Multi-cluster resource scheduling method, device and system
By using resource collectors in multi-cluster management systems for resource statistical processing, the problem of slow resource scheduling in multi-cluster environments is solved and the efficiency of resource scheduling is improved.
Patent Information
- Application Number
- CN202310279276.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-21
- Publication Date
- 2024-10-01
AI Technical Summary
In a multi-cluster environment, the scheduler of the cluster management system needs to process a large amount of resource information, resulting in low resource scheduling speed, large amount of calculation, and large amount of data transmission, which affects efficiency.
By introducing a resource collector into a multi-cluster management system, collecting and performing statistical processing to obtain node resource statistics, the amount of data transmitted and the amount of calculation are reduced. The scheduler determines the target cluster and allocates instances based on these data, improving the speed and efficiency of resource scheduling. efficiency.
It effectively reduces the data transmission and computing resource consumption between the resource collector and the scheduler, improves the speed and efficiency of resource scheduling, and is suitable for resource management in multi-cluster environments.
Smart Images

Figure CN118740933A_ABST
