Integrated electric control cabinet and data processing method for township sewage project
Through the analysis of sewage concentration and dispensing proportion data, the optimal dispensing ratio range is identified and the standard sewage concentration is locked, the problems of inaccurate monitoring and poor treatment effect during sewage treatment are solved, and efficient and accurate sewage concentration treatment is achieved. .
Patent Information
- Application Number
- CN202411190710.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-28
AI Technical Summary
In the prior art, inaccurate monitoring of sewage concentrations in the sewage treatment process leads to the failure to achieve the best condition of the treatment effect, and the real-time data abnormal detection accuracy is insufficient.
Through the data processing method of integrated electrical control cabinets for township sewage projects, different sewage concentration data and drug distribution proportion data are confirmed, the best drug distribution ratio range in similar treatments are identified, and the standard concentration of locked sewage is controlled based on periodic monitoring.
It improves the accuracy and overall effect of sewage concentration control, so that sewage can be treated as soon as possible, ensuring that the treatment effect reaches the best state.
Smart Images

Figure CN118702179B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment, and in particular to an integrated electric control cabinet and a data processing method for a township sewage project. Background Art
[0002] In view of the difficulty of land acquisition and land shortage in township and rural domestic sewage projects, in the process of sewage treatment, the sewage concentration is generally monitored by setting up relevant integrated electric control cabinets, and then the medicine is dispensed based on the relevant dispensing devices set inside the electric control cabinets, and the sewage is treated based on the dispensing;
[0003] The application with publication number CN117312617B discloses a real-time sewage treatment method and system based on sewage data monitoring, including: obtaining local segments, first sewage monitoring real-time data and adjacent sewage monitoring real-time data; obtaining the noise level of sewage monitoring real-time data according to local segments; obtaining the abnormal coefficient of data type; obtaining the adjusted K-neighborhood distance of the first sewage monitoring real-time data, performing abnormal detection on the first sewage monitoring real-time data and adjacent sewage monitoring real-time data, obtaining local outlier factors, marking abnormal sewage data according to the local outlier factors, and realizing real-time sewage treatment monitoring. The present invention solves the problem of insufficient accuracy of real-time sewage anomaly detection caused by the real-time increase of sewage monitoring data weakening the performance of abnormal values in sewage monitoring data in all sewage monitoring data.
[0004] In the process of sewage treatment by the relevant electric control cabinet, the corresponding proportion of medicine is generally determined based on the corresponding proportion of sewage concentration, and the sewage is treated in real time. However, this method does not conduct detailed data analysis. The different sewage concentrations have the best purification process in the past data, and the relevant medicine dispensing process exists simultaneously. The sewage concentration is in a state of constant change. Therefore, the monitored sewage concentration is inaccurate during the monitoring process. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides an integrated electric control cabinet and a data processing method for township sewage projects, which solves the problem that the sewage concentration is not in the best state during the treatment process.
[0006] To achieve the above purpose, the present invention is implemented by the following technical scheme: a data processing method for an integrated electric control cabinet for a township sewage project, comprising the following steps:
[0007] S1. Confirm the sewage concentration related processing data of the integrated electric control cabinet in different past processing processes in turn, where the sewage concentration related processing data includes: the treated sewage concentration data and the relevant drug proportion data, and confirm the relevant treatment time of different sewage concentration data in turn, and confirm the same process from different processing processes. The specific sub-steps are:
[0008] S11. Confirm the initial data of the sewage concentration data in the relevant treatment process and calibrate it as C i , where i represents different processing processes, and the relevant drug proportion data used in the corresponding processing process is calibrated as P i ;
[0009] S12. Based on the sewage concentration data corresponding to different moments in the relevant treatment process, when the sewage concentration data is ≤Y1, a treatment completion signal is generated, where Y1 is a preset value, and the initial time of treatment is confirmed. From the initial time to the generation of the treatment completion signal, the relevant time length of the corresponding time is confirmed, and this relevant time length is calibrated as the relevant treatment time of this treatment process;
[0010] S13, from different processing processes, the initial data C i The same processing processes are calibrated as similar processes;
[0011] S2. Conduct correlation analysis on the confirmed similar processes, identify the relevant treatment time corresponding to different relevant medication ratio data from the similar processes, and identify the optimal medication ratio interval associated with the similar processes based on the correlation trends between different values. The specific method is as follows:
[0012] S21. Determine the initial data C of this similar process i , and then mark the different relevant drug proportion data in the same process as P i-k , where i represents different processing processes, k represents different relevant prescription proportion data, and then different P i-k The corresponding governance time is denoted as SS i-k ;
[0013] S22, according to different P i-k Corresponding to different SS i-k , generate its related governance time change curve, the horizontal coordinate of the change curve is the related medicine proportion data, and the vertical coordinate is the related governance time;
[0014] S23, according to the preset correlation value X1, the correlation range is from [0, X1] to [P i-k max-X1,P i-k max] changes, where P i-kmax is the maximum value of the corresponding proportion of relevant medication in the relevant governance time change curve. According to the real-time changing correlation range, some line segments within the correlation range of the corresponding change stage are marked as correlation segments:
[0015] Identify the lowest relevant governance time SS of its associated segment i-k min, and synchronize the several groups of related governance time SS associated with this associated segment i-k Perform variance processing to determine the variance Fc belonging to this associated line segment;
[0016] Based on the SS confirmed by this association segment i-k min and Fc, lock the relevant features Tz of the associated line segment, where Tz=SS i-k min×C1+Fc×C2, where C1 and C2 are both preset fixed coefficient factors, and then confirm the relevant features Tz corresponding to other associated segments one by one, and select the maximum value from several groups of related features Tz, and mark the associated segment corresponding to the maximum value as the best segment, identify the relevant prescription ratio data corresponding to the endpoint of the best segment, and determine the initial data C i The optimal drug ratio interval;
[0017] S24, for the initial data corresponding to other similar processes, the same execution method as in steps S21-S23 is adopted to confirm the optimal drug ratio interval associated with each different initial data one by one;
[0018] S3. At the beginning of the sewage treatment process in this stage, a set of monitoring cycles is determined, and the sewage concentration is monitored. Based on the sewage concentration monitoring curve generated within this monitoring cycle, the sewage standard concentration of the sewage in this stage is locked. The specific method is:
[0019] S31. Based on the set monitoring period T, where T is a preset value, confirm the sewage concentration monitoring curve generated within the monitoring period T, where the horizontal coordinate axis of the curve is the timeline and the vertical coordinate axis is the sewage concentration;
[0020] S32, starting from the initial point of the sewage concentration monitoring curve, identify the difference Cz of sewage concentration between the initial point and the subsequent adjacent points. If the difference Cz satisfies: |Cz|≤Y2, mark the subsequent adjacent points as the subsidiary points of the initial point, and then use the same identification method to determine whether the subsequent adjacent points of this subsidiary point are the subsidiary points of this point, and stop when the subsequently determined points are not the subsidiary points of the previous group of points, and mark the line segments associated with the initial point and the consecutive subsidiary points as the same type of line segments;
[0021] If |Cz|>Y2, the auxiliary point will not be calibrated, and starting from this point, identify whether the subsequent adjacent points of this point are auxiliary points of this point, confirm the line segments associated with the consecutive auxiliary points and calibrate them as the same type of line segments;
[0022] After the first group of similar line segments are determined, the subsequent points are processed in the same way, and the similar line segments that appear in succession are determined one by one;
[0023] S33, from the confirmed groups of similar line segments, select a group of similar line segments with the longest line length as calibration line segments, and average the several groups of sewage concentrations associated with the calibration line segments to determine the sewage standard concentration of the sewage at this stage;
[0024] S4. Based on the determined sewage standard concentration, confirm the initial data that is the same as the sewage standard concentration, and lock the optimal dosage ratio interval based on the confirmed initial data. Then, perform relevant dosage based on the data associated with the optimal dosage ratio interval to comprehensively treat the sewage in this stage.
[0025] Preferably, in step S23, if there are multiple groups of maximum values in the relevant feature Tz, a group of optimal line segments is randomly selected from the multiple groups of associated line segments.
[0026] Preferably, in step S33, if there are multiple groups of similar line segments whose lengths are not only the longest synchronization line length but also equal, then a group of line segments is randomly selected from the multiple groups of similar line segments as the calibration line segments.
[0027] Preferably, the integrated electric control cabinet for township sewage project includes:
[0028] On the past data analysis side, the sewage concentration-related treatment data in different past treatment processes are confirmed one by one, and the relevant treatment time of different sewage concentration data is confirmed one by one, and similar processes are confirmed from different treatment processes;
[0029] The drug ratio confirmation end performs correlation analysis on the confirmed similar processes, identifies the relevant governance time corresponding to different relevant drug ratio data from the similar processes, and identifies the optimal drug ratio interval associated with the similar processes based on the correlation trends between different values;
[0030] The sewage concentration confirmation end determines a set of monitoring cycles, monitors the sewage concentration of this stage, and locks the sewage standard concentration of the sewage in this stage based on the sewage concentration monitoring curve generated within this monitoring cycle;
[0031] The data output end, based on the determined sewage standard concentration, confirms the initial data that is the same as the sewage standard concentration, and locks the optimal dosage ratio range based on the confirmed initial data, and displays the confirmed optimal dosage ratio range through the display end.
[0032] The present invention provides an integrated electric control cabinet and data processing method for township sewage projects. Compared with the prior art, it has the following beneficial effects:
[0033] The present invention identifies the treatment time generated by different concentration data under different drug ratios from past sewage concentration treatment data, and then confirms the relevant treatment data of sewage concentration in the same process one by one based on the different treatment times associated with different drug ratio data, and performs range confirmation from the confirmed relevant data, and confirms the partial line segments associated with each different range, and then performs relevant confirmation on the relevant features of the partial line segments, selects the best line segment from several groups of related line segments, and locks the best drug ratio interval from the best line segment, based on the data processing process performed layer by layer, so that the accuracy of the processed interval reaches the best state, which is convenient for the overall effect of subsequent sewage concentration treatment;
[0034] When confirming the sewage concentration during the treatment process, the periodic monitoring method is adopted, and the monitoring curve generated during the periodic monitoring process is confirmed. The monitoring curve is subjected to correlation analysis, and the most standard sewage concentration is locked from the specific analysis results. Subsequently, based on the determined sewage concentration, the corresponding optimal dosage ratio interval is selected, and the relevant sewage concentration treatment is carried out based on the selected dosage ratio interval, so as to fully guarantee the overall effect of sewage concentration treatment and enable the sewage to complete the relevant treatment in the fastest time. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the process of the present invention;
[0036] Figure 2 It is a schematic diagram of the principle framework of the present invention. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] Embodiment 1
[0039] See also Figure 1 , this application provides a data processing method for an integrated electric control cabinet for a township sewage project, comprising the following steps:
[0040] S1. Confirm the sewage concentration-related treatment data of the integrated electric control cabinet in different past treatment processes in turn, where the sewage concentration-related treatment data include: the sewage concentration data to be treated and the relevant drug proportion data, and confirm the relevant treatment time of different sewage concentration data in turn, and confirm the same process from different treatment processes. Specifically, the sewage concentration data is the sewage concentration proportion data before treatment, that is, the specific content of internal pollutants, and the relevant drug proportion data is the concentration proportion data of the corresponding agent in the treatment process, that is, the specific content of the relevant treatment agent. Then, during treatment, the corresponding relevant treatment time will be generated, and the relevant treatment time is the specific duration when the corresponding sewage concentration data meets the standard;
[0041] Among them, the specific sub-steps for confirming the relevant treatment time of different sewage concentration data are:
[0042] S11. Confirm the initial data of the sewage concentration data in the relevant treatment process and calibrate it as C i , where i represents different processing processes, and the relevant drug proportion data used in the corresponding processing process is calibrated as P i ;
[0043] S12. Based on the sewage concentration data corresponding to different moments in the relevant treatment process, when the sewage concentration data is ≤Y1, a treatment completion signal is generated, wherein Y1 is a preset value, and its specific value is determined by the operator based on experience, which is the standard value of sewage concentration. The initial moment of treatment is confirmed, and the relevant duration of the corresponding moment from the initial moment to the generation of the treatment completion signal is confirmed, and this relevant duration is calibrated as the relevant treatment time of this treatment process;
[0044] S13, from different processing processes, the initial data C i The same processing processes are calibrated as similar processes;
[0045] Specifically, in order to facilitate the subsequent confirmation of the optimal dosage ratio range, it is necessary to identify which processes have shorter processing time in the processing of similar concentration data, so as to identify better treatment results, and from the better treatment results, identify the optimal dosage ratio range corresponding to the corresponding sewage concentration.
[0046] S2. Conduct correlation analysis on the confirmed similar processes, identify the relevant treatment time corresponding to different relevant drug proportion data from the similar processes, and identify the best drug proportion interval associated with the similar processes based on the relevant trends between different values. Specifically, each different similar process corresponds to different initial data, that is, the initial data of sewage concentration data. When treating different initial data, there are multiple different relevant drug proportion data. In this case, the relevant data has a better performance in the sewage treatment process, so the best drug proportion interval is selected;
[0047] The specific sub-steps of identification include:
[0048] S21. Determine the initial data C of this similar process i , and then mark the different relevant drug proportion data in the same process as P i-k , where i represents different processing processes (i.e., similar processes), k represents different relevant prescription proportion data, and then different P i-k The corresponding governance time is denoted as SS i-k ;
[0049] S22, according to different P i-k Corresponding to different SS i-k , generate its related governance time change curve, the horizontal coordinate of the change curve is the related medication proportion data, and the vertical coordinate is the related governance time;
[0050] S23, according to the preset correlation value X1, wherein the specific value of X1 is determined by the operator based on experience, and its correlation range is from [0, X1] to [P i-k max-X1,P i-k max] changes, where P i-k max is the maximum value of the corresponding proportion of relevant medication in the relevant governance time change curve. According to the real-time changing correlation range, some line segments within the correlation range of the corresponding change stage are marked as correlation segments:
[0051] Identify the lowest relevant governance time SS of its associated segment i-k min, and synchronize the several groups of related governance time SS associated with this associated segment i-kVariance processing is performed to determine the variance Fc of this associated line segment. Specifically, the associated line segment is associated with n groups of related governance time, and the mean value of the n groups of related governance time is Jz. The square value of the difference between a single group of related governance time and Jz is preferentially confirmed, and the n groups of square values are summed to determine the total value, and then the total value is squared to determine the variance Fc of this associated line segment. Different associated line segments correspond to several groups of different governance time. Variance processing of several groups of different data is relatively common in the prior art, so it will not be described in detail here.
[0052] Based on the SS confirmed by this association segment i-k min and Fc, lock the relevant features Tz of the associated line segment, where Tz=SS i-k min×C1+Fc×C2, where C1 and C2 are both preset fixed coefficient factors, and their specific values are determined by the operator based on experience. Then, the relevant features Tz corresponding to other associated line segments are confirmed one by one, and the maximum value is selected from several groups of related features Tz. The associated line segment corresponding to the maximum value is marked as the best line segment, and the relevant dispensing ratio data corresponding to the endpoint of the best line segment is identified to determine the initial data C i The optimal drug ratio interval, if there are multiple groups of maximum values, then a group of optimal segments are randomly selected from multiple groups of associated segments;
[0053] Specifically, after the curve is generated, it moves on the horizontal coordinate axis in the two-dimensional coordinate system based on the corresponding change range. During the movement, the change range changes gradually. In the relevant change process, it can also be understood that there is a movement range, and the movement range moves on the horizontal coordinate axis, and the range parameter of the movement range is X1. In the process of movement, the curve will be segmented, and each different movement range corresponds to a set of different associated line segments. Based on the determined movement range, there will be associated line segments belonging to this movement range.
[0054] S24. For the initial data corresponding to other similar processes, the same execution method as in steps S21-S23 is adopted to confirm the optimal drug ratio interval associated with each different initial data one by one.
[0055] Embodiment 2
[0056] In the specific implementation process, the specific difference between this embodiment and the above embodiment is that the above embodiment is mainly aimed at the relevant confirmation of the optimal dosage ratio interval, while this embodiment is mainly aimed at its specific sewage treatment process, and uses the optimal dosage ratio interval to purify the relevant sewage in real time;
[0057] The following steps are also included:
[0058] S3. At the beginning of the sewage treatment process in this stage, a set of monitoring cycles is determined, and the sewage concentration is monitored. Based on the sewage concentration monitoring curve generated in this monitoring cycle, the sewage standard concentration of the sewage in this stage is locked. The specific method of locking is:
[0059] S31. Based on the set monitoring period T, where T is a preset value, the specific value of which is determined in advance by relevant operators based on experience, the sewage concentration monitoring curve generated within the monitoring period T is confirmed, and the horizontal coordinate axis of the curve is the timeline, and the vertical coordinate axis is the sewage concentration;
[0060] S32, starting from the initial point of the sewage concentration monitoring curve, identify the difference Cz of sewage concentration between the initial point and the subsequent adjacent points. If the difference Cz satisfies: |Cz|≤Y2, where Y2 is a preset value, the subsequent adjacent points are marked as the subsidiary points of the initial point. Then, in the same identification method, determine whether the subsequent adjacent points of this subsidiary point are the subsidiary points of this point. Stop when the subsequently determined point is not the subsidiary point of the previous group of points. Mark the line segments associated with the initial point and the consecutive subsidiary points as the same type of line segments.
[0061] If |Cz|>Y2, the auxiliary point will not be calibrated, and starting from this point, identify whether the subsequent adjacent points of this point are auxiliary points of this point, confirm the line segments associated with the consecutive auxiliary points and calibrate them as the same type of line segments;
[0062] After the first group of similar line segments are determined, the subsequent points are processed in the same way, and the similar line segments that appear in succession are determined one by one. Specifically, if the concentration difference between the adjacent points related to the similar line segments that appear in succession meets the corresponding evaluation conditions, then starting from the initial point of the curve, they are confirmed one by one, and each group of different similar line segments can be confirmed and calibrated one by one;
[0063] S33. From the confirmed groups of similar line segments, select a group of similar line segments with the longest line length as calibration line segments, and perform mean processing on the groups of sewage concentrations associated with the calibration line segments to confirm the sewage standard concentration of the sewage at this stage. If there are multiple groups of similar line segments whose line lengths are not only in the longest state but also in the same state, then randomly select a group of line segments from the multiple groups of similar line segments as calibration line segments. Specifically, each corresponding similar line segment is associated with different concentration data. In order to make the monitored concentration data reach the most accurate state, it is necessary to adopt a periodic monitoring method for monitoring. In the monitoring process, since sewage is in a state of continuous addition, its sewage concentration is in a state of real-time change. In order to achieve a more accurate concentration confirmation result, the related locks of similar line segments are performed one by one, and the optimal concentration is determined therefrom, so as to achieve the most accurate sewage concentration to ensure its standard concentration.
[0064] S4. Based on the determined sewage standard concentration, confirm the initial data that is the same as the sewage standard concentration, and lock the optimal dosage ratio interval based on the confirmed initial data. Then, perform relevant dosage based on the data associated with the optimal dosage ratio interval to comprehensively treat the sewage in this stage.
[0065] Embodiment 3
[0066] Integrated electric control cabinet for township sewage project, including:
[0067] On the past data analysis side, the sewage concentration-related treatment data in different past treatment processes are confirmed one by one, and the relevant treatment time of different sewage concentration data is confirmed one by one, and similar processes are confirmed from different treatment processes;
[0068] The drug ratio confirmation end performs correlation analysis on the confirmed similar processes, identifies the relevant governance time corresponding to different relevant drug ratio data from the similar processes, and identifies the optimal drug ratio interval associated with the similar processes based on the correlation trends between different values;
[0069] The sewage concentration confirmation end determines a set of monitoring cycles, monitors the sewage concentration of this stage, and locks the sewage standard concentration of the sewage in this stage based on the sewage concentration monitoring curve generated within this monitoring cycle;
[0070] The data output end, based on the determined sewage standard concentration, confirms the initial data that is the same as the sewage standard concentration, and locks the optimal dosage ratio range based on the confirmed initial data, and displays the confirmed optimal dosage ratio range through the display end.
[0071] Embodiment 4
[0072] The specific implementation process of this embodiment includes all the implementation processes of the above three groups of embodiments.
[0073] Some of the data in the above formulas are dimensionless and numerically calculated. Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
[0074] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.
Claims
1. The data processing method of the integrated electric control cabinet of the township sewage project is characterized by: The following steps are involved: S1. Confirm the sewage concentration-related treatment data of the integrated electric control cabinet in different past treatment processes in turn, where the sewage concentration-related treatment data includes: the treated sewage concentration data and the relevant drug proportion data, and confirm the relevant treatment time of different sewage concentration data in turn, and confirm the same process from different treatment processes; S2. Conduct correlation analysis on the confirmed similar processes, identify the relevant treatment time corresponding to different relevant medication ratio data from the similar processes, and identify the optimal medication ratio interval associated with the similar processes based on the correlation trends between different values; S3. At the beginning of the sewage treatment process in this stage, a set of monitoring cycles is determined, and the sewage concentration is monitored. Based on the sewage concentration monitoring curve generated within this monitoring cycle, the sewage standard concentration of the sewage in this stage is locked; S4. Based on the determined sewage standard concentration, confirm the initial data that is the same as the sewage standard concentration, and lock the optimal dosage ratio interval based on the confirmed initial data. Then, perform relevant dosage based on the data associated with the optimal dosage ratio interval to comprehensively treat the sewage in this stage.
2. The data processing method of the integrated electric control cabinet for township sewage projects according to claim 1 is characterized in that: In step S1, the specific sub-steps for confirming the relevant treatment time of different sewage concentration data are: S11. Confirm the initial data of the sewage concentration data in the relevant treatment process and calibrate it as C i , where i represents different processing processes, and the relevant drug proportion data used in the corresponding processing process is calibrated as P i ; S12. Based on the sewage concentration data corresponding to different moments in the relevant treatment process, when the sewage concentration data is ≤Y1, a treatment completion signal is generated, where Y1 is a preset value, and the initial time of treatment is confirmed. From the initial time to the generation of the treatment completion signal, the relevant time length of the corresponding time is confirmed, and this relevant time length is calibrated as the relevant treatment time of this treatment process; S13, from different processing processes, the initial data C i The same processing processes are categorized as similar processes.
3. The data processing method of the integrated electric control cabinet for township sewage projects according to claim 2 is characterized in that: In step S2, the specific method of identifying the optimal dispensing ratio interval associated with the same type of process is: S21. Determine the initial data C of this similar process i , and then mark the different relevant drug proportion data in the same process as P i-k , where i represents different processing processes, k represents different relevant prescription proportion data, and then different P i-k The corresponding governance time is denoted as SS i-k ; S22, according to different P i-k Corresponding to different SS i-k , generate its related governance time change curve, the horizontal coordinate of the change curve is the related medicine proportion data, and the vertical coordinate is the related governance time; S23, according to the preset correlation value X1, the correlation range is from [0, X1] to [P i-k max-X1,P i-k max] changes, where P i-k max is the maximum value of the corresponding proportion of relevant medication in the relevant governance time change curve. According to the real-time changing correlation range, some line segments within the correlation range of the corresponding change stage are marked as correlation segments: Identify the lowest relevant governance time SS of its associated segment i-k min, and synchronize the several groups of related governance time SS associated with this associated segment i-k Perform variance processing to determine the variance Fc belonging to this associated line segment; Based on the SS confirmed by this association segment i-k min and Fc, lock the relevant features Tz of the associated line segment, where Tz=SS i- k min×C1+Fc×C2, where C1 and C2 are both preset fixed coefficient factors, and then confirm the relevant features Tz corresponding to other associated segments one by one, and select the maximum value from several groups of related features Tz, and mark the associated segment corresponding to the maximum value as the best segment, identify the relevant prescription ratio data corresponding to the endpoint of the best segment, and determine the initial data C i The optimal drug ratio interval; S24. For the initial data corresponding to other similar processes, the same execution method as in steps S21-S23 is adopted to confirm the optimal drug ratio interval associated with each different initial data one by one.
4. The data processing method of the integrated electric control cabinet for township sewage projects according to claim 3 is characterized in that: In the step S23, if there are multiple groups of maximum values in the relevant feature Tz, a group of optimal line segments is randomly selected from the multiple groups of associated line segments.
5. The data processing method of the integrated electric control cabinet for township sewage projects according to claim 1 is characterized in that: In step S3, the specific method of locking the sewage standard concentration of the sewage at this stage is: S31. Based on the set monitoring period T, where T is a preset value, confirm the sewage concentration monitoring curve generated within the monitoring period T, where the horizontal coordinate axis of the curve is the timeline and the vertical coordinate axis is the sewage concentration; S32, starting from the initial point of the sewage concentration monitoring curve, identify the difference Cz of sewage concentration between the initial point and the subsequent adjacent points. If the difference Cz satisfies: |Cz|≤Y2, where Y2 is a preset value, the subsequent adjacent points are marked as the subsidiary points of the initial point. Then, in the same identification method, determine whether the subsequent adjacent points of this subsidiary point are the subsidiary points of this point. Stop when the subsequently determined point is not the subsidiary point of the previous group of points. Mark the line segments associated with the initial point and the consecutive subsidiary points as the same type of line segments. If |Cz|>Y2, the auxiliary point will not be calibrated, and starting from this point, identify whether the subsequent adjacent points of this point are auxiliary points of this point, confirm the line segments associated with the consecutive auxiliary points and calibrate them as the same type of line segments; After the first group of similar line segments are determined, the subsequent points are processed in the same way, and the similar line segments that appear in succession are determined one by one; S33. From the confirmed groups of similar line segments, select a group of similar line segments with the longest line length as calibration line segments, and average the several groups of sewage concentrations associated with the calibration line segments to confirm the sewage standard concentration of the sewage in this stage.
6. The data processing method of the integrated electric control cabinet for township sewage projects according to claim 5 is characterized in that: In the step S33, if there are multiple groups of similar line segments whose lengths are not only equal to the longest synchronization line length but also equal to each other, then one group of line segments is randomly selected from the multiple groups of similar line segments as the calibration line segments.
7. An integrated electric control cabinet for a township sewage project, the integrated electric control cabinet being operated according to the data processing method according to any one of claims 1 to 6, characterized in that: include: On the past data analysis side, the sewage concentration-related treatment data in different past treatment processes are confirmed one by one, and the relevant treatment time of different sewage concentration data is confirmed one by one, and similar processes are confirmed from different treatment processes; The drug ratio confirmation end performs correlation analysis on the confirmed similar processes, identifies the relevant governance time corresponding to different relevant drug ratio data from the similar processes, and identifies the optimal drug ratio interval associated with the similar processes based on the correlation trends between different values; The sewage concentration confirmation end determines a set of monitoring cycles, monitors the sewage concentration of this stage, and locks the sewage standard concentration of the sewage in this stage based on the sewage concentration monitoring curve generated within this monitoring cycle; The data output end, based on the determined sewage standard concentration, confirms the initial data that is the same as the sewage standard concentration, and locks the optimal dosage ratio range based on the confirmed initial data, and displays the confirmed optimal dosage ratio range through the display end.