Method and device for controlling energy storage of fan

By training the wind speed prediction model and controlling the power supply mode of the wind turbine in real time, the problem of unstable power generation performance of the wind turbine is solved and the power generation revenue and stability of the wind farm are improved.

CN118728637APending Publication Date: 2024-10-01GOLDWIND SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310305096.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-03-22
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The power generation performance of wind turbines is unstable and is greatly affected by wind speed and grid electricity price fluctuations, resulting in increased volatility in power generation income and making it difficult to maximize power generation income.

Method used

By acquiring historical wind speed data of wind turbines, training wind speed prediction models, predicting expected wind speed and power generation factors, and controlling wind turbines to selectively supply power to energy storage devices or power grids based on expected wind speed and electricity prices, and switching control modes in real time to optimize power generation performance. .

Benefits of technology

The power generation performance and income of the wind farm are improved. By accurately predicting wind speed and power generation factors, the optimal power generation strategy of the wind turbine is realized and the overall power generation income is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728637A_ABST
    Figure CN118728637A_ABST
Patent Text Reader

Abstract

The invention provides a method and a device for controlling energy storage of a fan. The method comprises the following steps: acquiring historical wind speed data of a wind turbine generator; inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model; predicting an expected wind speed within a predetermined time length by using a wind speed prediction model; on the basis of the expected wind speed in the preset time length and the preset power track of the wind turbine generator, predicting an expected power generation factor of each preset time period in the preset time length under the condition that the wind turbine generator keeps supplying power to a power grid; determining a predetermined constraint condition of each predetermined time period according to the expected power generation factor of each predetermined time period; according to the preset constraint condition of each preset time period, during each preset time period, the wind turbine generator is controlled to selectively supply power to the energy storage device or the power grid, and the energy storage device is instructed or forbidden to supply power to the power grid. And the power generation performance of the wind power plant is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention generally relates to the technical field of wind power generation, and more specifically, to a method and device for wind turbine energy storage control. Background Art

[0002] Wind power generation is inherently unstable. The power output of wind turbines is closely related to the wind speed and has high rigidity instability. For power grids, operational stability is crucial. Large fluctuations in power grid frequency can seriously affect industrial production activities. At the same time, there is also a certain degree of volatility in electricity load. For example, the electricity load is larger during the day than at night. In addition, the current power grid operation model in many countries around the world has begun to adopt a fluctuating electricity price model, and the electricity price can fluctuate within a certain range as the load of the power grid changes.

[0003] Therefore, many factors will affect the actual power generation performance of wind turbines, resulting in increased uncertainty in the power generation performance of wind turbines. Summary of the invention

[0004] An exemplary embodiment of the present invention aims to provide a method and device for wind turbine energy storage control, which is beneficial to improving the power generation performance of a wind farm.

[0005] According to an exemplary embodiment of the present disclosure, a method for wind turbine energy storage control is provided, the method comprising: acquiring historical wind speed data of a wind turbine group; inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model; using the wind speed prediction model to predict the expected wind speed within a predetermined time period; based on the expected wind speed within the predetermined time period and a preset power trajectory of the wind turbine group, predicting the expected power generation factor of the wind turbine group for each predetermined time period within the predetermined time period while maintaining power supply to the grid; determining predetermined constraints for each predetermined time period based on the expected power generation factor for each predetermined time period; and according to the predetermined constraints for each predetermined time period, during each predetermined time period, controlling the wind turbine group to selectively supply power to an energy storage device or a grid, and instructing or prohibiting the energy storage device from supplying power to the grid.

[0006] According to an exemplary embodiment of the present disclosure, a device for wind turbine energy storage control is provided, the device comprising: a processor; and a memory storing a computer program, and when the computer program is executed by the processor, a method for wind turbine energy storage control according to an exemplary embodiment of the present disclosure is implemented.

[0007] According to an exemplary embodiment of the present disclosure, a computer-readable storage medium storing a computer program is provided. When the computer program is executed by a processor, the method for wind turbine energy storage control according to the exemplary embodiment of the present disclosure is implemented.

[0008] By using the method and device for wind turbine energy storage control and the computer-readable storage medium according to the exemplary embodiments of the present disclosure, at least one of the following technical effects can be achieved: the prediction accuracy of the expected power generation factor is improved by improving the accuracy of the predicted wind speed; the expected optimal factor time range and the minimum factor time range can be determined in advance, which is convenient for real-time switching of the control mode of the wind turbine and the energy storage device; it is beneficial to improve the power generation performance of the wind farm and improve the actual power generation factor of the wind farm. For example, the actual power generation income of the wind farm can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] The above and other objects, features and advantages of exemplary embodiments of the present invention will become more apparent from the following detailed description taken in conjunction with the accompanying drawings which exemplarily illustrate exemplary embodiments.

[0010] Figure 1 A flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0011] Figure 2 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0012] Figure 3 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0013] Figure 4 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0014] Figure 5 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0015] Figure 6 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0016] Figure 7 An exemplary block diagram of a wind turbine energy storage system according to an exemplary embodiment of the present disclosure is shown.

[0017] Figure 8 A graph showing expected wind speed according to an exemplary embodiment of the present disclosure.

[0018] Fig. 9 A graph showing a preset power trajectory according to an exemplary embodiment of the present disclosure.

[0019] Fig.10 A graph showing expected output power according to an exemplary embodiment of the present disclosure.

[0020] Fig.11 A schematic block diagram of a device for wind turbine energy storage control according to an exemplary embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0021] As a clean energy application technology, wind power generation can convert wind energy into electrical energy. However, wind energy is naturally unstable, so there is a certain degree of instability in wind power generation. The instability of wind speed directly leads to the instability of the power output of wind turbines. From the perspective of the entire wind farm, the grid-connected power generation of the wind farm fluctuates with the change of wind speed.

[0022] On the other hand, wind turbines can supply power to the power grid, and the power transmission of the power grid will also affect the power generation performance of wind turbines. For example, the current power grid operation mode in many countries around the world has begun to adopt a fluctuating electricity price model, and the electricity price can fluctuate within a certain range as the load of the power grid changes. For areas that adopt fluctuating electricity prices, electricity prices will change over time. For example, electricity prices may be different in different seasons, and electricity prices may also be different at different times of the day. For residential electricity consumption, the electricity price level is higher during peak electricity consumption and lower during low electricity consumption. Therefore, the volatility of wind turbine power generation itself is superimposed on the volatility of power grid transmission-related factors (for example, electricity prices), which makes the power generation performance of wind turbines more uncertain, and the volatility of the power generation performance of the entire wind farm is further aggravated.

[0023] The uncertainty of wind speed on the output power generated by the wind turbine, and the uncertainty of grid-related factors (e.g., electricity price) on the online performance of the wind turbine, make the power generation performance of the wind turbine difficult to control. The power generation performance of a wind turbine can involve a variety of evaluation indicators, and the power generation factor of the wind turbine can be used to characterize the power generation performance of the wind turbine. For example, power generation revenue, as one of the power generation factors, can be used as a more prominent and direct evaluation indicator to measure the power generation performance of the wind turbine and the power generation performance of the entire wind farm. In addition, power generation losses (e.g., annual power generation losses) can also be used to measure the power generation performance of the wind turbine and the power generation performance of the entire wind farm, thereby measuring the power generation performance in a complementary manner to the power generation revenue evaluation method. However, the present disclosure is not limited to this, and other types of power generation factors can also be used to evaluate the power generation performance of a wind turbine or a wind farm.

[0024] As for power generation revenue, the volatility of electricity prices is further superimposed on the volatility of wind speed, resulting in increased volatility of wind farm power generation revenue, which brings many difficulties for wind farms to achieve maximum power generation revenue.

[0025] In the application scenario of fluctuating electricity prices, the wind speed usually has a large fluctuation, which causes the output power of each wind turbine in the wind farm to fluctuate. The volatility of the grid-connected electricity price will further aggravate the impact on the stability of the wind farm's power generation factors. For example, when the grid-connected electricity price is high, the wind speed is low, resulting in a lower output power of the wind turbine; and when the grid-connected electricity price is low, the wind speed is high, resulting in a higher output power of the wind turbine. If the wind turbines are always supplying power to the grid, it may not be conducive to maximizing the power generation revenue of the wind farm, and will have an adverse impact on the overall revenue of the wind farm.

[0026] Considering the problems related to the instability of the power generation factor caused by the volatility of the grid-connected power of wind turbines and the volatility of electricity prices, the present invention provides a method and device for wind turbine energy storage control to improve the power generation performance of wind farms, for example, to improve the power generation income of wind farms. For example, by using historical wind speed data based on time series and training a wind speed prediction model through a machine learning algorithm, a wind speed prediction model that can accurately predict future wind speeds can be obtained. Based on the expected wind speed predicted by the wind speed prediction model, the expected output power of the wind turbine can be obtained, and then combined with the fluctuating electricity price, the expected power generation factor of the wind turbine in different time periods can be evaluated, so that the corresponding wind turbine energy storage control strategy (for example, when the expected power generation factor is low, the output power of the wind turbine is not connected to the grid, but stored in the energy storage device; when the expected power generation factor is high, the output power of the wind turbine is connected to the grid and the energy storage device is discharged) can be used to improve the power generation performance of the wind farm (for example, to improve the actual power generation income of the wind turbine), so that the overall power generation performance of the wind farm is improved.

[0027] The following provides a description of specific embodiments in conjunction with the accompanying drawings to help readers gain a comprehensive understanding of the methods, devices and / or systems described herein. For greater clarity and conciseness, descriptions of features known in the art may be omitted.

[0028] The features described herein can be implemented in different forms and should not be construed as being limited to the examples described herein. Rather, the examples described herein have been provided to illustrate only some of the many possible ways to implement the methods, devices, and / or systems described herein, which will be clear after understanding the disclosure of the present application.

[0029] The terms used herein are only used to describe various examples and are not intended to limit the disclosure. As used herein, the term "and / or" includes any one of the associated listed items and any combination of any two or more. The terms "comprises," "includes," and "has" indicate the presence of the described features, quantities, operations, components, elements, and / or combinations thereof, but do not exclude the presence or addition of one or more other features, quantities, operations, components, elements, and / or combinations thereof.

[0030] Unless explicitly defined herein, terms (such as those defined in a general dictionary) should be interpreted as having a meaning consistent with their meaning in the context of the relevant field and the present disclosure, and should not be interpreted in an idealized or overly formal manner. In addition, in the description of examples, in order to avoid a vague interpretation of the present disclosure caused by a detailed description of a well-known related structure or function, a detailed description thereof will be omitted.

[0031] Figure 1 A flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown. Figure 7 An exemplary block diagram of a wind turbine energy storage system according to an exemplary embodiment of the present disclosure is shown. Figure 7 To understand the various operations of the method for wind turbine energy storage control.

[0032] Reference Figure 1 In step S11, historical wind speed data of the wind turbine is obtained. Figure 7 The wind speed prediction module 71 shown in FIG. 7 is used to collect data (S711) to obtain historical wind speed data of the wind turbine generator set at the machine site in the past period of time, for example, to collect transient historical wind speed data according to a sampling period (for example, 20ms, 7s). The historical wind speed data can be stored in the wind speed prediction module 71 in a time series form, which can be expressed as follows:

[0033] v=[v(t0), v(t1), v(t2),..., v(t n )] (1)

[0034] The historical wind speed time series set v can represent the previous time t0 to t n The historical wind speed collection for the period.

[0035] The wind speed prediction module 71 can obtain the historical wind speed data of each wind turbine 721 in the wind farm through the wind speed measuring device (e.g., wind radar) in the wind farm. The historical wind speed data will be used as training samples of the wind speed prediction model and to calibrate the wind speed prediction model.

[0036] In step S12, the historical wind speed data is input into the wind speed prediction model stored in the database to train the wind speed prediction model. The database can be arranged in a processor capable of communicating with the wind turbine, for example, a wind farm area controller, a wind turbine controller, a wind farm cloud server, or a cloud database. The database is suitable for storing the wind speed prediction model trained using a machine learning algorithm.

[0037] Figure 2 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0038] In step S21, the historical wind speed data of the site where the wind turbine is located is preprocessed. In the embodiment of the present disclosure, the original historical wind speed data can be preprocessed by filtering to filter out the noise in the original data. The historical wind speed data can be preprocessed using a moving average method to reduce the volatility of the wind speed. For example, the historical wind speed data at intervals of 20ms can be processed into a sliding average wind speed of 30s or 60s. Other types of data processing methods can also be used to preprocess the historical wind speed data to improve the wind speed prediction accuracy for the wind speed prediction model obtained by model training using historical wind speed data. In this way, the adverse effects of the volatility of the historical wind speed data on subsequent model training can be reduced through preprocessing, thereby improving the stability of the historical wind speed data used as the model input.

[0039] The pre-processed historical wind speed data can be input into the wind speed prediction model to train the wind speed prediction model using a machine learning algorithm until the wind speed prediction accuracy deviation meets the preset accuracy threshold requirement. A portion of the pre-processed historical wind speed data (e.g., the first 66%) can be selected as input for the model training phase, and the remaining portion of the data (e.g., the last 34%) can be selected as input for the model verification phase, thereby ultimately obtaining a trained wind speed prediction model that meets the preset accuracy threshold requirement.

[0040] In step S22, the pre-processed historical wind speed data is input into the wind speed prediction model to train the wind speed prediction model using a machine learning algorithm. For example, the historical wind speed data pre-processed by the sliding average method is suitable for model training based on the auto-regression moving average (ARMA) algorithm, and the wind speed prediction model obtained by such training can achieve high-precision wind speed prediction. Other types of machine algorithms (e.g., exponential smoothing algorithm, Holt-Winters algorithm, auto-regression algorithm, moving average algorithm, etc.) can also be selected according to actual application requirements to train the wind speed prediction model. A wind speed prediction model with high prediction accuracy can be obtained by a machine learning algorithm based on time series analysis and prediction.

[0041] In step S23, it is determined whether the wind speed prediction accuracy deviation meets the preset accuracy threshold requirement. In the model verification stage, the preset accuracy threshold requirement can be used as an evaluation indicator of the wind speed prediction model. For example, the wind speed prediction accuracy deviation can represent the root mean square error between the predicted wind speed data output by the wind speed prediction model and the historical wind speed data. The preset accuracy threshold requirement may include: the wind speed prediction accuracy deviation is less than or equal to the preset accuracy deviation threshold. The preset accuracy deviation threshold can be set according to actual application requirements and experience.

[0042] The predicted wind speed data can be expressed in the form of a time series as follows:

[0043]

[0044] Forecast wind speed time series set It can represent the previous time t0 to t n The set of forecast wind speeds for the period.

[0045] The predicted wind speed time series set can be calculated according to the following equation: The root mean square error RMSE between the historical wind speed time series v v :

[0046]

[0047] If the root mean square error RMSE v If the wind speed prediction accuracy deviation is less than or equal to the preset accuracy deviation threshold, it is determined that the wind speed prediction accuracy deviation meets the preset accuracy threshold requirement, and the model training is stopped; otherwise, the model training and model verification are continued until the wind speed prediction accuracy deviation meets the preset accuracy threshold requirement.

[0048] The wind speed prediction module 71 can be used to perform model training S712, model verification S713, and model output S714 on the wind speed prediction model, so as to obtain a trained wind speed prediction model and output it to the controller 731 in the control module 73. The wind speed prediction module 71 can be set in a device that can communicate with the wind turbine to predict the expected wind speed at the machine site where the wind turbine is located. For example, the wind speed prediction module 71 can be set in the field controller of the wind farm, or in the controller of a single wind turbine, or in the cloud processor of the wind farm. The controller 731 can be independent of the main controller of the wind turbine, and can have a separate computing unit and storage unit; it can also be embedded in the main controller of the wind turbine. In this case, a separate storage space can be opened for the controller 731, and a processor with relatively strong computing power can be used to ensure the rapid response speed of the controller and ensure the safe and stable operation of the wind turbine.

[0049] Reference Figure 1 , in step S13, the expected wind speed within a predetermined time period is predicted using a wind speed prediction model. In an embodiment of the present disclosure, the controller 731 may use a wind speed prediction model to predict the expected wind speed in the future, for example, the expected wind speed within a predetermined time period may be predicted, so as to predict the expected power generation and the expected power generation factor within the predetermined time period. Although the wind power prediction system commonly provided in a wind farm may also be used to predict the wind speed change in the wind farm by predicting the wind speed change at the wind tower, this scheme is difficult to accurately predict each machine site, and the time resolution of the predicted wind speed is poor (for example, the minimum is 30 minutes), resulting in excessive time granularity. According to the wind speed prediction method of an embodiment of the present disclosure, the wind speed prediction model that can accurately predict the wind speed may be used to improve the accuracy of wind speed prediction.

[0050] As described above, after obtaining a wind speed prediction model whose wind speed prediction accuracy deviation meets the preset accuracy threshold requirement through training, the wind speed prediction model can be put into use to predict the expected wind speed in the future. The output of the wind speed prediction model may include a time series set of expected wind speeds within a predetermined time period, such as the future time t0 to t n The set of expected wind speeds for a period (e.g., the next 48 hours).

[0051] Figure 8 A curve diagram of expected wind speed according to an exemplary embodiment of the present disclosure is shown. The expected wind speed time series set within a predetermined time period output by the wind speed prediction model can be fitted to obtain a curve of expected wind speed changing with time, such as Figure 8 shown.

[0052] Reference Figure 1In step S14, based on the expected wind speed within the predetermined time period and the preset power trajectory of the wind turbine, the expected power generation factor of the wind turbine in each predetermined time period within the predetermined time period is predicted while maintaining power supply to the grid. The preset power trajectory may characterize the correspondence between the wind speed and the output power of the wind turbine. For example, the preset power trajectory may include a preset power trajectory that uses different forms to characterize the correspondence between wind speed and output power, such as a wind speed-power curve, a wind speed-power hash point, and a wind speed-power fitting broken line. The expected power generation factor may include expected power generation benefits or expected power generation losses. The expected power generation factor may also include other types of indicators for evaluating the power generation performance of the wind turbine.

[0053] The expected output power within a predetermined time period can be predicted using the expected wind speed and the preset power trajectory, and the size of the power generation factor can be estimated accordingly. For example, the controller 731 can predict the expected power generation factor of each predetermined time period within the predetermined time period while the wind turbine generator set maintains power supply to the grid based on the expected wind speed within the predetermined time period, the preset power trajectory D732, and the expected electricity price data D733. In the embodiment of the present disclosure, the wind turbine generator set maintains power supply to the grid, which can correspond to the situation where all the output power of the wind turbine generator set is provided to the grid.

[0054] Figure 3 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0055] In step S31, based on the expected wind speed within the predetermined time period and the preset power trajectory, the expected output power of the wind turbine within the predetermined time period is predicted by linear fitting. In the embodiment of the present disclosure, the preset power trajectory may represent a curve of theoretical output power relative to wind speed determined according to the characteristics of the wind turbine itself (e.g., model, component parameters, etc.) (e.g., a power curve of the wind turbine), such as Fig. 9 A linear fitting method (eg, first-order linear fitting) may be used to calculate the expected output power of the wind turbine generator set within a predetermined time period based on the expected wind speed within the predetermined time period and the preset power trajectory of the wind turbine generator set.

[0056] In step S32, based on the expected output power within the predetermined time period and the expected electricity price data within the predetermined time period, the expected power generation factor of the wind turbine set in each predetermined time period within the predetermined time period is predicted while the wind turbine set is still supplying power to the grid. In the embodiment of the present disclosure, it is assumed that the output power of the wind turbine set is all connected to the grid, that is, the power supply to the grid is always maintained, and the expected power generation factor of each predetermined time period within the predetermined time period is predicted to evaluate the relative size of the expected power generation factor between the predetermined time periods, so as to adjust the wind turbine energy storage control strategy for each predetermined time period to improve the power generation factor of the wind turbine set during actual operation.

[0057] Figure 4Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0058] In step S41, based on the expected output power within the predetermined time period, an expected output power time series set within the predetermined time period is generated. The expected output power time series set p within the predetermined time period can be expressed as:

[0059]

[0060] The expected output power time series set p can represent the future time from t0 to t n The expected output power set during a period (i.e., within a predetermined time period).

[0061] Fig.10 A curve diagram of the expected output power according to an exemplary embodiment of the present disclosure is shown. The expected output power time series set within a predetermined time period can be fitted to obtain a curve of the expected output power changing with time, such as Fig.10 shown.

[0062] In an embodiment of the present disclosure, the expected output power time series set within a predetermined duration is one of the important factors for predicting the expected power generation factor within the predetermined duration, and can be used to evaluate the expected power generation factor in different time periods within the predetermined duration.

[0063] Reference Figure 4 , in step S42, the expected electricity price data within a predetermined time period is obtained through the external communication interface of the wind turbine set, and the expected electricity price time series set within the predetermined time period is generated based on the expected electricity price data. The expected electricity price data may include electricity price cycle variables that characterize the change of electricity price over time, and the corresponding relationship between electricity price and time can be obtained through the expected electricity price data. In an embodiment of the present disclosure, the expected electricity price data may be pre-stored in the memory of the wind turbine set, or the expected electricity price data of the area where the wind farm is located may be obtained through the external communication interface in the communication module of the wind turbine set. For example, the expected electricity price data within a predetermined time period may be obtained from a remote server or service platform (e.g., a green electricity trading platform) storing the expected electricity price data through remote communication.

[0064] The fluctuation of electricity prices is related to the load of the power grid and shows a certain regularity every day. For example, the electricity price may be higher when the power grid load is high during the day, and lower at night when the power grid load is low. The changing trends during the day and night in different seasons are also similar. Therefore, the expected electricity price data within a predetermined time period can also be determined by calculating the average fluctuation value of the electricity price per day or at different times of the day in the previous quarter or month in history.

[0065] The expected electricity price data within a predetermined time period can be converted into the expected electricity price time series set within a predetermined time period. The expression is as follows.

[0066]

[0067] Expected electricity price time series set Can represent the future time t0 to t n A set of expected electricity prices for a period (i.e., a predetermined length of time).

[0068] In step S43, based on the expected output power time series set and the expected electricity price time series set within the predetermined time length, the expected power generation factor time series set within the predetermined time length is obtained using the expected power generation factor objective function, wherein the expected power generation factor objective function is used to calculate the expected power generation factor for each predetermined time period within the predetermined time length. For example, the expected power generation factor objective function may include an expected power generation revenue objective function for calculating the expected power generation revenue for each predetermined time period within the predetermined time length. Optionally, the expected power generation factor objective function may include an expected power generation loss objective function for calculating the expected power generation loss for each predetermined time period within the predetermined time length. For example, the expected power generation loss for each predetermined time period may be calculated based on the predetermined power generation revenue and the expected power generation revenue for each predetermined time period within the predetermined time length.

[0069] In the embodiments of the present disclosure, the predetermined duration may be evenly divided into a plurality of predetermined time periods, or may be divided into a plurality of predetermined time periods of different lengths according to actual application requirements. n The predetermined time length represented by is divided into m predetermined time periods, namely, the first predetermined time period Δt1 to the mth predetermined time period Δt m .

[0070] The expected power generation factor objective function may represent a fitting function of the power generation factor changing according to the fluctuating electricity price. The expected power generation factor objective function may be pre-stored in a database. The database may be arranged in a processor capable of communicating with the wind turbine generator, for example, a wind farm area controller, a wind turbine generator controller, a wind farm cloud server, or a cloud database.

[0071] For example, the expected power generation revenue objective function can be expressed as:

[0072]

[0073] Among them, J(Δt j ) represents the expected power generation income of the jth predetermined time period within the predetermined time period, k represents the total number of time points within the jth predetermined time period, Indicates that within the jth scheduled time period t i The expected output power at time, Indicates that within the jth scheduled time period t i The expected electricity price at the time.

[0074] In this way, the expected power generation revenue time series set J(Δt1, Δt m ), which can be expressed as:

[0075] J(Δt1, Δt m )=[J(Δt1), J(Δt2),..., J(Δt m )] (7)

[0076] Among them, J(Δt1), J(Δt2),..., J(Δt m ) represent the first predetermined time period Δt1 to the mth predetermined time period Δt m Expected electricity generation revenue.

[0077] Reference Figure 1 In step S15, the predetermined constraint condition of each predetermined time period is determined according to the expected power generation factor of each predetermined time period. The magnitudes of the expected power generation factors of all predetermined time periods within the predetermined time length may be compared to identify each predetermined time period by the magnitude of the expected power generation factor, thereby determining the predetermined constraint condition of each predetermined time period.

[0078] Figure 5 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0079] In step S51, all the scheduled time periods within the scheduled time length are divided into a plurality of scheduled time ranges according to the size of the expected power generation factor of each scheduled time period. By dividing the time ranges, the power generation factor characteristics corresponding to each scheduled time period can be further identified. By classifying the scheduled time periods based on the size of the expected power generation factor, different wind turbine energy storage control strategies can be determined for different scheduled time ranges.

[0080] In an embodiment of the present disclosure, multiple predetermined time ranges may include: a first predetermined time range, including a first predetermined time period corresponding to the minimum expected power generation factor; a second predetermined time range, including a second predetermined time period corresponding to the maximum expected power generation factor; and a third predetermined time range, including a third predetermined time period corresponding to an expected power generation factor between the maximum expected power generation factor and the minimum expected power generation factor.

[0081] For example, the following function can be used to obtain the first predetermined time range corresponding to the minimum expected power generation revenue: and a second predetermined time range corresponding to the maximum expected power generation revenue

[0082]

[0083]

[0084] In step S52, multiple predetermined constraints corresponding to multiple predetermined time ranges are determined. Since different predetermined time ranges correspond to different expected power generation benefits, in order to maximize the overall power generation benefits, different wind turbine energy storage control strategies need to be implemented for different predetermined time ranges, so that different predetermined time ranges correspond to different predetermined constraints. Optionally, the opposite calculation method can be used to obtain the first predetermined time range corresponding to the maximum expected power generation loss and the second predetermined time range corresponding to the minimum expected power generation loss.

[0085] In an embodiment of the present disclosure, multiple predetermined constraints may include: a first predetermined constraint, corresponding to a first predetermined time range and used to control the wind turbine to input all actual output power into the energy storage device, and prohibit the energy storage device from supplying power to the grid; a second predetermined constraint, corresponding to a second predetermined time range and used to control the wind turbine to input all actual output power into the grid, and control the energy storage device to input stored electric energy into the grid; a third predetermined constraint, corresponding to a third predetermined time range and used to control the wind turbine to input all actual output power into the grid, and prohibit the energy storage device from supplying power to the grid.

[0086] According to different predetermined constraints, the controller 731 may execute the operation mode switching S723 in real time.

[0087] For the first predetermined constraint condition, the wind turbine 721 and the energy storage device 722 can be placed in the first operating mode through the controller 731. For example, the controller 731 issues a control instruction to cut off the physical electrical connection between the wind turbine 721 and the energy storage device 722 and the power grid 74, and at the same time close the physical electrical connection between the wind turbine 721 and the energy storage device 722, so that the wind turbine 721 does not input the output electric energy into the power grid 74, but inputs it into the energy storage device 722, so that the energy storage device 722 is in a charging state.

[0088] For the second predetermined constraint condition, the wind turbine 721 and the energy storage device 722 can be placed in the second operating mode through the controller 731. For example, the controller 731 issues a control instruction to close the physical electrical connection between the wind turbine 721 and the energy storage device 722 and the power grid 74, and at the same time cut off the physical electrical connection between the wind turbine 721 and the energy storage device 722, so that the wind turbine 721 directly inputs the output power into the power grid 74, and at the same time the energy storage device 722 releases the stored electrical energy to the power grid 74.

[0089] For the third predetermined constraint condition, the wind turbine 721 and the energy storage device 722 can be placed in the third operating mode through the controller 731. For example, the controller 731 issues a control instruction to close the physical electrical connection between the wind turbine 721 and the power grid 74, so that the wind turbine 721 is normally connected to the grid, that is, the output power of the wind turbine 721 is directly connected to the power grid 74, and at the same time, the physical electrical connection between the energy storage device 722 and the wind turbine 721 and the power grid 74 is disconnected. At this time, the wind turbine 721 is in standby mode, neither charging nor releasing power to the power grid 74.

[0090] When the operation of the wind turbine group enters the corresponding predetermined time range as time goes by, the operation mode switching can be executed in real time to switch the wind turbine energy storage control strategy.

[0091] Reference Figure 1 In step S16, according to the predetermined constraints of each predetermined time period, during each predetermined time period, the wind turbine is controlled to selectively supply power to the energy storage device or the grid, and the energy storage device is instructed or prohibited to supply power to the grid.

[0092] The operation mode that should be adopted at the current time can be determined by identifying the predetermined time range to which the predetermined time period at the current time belongs.

[0093] Figure 6 Another flow chart of a method for controlling wind turbine energy storage according to an exemplary embodiment of the present disclosure is shown.

[0094] In step S61, the predetermined time range to which the current time belongs is determined from among the plurality of predetermined time ranges. As described above, all predetermined time periods within the predetermined duration are pre-divided into a plurality of predetermined time ranges. When the operation time of the wind turbine generator system enters the predetermined duration, the predetermined time range to which the predetermined time period of the current time belongs can be determined in real time.

[0095] In step S62, according to the predetermined constraint condition corresponding to the predetermined time range to which the current time belongs, the wind turbine is controlled to selectively supply power to the energy storage device or the power grid, and the energy storage device is instructed or prohibited to supply power to the power grid. As described above, different predetermined time ranges correspond to different predetermined constraint conditions, so the operation mode switching can be performed according to the predetermined time range to which the current time belongs.

[0096] In an embodiment of the present disclosure, in response to determining that the current time t belongs to the first predetermined time range The wind turbine 721 and the energy storage device 722 can be placed in the first operation mode by the controller 731. For example, the controller 731 issues a control instruction to cut off the physical electrical connection between the wind turbine 721 and the energy storage device 722 and the power grid 74, and close the physical electrical connection between the wind turbine 721 and the energy storage device 722, so that the wind turbine 721 does not input the output electric energy into the power grid 74, but inputs it into the energy storage device 722, so that the energy storage device 722 is in a charging state; in response to determining that the current time t belongs to the second predetermined time range The wind turbine 721 and the energy storage device 722 can be placed in the second operation mode by the controller 731. For example, the controller 731 issues a control instruction to close the physical electrical connection between the wind turbine 721 and the energy storage device 722 and the power grid 74, and cut off the physical electrical connection between the wind turbine 721 and the energy storage device 722, so that the wind turbine 721 directly inputs the output power to the power grid 74, and the energy storage device 722 releases the stored electric energy to the power grid 74; in response to determining that the current time t belongs to a time other than and For a third predetermined time range outside the range, the wind turbine 721 and the energy storage device 722 can be placed in a third operating mode through the controller 731. For example, the controller 731 issues a control instruction to close the physical electrical connection between the wind turbine 721 and the power grid 74, so that the wind turbine 721 is normally connected to the grid, that is, the output power of the wind turbine 721 is directly connected to the power grid 74, and at the same time, the physical electrical connection between the energy storage device 722 and the wind turbine 721 and the power grid 74 is disconnected. At this time, the wind turbine 721 is in a standby state, neither charging nor releasing power to the power grid 74.

[0097] By switching the operating modes of wind turbines and energy storage devices in real time, the overall power generation benefits of wind turbines within a predetermined period of time can be effectively improved, thereby improving the overall power generation benefits of wind farms.

[0098] In addition, the above method may also include predetermining the capacity of the energy storage device according to the rated power generation of the wind turbine and the length of the predetermined time period. In the embodiment of the present disclosure, the energy storage device may be distributed in each wind turbine to form a distributed energy storage system; or it may be a centralized energy storage system capable of receiving the output power of the entire wind farm. The battery of the energy storage device may be a lithium iron phosphate battery, a lithium manganese oxide battery or a vanadium liquid flow battery, etc., which are suitable for wind turbine energy storage according to actual application requirements.

[0099] In the embodiment of the present disclosure, the energy storage capacity C of a single wind turbine generator set can be calculated based on the rated power P of the wind turbine generator set. e , the time length Δt of the predetermined time period, the weight w of the predetermined time period and the safety margin coefficient γ (for example, γ>1) can be calculated according to the following formula:

[0100] C=P e ×w×Δt×γ (10)

[0101] The predetermined time period weight w (eg, 1≤w≤2) may be set according to economic indicators of the wind farm.

[0102] The capacity of the energy storage device distributed on a single wind turbine can be determined according to formula (10), and the capacity of the centralized energy storage system required for all wind turbines in the entire wind farm can also be determined according to the capacity of each wind turbine calculated using formula (10).

[0103] Fig.11 A schematic block diagram of a device 11 for wind turbine energy storage control according to an exemplary embodiment of the present disclosure is shown.

[0104] Reference Fig.11 The device 11 for wind turbine energy storage control may include a memory 111 and a processor 112. A computer program 113 is stored in the memory 111. When the computer program 113 is executed by the processor 112, the method for wind turbine energy storage control according to an embodiment of the present disclosure is implemented.

[0105] For example, when the computer program 113 is executed by the processor 112, the following operations according to the exemplary embodiments of the present disclosure may be implemented: obtaining historical wind speed data of the wind turbine group; inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model; using the wind speed prediction model to predict the expected wind speed within a predetermined time period; based on the expected wind speed within the predetermined time period and the preset power trajectory of the wind turbine group, predicting the expected power generation factor of the wind turbine group for each predetermined time period within the predetermined time period while maintaining power supply to the grid; determining predetermined constraints for each predetermined time period based on the expected power generation factor for each predetermined time period; and controlling the wind turbine group to selectively supply power to the energy storage device or the grid during each predetermined time period based on the predetermined constraints for each predetermined time period, and instructing or prohibiting the energy storage device from supplying power to the grid.

[0106] According to an embodiment of the present disclosure, there is further provided a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the method for wind turbine energy storage control according to an embodiment of the present disclosure can be implemented.

[0107] In an embodiment of the present disclosure, a computer-readable storage medium may carry one or more programs, and when the computer program is executed, a method for wind turbine energy storage control according to an embodiment of the present disclosure may be implemented, such as the following operations: obtaining historical wind speed data of a wind turbine; inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model; using the wind speed prediction model to predict the expected wind speed within a predetermined time period; based on the expected wind speed within the predetermined time period and a preset power trajectory of the wind turbine, predicting the expected power generation factor of the wind turbine for each predetermined time period within the predetermined time period while maintaining power supply to the grid; determining predetermined constraints for each predetermined time period based on the expected power generation factor for each predetermined time period; and controlling the wind turbine to selectively supply power to an energy storage device or a grid during each predetermined time period based on the predetermined constraints for each predetermined time period, and instructing or prohibiting the energy storage device from supplying power to the grid.

[0108] The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof. In an embodiment of the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a computer program that may be used by or in conjunction with an instruction execution system, device or device. The computer program contained on the computer-readable storage medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination thereof. The computer-readable storage medium may be contained in any device; it may also exist alone without being assembled into the device.

[0109] The above has been referred to Figures 1 to 11 The method and apparatus for wind turbine energy storage control and computer readable storage medium according to the embodiments of the present disclosure are described. However, it should be understood that: Figure 7 The wind turbine energy storage system shown in is not limited to the components or modules shown above, but some components or modules may be added or deleted as needed, and the above components or modules may also be combined. Fig.11 The devices and their respective components shown in the drawings may be respectively configured as software, hardware, firmware or any combination of the above items to perform specific functions.

[0110] By using the method and device for wind turbine energy storage control and the computer-readable storage medium according to the embodiments of the present disclosure, at least one of the following technical effects can be achieved: based on the wind speed prediction model trained by using a machine learning algorithm, the accuracy of predicted wind speed can be improved, thereby improving the prediction accuracy of the expected power generation factor; the expected optimal factor time range and minimum factor time range can be predetermined, which is convenient for real-time switching of the control mode of the wind turbine and the energy storage device; by adopting corresponding wind turbine energy storage control strategies for different predetermined time ranges, the power generation performance of the wind turbine in the future period can be effectively improved, thereby improving the overall performance of the wind farm, for example, the overall power generation income of the wind turbine in the future period can be improved, thereby improving the overall power generation income of the wind farm.

[0111] The control logic or function performed by each component or controller in the control system can be represented by a flow chart or similar diagram in one or more figures. These figures provide representative control strategies and / or logic, which can be implemented using one or more processing strategies (such as event-driven, interrupt-driven, multi-tasking, multi-threading, etc.). Therefore, the various steps or functions shown can be executed in the order shown, executed in parallel, or omitted in some cases. Although not always clearly shown, it will be appreciated by those of ordinary skill in the art that one or more steps or functions shown can be repeatedly executed according to the specific processing strategy used.

[0112] While the present disclosure has been shown and described with reference to preferred embodiments, it will be understood by those skilled in the art that various modifications and variations may be made to these embodiments without departing from the spirit and scope of the disclosure as defined by the appended claims.

Claims

1. A method for controlling wind turbine energy storage, characterized in that: The method comprises: Obtain historical wind speed data of wind turbines; Inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model; Predicting the expected wind speed within a predetermined time period using the wind speed prediction model; Based on the expected wind speed within the predetermined time period and the preset power trajectory of the wind turbine generator set, predicting the expected power generation factor of the wind turbine generator set in each predetermined time period within the predetermined time period while maintaining power supply to the power grid; Determining a predetermined constraint condition for each predetermined time period according to the expected power generation factor for each predetermined time period; According to the predetermined constraint conditions of each predetermined time period, during each predetermined time period, Controlling the wind turbine to selectively supply power to the energy storage device or the power grid, and Instruct or prohibit the energy storage device from supplying power to the grid.

2. The method according to claim 1, characterized in that Inputting the historical wind speed data into a wind speed prediction model stored in a database to train the wind speed prediction model includes: Preprocessing the historical wind speed data of the site where the wind turbine is located; The preprocessed historical wind speed data is input into the wind speed prediction model to train the wind speed prediction model using a machine learning algorithm until the wind speed prediction accuracy deviation meets a preset accuracy threshold requirement.

3. The method according to claim 2, characterized in that The wind speed prediction accuracy deviation represents the root mean square error between the predicted wind speed data output by the wind speed prediction model and the historical wind speed data. The preset accuracy threshold requirement includes: the wind speed prediction accuracy deviation is less than or equal to a preset accuracy deviation threshold.

4. The method according to claim 1, characterized in that Based on the expected wind speed within the predetermined time period and the preset power trajectory of the wind turbine generator set, predicting the expected power generation factor of the wind turbine generator set in each predetermined time period within the predetermined time period while maintaining power supply to the power grid, including: Based on the expected wind speed within the predetermined time period and the preset power trajectory, predicting the expected output power of the wind turbine within the predetermined time period by linear fitting; Based on the expected output power within the predetermined time period and the expected electricity price data within the predetermined time period, the expected power generation factor of the wind turbine in each predetermined time period within the predetermined time period is predicted while maintaining power supply to the power grid.

5. The method according to claim 4, characterized in that Based on the expected output power within the predetermined time period and the expected electricity price data within the predetermined time period, predicting the expected power generation factor of the wind turbine generator set in each predetermined time period within the predetermined time period while maintaining power supply to the power grid, includes: Based on the expected output power within the predetermined time period, generating an expected output power time sequence set within the predetermined time period; Acquiring expected electricity price data within the predetermined time period through the external communication interface of the wind turbine generator set, and generating an expected electricity price time series set within the predetermined time period based on the expected electricity price data; Based on the expected output power time series set and the expected electricity price time series set within the predetermined time length, the expected power generation factor time series set within the predetermined time length is obtained using the expected power generation factor objective function, wherein the expected power generation factor objective function is used to calculate the expected power generation factor for each predetermined time period within the predetermined time length.

6. The method according to claim 1, characterized in that Determining the predetermined constraint conditions for each predetermined time period according to the expected power generation factor for each predetermined time period includes: Dividing all the predetermined time periods within the predetermined time length into a plurality of predetermined time ranges according to the magnitude of the expected power generation factor of each predetermined time period; A plurality of predetermined constraints corresponding to the plurality of predetermined time ranges are determined.

7. The method according to claim 6, characterized in that The plurality of predetermined time ranges include: a first predetermined time range, comprising a first predetermined time period corresponding to a minimum expected power generation factor; a second predetermined time range, including a second predetermined time period corresponding to a maximum expected power generation factor; The third predetermined time range includes a third predetermined time period corresponding to an expected power generation factor between the maximum expected power generation factor and the minimum expected power generation factor.

8. The method according to claim 7, characterized in that The plurality of predetermined constraints include: a first predetermined constraint condition, corresponding to the first predetermined time range and used to control the wind turbine generator set to input all actual output power into the energy storage device, and prohibit the energy storage device from supplying power to the power grid; a second predetermined constraint condition, corresponding to the second predetermined time range and used to control the wind turbine generator set to input all of its actual output power into the power grid, and to control the energy storage device to input stored electric energy into the power grid; The third predetermined constraint condition corresponds to the third predetermined time range and is used to control the wind turbine generator set to input all of its actual output power into the power grid and prohibit the energy storage device from supplying power to the power grid.

9. The method according to any one of claims 6 to 8, characterized in that According to the predetermined constraint conditions of each predetermined time period, during each predetermined time period, controlling the wind turbine to selectively supply power to the energy storage device or the power grid, and instructing or prohibiting the energy storage device from supplying power to the power grid, comprises: Determining, from the plurality of predetermined time ranges, a predetermined time range to which the current time belongs; According to the predetermined constraint corresponding to the predetermined time range to which the current time belongs, Controlling the wind turbine to selectively supply power to the energy storage device or the power grid, and Instruct or prohibit the energy storage device from supplying power to the grid.

10. The method for controlling wind turbine energy storage according to claim 1, characterized in that: The method further includes: predetermining the capacity of the energy storage device according to the rated power generation power of the wind turbine generator set and the length of the predetermined time period.

11. The method for controlling wind turbine energy storage according to claim 1, characterized in that: The expected power generation factor includes: expected power generation income or expected power generation loss.

12. A device for wind turbine energy storage control, characterized in that: The device comprises: Processor; and A memory storing a computer program, which, when executed by a processor, implements the method for wind turbine energy storage control as described in any one of claims 1 to 11.

13. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the computer program implements the method for wind turbine energy storage control as described in any one of claims 1 to 11.