Construction method of wind power plant digital twin system considering parallel control
Through 5D modeling and parallel control technology, the wind farm digital twin system is constructed, which solves the difficulties of wind farm management and operation and maintenance, realizes intelligent operation and maintenance and optimized management, and improves operation and maintenance efficiency and cost-effectiveness.
Patent Information
- Application Number
- CN202410794019.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-01
AI Technical Summary
There are difficulties in the management, operation and maintenance of existing wind farms, especially because they are widely distributed, large in number, far away from the monitoring center, have harsh working environments, and lack intelligent operation and maintenance methods.
The 5D modeling method is used to build a wind farm digital twin system, and parallel control and digital twin technologies are combined to simulate the operating status of the wind farm through virtual scenes and artificial system models to achieve status monitoring, fault warning, human-computer interaction and wind prediction, and optimize management.
It realizes intelligent operation and maintenance of wind farms, improves operation and maintenance efficiency, reduces operation and maintenance costs, ensures the accuracy and credibility of system simulation, and provides a full range of intelligent operation and management support.
Smart Images

Figure CN118734690A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind power generation, and in particular to a method for constructing a wind farm digital twin system considering parallel control. Background Art
[0002] With the increase in global energy demand and the promotion of renewable energy policies, wind power, as a clean and renewable energy form, has received widespread attention for its development and utilization, and has gradually developed an industrial chain based on wind turbines, blades, pitch, transmission and control technologies. Although wind power generation technology is relatively mature and low-cost, it also has its own disadvantages: wind turbines are generally distributed over a wide area, in large numbers, and far away from the monitoring center, with a harsh working environment, which brings great difficulties to the management and operation of wind farms.
[0003] Digital twin technology relies on simulation, measurement and data analysis to achieve real-time virtual-reality interaction, closed-loop perception, diagnosis and prediction. Digital twin technology creates a virtual copy of a wind farm connected to a physical wind turbine, making it possible to simulate, analyze and optimize the operating status of the wind farm in a virtual environment. This can not only improve the operation and maintenance efficiency of the wind farm, but also reduce the operation and maintenance costs.
[0004] The idea of parallel control based on artificial systems (A), computational experiments (C) and parallel execution (P) (ACP for short) was first proposed by Professor Wang Feiyue. First, an artificial system is constructed to approximate the dynamic characteristics of the actual system. Then, the situations and states that may occur during the operation of the actual system are predicted and judged. Finally, relying on the virtual-real interaction between the above two systems, the actual system is made to approach the artificial system, and the effective management and control of the actual complex system is achieved with the help of the artificial system.
[0005] With the efforts of experts and scholars from all over the world, represented by Professor Wang Feiyue, digital twin technology and the idea of parallel control have been applied to many research fields and complex systems. For example, in the field of intelligent manufacturing, the combination of digital twin and parallel control can be used to optimize production processes and improve production efficiency and product quality. By implementing parallel control in the digital twin model, the production process can be simulated, predicted and adjusted without interfering with actual production, thereby achieving a higher level of automation and intelligence. However, there has been no public report on the construction method of wind farm digital twin system considering parallel control. Summary of the invention
[0006] The technical problem to be solved by the present invention is to provide a method for constructing a digital twin system of a wind farm taking parallel control into consideration, and to realize intelligent operation and maintenance of the wind farm by combining parallel control and digital twin.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0008] A method for constructing a wind farm digital twin system considering parallel control includes the following steps:
[0009] The wind farm is modeled using the 5D modeling method, and the formula of the constructed wind farm digital twin system is described as follows:
[0010] WT DT = {W PE ,W VE ,W DC ,W Ss ,W PC}
[0011] Where, WT DT is the wind farm digital twin system, W PE is the physical wind farm, W VE is a virtual wind farm, W DC is the data center, W Ss It's a service, PC It is parallel control;
[0012] Collect data and information from the physical wind farm to build a wind farm digital twin system;
[0013] Build a virtual wind farm including a virtual scene of the wind farm and an artificial system model;
[0014] Use data centers to eliminate information silos and achieve closed-loop interaction between digital and virtual spaces;
[0015] Through deep mining and feature extraction of data generated by physical wind farms and wind farm digital twin systems, status monitoring, fault warning, human-computer interaction and wind power forecasting services can be realized;
[0016] Based on ACP theory, parallel control technology is used to simulate and manage the operating status of physical wind farms and optimize management.
[0017] A further improvement of the technical solution of the present invention is that: the physical wind farm is used to collect data and information for constructing a digital twin system of the wind farm, providing a realistic drive for the digital twin system of the wind farm; the physical wind farm includes a number of wind turbines and a SCADA system; the wind turbine includes at least a tower, a nacelle, a hub, blades, a gearbox and a generator; the SCADA system is a real-time monitoring system widely used in physical wind farms, which can collect operating data from the wind turbines, realize monitoring and control of the wind turbines and real-time collection and transmission of operating data of the wind turbines; the operating data includes at least environmental data, transmission data, electrical data and perception data.
[0018] A further improvement of the technical solution of the present invention is that the specific implementation steps of the virtual scene of the wind farm are as follows:
[0019] S1, determine the modeling scope as wind turbines and wind farm scenarios;
[0020] S2, refer to the physical wind farm design documents or related information to obtain the standard size and parameters of the wind turbine;
[0021] S3, use 3D Max software to build a three-dimensional model of the wind turbine, add materials and rendering, and complete the geometric modeling of the wind turbine;
[0022] S4, further optimize the number of faces of the model, make the model lightweight, and export it to fbx format file;
[0023] S5, import the fbx file into Unity, write a C# script and install it on the model to realize the behavior modeling of the wind turbine;
[0024] S6, build a virtual scene of the wind farm in Unity by adding ambient lighting, texture materials, and background.
[0025] A further improvement of the technical solution of the present invention is that the artificial system model is established on the Matlab / Simulink platform, and various modules in Simulink are used to build a dynamic model of the wind turbine, which at least includes a wind speed model, a motor model and a control system model.
[0026] A further improvement of the technical solution of the present invention is that the data center covers various basic functions, including data acquisition and processing, data integration and storage, data analysis and application; the data center uses TCP / IP and MQTT communication methods to obtain wind speed, wind direction data and related operating parameters and control instructions from the SCADA system of the physical wind farm in real time, and stores the data in a database. By comparing real-time data with simulation data, it can identify abnormal conditions during the operation of the physical wind farm and provide data support for services in the digital twin system of the wind farm.
[0027] A further improvement of the technical solution of the present invention is that the service is a comprehensive encapsulation of various algorithms and models, which is helpful for the operation and realization of the internal functions of the wind farm digital twin system; through deep mining and feature extraction of the data generated by the wind farm and the twin model, status monitoring, fault warning, human-computer interaction and wind prediction services can be realized.
[0028] A further improvement of the technical solution of the present invention is that both the state monitoring and the fault warning can obtain various indicator data of the physical wind farm from the data center in real time, and help managers to find problems in time and take countermeasures by analyzing and visualizing the data; the specific implementation steps are as follows:
[0029] (1) Determine the data that needs to be monitored;
[0030] (2) Establish a connection with the data center database in Unity to obtain the required monitoring data in real time;
[0031] (3) Parse the received data and convert it into a usable data format;
[0032] (4) Write an anomaly detection algorithm to monitor whether the physical wind farm status is abnormal or close to abnormal;
[0033] (5) Design user interfaces using Unity’s UI system, including real-time data display and physical wind farm status monitoring;
[0034] (6) When an abnormal situation is detected, the early warning mechanism is triggered, a warning box pops up, the color of the UI element changes, and a sound is played.
[0035] A further improvement of the technical solution of the present invention is that: the wind prediction service predicts the operating status and development trend of future physical wind farms based on historical data and machine learning, providing a scientific basis for decision-making; the way to implement the wind prediction service is to integrate Unity and Python, wherein Python is used to develop and train wind prediction models based on machine learning technology, and Unity is used to obtain real-time data and display prediction results; TCP / IPSocket technology is used to realize communication between Unity and Python, with the Python-side code serving as the Socket server and the Unity-side C# code serving as the Socket client.
[0036] The further improvement of the technical solution of the present invention lies in: the human-computer interaction service is designed based on Unity; the visual interface is the first interface for human-computer interaction; the UGUI tool built into Unity provides users with a powerful user graphical interface solution, and the GUI system becomes a connection port for users to communicate with computers on the screen through a graphical interface; find the UI option in the GameObject list, add the UI object to the Canvas scene, and then associate the corresponding script with the UI object to generate response events and detect trigger methods, thereby realizing the interactive operation between users and UI elements.
[0037] A further improvement of the technical solution of the present invention is that the parallel control is based on the ACP theory, and the optimization control strategy is obtained by performing computational experiments on the parameters of the real physical wind farm, and the structure and parameters of the artificial system model are continuously corrected to make the artificial system model approach the real physical wind farm, and the artificial system model is cultivated; decisions are generated according to the experimental results and executed in parallel to make the actual physical wind farm control strategy approach the optimization control strategy of the artificial system model.
[0038] Due to the adoption of the above technical solution, the technical progress achieved by the present invention is:
[0039] 1. After considering parallel control, the present invention adopts a 5D modeling method to model the wind farm. The constructed wind farm digital twin system includes a physical wind farm, a virtual wind farm, a data center, services and parallel control. By combining parallel control and digital twins, intelligent operation and maintenance of the wind farm is realized.
[0040] 2. The parallel control in the present invention ensures the accuracy and credibility of the system simulation by comparing and calibrating the model in the digital twin system with the operating data of the physical wind farm. This parallel control mechanism enables the digital twin system to perform various simulation tests, optimization scheme verification and other operations in a virtual environment, and accurately map the results to the operation of the physical wind farm, thereby realizing the optimized management of the wind farm operation by the digital twin system.
[0041] 3. The digital twin system of the wind farm established by the present invention provides the data and information requirements for establishing the digital twin system by collecting data from the physical wind farm. Data processing is realized through the data center to construct a virtual twin model of the wind farm based on hybrid modeling. The operating status of the wind farm is simulated and managed through parallel control technology, so that the physical wind farm can respond to changes in the external environment and internal working status in a timely manner to achieve the optimal operating state.
[0042] 4. The wind farm digital twin system constructed by the present invention also provides services such as visual monitoring, fault warning, human-computer interaction and wind power forecasting, providing all-round support for the intelligent operation and management of wind farms. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work.
[0044] Figure 1 is a structural block diagram of a wind farm digital twin system considering parallel control provided in an embodiment of the present invention;
[0045] Figure 2 is a flow chart for building a virtual scene of a wind farm in an embodiment of the present invention;
[0046] Figure 3 It is a flowchart of the implementation steps of the status monitoring and fault warning service in the embodiment of the present invention. DETAILED DESCRIPTION
[0047] It should be noted that the terms "including" and "having" and any variations thereof in the specification and claims of the present invention and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or apparatus.
[0048] The present invention is further described in detail below with reference to the accompanying drawings and embodiments:
[0049] like Figure 1 As shown, a method for constructing a wind farm digital twin system considering parallel control includes the following steps:
[0050] The wind farm is modeled using the 5D modeling method, and the formula of the constructed wind farm digital twin system is described as follows:
[0051] WT DT = {W PE ,W VE ,W DC ,W Ss ,W PC}
[0052] Where WT DT is the wind farm digital twin system, W PE is the physical wind farm, W VE is a virtual wind farm, W DC is the data center, W Ss It's a service, PCIt is parallel control;
[0053] Collect data and information from the physical wind farm to build a wind farm digital twin system;
[0054] Build a virtual wind farm including a virtual scene of the wind farm and an artificial system model;
[0055] Use data centers to eliminate information silos and achieve closed-loop interaction between digital and virtual spaces;
[0056] Through deep mining and feature extraction of data generated by physical wind farms and wind farm digital twin systems, services such as status monitoring, fault warning, human-computer interaction and wind power forecasting can be realized;
[0057] Based on ACP theory, parallel control technology is used to simulate and manage the operating status of physical wind farms and optimize management.
[0058] Furthermore, the physical wind farm is used to collect data and information for building the wind farm digital twin system, providing a realistic driver for the wind farm digital twin system; the physical wind farm includes several wind turbines and a SCADA system;
[0059] Specifically, a wind turbine consists of key parts such as a tower, a nacelle, a hub, blades, a gearbox and a generator. Its working principle is to use wind energy to drive the blades to rotate, which in turn drives the generator to generate electricity, thus realizing the conversion of wind energy into electrical energy. The SCADA system is a real-time monitoring system widely used in wind farms. It can collect a large amount of operating data from wind turbines, mainly including environmental data, transmission data, electrical data, sensor data and other data. As an important module of a wind farm, the SCADA system realizes the monitoring and control of wind turbines and the real-time collection and transmission of wind turbine operating data.
[0060] Further, such as Figure 2 As shown in the figure, the specific implementation steps of the virtual scene of the wind farm are as follows:
[0061] S1, determine the modeling scope as wind turbines and wind farm scenarios;
[0062] S2, refer to the physical wind farm design documents or other relevant information to obtain the standard size and parameters of the wind turbine;
[0063] S3, use 3D Max software to build a three-dimensional model of the wind turbine, add materials and rendering, and complete the geometric modeling of the wind turbine;
[0064] S4, further optimize the number of faces of the model, make the model lightweight, and export it to fbx format file;
[0065] S5, import the fbx file into Unity, write a C# script and install it on the model to realize the behavior modeling of the wind turbine;
[0066] S6, build a virtual scene of the wind farm in Unity by adding ambient lighting, texture materials, and background.
[0067] Furthermore, the artificial system model is established on the Matlab / Simulink platform, and the dynamic model of the wind turbine is constructed using various modules in Simulink, including the wind speed model, motor model, and control system model.
[0068] Furthermore, the data center covers various basic functions, including data acquisition and processing, data integration and storage, data analysis and application; the data center uses TCP / IP, MQTT and other communication methods to obtain wind speed, wind direction data and related operating parameters and control instructions from the SCADA system of the physical wind farm in real time, and stores the data in the database. By comparing real-time data with simulation data, it can identify abnormal conditions in the operation of the physical wind farm and provide data support for the services in the wind farm digital twin system.
[0069] Furthermore, the service is a comprehensive encapsulation of various algorithms and models, which helps to operate and realize the internal functions of the wind farm digital twin system; through deep mining and feature extraction of the data generated by the wind farm and the twin model, it can realize services such as status monitoring, fault warning, human-computer interaction and wind power forecasting.
[0070] Furthermore, status monitoring and fault warning can obtain various indicator data of the physical wind farm in real time from the data center, and help managers to find problems in time and take countermeasures by analyzing and visualizing the data; Figure 3 As shown, the specific implementation steps are as follows:
[0071] (1) Determine the data that needs to be monitored, such as wind speed, wind direction, etc.
[0072] (2) Establish a connection with the data center database in Unity to obtain the required monitoring data in real time;
[0073] (3) Parse the received data and convert it into a usable data format, such as numbers, strings, etc.
[0074] (4) Write an anomaly detection algorithm to monitor whether the physical wind farm status is abnormal or close to abnormal;
[0075] (5) Design user interfaces using Unity’s UI system, including real-time data display and physical wind farm status monitoring;
[0076] (6) When an abnormal situation is detected, the early warning mechanism is triggered, a warning box pops up, the color of the UI element changes, and a sound is played.
[0077] Furthermore, the wind prediction service predicts the future operating status and development trend of physical wind farms based on historical data and machine learning, providing a scientific basis for decision-making; the way to implement the wind prediction service is to integrate Unity and Python, where Python is used to develop and train wind prediction models based on machine learning technology, while Unity is used to obtain real-time data and display prediction results; TCP / IP Socket technology is used to realize communication between Unity and Python, with the Python-side code serving as the Socket server and the Unity-side C# code serving as the Socket client.
[0078] Furthermore, the human-computer interaction service is designed based on Unity; the visual interface is the first interface for human-computer interaction; the built-in UGUI tool in Unity provides users with a powerful user graphical interface solution. The GUI system becomes the connection port for users to communicate with computers on the screen through the graphical interface; find the UI option in the GameObject list, add the UI object to the Canvas scene, and then associate the corresponding script with the UI object to generate response events and detect trigger methods, thereby realizing the interaction between users and UI elements. For example, by clicking different buttons, you can view the power output and wind speed of the wind turbine. In addition, you can also control the movement or rotation of the game camera by writing the input logic of the mouse and keyboard, so that users can observe the virtual scene from different angles.
[0079] Furthermore, parallel control is based on the ACP theory. By conducting computational experiments on the parameters of real physical wind farms, the optimal control strategy is obtained, and the structure and parameters of the artificial system model are continuously corrected to make the artificial system model approach the real physical wind farm and cultivate the artificial system model. Decisions are generated based on the experimental results and executed in parallel to make the actual physical wind farm control strategy approach the optimal control strategy of the artificial system model.
[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for constructing a wind farm digital twin system considering parallel control, characterized in that: The following steps are involved: The wind farm is modeled using the 5D modeling method, and the formula of the constructed wind farm digital twin system is described as follows: WT DT ={W PE ,W VE ,W DC ,W Ss ,W PC } Where WT DT is the wind farm digital twin system, W PE is the physical wind farm, W VE is a virtual wind farm, W DC is the data center, W Ss It's a service, PC It is parallel control; Collect data and information from the physical wind farm to build a wind farm digital twin system; Build a virtual wind farm including a virtual scene of the wind farm and an artificial system model; Use data centers to eliminate information silos and achieve closed-loop interaction between digital and virtual spaces; Through deep mining and feature extraction of data generated by physical wind farms and wind farm digital twin systems, status monitoring, fault warning, human-computer interaction and wind power forecasting services can be realized; Based on ACP theory, parallel control technology is used to simulate and manage the operating status of physical wind farms and optimize management.
2. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The physical wind farm is used to collect data and information for building a digital twin system of the wind farm, providing a realistic drive for the digital twin system of the wind farm; the physical wind farm includes several wind turbines and a SCADA system; the wind turbine includes at least a tower, a nacelle, a hub, blades, a gearbox and a generator; the SCADA system is a real-time monitoring system widely used in physical wind farms, which can collect operating data from the wind turbines, realize monitoring and control of the wind turbines, and real-time collection and transmission of the operating data of the wind turbines; the operating data includes at least environmental data, transmission data, electrical data, and perception data.
3. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The specific implementation steps of the virtual scene of the wind farm are as follows: S1, determine the modeling scope as wind turbines and wind farm scenarios; S2, refer to the physical wind farm design documents or related information to obtain the standard size and parameters of the wind turbine; S3, use 3D Max software to build a three-dimensional model of the wind turbine, add materials and rendering, and complete the geometric modeling of the wind turbine; S4, further optimize the number of faces of the model, make the model lightweight, and export it to fbx format file; S5, import the fbx file into Unity, write a C# script and install it on the model to realize the behavior modeling of the wind turbine; S6, build a virtual scene of the wind farm in Unity by adding ambient lighting, texture materials, and background.
4. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The artificial system model is established on the Matlab / Simulink platform, and various modules in Simulink are used to build a dynamic model of the wind turbine generator, which at least includes a wind speed model, a motor model and a control system model.
5. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The data center covers various basic functions, including data acquisition and processing, data integration and storage, data analysis and application; the data center uses TCP / IP and MQTT communication methods to obtain wind speed, wind direction data and related operating parameters and control instructions from the SCADA system of the physical wind farm in real time, and stores the data in the database. By comparing real-time data with simulation data, it can identify abnormal conditions in the operation of the physical wind farm and provide data support for the services in the wind farm digital twin system.
6. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The service is a comprehensive encapsulation of various algorithms and models, which helps to operate and realize the internal functions of the wind farm digital twin system; through deep mining and feature extraction of the data generated by the wind farm and the twin model, it can realize status monitoring, fault warning, human-computer interaction and wind prediction services.
7. The method for constructing a wind farm digital twin system considering parallel control according to claim 6, characterized in that: Both the state monitoring and the fault warning can obtain various indicator data of the physical wind farm from the data center in real time, and help managers to find problems and take countermeasures in time by analyzing and visualizing the data. The specific implementation steps are as follows: (1) Determine the data that needs to be monitored; (2) Establish a connection with the data center database in Unity to obtain the required monitoring data in real time; (3) Parse the received data and convert it into a usable data format; (4) Write an anomaly detection algorithm to monitor whether the physical wind farm status is abnormal or close to abnormal; (5) Design user interfaces using Unity’s UI system, including real-time data display and physical wind farm status monitoring; (6) When an abnormal situation is detected, the early warning mechanism is triggered, a warning box pops up, the color of the UI element changes, and a sound is played.
8. The method for constructing a wind farm digital twin system considering parallel control according to claim 6, characterized in that: The wind prediction service predicts the future operating status and development trend of physical wind farms based on historical data and machine learning, providing a scientific basis for decision-making; the way to implement the wind prediction service is to integrate Unity and Python, where Python is used to develop and train wind prediction models based on machine learning technology, and Unity is used to obtain real-time data and display prediction results; TCP / IP Socket technology is used to realize communication between Unity and Python, with the Python-side code serving as the Socket server and the Unity-side C# code serving as the Socket client.
9. The method for constructing a wind farm digital twin system considering parallel control according to claim 6, characterized in that: The human-computer interaction is designed based on Unity; the visual interface is the first interface of human-computer interaction; the UGUI tool built into Unity provides users with a powerful user graphical interface solution, and the GUI system becomes a connection port for users to communicate with computers on the screen through a graphical interface; find the UI option in the GameObject list, add the UI object to the Canvas scene, and then associate the corresponding script with the UI object to generate response events and detect trigger methods, thereby realizing the interactive operation between users and UI elements.
10. The method for constructing a wind farm digital twin system considering parallel control according to claim 1, characterized in that: The parallel control is based on the ACP theory. The optimal control strategy is obtained by performing computational experiments on the parameters of a real physical wind farm. The structure and parameters of the artificial system model are continuously corrected to make the artificial system model approach the real physical wind farm and cultivate the artificial system model. Decisions are generated based on the experimental results and executed in parallel to make the actual physical wind farm control strategy approach the optimal control strategy of the artificial system model.
Citation Information
Cited By
Wind power plant power prediction method and system based on digital twinning
CN120509543A