Dynamic aggregation method and device for large-scale resources of virtual power plant and medium

By constructing a dynamic aggregation optimization model, combining the equivalent model and the power baseline model, the equivalent parameters of the virtual power plant are optimized, which solves the problem of insufficient distributed resource regulation capabilities, achieves stable operation of the power grid and flexible dispatch of distributed resources, and improves Improves the flexibility of power grid regulation.

CN118748431AActive Publication Date: 2024-10-08SOUTHERN POWER GRID DIGITAL GRID RESEARCH INSTITUTE CO LTD

Patent Information

Application Number
CN202410715467.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-08
Estimated Expiration
2044-06-04

AI Technical Summary

Technical Problem

The existing dynamic aggregation technology of large-scale virtual power plant resources cannot fully consider the characteristics, adjustment speed, adjustment range and adjustment duration of different types of distributed resources, resulting in unstable power grid operation and low flexible dispatching capabilities of distributed resources.

Method used

By constructing a dynamic aggregation optimization model, combining the equivalent model and the power baseline model, using the connection between the cloud server and the distributed energy station, dynamic resource scheduling is performed, the equivalent parameters of the virtual power plant are optimized, and the flexible scheduling of distributed resources and the power grid are realized. stable operation.

Benefits of technology

While ensuring the reliable operation of the system, the regulation capabilities of the virtual power plant are utilized to the greatest extent, the flexible dispatching capabilities of distributed resources are improved, the operational risks of the power grid are reduced, and the flexibility of power grid regulation is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118748431A_ABST
    Figure CN118748431A_ABST
Patent Text Reader

Abstract

The invention discloses a dynamic aggregation method and device for large-scale resources of a virtual power plant and a medium, and belongs to the technical field of virtual power plants, and the method comprises the steps: constructing a dynamic aggregation optimization model according to the electric power information of a distributed energy station; solving an optimization problem by taking the maximum range of the equivalent parameters of the virtual power plant as a constraint condition to obtain initial parameters of the dynamic aggregation optimization model; performing day-ahead rolling correction and intraday dynamic adjustment on the dynamic aggregation optimization model to obtain a corrected dynamic aggregation optimization model, and calculating a new economic dispatching plan; the new economic dispatching plan is sent to a cloud server, so that the cloud server generates and returns a corresponding dispatching instruction; the scheduling instruction is decomposed, and the decomposed scheduling instruction is issued to the corresponding control side end for execution, so that the adjustment capability of dynamic aggregation of the virtual power plant is utilized to the greatest extent while the reliable operation of the system is guaranteed, and the flexible scheduling capability of various distributed resources is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of virtual power plants, and in particular to a method, device and storage medium for dynamically aggregating large-scale resources of a virtual power plant. Background Art

[0002] At present, the root cause of the uncertainty of distributed resource output has brought great challenges to the safe and stable operation of the power grid. While distributed resources gain benefits, the power grid also faces certain risk losses. To address this issue, in large-scale distributed resources, how to flexibly form virtual power plants through dynamic aggregation methods, consider the uncertainty of the source and load of virtual power plants, fully explore and utilize the flexible adjustment capabilities of various distributed energy sources, effectively avoid their risk losses, thereby maximizing the benefits of virtual power plants and improving the safety level of power grid operation, is one of the key measures for the governance of distributed resources.

[0003] In the existing dynamic aggregation technology of large-scale resources of virtual power plants, since multi-energy flow distributed resources are mainly distributed on the user side, their response has strong uncertainty, and distributed resources such as wind power and photovoltaics also have strong randomness and volatility. It brings great challenges to the aggregation and regulation technology of existing virtual power plants at different energy scales, spatial scales and time scales. It is difficult for existing technologies to fully consider the resource characteristics, regulation speed, regulation range, regulation duration and other aspects of different types of distributed resources. It is impossible to maximize the regulation capacity of dynamic aggregation of virtual power plants while ensuring the reliable operation of the system, resulting in "secondary dispatch" on the power grid side and low flexible dispatch capabilities of various distributed resources. Summary of the invention

[0004] The present invention provides a method, device and storage medium for dynamically aggregating large-scale resources of a virtual power plant, so as to maximize the regulation capability of dynamic aggregation of virtual power plants while ensuring the reliable operation of the system, and improve the flexible scheduling capability of various distributed resources.

[0005] The present invention provides a method for dynamically aggregating large-scale resources of a virtual power plant, which is applied to a management system, wherein the management system is respectively connected to a cloud server and several control edges of a distributed energy site; the cloud server is connected to an electric power trading market;

[0006] The method comprises:

[0007] According to the power information of the distributed energy site, a dynamic aggregation optimization model is constructed; the dynamic aggregation optimization model includes an equivalent model and a power baseline model;

[0008] According to the power baseline model, the maximum range of equivalent parameters of the virtual power plant is obtained;

[0009] Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model;

[0010] The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model.

[0011] Calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to a cloud server so that the cloud server generates and returns corresponding dispatch instructions;

[0012] The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

[0013] Furthermore, before constructing the dynamic aggregation optimization model according to the power information of the distributed energy site, the method further includes:

[0014] According to the power transaction information of the power transaction market, the information parameters of the distributed energy equipment in the distributed energy station, and the distributed energy prediction curve data in the distributed energy station, a standardized modeling method is used to model different types of distributed resources in the distributed energy station to obtain several distributed resource models;

[0015] According to the plurality of distributed resource models, the power information of the distributed energy site is obtained.

[0016] Furthermore, the dynamic aggregation optimization model is constructed according to the power information of the distributed energy site, specifically:

[0017] According to the range of the interconnection line power, the range of the current accumulated power of the virtual power plant and the range of the change of the interconnection line power of the virtual power plant, an equivalent model is constructed;

[0018] Taking minimizing the power generation cost of the virtual power plant as the objective function, taking the maximum range power balance constraint of the equivalent parameters of the virtual power plant, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraint of the energy storage equipment as the constraints of the objective function, a power baseline model is constructed;

[0019] The equivalent value model and the power baseline model are used as a dynamic aggregation optimization model.

[0020] Furthermore, the equivalent model is constructed according to the range of the tie line power, the range of the current accumulated power of the virtual power plant and the range of the change in the tie line power of the virtual power plant, specifically:

[0021] The expression of the equivalent model is:

[0022]

[0023]

[0024]

[0025] in, is the tie line power at time t, t∈Ω T is the set of all adjustable operating time periods, P tie,min and P tie,max are the minimum and maximum values ​​of the tie line power respectively; E tie,min and E tie,max are the minimum and maximum values ​​of the current accumulated electricity of the virtual power plant respectively; and They are the minimum and maximum downward and upward changes of the virtual power plant interconnection line power at time t respectively.

[0026] Furthermore, the objective function is to minimize the power generation cost of the virtual power plant, and the power balance constraint, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of the non-energy storage distributed resource, and the charging and discharging power constraint of the energy storage equipment are used as constraints of the objective function to construct a power baseline model, specifically:

[0027] The expression of the objective function is:

[0028]

[0029] Among them, Ω G It is the collection of all distributed resource power generation equipment. is the tie line power at time t, Ω T For, c i for, for, for;

[0030] The expression of the power balance constraint is:

[0031]

[0032] Among them, Ω G is the collection of all distributed resource generation equipment, Ω H is the set of all non-energy storage distributed resources, Ω S It is the collection of all energy storage resources; is the target active power of distributed resource generation equipment i at time t, is the active power of distributed resource device i at time t, is the active power of energy storage device i at time t; Inject active power into grid nodes for distributed resource generation equipment; is the active power injected into the grid node by non-energy storage distributed resources at time t; is the total load power at time t;

[0033] The expression of the active power constraint of the distributed resource power generation equipment at time t is:

[0034]

[0035] The expression of the power feasible region constraint of the non-energy storage distributed resource at time t is:

[0036]

[0037] The expression of the charging and discharging power constraint of the energy storage device at time t is:

[0038]

[0039] in, is the target active power column vector of distributed resource generation equipment i at time t, is the active power column vector of distributed resource device i at time t, is the active power column vector of energy storage device i at time t; Φ G,i represents the feasible domain of the active output variable of distributed resource generation equipment i at each moment; Φ H,i represents the feasible domain of the active output variable of non-energy storage distributed resource i at each moment; Φ S,i Represents the feasible domain of the power output variable of energy storage resource i at each moment.

[0040] Furthermore, the maximum range of equivalent parameters of the virtual power plant is obtained according to the power baseline model, specifically:

[0041] The power balance constraint, the active power constraint of distributed resource generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraints of energy storage equipment are taken as the maximum range of equivalent parameters of the virtual power plant.

[0042] Furthermore, the maximum range of equivalent parameters of the virtual power plant is used as a constraint condition to solve several preset optimization problems respectively to obtain the initial parameters of the dynamic aggregation optimization model;

[0043] Among them, several preset optimization problems are: minimizing the interconnection line power at time t, maximizing the interconnection line power at time t, minimizing the sum of the interconnection line power of all adjustable operating time periods, maximizing the sum of the interconnection line power of all adjustable operating time periods, minimizing the change in the interconnection line power of the virtual power plant at time t, and maximizing the change in the interconnection line power of the virtual power plant at time t.

[0044] Furthermore, the parameters in the equivalent model are corrected according to the day-ahead optimized dispatch data, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis according to the power information of the distributed energy equipment within the day, and the equivalent model is optimized according to the cost function to obtain a corrected dynamic aggregation optimization model, which is specifically:

[0045] By optimizing and solving the dynamic aggregation optimization model, the economic dispatch plan data with the largest deviation is obtained;

[0046] According to the reference curve and the scheduling plan data with the largest deviation, the parameters in the equivalent model are corrected;

[0047] Wherein, the benchmark curve is obtained according to the day-ahead optimized scheduling data of the power baseline model;

[0048] According to the power information of distributed energy equipment in the virtual power plant, the adjustable capacity range at the next dispatching moment is calculated, the information is updated to the power grid, and the adjustable resource parameters of the dynamic aggregation optimization model are revised on a daily basis.

[0049] Wherein, the power information includes: operation status information and energy storage charge status information;

[0050] An upper bound estimate of the cost function of the virtual power plant is obtained, several calculation points are selected between the upper and lower limits of the power of the equivalent model, a single-period optimization problem with a penalty is solved for each of the calculation points, the equivalent model is optimized, and a revised dynamic aggregation optimization model is obtained.

[0051] Furthermore, the economic dispatch plan data with the largest deviation is obtained by optimizing and solving the dynamic aggregation optimization model, specifically:

[0052] The expression for solving the economic dispatch plan data with the largest deviation is:

[0053]

[0054]

[0055] Among them, p tie is the column vector of the interconnection line power planned by the virtual power plant at each moment; p is the column vector of the power of each device at each scheduling moment, and They correspond to the upward and downward deviations between the interconnection line power and the dispatch plan at time t, respectively.

[0056] Furthermore, solving the single-period optimization problem with penalty for each of the calculation points is specifically as follows:

[0057] The expression for solving the single-period optimization problem with penalty for each of the calculation points is:

[0058]

[0059]

[0060] in, and They correspond to the upward and downward deviations between the tie line power and the dispatch plan at time t, is the reference power of energy storage device i at time t, where the constraint Indicates that the energy storage charging and discharging plan is the same as the base state, is the power generation cost of distributed resources at time t, is the electricity price cost coefficient of purchasing electricity through the interconnection line at time t, and M is the deviation parameter.

[0061] As a preferred solution, the present invention adopts a cloud-edge collaborative architecture, takes into account load forecasting, power forecasting and electricity price forecasting, sends the information collected on the edge side to the cloud of the control master station, and dynamically aggregates the existing edge-side distributed resources of the virtual power plant through a dynamic aggregation method, with the goal of minimizing the total electricity purchase cost, and calculates the optimal output of distributed resources considering multiple time scales with the goal of minimizing the total electricity purchase cost; in addition, the present invention also takes into account the response characteristics and spatial distribution of various flexible resources, and the real-time collection of various distributed resource telesignaling and telemetry data, and takes dynamic layering and partitioning measures for large-scale flexible resources under different business scenarios. On the one hand, it improves the collaborative control capability of distributed resources and increases the flexibility of power grid control; on the other hand, it fully considers the autonomous response rights of the aggregators of distributed resources, realizes timely and flexible dynamic aggregation and calling of virtual power plants, ensures the reliable operation of the system, and maximizes the use of the dynamic aggregation adjustment capability of virtual power plants, and improves the flexible scheduling capability of various distributed resources.

[0062] Accordingly, the present invention also provides a dynamic aggregation device for scaled resources of a virtual power plant, which is applied to a management system, wherein the management system is respectively connected to a cloud server and several control edges of a distributed energy site; the cloud server is connected to a power trading market;

[0063] The device comprises: a model construction module, a model correction module and a scheduling control module;

[0064] The model construction module is used to construct a dynamic aggregation optimization model according to the power information of the distributed energy site; the dynamic aggregation optimization model includes an equivalent model and a power baseline model;

[0065] The model correction module is used to obtain the maximum range of equivalent parameters of the virtual power plant according to the power baseline model;

[0066] Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model;

[0067] The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model.

[0068] The dispatch control module is used to calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to the cloud server so that the cloud server generates and returns corresponding dispatch instructions;

[0069] The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

[0070] Correspondingly, the present invention also provides a computer-readable storage medium, which includes a stored computer program; wherein, when the computer program is running, it controls the device where the computer-readable storage medium is located to execute a dynamic aggregation method of virtual power plant scale resources as described in the content of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] Figure 1 It is a flow chart of an embodiment of a method for dynamically aggregating large-scale resources of a virtual power plant provided by the present invention;

[0072] Figure 2 It is a structural schematic diagram of a framework of dynamic aggregation control of a virtual power plant in one embodiment of a method for dynamic aggregation of large-scale resources of a virtual power plant provided by the present invention;

[0073] Figure 3 It is a structural schematic diagram of an embodiment of a dynamic aggregation device for large-scale resources of a virtual power plant provided by the present invention;

[0074] Figure 4 It is a structural diagram of a basic platform of a general-purpose industrial control hardware device based on an embedded system, which is an embodiment of a dynamic aggregation device for large-scale resources of a virtual power plant provided by the present invention. DETAILED DESCRIPTION

[0075] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0076] Embodiment 1

[0077] Please refer to Figure 1 , a method for dynamically aggregating large-scale resources of a virtual power plant provided by an embodiment of the present invention, applied to a management system, wherein the management system is respectively connected to a cloud server and several control edges of a distributed energy site; the cloud server is connected to a power trading market;

[0078] The method comprises steps S101-S106:

[0079] Step S101: constructing a dynamic aggregation optimization model according to the power information of the distributed energy site; the dynamic aggregation optimization model includes an equivalent model and a power baseline model;

[0080] Step S102: obtaining the maximum range of equivalent parameters of the virtual power plant according to the power baseline model;

[0081] Step S103: taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model;

[0082] Step S104: modify the parameters in the equivalent model according to the day-ahead optimization dispatch data, perform intraday rolling modification on the adjustable resource parameters of the dynamic aggregation optimization model according to the power information of the distributed energy equipment within the day, and optimize the equivalent model according to the cost function to obtain a modified dynamic aggregation optimization model;

[0083] Step S105: Calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to the cloud server so that the cloud server generates and returns corresponding dispatch instructions;

[0084] Step S106: Decompose the scheduling instruction, and send the decomposed scheduling instruction to the corresponding control edge for execution.

[0085] Please refer to Figure 2 , the framework of dynamic aggregation and regulation of virtual power plants includes: market layer, supervision layer, dynamic aggregation layer and station control layer;

[0086] The electricity trading market located at the market layer is responsible for formulating market interaction mechanisms that conform to the dynamic aggregation of large-scale resources of virtual power plants, and for the layered and partitioned, dynamic resource aggregation trading mechanisms that meet the operation and management requirements of virtual power plant aggregators.

[0087] The distributed energy site control edge terminals located at the station control layer are responsible for establishing the regulation capability model of various distributed resources, and establishing the collection data and sensor data of real-time equipment operation, including resource parameters, topology structure, measured data, power forecast, etc., and interacting with the virtual power plant aggregator operation and management system located at the dynamic aggregation layer in real time, and automatically receiving the decomposition control instructions of the resource cluster to which it belongs.

[0088] The cloud server of the energy management system located at the regulatory layer obtains the peak-shaving demand information and price signals issued by the power trading market at the market layer, obtains the quotation information of the virtual power plant aggregation model reported by the management system, generates the corresponding aggregation dispatching instructions and returns them to the virtual power plant aggregator operation management system (management system).

[0089] The virtual power plant aggregator operation and management system located at the dynamic aggregation layer constructs a dynamic aggregation optimization model based on the power information of the distributed energy sites; the dynamic aggregation optimization model includes an equivalent model and a power baseline model;

[0090] According to the power baseline model, the maximum range of equivalent parameters of the virtual power plant is obtained;

[0091] Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model;

[0092] The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model.

[0093] Calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to a cloud server so that the cloud server generates and returns corresponding dispatch instructions;

[0094] The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

[0095] The management system dynamically aggregates the scaled resources within the cluster, realizes data storage and management of the entire life cycle of distributed resources through the data management layer, and uses sensors to collect information on the internal resources of the distributed energy control terminal equipment of the virtual power plant, including site parameters, measured data and power forecasts.

[0096] The management system reports the obtained aggregated data to the energy management system cloud server (cloud server) located at the supervisory layer, and receives the aggregated scheduling instructions issued by the cloud server.

[0097] In this embodiment, the response characteristics and spatial distribution of various flexible resources are taken into account, and various distributed resource telesignaling and telemetry data are collected in real time, and dynamic hierarchical partitioning measures are taken for large-scale flexible resources in different business scenarios. At the same time, considering the combinatorial optimization problem of massive flexible resources in high-dimensional space for multiple business scenarios, data processing can be carried out based on distributed real-time databases, wide-area message queues, and task scheduling managers to meet the data processing requirements in complex scenarios, and combined with the distribution network topology and the scenario adaptability of resources, hierarchical partitioning results are given.

[0098] Furthermore, before constructing the dynamic aggregation optimization model according to the power information of the distributed energy site, the method further includes:

[0099] According to the power transaction information of the power transaction market, the information parameters of the distributed energy equipment in the distributed energy station, and the distributed energy prediction curve data in the distributed energy station, a standardized modeling method is used to model different types of distributed resources in the distributed energy station to obtain several distributed resource models;

[0100] According to the plurality of distributed resource models, the power information of the distributed energy site is obtained.

[0101] In this embodiment, sensing technology is used to obtain static information about the configuration of various edge-side distributed resources, including basic information about distributed resources, resource capacity, power regulation response characteristics, upper and lower limits of ramp rates, and other related distributed resource parameters;

[0102] Conduct data modeling for key information such as the type, age, capacity, and response times of distributed resources, and establish an open capacity assessment model based on security conditions;

[0103] In this embodiment, common resources such as distributed energy storage, photovoltaic power generation, wind turbines, electric heat pump systems, hot spot cogeneration equipment, thermal storage boilers, gas boilers, electric vehicle charging piles, electrochemical energy storage and cold storage air conditioners in the dynamically aggregated virtual power plant are flexibly classified, and standardized modeling methods are used to model different types of distributed resources, which can be divided into the following five categories of distributed resources:

[0104] 1) Interruptible load resources: refers to load resources that can withdraw a certain amount of load within a certain period of time during system operation.

[0105] 2) Peak load resources: refers to the load resources that can be used to adjust the operating time period by connecting part of the load in a peak-shifting manner during system operation.

[0106] 3) Continuously adjustable resources: refers to resources that can adjust the power they emit or absorb within a certain range during system operation.

[0107] 4) Variable-speed adjustment resources: refers to the resources that can be adjusted at different upper gears during system operation.

[0108] 5) Energy storage resources: refers to the resources that receive power absorption instructions within an adjustable time interval to store energy during system operation, and adjust power output within other planned time intervals to compensate for the power injected into the grid and provide power support.

[0109] In this embodiment, the information interaction method of the power communication protocol is adopted to collect online telemetry data such as the operating status and power measurement of edge resources;

[0110] The information interaction method of the server-client mode is adopted to establish a distributed resource timing information list such as load forecast and power forecast.

[0111] According to the edge-side resources and their power regulation response speed, the user-side resources are divided into fast-response adjustable resources and slow-response adjustable resources.

[0112] Furthermore, the dynamic aggregation optimization model is constructed according to the power information of the distributed energy site, specifically:

[0113] According to the range of the interconnection line power, the range of the current accumulated power of the virtual power plant and the range of the change of the interconnection line power of the virtual power plant, an equivalent model is constructed;

[0114] Taking minimizing the power generation cost of the virtual power plant as the objective function, taking the maximum range power balance constraint of the equivalent parameters of the virtual power plant, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraint of the energy storage equipment as the constraints of the objective function, a power baseline model is constructed;

[0115] The equivalent value model and the power baseline model are used as a dynamic aggregation optimization model.

[0116] Furthermore, the equivalent model is constructed according to the range of the tie line power, the range of the current accumulated power of the virtual power plant and the range of the change in the tie line power of the virtual power plant, specifically:

[0117] The expression of the equivalent model is:

[0118]

[0119]

[0120]

[0121] in, is the tie line power at time t, t∈Ω T is the set of all adjustable operating time periods, P tie,min and P tie,max are the minimum and maximum values ​​of the tie line power respectively; E tie,min and E tie,max are the minimum and maximum values ​​of the current accumulated electricity of the virtual power plant respectively; and They are the minimum and maximum downward and upward changes of the virtual power plant interconnection line power at time t respectively.

[0122] Furthermore, the objective function is to minimize the power generation cost of the virtual power plant, and the power balance constraint, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of the non-energy storage distributed resource, and the charging and discharging power constraint of the energy storage equipment are used as constraints of the objective function to construct a power baseline model, specifically:

[0123] The expression of the objective function is:

[0124]

[0125] Among them, Ω G It is the collection of all distributed resource power generation equipment. is the tie line power at time t, Ω T For, c i for, for, for;

[0126] The expression of the power balance constraint is:

[0127]

[0128] Among them, Ω G is the collection of all distributed resource generation equipment, Ω H is the set of all non-energy storage distributed resources, Ω S It is the collection of all energy storage resources; is the target active power of distributed resource generation equipment i at time t, is the active power of distributed resource device i at time t, is the active power of energy storage device i at time t; Inject active power into grid nodes for distributed resource generation equipment; is the active power injected into the grid node by non-energy storage distributed resources at time t; is the total load power at time t;

[0129] The expression of the active power constraint of the distributed resource power generation equipment at time t is:

[0130]

[0131] The expression of the power feasible region constraint of the non-energy storage distributed resource at time t is:

[0132]

[0133] The expression of the charging and discharging power constraint of the energy storage device at time t is:

[0134]

[0135] in, is the target active power column vector of distributed resource generation equipment i at time t, is the active power column vector of distributed resource device i at time t, is the active power column vector of energy storage device i at time t; Φ G,i represents the feasible domain of the active output variable of distributed resource generation equipment i at each moment; Φ H,i represents the feasible domain of the active output variable of non-energy storage distributed resource i at each moment; Φ S,i Represents the feasible domain of the power output variable of energy storage resource i at each moment.

[0136] The dynamic aggregation optimization model constructed in the present invention combines load forecasting, power forecasting and electricity price forecasting, takes into account power balance constraints, interconnection line power constraints, equipment operation constraints and energy storage system charging and discharging power constraints, dynamically aggregates existing edge-side distributed resources at the control master station, and calculates the optimal output of distributed resources with the goal of minimizing the total electricity purchase cost taking into account multiple time scales.

[0137] The dynamic aggregation method provided by the present invention is divided into two stages: a day-ahead rolling optimization stage and a dynamic adjustment stage. In the day-ahead rolling optimization stage, the day-ahead load prediction model parameters are updated according to the latest weather information, light intensity, wind speed, and intraday load forecast information of the day, and the fitting model is adjusted to the optimal prediction parameters for the day's load forecast, thereby improving the accuracy of the prediction results within the day.

[0138] According to the power baseline model, the maximum range of the equivalent parameters of the virtual power plant is obtained and used as the constraint condition of the optimization problem. The economic dispatch plan with the largest deviation is solved through optimization, and the equivalent parameters are cyclically corrected according to the economic dispatch plan with the largest deviation and the benchmark curve. The cycle is repeated until the maximum deviation is less than or equal to the convergence accuracy to ensure that all operating variables of the equivalent model are within the feasible domain. The dynamic aggregation optimization model is corrected in the rolling optimization link of the day before, and an aggregation model that is robust in both feasibility and economy is obtained.

[0139] Furthermore, the maximum range of equivalent parameters of the virtual power plant is used as a constraint condition to solve several preset optimization problems respectively to obtain the initial parameters of the dynamic aggregation optimization model;

[0140] Among them, several preset optimization problems are: minimizing the interconnection line power at time t, maximizing the interconnection line power at time t, minimizing the sum of the interconnection line power of all adjustable operating time periods, maximizing the sum of the interconnection line power of all adjustable operating time periods, minimizing the change in the interconnection line power of the virtual power plant at time t, and maximizing the change in the interconnection line power of the virtual power plant at time t.

[0141] Furthermore, the maximum range of equivalent parameters of the virtual power plant is obtained according to the power baseline model, specifically:

[0142] The power balance constraint, the active power constraint of distributed resource generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraints of energy storage equipment are taken as the maximum range of equivalent parameters of the virtual power plant.

[0143] Furthermore, the parameters in the equivalent model are corrected according to the day-ahead optimized dispatch data, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis according to the power information of the distributed energy equipment within the day, and the equivalent model is optimized according to the cost function to obtain a corrected dynamic aggregation optimization model, which is specifically:

[0144] By optimizing and solving the dynamic aggregation optimization model, the economic dispatch plan data with the largest deviation is obtained;

[0145] According to the reference curve and the scheduling plan data with the largest deviation, the parameters in the equivalent model are corrected;

[0146] Wherein, the benchmark curve is obtained according to the day-ahead optimized scheduling data of the power baseline model;

[0147] According to the power information of distributed energy equipment in the virtual power plant, the adjustable capacity range at the next dispatching moment is calculated, the information is updated to the power grid, and the adjustable resource parameters of the dynamic aggregation optimization model are revised on a daily basis.

[0148] Wherein, the power information includes: operation status information and energy storage charge status information;

[0149] An upper bound estimate of the cost function of the virtual power plant is obtained, several calculation points are selected between the upper and lower limits of the power of the equivalent model, a single-period optimization problem with a penalty is solved for each of the calculation points, the equivalent model is optimized, and a revised dynamic aggregation optimization model is obtained.

[0150] In this embodiment, the solution of the economic dispatch plan includes the equivalent model and the power baseline model. load and renewable energy generation Therefore, the equivalent model parameters and cost function of the virtual power plant change with the dispatch time and need to be calculated separately for each dispatch time.

[0151] The benchmark curve is the power curve received or injected into the power grid by the virtual power plant through the interconnection line. It is the result of the day-ahead optimization dispatch, that is, the calculation result of the power baseline model.

[0152] Furthermore, the economic dispatch plan data with the largest deviation is obtained by optimizing and solving the dynamic aggregation optimization model, specifically:

[0153] The expression for solving the economic dispatch plan data with the largest deviation is:

[0154]

[0155]

[0156] Among them, p tie is the column vector of the interconnection line power planned by the virtual power plant at each moment; p is the column vector of the power of each device at each scheduling moment, and They correspond to the upward and downward deviations between the interconnection line power and the dispatch plan at time t, respectively.

[0157] Furthermore, solving the single-period optimization problem with penalty for each of the calculation points is specifically as follows:

[0158] The expression for solving the single-period optimization problem with penalty for each of the calculation points is:

[0159]

[0160]

[0161] in, and They correspond to the upward and downward deviations between the tie line power and the dispatch plan at time t, is the reference power of energy storage device i at time t, where the constraint It means that the energy storage charging and discharging plan is the same as the base state. is the generation cost of distributed resources at time t, is the electricity price cost coefficient of purchasing electricity through the interconnection line at time t, and M is the deviation parameter.

[0162] In the dynamic adjustment phase, for the current time t, the optimization problem is solved with power balance constraints, active power constraints of distributed resource generation equipment, power feasible domain constraints of non-energy storage distributed resources, and charging and discharging power constraints of energy storage equipment as constraints. and According to the deterministic economic dispatch plan at time t, it is necessary to make intraday rolling corrections to the adjustable resource parameters, that is, to correct the adjustable capacity. At this time, solving the adjustable range of the virtual power plant becomes a deterministic optimization problem, which can reduce the rolling correction connection and even eliminate the conservatism caused by uncertainty in the superior power grid dispatch plan.

[0163] The uncertainty problem in the dispatch plan of the upper power grid affects the operation plan of time-coupled components such as energy storage, thereby affecting the cost. Therefore, the upper limit estimate of the cost function of the virtual power plant is obtained. The cost function is described by a piecewise linear function. Several calculation points are taken between the upper and lower limits of the power of the equivalent model. The single-period optimization problem with penalty is solved for each calculation point. The upper and lower limits of power are rolled over during the day to reduce the impact of uncertainty, and a more accurate dynamic aggregation optimization model is obtained.

[0164] Implementing the embodiments of the present invention has the following effects:

[0165] The present invention adopts a cloud-edge collaborative architecture, takes into account load forecasting, power forecasting and electricity price forecasting, sends the information collected on the edge side to the cloud side of the control master station, and dynamically aggregates the existing edge-side distributed resources of the virtual power plant through a dynamic aggregation method, with the goal of minimizing the total electricity purchase cost, and calculates the optimal output of distributed resources considering multiple time scales with the goal of minimizing the total electricity purchase cost; in addition, the present invention also takes into account the response characteristics and spatial distribution of various flexible resources, and the real-time collection of various distributed resource telesignaling and telemetry data, and takes dynamic layering and partitioning measures for large-scale flexible resources under different business scenarios. On the one hand, it improves the collaborative control capability of distributed resources and increases the flexibility of power grid control; on the other hand, it fully considers the autonomous response rights of the aggregators of distributed resources, realizes timely and flexible dynamic aggregation and calling of virtual power plants, ensures the reliable operation of the system, and maximizes the use of the dynamic aggregation adjustment capability of virtual power plants, and improves the flexible scheduling capability of various distributed resources.

[0166] Embodiment 2

[0167] An embodiment of the present invention provides a dynamic aggregation device for large-scale resources of a virtual power plant, which is applied to a management system, wherein the management system is respectively connected to a cloud server and several control edges of a distributed energy site; the cloud server is connected to an electric power trading market;

[0168] Please refer to Figure 3 , a dynamic aggregation device for scaled resources of a virtual power plant provided by an embodiment of the present invention comprises: a model construction module 201, a model correction module 202 and a dispatch control module 203;

[0169] The model construction module is used to construct a dynamic aggregation optimization model according to the power information of the distributed energy site; the dynamic aggregation optimization model includes an equivalent model and a power baseline model;

[0170] The model correction module is used to obtain the maximum range of equivalent parameters of the virtual power plant according to the power baseline model;

[0171] Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model;

[0172] The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model.

[0173] The dispatch control module is used to calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to the cloud server so that the cloud server generates and returns corresponding dispatch instructions;

[0174] The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

[0175] Furthermore, before constructing the dynamic aggregation optimization model according to the power information of the distributed energy site, the method further includes:

[0176] According to the power transaction information of the power transaction market, the information parameters of the distributed energy equipment in the distributed energy station, and the distributed energy prediction curve data in the distributed energy station, a standardized modeling method is used to model different types of distributed resources in the distributed energy station to obtain several distributed resource models;

[0177] According to the plurality of distributed resource models, the power information of the distributed energy site is obtained.

[0178] Furthermore, the dynamic aggregation optimization model is constructed according to the power information of the distributed energy site, specifically:

[0179] According to the range of the interconnection line power, the range of the current accumulated power of the virtual power plant and the range of the change of the interconnection line power of the virtual power plant, an equivalent model is constructed;

[0180] Taking minimizing the power generation cost of the virtual power plant as the objective function, taking the maximum range power balance constraint of the equivalent parameters of the virtual power plant, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraint of the energy storage equipment as the constraints of the objective function, a power baseline model is constructed;

[0181] The equivalent value model and the power baseline model are used as a dynamic aggregation optimization model.

[0182] Furthermore, the equivalent model is constructed according to the range of the tie line power, the range of the current accumulated power of the virtual power plant and the range of the change in the tie line power of the virtual power plant, specifically:

[0183] The expression of the equivalent model is:

[0184]

[0185]

[0186]

[0187] in, is the tie line power at time t, t∈Ω T is the set of all adjustable operating time periods, P tie,min and P tie,max are the minimum and maximum values ​​of the tie line power respectively; E tie,min and E tie,max are the minimum and maximum values ​​of the current accumulated electricity of the virtual power plant respectively; and They are the minimum and maximum downward and upward changes of the virtual power plant interconnection line power at time t respectively.

[0188] Furthermore, the objective function is to minimize the power generation cost of the virtual power plant, and the power balance constraint, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of the non-energy storage distributed resource, and the charging and discharging power constraint of the energy storage equipment are used as constraints of the objective function to construct a power baseline model, specifically:

[0189] The expression of the objective function is:

[0190]

[0191] Among them, Ω G It is the collection of all distributed resource power generation equipment. is the tie line power at time t, Ω T For, c i for, for, for;

[0192] The expression of the power balance constraint is:

[0193]

[0194] Among them, Ω G is the collection of all distributed resource generation equipment, Ω H is the set of all non-energy storage distributed resources, Ω S It is the collection of all energy storage resources; is the target active power of distributed resource generation equipment i at time t, is the active power of distributed resource device i at time t, is the active power of energy storage device i at time t; Inject active power into grid nodes for distributed resource generation equipment; is the active power injected into the grid node by non-energy storage distributed resources at time t; is the total load power at time t;

[0195] The expression of the active power constraint of the distributed resource power generation equipment at time t is:

[0196]

[0197] The expression of the power feasible region constraint of the non-energy storage distributed resource at time t is:

[0198]

[0199] The expression of the charging and discharging power constraint of the energy storage device at time t is:

[0200]

[0201] in, is the target active power column vector of distributed resource generation equipment i at time t, is the active power column vector of distributed resource device i at time t, is the active power column vector of energy storage device i at time t; Φ G,i represents the feasible domain of the active output variable of distributed resource generation equipment i at each moment; Φ H,irepresents the feasible domain of the active output variable of non-energy storage distributed resource i at each moment; Φ S,i Represents the feasible domain of the power output variable of energy storage resource i at each moment.

[0202] Furthermore, the maximum range of equivalent parameters of the virtual power plant is obtained according to the power baseline model, specifically:

[0203] The power balance constraint, the active power constraint of distributed resource generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraints of energy storage equipment are taken as the maximum range of equivalent parameters of the virtual power plant.

[0204] Furthermore, the maximum range of equivalent parameters of the virtual power plant is used as a constraint condition to solve several preset optimization problems respectively to obtain the initial parameters of the dynamic aggregation optimization model;

[0205] Among them, several preset optimization problems are: minimizing the interconnection line power at time t, maximizing the interconnection line power at time t, minimizing the sum of the interconnection line power of all adjustable operating time periods, maximizing the sum of the interconnection line power of all adjustable operating time periods, minimizing the change in the interconnection line power of the virtual power plant at time t, and maximizing the change in the interconnection line power of the virtual power plant at time t.

[0206] Furthermore, the parameters in the equivalent model are corrected according to the day-ahead optimized dispatch data, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis according to the power information of the distributed energy equipment within the day, and the equivalent model is optimized according to the cost function to obtain a corrected dynamic aggregation optimization model, which is specifically:

[0207] By optimizing and solving the dynamic aggregation optimization model, the economic dispatch plan data with the largest deviation is obtained;

[0208] According to the reference curve and the scheduling plan data with the largest deviation, the parameters in the equivalent model are corrected;

[0209] Wherein, the benchmark curve is obtained according to the day-ahead optimized scheduling data of the power baseline model;

[0210] According to the power information of distributed energy equipment in the virtual power plant, the adjustable capacity range at the next dispatching moment is calculated, the information is updated to the power grid, and the adjustable resource parameters of the dynamic aggregation optimization model are revised on a daily basis.

[0211] Wherein, the power information includes: operation status information and energy storage charge status information;

[0212] An upper bound estimate of the cost function of the virtual power plant is obtained, several calculation points are selected between the upper and lower limits of the power of the equivalent model, a single-period optimization problem with a penalty is solved for each of the calculation points, the equivalent model is optimized, and a revised dynamic aggregation optimization model is obtained.

[0213] Furthermore, the economic dispatch plan data with the largest deviation is obtained by optimizing and solving the dynamic aggregation optimization model, specifically:

[0214] The expression for solving the economic dispatch plan data with the largest deviation is:

[0215]

[0216]

[0217] Among them, p tie is the column vector of the interconnection line power planned by the virtual power plant at each moment; p is the column vector of the power of each device at each scheduling moment, and They correspond to the upward and downward deviations between the interconnection line power and the dispatch plan at time t, respectively.

[0218] Furthermore, solving the single-period optimization problem with penalty for each of the calculation points is specifically as follows:

[0219] The expression for solving the single-period optimization problem with penalty for each of the calculation points is:

[0220]

[0221]

[0222] in, and They correspond to the upward and downward deviations between the tie line power and the dispatch plan at time t, is the reference power of energy storage device i at time t, where the constraint It means that the energy storage charging and discharging plan is the same as the base state. is the generation cost of distributed resources at time t, is the electricity price cost coefficient of purchasing electricity through the interconnection line at time t, and M is the deviation parameter.

[0223] The above-mentioned dynamic aggregation device of virtual power plant scale resources can implement the dynamic aggregation method of virtual power plant scale resources in the above-mentioned method embodiment. The options in the above-mentioned method embodiment are also applicable to this embodiment and will not be described in detail here. The rest of the contents of the embodiment of this application can refer to the contents of the above-mentioned method embodiment, and will not be repeated in this embodiment.

[0224] In this embodiment, since the virtual power plant involves many forms of user-side energy resources, please refer to Figure 4 The present invention proposes a general-purpose industrial control hardware device basic platform based on an embedded system. Through cloud-edge collaborative technology, the monitoring architecture system of traditional distributed energy stations is reformed and innovated, and a data flow interaction architecture for new energy production and consumption is established. It supports the economical and efficient use of computing resources, emphasizes the scalability and on-demand service of resources, and comprehensively integrates resource combination, monitoring, economic and environmental benefits to obtain the optimal solution in the process of distributed autonomous operation.

[0225] The platform is connected to the virtual power plant aggregator operation and management system of the upper power grid control center, and gathers a large number of adjustable resources to the south. After the control center sends the demand to the virtual power plant aggregator operation and management system, the general chemical control hardware device basic platform dynamically decomposes the upper demand response power or load according to different characteristics, and solves the dynamic aggregation optimization model of the scaled resources of the virtual power plant to achieve effective decomposition of the adjustable load and meet the demand response requirements.

[0226] The software modular design of the basic platform of general-purpose industrial control hardware devices based on embedded systems includes: system layer, application layer, driver layer and hardware boards;

[0227] The system layer and application layer set up basic functions such as synchronous sampling, frequency tracking and FFT calculation to support the functions of the virtual power plant aggregator operation and management system. The driver layer connects the system layer, application layer and hardware boards respectively, and configures the corresponding drivers.

[0228] The basic platform of general-purpose industrial control hardware devices based on embedded systems integrates network, computing, storage and application functions, realizes functions such as collection, storage and forwarding, has flexible communication ports, sends the target value of optimized distributed resource output to the edge end, changes the output through its power controller, and returns the actual power measurement value.

[0229] Embodiment 3

[0230] Accordingly, the present invention also provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the dynamic aggregation method of virtual power plant scale resources as described in any one of the above embodiments.

[0231] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program in the terminal device.

[0232] The terminal device may be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.

[0233] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the terminal device, and uses various interfaces and lines to connect various parts of the entire terminal device.

[0234] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the terminal device by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile terminal, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Med ia Card, SMC), a secure digital (SecureDi gita l, SD) card, a flash card (F l ash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0235] Wherein, if the module / unit integrated in the terminal device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium can include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.

[0236] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for dynamically aggregating large-scale resources of a virtual power plant, characterized in that: Applied to a management system, the management system is connected to a cloud server and several control edges of a distributed energy site respectively; the cloud server is connected to a power trading market; The method comprises: According to the power information of the distributed energy site, a dynamic aggregation optimization model is constructed; the dynamic aggregation optimization model includes an equivalent model and a power baseline model; According to the power baseline model, the maximum range of equivalent parameters of the virtual power plant is obtained; Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model; The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model. Calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to a cloud server so that the cloud server generates and returns corresponding dispatch instructions; The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

2. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 1, characterized in that: Before constructing the dynamic aggregation optimization model according to the power information of the distributed energy site, the method further includes: According to the power transaction information of the power transaction market, the information parameters of the distributed energy equipment in the distributed energy station, and the distributed energy prediction curve data in the distributed energy station, a standardized modeling method is used to model different types of distributed resources in the distributed energy station to obtain several distributed resource models; According to the plurality of distributed resource models, the power information of the distributed energy site is obtained.

3. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 1, characterized in that: According to the power information of distributed energy sites, a dynamic aggregation optimization model is constructed, specifically: According to the range of the interconnection line power, the range of the current accumulated power of the virtual power plant and the range of the change of the interconnection line power of the virtual power plant, an equivalent model is constructed; Taking minimizing the power generation cost of the virtual power plant as the objective function, taking the maximum range power balance constraint of the equivalent parameters of the virtual power plant, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraint of the energy storage equipment as the constraints of the objective function, a power baseline model is constructed; The equivalent value model and the power baseline model are used as a dynamic aggregation optimization model.

4. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 3, characterized in that: The equivalent model is constructed according to the range of the tie line power, the range of the current accumulated power of the virtual power plant and the range of the change in the tie line power of the virtual power plant, specifically: The expression of the equivalent model is: in, is the tie line power at time t, t∈Ω T is the set of all adjustable operating time periods, P tie,min and P tie,max are the minimum and maximum values ​​of the tie line power respectively; E tie,min and E tie,max are the minimum and maximum values ​​of the current accumulated electricity of the virtual power plant respectively; and They are the minimum and maximum downward and upward changes of the virtual power plant interconnection line power at time t respectively.

5. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 3, characterized in that: The objective function is to minimize the power generation cost of the virtual power plant, and the power balance constraint, the active power constraint of the distributed resource power generation equipment, the power feasible domain constraint of the non-energy storage distributed resource, and the charging and discharging power constraint of the energy storage equipment are used as constraints of the objective function to construct a power baseline model, specifically: The expression of the objective function is: Among them, Ω G It is the collection of all distributed resource power generation equipment. is the tie line power at time t, Ω T is the set of all adjustable running time periods, c i is the generation cost function of distributed resources, is the electricity price cost coefficient of purchasing electricity through the interconnection line at time t, is the active power output of distributed resources at time t; The expression of the power balance constraint is: Among them, Ω G is the collection of all distributed resource generation equipment, Ω H is the set of all non-energy storage distributed resources, Ω S It is the collection of all energy storage resources; is the target active power of distributed resource generation equipment i at time t, is the active power of distributed resource device i at time t, is the active power of energy storage device i at time t; Inject active power into grid nodes for distributed resource generation equipment; is the active power injected into the grid node by non-energy storage distributed resources at time t; is the total load power at time t; The expression of the active power constraint of the distributed resource power generation equipment at time t is: The expression of the power feasible region constraint of the non-energy storage distributed resource at time t is: The expression of the charging and discharging power constraint of the energy storage device at time t is: in, is the target active power column vector of distributed resource generation equipment i at time t, is the active power column vector of distributed resource device i at time t, is the active power column vector of energy storage device i at time t; Φ G,i represents the feasible domain of the active output variable of distributed resource generation equipment i at each moment; Φ H,i represents the feasible domain of the active output variable of non-energy storage distributed resource i at each moment; Φ S,i Represents the feasible domain of the power output variable of energy storage resource i at each moment.

6. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 5, characterized in that: The maximum range of equivalent parameters of the virtual power plant is obtained according to the power baseline model, specifically: The power balance constraint, the active power constraint of distributed resource generation equipment, the power feasible domain constraint of non-energy storage distributed resources, and the charging and discharging power constraints of energy storage equipment are taken as the maximum range of equivalent parameters of the virtual power plant.

7. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 6, characterized in that: The maximum range of equivalent parameters of the virtual power plant is used as a constraint condition to solve several preset optimization problems respectively to obtain the initial parameters of the dynamic aggregation optimization model; Among them, several preset optimization problems are: minimizing the interconnection line power at time t, maximizing the interconnection line power at time t, minimizing the sum of the interconnection line power of all adjustable operating time periods, maximizing the sum of the interconnection line power of all adjustable operating time periods, minimizing the change in the interconnection line power of the virtual power plant at time t, and maximizing the change in the interconnection line power of the virtual power plant at time t.

8. A method for dynamically aggregating large-scale resources of a virtual power plant according to any one of claims 1 to 7, characterized in that: The parameters in the equivalent model are corrected according to the day-ahead optimized dispatch data, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis according to the power information of the distributed energy equipment within the day, and the equivalent model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model, which is specifically: By optimizing and solving the dynamic aggregation optimization model, the economic dispatch plan data with the largest deviation is obtained; According to the reference curve and the scheduling plan data with the largest deviation, the parameters in the equivalent model are corrected; Wherein, the benchmark curve is obtained according to the day-ahead optimized scheduling data of the power baseline model; According to the power information of distributed energy equipment in the virtual power plant, the adjustable capacity range at the next dispatching moment is calculated, the information is updated to the power grid, and the adjustable resource parameters of the dynamic aggregation optimization model are revised on a daily basis. Wherein, the power information includes: operation status information and energy storage charge status information; An upper bound estimate of the cost function of the virtual power plant is obtained, several calculation points are selected between the upper and lower limits of the power of the equivalent model, a single-period optimization problem with a penalty is solved for each of the calculation points, the equivalent model is optimized, and a revised dynamic aggregation optimization model is obtained.

9. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 8, characterized in that: The economic dispatch plan data with the largest deviation is obtained by optimizing and solving the dynamic aggregation optimization model, specifically: The expression for solving the economic dispatch plan data with the largest deviation is: Among them, p tie is the column vector of the interconnection line power planned by the virtual power plant at each moment; p is the column vector of the power of each device at each scheduling moment, and They correspond to the upward and downward deviations between the interconnection line power and the dispatch plan at time t, respectively.

10. A method for dynamically aggregating large-scale resources of a virtual power plant according to claim 8, characterized in that: The single-period optimization problem with penalty items is solved for each of the calculation points, specifically: The expression for solving the single-period optimization problem with penalty for each of the calculation points is: in, and They correspond to the upward and downward deviations between the tie line power and the dispatch plan at time t, is the reference power of energy storage device i at time t, where the constraint It means that the energy storage charging and discharging plan is the same as the base state. is the generation cost of distributed resources at time t, is the electricity price cost coefficient of purchasing electricity through the interconnection line at time t, and M is the deviation parameter.

11. A dynamic aggregation device for large-scale resources of a virtual power plant, characterized in that: Applied to a management system, the management system is connected to a cloud server and several control edges of a distributed energy site respectively; the cloud server is connected to a power trading market; The device comprises: a model construction module, a model correction module and a scheduling control module; The model construction module is used to construct a dynamic aggregation optimization model according to the power information of the distributed energy site; the dynamic aggregation optimization model includes an equivalent model and a power baseline model; The model correction module is used to obtain the maximum range of equivalent parameters of the virtual power plant according to the power baseline model; Taking the maximum range of equivalent parameters of the virtual power plant as a constraint condition, solving several preset optimization problems respectively to obtain initial parameters of the dynamic aggregation optimization model; The parameters in the equivalent value model are corrected according to the day-ahead optimized dispatch data. According to the power information of the distributed energy equipment within the day, the adjustable resource parameters of the dynamic aggregation optimization model are corrected on a rolling basis within the day. The equivalent value model is optimized according to the cost function to obtain the corrected dynamic aggregation optimization model. The dispatch control module is used to calculate a new economic dispatch plan using the modified dynamic aggregation optimization model; send the new economic dispatch plan to the cloud server so that the cloud server generates and returns corresponding dispatch instructions; The scheduling instruction is decomposed, and the decomposed scheduling instruction is sent to the corresponding control edge for execution.

12. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored computer program; wherein, when the computer program is running, it controls the device where the computer-readable storage medium is located to execute a method for dynamically aggregating large-scale resources of a virtual power plant as described in any one of claims 1 to 10.

Citation Information

Patent Citations

  • Virtual power plant equivalence method based on day-ahead aggregation and intra-day rolling correction connection

    CN112072645A

  • Virtual power plant regulation capability assessment method and system based on aggregation of multiple resources

    CN114429274A

  • Energy efficiency power plant modeling and power supply planning method and system

    CN117057127A

  • Virtual aggregation system and method for regional energy source complex

    WO2021244000A1

Cited By

  • Resource allocation method and system based on virtual power plant

    CN119298041A

  • Virtual power plant wide area aggregation optimization scheduling method

    CN119443632A

  • Distributed resource assessment aggregation method and device of virtual power plant and electronic equipment

    CN120341860A

  • Power management method based on cloud computing, terminal equipment and storage medium

    CN120749803A

  • A power management method based on cloud computing, a terminal device and a storage medium

    CN120749803B