energy storage system. 标 It can be designed according to actual needs. Generally, it can be 0.1-1KWh. Of course, it also needs to be determined according to the specific situation. The surplus electricity that is not charged can be connected to the power grid. The details will not be elaborated here.

[0033] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.

Claims

1. An energy management method for an energy storage system, characterized in that: The energy management method of the energy storage system comprises the following steps: S1: Predict the power generation of the photovoltaic power station to obtain the predicted power generation P i ', and construct a predicted power generation curve within a preset period, where i is the number of each time point within the preset period; S2: Correcting the predicted power generation curve to obtain a corrected predicted curve; S3: Predict the power consumption of the photovoltaic power station to obtain the predicted power consumption q i ', construct a predicted power consumption curve within the preset period; S4: implant the corrected prediction curve and the predicted power consumption curve into a plane coordinate, and determine whether the predicted power generation power in the current time is less than the predicted power consumption power. If so, do not send a charging signal or disconnect the power supply of the energy storage system; if not, execute S5; S5: Determine whether the current energy storage system is in a charging state. If yes, continue charging. If no, execute S6; S6: Determine whether the current surplus power Q is greater than a preset charging standard power Q 标 , if yes, then send a charging signal, if no, then do not send a charging signal; The current surplus electricity Q calculation method includes: marking the intersection of the modified prediction curve and the predicted power consumption curve, defining the part of the curve where the predicted power generation is greater than the predicted power consumption as the surplus area, and calculating the surplus area at the current time point to obtain the current surplus electricity , where a is the current time point, b is the end point of the surplus area, P is the ordinate power corresponding to the modified forecast curve, and q is the ordinate power corresponding to the forecast power curve.

2. The energy management method of an energy storage system according to claim 1, characterized in that: The preset period is one of year, quarter, month, ten days, week, day or hour.

3. The energy management method of an energy storage system according to claim 1, characterized in that: The preset period is day.

4. The energy management method of an energy storage system according to claim 1, characterized in that: The preset period is hours.

5. The energy management method of an energy storage system according to claim 1, characterized in that: The method for correcting the predicted power generation curve includes: obtaining the actual power generation P of the current photovoltaic power station i ; Then calculate the deviation power generation based on the predicted power generation and the actual power generation , the deviation power generation , and then generate power according to the deviation , calculate the deviation power generation at the predicted time point , where k is the time period number from the current time point to the predicted time point; obtain the corrected power generation , and then correct the generated power P i+k ''Implant it into the coordinate system with the horizontal axis as the time point and the vertical axis as the electric power in chronological order to obtain the corrected prediction curve.

6. The energy management method of an energy storage system according to claim 5, characterized in that: The deviation power generation at the predicted time point The calculation method includes: constructing a plane coordinate system, the plane coordinate system takes the time point of the preset period as the horizontal coordinate and the power generation power P as the vertical coordinate, implanting the deviation power generation according to time, connecting each point to form a deviation curve, and then obtaining the deviation power generation ,in is the derivative of the deviation curve at the current time point, T k is the length of the time period from the predicted time point to the current time point, and K is the number corresponding to the peak illumination time point.

7. The energy management method of an energy storage system according to claim 1, characterized in that: The predicted power consumption q i The calculation method of ' comprises: constructing a plane coordinate system, wherein the horizontal coordinate of the plane coordinate system is the time point of the preset period, and the vertical coordinate is the electric power; according to a pre-constructed power consumption schedule, obtaining the power consumption equipment and power P at each time point in the preset period m , loss P m ' and quantity; then calculate the power consumption q at the time point i '.

8. The energy management method of an energy storage system according to claim 7, characterized in that: The predicted power consumption , where m is the number of each electrical appliance type, M is the total number of electrical appliance types, m=1, 2, ┈, M; s is the type number of the electrical appliance used at the calculation time point, ε is the circuit adjustment coefficient, N s The number of electrical appliances currently in use.

9. The energy management method of an energy storage system according to claim 8, characterized in that: The predicted power consumption is implanted into a plane coordinate system according to time to obtain a power consumption curve. The horizontal coordinate of the plane coordinate system is each time point in the calculation cycle, and the vertical coordinate is the power. The power consumption curve is used as the predicted power consumption curve.

10. The energy management method of an energy storage system according to claim 8, characterized in that: The predicted power consumption is implanted into a plane coordinate system according to time to obtain a power consumption curve. The horizontal coordinate of the plane coordinate system is each time point within a calculation period, and the vertical coordinate is the power. The power consumption curve is optimized to serve as a predicted power consumption curve. The power consumption curve optimization method includes: obtaining the actual power consumption at the current time point, and vertically translating the power consumption curve to the actual power consumption to obtain a predicted power consumption curve.