Train working diagram compiling method, device and equipment and storage medium

Through the preset line-drawing algorithm and integer programming model, the stability problem of the rail transit system in the preparation of operation diagrams during the transition period between flat and peak periods is solved, automatic preparation and balanced transition are realized, and operational efficiency and passenger experience are improved.

CN118744748AActive Publication Date: 2024-10-08TRAFFIC CONTROL TECH CO LTD +1

Patent Information

Application Number
CN202410911059.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-10-08
Estimated Expiration
2044-07-08

AI Technical Summary

Technical Problem

It is difficult to compile the operation chart of the rail transit system during the transition period from peak to peak periods to balance passenger demand and station pick-up capacity, resulting in unstable changes in service frequency and operating routes, affecting passenger experience and operational efficiency.

Method used

The preset line drawing algorithm is used to perform periodic line drawing and equal interval adjustment according to the transition direction from the peak period to the off-peak period, to generate the operation line during the transition period from the off-peak period, and allocate the vehicle base based on the all-day operation line, and build an integer programming model to Optimize the vehicle bottom linkage and operation diagram compilation.

Benefits of technology

It realizes the automatic preparation of train operations and the balanced transition between peak and peak periods, improves the continuity and stability of services, simplifies dispatching work, optimizes resource use and reduces operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118744748A_ABST
    Figure CN118744748A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a train working diagram compiling method and device, equipment and a storage medium. The method is applied to the technical field of rail transit and comprises the steps of generating a running line of a flat peak period and a running line of a peak period based on a flat peak period departure interval and a peak period departure interval respectively; for the flat peak transition period, a preset line drawing algorithm is adopted to perform periodic line drawing on the preset operation line according to the transition direction from the peak period to the flat peak period, the operation line in each line drawing period is adjusted at equal intervals, the operation line of the flat peak transition period is obtained, and the preset operation line is generated according to the departure interval of the peak period; and performing vehicle bottom distribution based on the running line of each period of the whole day, and generating a whole-day plan running chart. In this way, automatic compilation of the train working diagram and balanced transition of the train peak can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of rail transit technology, and in particular to a method, device, equipment and storage medium for compiling a train operation diagram. Background Art

[0002] With the acceleration of urbanization, rail transit, as an important part of urban transportation, is developing at an increasingly rapid pace. The efficient operation of rail transit is of great significance to alleviating urban traffic pressure and improving the travel efficiency of citizens. The operation diagram is the plan and instructions for train operation in the rail transit system, which determines the departure time, running speed, stopover stations and intervals between trains. The transition between flat and peak hours in the operation diagram is an important link in the process of diagram compilation. The transition period between flat and peak hours of the train refers to the time period when the passenger flow changes significantly between the morning and evening peak hours and the non-peak hours. During the transition period between flat and peak hours, it is necessary to consider the feelings of passengers and not to suddenly reduce the service frequency. At the same time, it is also necessary to reasonably select the train receiving and departure time according to the receiving capacity of the yard and the return conditions of the line. The compilation and optimization of the operation diagram during the transition period between flat and peak hours has always been a pain point and difficulty in the process of diagram compilation. Summary of the invention

[0003] The present invention provides a train operation diagram compilation method, device, equipment and storage medium.

[0004] According to a first aspect of the present disclosure, a method for compiling a train operation diagram is provided. The method comprises:

[0005] Generate off-peak period operation lines and peak period operation lines based on off-peak period departure intervals and peak period departure intervals respectively;

[0006] For the transition period between flat and peak periods, the preset line drawing algorithm is used to periodically draw lines from the preset running lines in the transition direction from peak period to flat period, and the running lines in each line drawing cycle are adjusted at equal intervals to obtain the running lines in the transition period between flat and peak periods, wherein the preset running lines are generated according to the departure intervals during the peak period;

[0007] Carriage base allocation is carried out based on the operation lines at different periods of the day to generate a full-day planned operation diagram.

[0008] According to the above aspects and any possible implementation, an implementation is further provided, in which, for the flat-peak transition period, a preset line extraction algorithm is used to periodically extract the preset running line according to the transition direction from the peak period to the flat-peak period, including:

[0009] Determine the total number of lines required for the transition period between peak and off-peak periods based on the total turnaround time, off-peak intervals, and peak intervals;

[0010] For the transition period from the peak period to the flat peak period, the preset line drawing algorithm is used to draw lines in the direction from the peak period to the flat peak period;

[0011] For the flat-to-peak transition period from the flat-peak period to the peak period, a preset line drawing algorithm is used to draw lines in the reverse direction from the peak period to the flat-peak period.

[0012] According to the above aspects and any possible implementation, a further implementation is provided, in which the operating line in each line extraction cycle is adjusted at equal intervals to obtain the operating line in the flat peak transition period, including:

[0013] According to the transition direction from peak period to flat period, the remaining running lines after line extraction in each line extraction cycle are adjusted at equal intervals;

[0014] For the last running line with the smallest interval with the running line during the off-peak period in the last line extraction cycle, if the smallest interval between the last running line and the running line during the off-peak period is less than 1 / 2 of the departure interval during the off-peak period, the last running line will be deleted.

[0015] According to the above aspects and any possible implementation, an implementation is further provided, which determines the total number of lines required for the transition period between the flat and peak periods based on the full turnaround time, the departure interval during the flat and peak periods, and the departure interval during the peak periods, including:

[0016] When the vehicle runs on a single route, the total number of lines G required during the transition period between peak and flat seasons is calculated according to the following formula:

[0017] G=T / h1-T / h2

[0018] Among them, T is the full turnaround time of the vehicle running on a single route, h1 is the departure interval during peak hours, and h2 is the departure interval during off-peak hours;

[0019] When there are large and small intersections in vehicle operation, the total number of lines G required during the transition period between flat and peak hours is calculated according to the following formula:

[0020] G=T 大 / h 1大 +T 小 / h 1小 -T 大 / h 2大 -T 小 / h 2小 ,

[0021] Among them, T 大 is the total turnover time of the vehicle running along the main route, T 小 is the total turnover time of the vehicle running on the short route, h 1大 is the average departure interval of vehicles running on large routes during peak hours, h1小 is the average departure interval of vehicles running on short-distance routes during peak hours, h 2大 is the average departure interval of vehicles running on large routes during off-peak hours, h 2小 , is the average departure interval of vehicles running on small routes during off-peak hours;

[0022] The method also includes:

[0023] When there are large and small intersections in vehicle operation, each running line corresponding to the small intersection is shortened according to the preset ratio of the running lines of the large intersection and the small intersection.

[0024] According to the above aspects and any possible implementation, a further implementation is provided, which performs vehicle bottom allocation based on the operation lines in various periods throughout the day to generate a full-day planned operation diagram, including:

[0025] The objective functions of the vehicle bottom connection are determined for the depot and return period and the flat-peak transition period, and an integer programming model is constructed. The depot and return period refers to the period when trains leave the depot and return to the section after the operation on the morning peak line.

[0026] The integer programming model is solved to obtain a full-day planned operation diagram with balanced transition from the start to the end of train operation, with peak and flat loads.

[0027] According to the above aspects and any possible implementation, an implementation is further provided, wherein the objective function of vehicle bottom connection is determined for the outbound and return periods and the flat-peak transition period, respectively, and an integer programming model is constructed, including:

[0028] For the outbound and return periods, the objective function is determined by minimizing the time that the vehicle is idle during outbound or return periods.

[0029] For the transition period between flat and peak hours, a dual objective function is determined with the goal of minimizing the total connection time and minimizing the operating line deviation.

[0030] As described above and any possible implementation method, an implementation method is further provided, wherein the constraints of the objective function include vehicle bottom uniqueness constraint, return time constraint, vehicle bottom operation mode constraint, operating line translation constraint and vehicle storage quantity constraint.

[0031] According to a second aspect of the present disclosure, a train operation diagram compilation device is provided. The device comprises:

[0032] The operation line generation module is used to generate the operation line in the off-peak period and the operation line in the peak period based on the departure interval in the off-peak period and the departure interval in the peak period respectively;

[0033] The running line adjustment module is used to periodically draw lines from the preset running lines according to the transition direction from the peak period to the flat peak period using the preset line drawing algorithm during the flat peak period, and adjust the running lines in each line drawing cycle at equal intervals to obtain the running lines during the flat peak period, wherein the preset running lines are generated according to the departure intervals during the peak period;

[0034] The operation diagram generation module is used to allocate vehicles based on the operation lines in various periods of the day and generate a full-day planned operation diagram.

[0035] According to a third aspect of the present disclosure, an electronic device is provided, which includes a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the program, the method described above is implemented.

[0036] According to a fourth aspect of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the method according to the first aspect of the present disclosure is implemented.

[0037] The present invention realizes automatic laying of operating lines during the transition period from peak period to off-peak period by periodically drawing lines according to the transition direction from peak period to off-peak period and adjusting each drawing line cycle at equal intervals, and obtains the full-day planned operation diagram of the train based on the vehicle bottom allocation based on the operating lines throughout the day. It can realize automatic compilation of train operation and realize balanced transition between off-peak and off-peak periods of the train.

[0038] It should be understood that the contents described in the summary of the invention are not intended to limit the key or important features of the embodiments of the present disclosure, nor are they intended to limit the scope of the present disclosure. Other features of the present disclosure will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. The accompanying drawings are used to better understand the present solution and do not constitute a limitation of the present disclosure. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, among which:

[0040] Figure 1 A flow chart of a train operation diagram compilation method according to an embodiment of the present disclosure is shown;

[0041] Figure 2 A schematic diagram of positive line extraction from a peak period to a flat peak period according to an embodiment of the present disclosure is shown;

[0042] Figure 3 A schematic diagram of reverse line extraction from a flat peak period to a peak period according to an embodiment of the present disclosure is shown;

[0043] Figure 4A schematic diagram of a running line layout of a vehicle running on large and small intersections according to an embodiment of the present disclosure is shown;

[0044] Figure 5 A block diagram of a train operation diagram compiling device according to an embodiment of the present disclosure is shown;

[0045] Figure 6 A block diagram of an exemplary electronic device capable of implementing embodiments of the present disclosure is shown. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0047] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0048] In the present disclosure, by periodically drawing lines according to the transition direction from peak period to flat period and adjusting the equal intervals of each line drawing cycle, the automatic drawing of the running lines during the flat-peak transition period is realized, and the vehicle bottom allocation is performed based on the running lines of the whole day to obtain the full-day planned running diagram of the train, which can realize the automatic compilation of train operation and realize the balanced transition of the train during flat-peak period.

[0049] Figure 1 A flow chart of a train operation diagram preparation method 100 according to an embodiment of the present disclosure is shown.

[0050] The method 100 comprises the following steps:

[0051] Step S110, generating an off-peak period operation line and a peak period operation line based on the off-peak period departure interval and the peak period departure interval respectively;

[0052] Step S120, for the flat-peak transition period, a preset line drawing algorithm is used to periodically draw lines on the preset running lines according to the transition direction from the peak period to the flat-peak period, and the running lines in each line drawing cycle are adjusted at equal intervals to obtain the running lines in the flat-peak transition period, wherein the preset running lines are generated according to the departure intervals during the peak period;

[0053] Step S130, performing vehicle bottom allocation based on the operation lines of each period throughout the day to generate a full-day planned operation diagram.

[0054] In some embodiments, in step S120, for the flat-peak transition period, a preset line extraction algorithm is used to periodically extract the preset running line according to the transition direction from the peak period to the flat-peak period, including:

[0055] Determine the total number of lines required for the transition period between peak and off-peak periods based on the total turnaround time, off-peak intervals, and peak intervals;

[0056] For the transition period from the peak period to the flat peak period, the preset line drawing algorithm is used to draw lines in the direction from the peak period to the flat peak period;

[0057] For the flat-to-peak transition period from the flat-peak period to the peak period, a preset line drawing algorithm is used to draw lines in the reverse direction from the peak period to the flat-peak period.

[0058] The setting of the preset line extraction algorithm needs to consider multiple factors to ensure that the rail transit system transitions smoothly between peak and off-peak periods.

[0059] Optionally, the preset thread extraction algorithm may determine the thread extraction cycle and the number of running threads that need to be reduced in each thread extraction cycle according to the number of threads extracted and the duration of the transition period.

[0060] Optionally, the preset line extraction algorithm includes:

[0061] Construct the line extraction ratio matrix A, where the element in the Mth row and Nth column of the line extraction ratio matrix A M and N are both positive integers;

[0062] like And N = 1, then according to the transition direction from peak period to flat peak period, the target element Corresponding wire extraction ratio M a :N a Periodically draw lines from the preset running line, where h1 is the departure interval during peak hours, h2 is the departure interval during off-peak hours, and the line drawing ratio M a :N a Indicates that in each wire extraction cycle, a Delete N from the running lines a Running lines;

[0063] like If N>1, then according to the transition direction from peak period to flat period, the first target element Corresponding wire extraction ratio M b :N b and the second target element Corresponding wire extraction ratio (Mb -1):(N b -1), periodically draw the line from the preset running line;

[0064] like Then As the objective function, Solve the constraints and follow the transition direction from peak period to flat period to solve the third target element in the solution. Corresponding wire extraction ratio M c :N c Perform x1 cycles of line extraction to solve the fourth target element in the result Corresponding wire extraction ratio M d :N d Perform x2 cycles of line extraction, where G represents the total number of line extractions required during the flat-peak transition period, and N represents the total number of line extractions required during the flat-peak transition period. * represents a positive integer, t Depot Indicates the time required for a vehicle to return to the depot after the operation ends.

[0065] According to an embodiment of the present disclosure, a specific line drawing method for reducing the number of operating lines is provided. By presetting a line drawing algorithm, the number of operating lines can be reduced as evenly as possible in each line drawing cycle to maintain the continuity and stability of train services.

[0066] In some embodiments, in step S120, the operating line in each line extraction cycle is adjusted at equal intervals to obtain the operating line in the flat peak transition period, including:

[0067] According to the transition direction from peak period to flat period, the remaining running lines after line extraction in each line extraction cycle are adjusted at equal intervals;

[0068] For the last running line with the smallest interval with the running line during the off-peak period in the last line extraction cycle, if the smallest interval between the last running line and the running line during the off-peak period is less than 1 / 2 of the departure interval during the off-peak period, the last running line will be deleted.

[0069] For example, in any M:N cycle, after deleting N operating lines, the remaining (MN-1) trains need to be adjusted at equal intervals.

[0070] From the peak period to the off-peak period, the small proportion should be laid out first, and then the large proportion. Starting from the peak end time t0, select the number corresponding to the small proportion drawing beat After x1 and x2 are completed, the last train will enter the flat peak period according to h2, completing the transition from high to flat peak.

[0071] The transition from flat peak to peak is the reverse process from peak to flat peak. It is necessary to lay out the running line from the peak period in reverse order. After completing the transition from x1 to x2, if the interval between the current train and the next flat peak preset train is less than The last train of the last proportional interval will not be retained. Otherwise, two trains will be retained. At this point, the layout of the single-route operation line for the whole day can be completed starting from the first train.

[0072] According to an embodiment of the present disclosure, a method for adjusting the running lines at equal intervals after line drawing is provided, which can provide passengers with more efficient, stable and reliable services. Equal interval scheduling simplifies the scheduling of vehicles and personnel, optimizes resource utilization and reduces operating costs.

[0073] In some embodiments, based on the full turnaround time, the departure interval during the off-peak period, and the departure interval during the peak period, the total number of lines required for the transition period between the off-peak period and the peak period is determined, including:

[0074] When the vehicle runs on a single route, the total number of lines G required during the transition period between peak and flat seasons is calculated according to the following formula:

[0075] G=T / h1-T / h2

[0076] Among them, T is the full turnaround time of the vehicle running on a single route, h1 is the departure interval during peak hours, and h2 is the departure interval during off-peak hours;

[0077] When there are large and small intersections in vehicle operation, the total number of lines G required during the transition period between flat and peak hours is calculated according to the following formula:

[0078] G=T 大 / h 1大 +T 小 / h 1小 -T 大 / h 2大 -T 小 / h 2小 ,

[0079] Among them, T 大 is the total turnover time of the vehicle running along the main route, T 小 is the total turnover time of the vehicle running on the short route, h 1大 is the average departure interval of vehicles running on large routes during peak hours, h 1小 is the average departure interval of vehicles running on short-distance routes during peak hours, h 2大 is the average departure interval of vehicles running on large routes during off-peak hours, h 2小 , is the average departure interval of vehicles running on small routes during off-peak hours;

[0080] The method also includes:

[0081] When there are large and small intersections in vehicle operation, each running line corresponding to the small intersection is shortened according to the preset ratio of the running lines of the large intersection and the small intersection.

[0082] According to the embodiments of the present disclosure, there are provided methods for calculating the number of lines drawn corresponding to the two situations where the vehicle operates on a single route and where there are large and small routes, as well as a method for drawing the operating lines when there are large and small routes, so that the compilation of the train operation diagram can adapt to various actual needs.

[0083] In some embodiments, step S130, based on the operation lines of each period of the day, the vehicle bottom allocation is performed to generate a full-day planned operation diagram, including:

[0084] The objective functions of the vehicle bottom connection are determined for the depot and return period and the flat-peak transition period, and an integer programming model is constructed. The depot and return period refers to the period when trains leave the depot and return to the section after the operation on the morning peak line.

[0085] The integer programming model is solved to obtain a full-day planned operation diagram with balanced transition from the start to the end of train operation, with peak and flat loads.

[0086] According to the embodiments of the present disclosure, vehicle allocation is achieved by linking the outbound and return periods and the transition period between peak and flat periods, and the scheduling and allocation of vehicles are closely linked to operational needs to ensure effective use of vehicles and operational efficiency.

[0087] In some embodiments, the objective function of vehicle bottom connection is determined for the outbound and return periods and the flat-peak transition period, and an integer programming model is constructed, including:

[0088] For the outbound and return periods, the objective function is determined by minimizing the time that the vehicle is idle during outbound or return periods.

[0089] For the transition period between flat and peak hours, a dual objective function is determined with the goal of minimizing the total connection time and minimizing the operating line deviation.

[0090] Optionally, for the outbound and return periods, the objective is to minimize the idle time of the vehicle during outbound or return periods, and the objective function is determined as follows:

[0091]

[0092] Where D represents the parking lot set, d i represents any section in the depot set, F represents the set of up and down train departures, n i represents any train number, K = {k1, k2, k i , …}, K represents the vehicle bottom sequence, k i Indicates any vehicle bottom. Indicates the segment d i The number of trains n that depart and arrive at the first station s1 i of idle time.

[0093] Minimizing vehicle idle time means reducing the time the vehicle is running in a non-operating state, which helps save fuel, reduce vehicle wear and tear and reduce operating costs, improve vehicle utilization efficiency, and ensure that the vehicle serves passengers as much as possible during operating hours.

[0094] Optionally, for the flat-peak transition period, the dual objective function is determined as follows, with the goal of minimizing the total connection time and minimizing the running line deviation:

[0095]

[0096] Among them, NU represents the set of up train numbers, FU represents the set of up train departure numbers, and FU represents the set of up train arrival numbers. Indicates train number n i It is the preset offset of the undercarriage connection. N represents the set of up and down running trains. Indicates that the k-car bottom is in car number n i and train number n j The continuation time.

[0097] Minimizing the total connection time can reduce passengers' waiting time when transferring and improve their travel experience; minimizing the operating line deviation means that the vehicle's operating route changes less during peak and non-peak hours, which helps maintain operational stability and predictability.

[0098] According to the embodiments of the present disclosure, the car-under-car connections during the outbound and return periods and the transition period between peak and flat periods correspond to different objective functions, and the needs of train operation can be considered in different time periods. The setting of these objectives can achieve optimal allocation of resources in different operating periods, improve operational efficiency, reduce costs, and ensure that passengers receive high-quality services.

[0099] In some embodiments, the constraints of the objective function include vehicle bottom uniqueness constraint, turnaround time constraint, vehicle bottom operation mode constraint, operation line translation constraint, and vehicle storage quantity constraint in the yard.

[0100] Optionally, the vehicle bottom uniqueness constraint is:

[0101] Optionally, the return time constraint is: in, Indicates that at site s i Minimum turnaround time from uplink to downlink;

[0102] Optionally, when the vehicle is operated according to a single route, the vehicle bottom operation mode constraint is:

[0103]

[0104] in, Indicates train number n j The arrival time at the first station s1, Indicates train number n i At the last site n The departure time, Indicates train number n j The preset offset for the underbody hook, Indicates train number n i The first station s1 and train number n j The last site n It's the same site. Indicates train number n j The first station s1 and train number n i The last site n It’s the same site;

[0105] Optionally, when there are large and small intersections in vehicle operation, the vehicle bottom operation mode is constrained as follows:

[0106] Optionally, the running line translation constraint is:

[0107]

[0108] Among them, ND represents the downlink train number set;

[0109] Optionally, the parking quantity constraint of the yard is: in, Indicates that in d i The number of vehicles in the yard.

[0110] According to the embodiments of the present disclosure, constraints to be satisfied by the objective function of undercarriage connection are provided. The undercarriage uniqueness constraint ensures that each vehicle can only perform one task at any given time to avoid scheduling conflicts; the turnaround time constraint ensures that the vehicle has enough time to perform necessary turnaround operations after completing a trip, such as passengers getting on and off, cleaning, inspection, etc.; the purpose of the provided undercarriage operation constraint formula is to ensure that the vehicle can be effectively connected and reasonably scheduled when operating on a single route and on different routes to adapt to different operational needs; the operating line translation constraint can control the conversion between operating lines to reduce passenger inconvenience and operational complexity; the parking lot number constraint ensures that there is enough space in the garage or lot to store vehicles to avoid vehicles with nowhere to park or excessive congestion.

[0111] The method 100 of the embodiment of the present disclosure is described below with a specific implementation case:

[0112] In the process of compiling the operation diagram, two main contents are considered: one is the layout of the operation line, and the other is the connection under the car. In the stage of laying the operation line, the difficulty lies in how to lay the operation line evenly from the peak period to the off-peak period. In order to reduce the waiting time of passengers caused by the sudden change of the operation interval, in the actual operation process, the operator will return the train at a certain rhythm during the operation, thereby lengthening the driving interval.

[0113] In the disclosed embodiment, taking the transition from peak period to off-peak period as an example, according to the departure interval ratio of off-peak period, if the lines are drawn in the manner of M:n, then N lines are deleted from the M lines. After the N lines are deleted, MN lines are evenly adjusted in the time interval corresponding to the M lines to achieve an overall transition from peak intervals to off-peak intervals. Figure 2 FIG. 1 is a schematic diagram of a forward line extraction process from a peak period to a flat peak period according to an embodiment of the present disclosure, as shown in FIG. Figure 2 As shown in the figure, the L1 operating line is the first operating line to enter the flat peak period from the peak. After the L1 operating line, the operating lines are extracted in the manner of 4:1 and 3:1, and the mixing is completed, that is, the transition from the peak small interval operation before the L1 operating line to the flat peak small route operation after the green line is realized. The proportion and rhythm of the extraction can be preset based on experience.

[0114] Optionally, in this embodiment, an optimization model is constructed by the following steps to achieve balanced vehicle withdrawal:

[0115] Step 1, determine the number of vehicles that need to be increased or decreased: Based on the full turnover time T and the departure interval, the number of vehicles G that need to be taken offline when the peak period turns into the off-peak period can be calculated.

[0116] Taking the transition from peak to flat peak as an example, when the operation plan is a single route, the number of vehicle bottoms that need to be reduced (the number of lines drawn) is calculated according to the following formula:

[0117]

[0118] Among them, T is the total turnaround time, h1 is the departure interval during peak hours, and h2 is the departure interval during off-peak hours;

[0119] When the operation plan involves large and small routes, the number of vehicle bottoms that need to be reduced (the number of lines drawn) is calculated according to the following formula:

[0120]

[0121] Among them, T 大 , T 小is the total turnover time of the large and small routes, h 1大 、h 2小 They are the average intervals between peak and off-peak routes.

[0122] Step 2, construct the wire extraction ratio matrix: The ratio matrix A = M*N can be constructed, where N is the number of wires extracted and M is the wire extraction cycle. Considering the transition time, A can be constructed as a 6*6 matrix. The element α in the matrix A (M,N) The ratio of the departure interval change after the line is drawn compared with the departure interval during the peak period. The calculation method is as follows:

[0123]

[0124] Step 3: Determine a reasonable wire drawing ratio for wire drawing:

[0125] 1) If h2 / h1=α (M,N) ∈A, then the wire extraction ratio is M∶N;

[0126] If N=1, the line is drawn according to M:N;

[0127] If N>1, then according to α′ (M-1,N-1) With α (M,N) The ratio of transition is α. (M′,N′) The number of times the line is drawn, x2 is the number of times α is drawn (M,N) The number of times the line is drawn;

[0128] 2) If Considering the feasibility of actual operation, it is necessary to select two reasonable sets of extraction ratios in matrix A, namely α (M,N) With α (M′,N′) , through the constructed transition period function, a reasonable combination of wire extraction ratios is determined to achieve transition;

[0129]

[0130] stx1*N+x2*N′=G

[0131] h1*(x1*(M-1)+x2*(M′-1))≤G*t Depot

[0132] x1,x2∈N *

[0133] α (M,N) , α′ (M′,N′) ∈A

[0134] Among them, x1 is the (M,N) The number of times the line is drawn, x2 is the number of times α is drawn (M′,N′) The number of times the line is drawn, t DepotIt represents the time required for the vehicle to return to the depot after the operation ends, N * Represents a positive integer.

[0135] Step 4: After the line is drawn, the interval adjustment and train connection are completed: In any M:N cycle, after deleting N running lines, the remaining MN-1 trains need to be adjusted to equal intervals. From peak to flat peak, you need to draw a small scale first, then a large scale. Starting from the peak end time t0, select the number of small scale line drawing beats After x1 and x2 are completed, the last train will enter the flat peak period according to the h2 interval, completing the transition from high to flat peak. Figure 3 Schematic diagram of reverse line drawing from flat peak period to peak period according to an embodiment of the present disclosure. The transition from flat peak to peak is the reverse process from peak to flat peak, and it is necessary to draw lines from the peak period (L2) in reverse order. Figure 3 After completing the transition from x1 to x2, if the interval between the current train and the next off-peak preset train is less than The last train of the last proportional interval will not be retained. Otherwise, two trains (L3 and L4) will be retained. At this point, the layout of the single-route operation line for the whole day can be completed starting from the first train.

[0136] Step 5: Draw the running lines of large and small intersections: Figure 4 A schematic diagram of the running line of a vehicle running on large and small intersections according to an embodiment of the present disclosure is shown. Figure 4 As shown, when the operation plan involves large and small routes, the operating line is first laid out in a single route mode according to the number of trains going offline. After the laying is completed, the small route is shortened according to the large and small route ratio requirements.

[0137] Step 6, car bottom connection: After the running line is laid out, the car bottom connection needs to be carried out. The car bottom connection part can be divided into two stages: the train leaving the depot and returning to the section after the end of operation on the morning peak line, and the transition period between flat peak and low peak. In order to better describe the car bottom connection problem, the parameters are defined as shown in Table 1.

[0138] Table 1:

[0139]

[0140]

[0141] In the connection process, the connection and source of the bottom of the vehicle are considered, and the following two decision variables are constructed:

[0142]

[0143] 1) Objective function

[0144] During the morning peak hour train exit and operation end return stage, the main purpose is to reduce the running time of empty trains. The objective function is as follows:

[0145]

[0146] During the transition period between flat and peak hours, it is necessary to maximize turnover efficiency and reduce total connection time; at the same time, on the basis of ensuring connection efficiency, minimize the deviation of the running line to ensure balanced running intervals. Therefore, the dual objective function is constructed as follows:

[0147]

[0148] 2) Constraints

[0149] During the connection process, constraints such as vehicle bottom uniqueness and return time need to be considered. The specific constraints are as follows:

[0150] ① Each running line can only have one vehicle bottom in charge (vehicle bottom uniqueness):

[0151]

[0152] ②Return time constraint:

[0153]

[0154] ③Restrictions on vehicle bottom usage

[0155] i. The same vehicle bottom uses the same intersection and ii. Using different routes for the same vehicle bottom

[0156]

[0157] ④The amount of translation that each running line can have:

[0158]

[0159] ⑤The number of vehicles under the vehicle deck is not greater than the number of vehicles stored in the yard:

[0160]

[0161] In the process of vehicle bottom connection, common heuristic algorithms such as genetic algorithm and simulated annealing algorithm can be used for solution. After the solution is completed, a full-day planned operation diagram from the start of operation to the end of operation can be obtained.

[0162] The disclosed embodiment simulates the map compilation process of map compilers, constructs an optimization model, adopts a balanced vehicle withdrawal strategy, realizes balanced transition between flat and peak hours and vehicle bottom connection within a given time range, and improves the efficiency of map compilation; at the same time, it is also possible to explore the optimal transition strategy by adjusting the transition duration.

[0163] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present disclosure is not limited by the order of the actions described, because according to the present disclosure, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present disclosure.

[0164] The above is an introduction to the method embodiment. The following is a further explanation of the scheme disclosed in the present invention through an apparatus embodiment.

[0165] Figure 5 FIG. 1 is a block diagram of a train operation diagram preparation device according to an embodiment of the present disclosure. Figure 5 As shown, the device 500 includes:

[0166] The operation line generation module 510 is used to generate the operation line in the off-peak period and the operation line in the peak period based on the departure interval in the off-peak period and the departure interval in the peak period respectively;

[0167] The running line adjustment module 520 is used to periodically draw lines from the preset running lines according to the transition direction from the peak period to the flat peak period using a preset line drawing algorithm during the flat peak period, and adjust the running lines in each line drawing cycle at equal intervals to obtain the running lines during the flat peak period, wherein the preset running lines are generated according to the departure intervals during the peak period;

[0168] The operation diagram generation module 530 is used to perform vehicle bottom allocation based on the operation lines of various periods throughout the day and generate a full-day planned operation diagram.

[0169] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described module can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0170] According to an embodiment of the present disclosure, the present disclosure also provides an electronic device, a readable storage medium and a computer program product.

[0171] Figure 6A block diagram of an exemplary electronic device 600 capable of implementing an embodiment of the present disclosure is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or claimed herein.

[0172] The electronic device 600 includes a computing unit 601, which can perform various appropriate actions and processes according to a computer program stored in a ROM 602 or a computer program loaded from a storage unit 608 into a RAM 603. In the RAM 603, various programs and data required for the operation of the electronic device 600 can also be stored. The computing unit 601, the ROM 602, and the RAM 603 are connected to each other via a bus 604. An I / O interface 605 is also connected to the bus 604.

[0173] Multiple components in the electronic device 600 are connected to the I / O interface 605, including: an input unit 606, such as a keyboard, a mouse, etc.; an output unit 607, such as various types of displays, speakers, etc.; a storage unit 608, such as a disk, an optical disk, etc.; and a communication unit 609, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 609 allows the electronic device 600 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.

[0174] The computing unit 601 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 601 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 601 performs the various methods and processes described above, such as method 100. For example, in some embodiments, the method 100 may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit 608. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 600 via ROM 602 and / or communication unit 609. When the computer program is loaded into RAM 603 and executed by the computing unit 601, one or more steps of the method 100 described above may be performed. Alternatively, in other embodiments, the computing unit 601 may be configured to perform the method 100 in any other appropriate manner (e.g., by means of firmware).

[0175] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0176] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0177] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0178] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).

[0179] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0180] A computer system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship with each other. The server may be a cloud server, a server of a distributed system, or a server combined with a blockchain.

[0181] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps recorded in this disclosure can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solutions disclosed in this disclosure can be achieved, and this document does not limit this.

[0182] The above specific implementations do not constitute a limitation on the protection scope of the present disclosure. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present disclosure shall be included in the protection scope of the present disclosure.

Claims

1. A method for compiling a train operation diagram, characterized in that: include: Generate off-peak period operation lines and peak period operation lines based on off-peak period departure intervals and peak period departure intervals respectively; The preset line extraction algorithm is used to periodically extract the preset running line according to the transition direction from the peak period to the flat peak period, and the running line in each line extraction cycle is adjusted at equal intervals to obtain the running line in the flat peak transition period, wherein the preset running line is generated according to the peak period departure interval; Carriage base allocation is carried out based on the operation lines at different periods of the day to generate a full-day planned operation diagram.

2. The method according to claim 1, characterized in that The method of using a preset line extraction algorithm to periodically extract the preset operation line according to the transition direction from the peak period to the flat peak period includes: Determine the total number of lines required for the transition period between peak and off-peak periods based on the total turnaround time, off-peak intervals, and peak intervals; For the transition period from the peak period to the flat peak period, the preset line drawing algorithm is used to draw lines in the direction from the peak period to the flat peak period; For the flat-to-peak transition period from the flat-peak period to the peak period, a preset line drawing algorithm is used to draw lines in the reverse direction from the peak period to the flat-peak period.

3. The method according to claim 1, characterized in that The operation line in each line extraction cycle is adjusted at equal intervals to obtain the operation line in the transition period between the flat and peak periods, including: According to the transition direction from peak period to flat period, the remaining running lines after line extraction in each line extraction cycle are adjusted at equal intervals; For the last running line with the smallest interval with the running line during the off-peak period in the last line extraction cycle, if the minimum interval between the last running line and the running line during the off-peak period is less than the departure interval during the off-peak period, Then the last running line is deleted.

4. The method according to claim 2, characterized in that: The total number of lines required for the transition period between peak and off-peak periods is determined based on the full turnaround time, the departure interval during the off-peak period, and the departure interval during the peak period, including: When the vehicle runs on a single route, the total number of lines G required during the transition period between peak and flat seasons is calculated according to the following formula: G=t / h1-t / h2 Among them, T is the total turnover time of the vehicle running on a single route, h1 is the departure interval during peak hours, and h2 is the departure interval during off-peak hours; When there are large and small intersections in vehicle operation, the total number of lines G required during the transition period between flat and peak hours is calculated according to the following formula: G=T big / h1 big+T small / h1 small-T big / h2 big-T small / h2 small, Among them, T is the full turnover time of the vehicle running on the large route, T is the full turnover time of the vehicle running on the small route, h1 is the average departure interval of the vehicle running on the large route during the peak period, h1 is the average departure interval of the vehicle running on the small route during the peak period, h2 is the average departure interval of the vehicle running on the large route during the off-peak period, and h2 is the average departure interval of the vehicle running on the small route during the off-peak period; The method further comprises: When there are large and small intersections in vehicle operation, each running line corresponding to the small intersection is shortened according to the preset ratio of the running lines of the large intersection and the small intersection.

5. The method according to claim 1, characterized in that The vehicle bottom allocation is performed based on the operation lines in various periods throughout the day to generate a full-day planned operation diagram, including: Determine the objective function of vehicle bottom connection for the depot and return period and the flat peak transition period, and construct an integer programming model, wherein the depot and return period refers to the period when trains leave the depot and return to the section after the operation on the morning peak line; The integer programming model is solved to obtain a full-day planned operation diagram with balanced transition between peak and flat times from the start of train operation to the end of operation.

6. The method according to claim 5, characterized in that The objective function of vehicle bottom connection is determined for the outbound and return periods and the flat-peak transition period, and an integer programming model is constructed, including: For the outbound and return periods, the objective function is determined by minimizing the time that the vehicle is idle during outbound or return periods. For the transition period between flat and peak hours, a dual objective function is determined with the goal of minimizing the total connection time and minimizing the operating line deviation.

7. The method according to claim 6, characterized in that The constraints of the objective function include vehicle bottom uniqueness constraint, turnaround time constraint, vehicle bottom operation mode constraint, running line translation constraint and vehicle storage quantity constraint.

8. A train operation diagram compiling device, characterized in that: include: The operation line generation module is used to generate the operation line in the off-peak period and the operation line in the peak period based on the departure interval in the off-peak period and the departure interval in the peak period respectively; A running line adjustment module is used to periodically draw lines from the preset running lines according to the transition direction from the peak period to the flat peak period using a preset line drawing algorithm, and to adjust the running lines in each line drawing cycle at equal intervals to obtain running lines in the flat peak transition period, wherein the preset running lines are generated according to the departure intervals of the peak period; The operation diagram generation module is used to allocate vehicles based on the operation lines in various periods of the day and generate a full-day planned operation diagram.

9. An electronic device, comprising: at least one processor; as well as a memory communicatively connected to the at least one processor; wherein, The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor to enable the at least one processor to perform the method of any one of claims 1 to 7.

10. A non-transitory computer-readable storage medium storing computer instructions, wherein: The computer instructions are used to cause the computer to execute the method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method for implementing auto making city rail train diagram

    CN101388050A

  • Method for automatically compiling urban rail train working diagram for single running route

    CN113320577A

  • Train working diagram compilation method and device based on flat peak conversion algorithm

    CN113442974A

  • Train scheduling method based on urban rail transit train timetable peak transfer optimization

    CN113968265A

  • Urban rail train working diagram automatic compiling method and system oriented to large and small road crossing mode

    CN115817588A

Cited By

  • Train working diagram peak-valley smooth conversion method, device and equipment and storage medium

    CN121201166A