Construction method of river bank flood control vegetation
Through the investigation of river embankments, we formulated a vegetation construction plan, set up vegetation buffer zones and planted specific plants, which solved the problem in the existing technology that flood control vegetation on river embankments cannot effectively prevent floods and protect slopes, improved the flood control effect and practicality, and promoted the improvement of the ecological environment. recover.
Patent Information
- Application Number
- CN202411004811.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-11
AI Technical Summary
The existing flood control vegetation on river embankments cannot effectively achieve flood control and slope protection effects, and its practicality is low.
By conducting surveys on river embankments, we collect data on soil pH, soil texture, groundwater level, water flow velocity, and flood frequency, and formulate a suitable vegetation construction plan, including setting up vegetation buffer zones in the contact areas between river embankments and river water, and setting up vegetation buffer zones on slopes. Plant specific plants to enhance soil consolidation and ensure at least 80% vegetation coverage.
It improves the flood control and slope protection effect of flood control vegetation on river embankments, enhances practicability, and achieves the stability of river embankments and the restoration and improvement of the ecological environment.
Smart Images

Figure CN118749356A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of flood control vegetation construction, and in particular to a method for constructing flood control vegetation on a river bank. Background Art
[0002] For river banks that have not been planted with vegetation, after being washed by floods and heavy rains, rainwater can easily carry mud, gravel, etc. into the river, causing the riverbed to rise. At present, flood-control vegetation is planted on most river banks, which can play its ecological and landscape greening functions on the one hand, and play the role of flood control and slope protection on the other.
[0003] However, the existing flood-control vegetation on river banks is more for ornamental purposes, but cannot achieve the effect of flood control and slope protection, and has low practicality.
[0004] Therefore, how to improve the flood control and slope protection effect of flood control vegetation on river embankments and improve its practical performance has become a problem that needs to be solved.
[0005] The above information disclosed in the background section is only for enhancing understanding of the background of the present application and therefore it may contain information that does not form the prior art known to a person of ordinary skill in the art. Summary of the invention
[0006] The present application provides a method for constructing flood-prevention vegetation on river banks, so as to solve the problems existing in the prior art.
[0007] The present application provides a method for constructing river bank flood prevention vegetation, comprising the following steps:
[0008] S1. Conduct a survey on the river bank and collect survey data on soil pH value, soil texture, groundwater level, water flow velocity, and flood frequency of the river bank;
[0009] S2. Formulate a vegetation construction plan suitable for the river bank based on the survey data, wherein the vegetation construction plan includes: determining the vegetation coverage rate and the types of plants to be planted;
[0010] In the contact area between the river bank and the river water, a vegetation buffer zone is set up to mitigate the impact of water flow on the river bank; at the same time, corresponding plants are planted on the slope of the river bank to enhance the consolidation capacity of the soil.
[0011] In some embodiments, the plant species include at least: trees, shrubs and herbaceous plants.
[0012] In some embodiments, the root system depth of the tree is at least 1 m, and the root system depth of the shrub is at least 0.5 m.
[0013] In some embodiments, the planting ratio of trees to shrubs and herbaceous plants is 5:3:2.
[0014] In some embodiments, the row spacing and plant spacing of the tree planting are both 2-5m, the row spacing and plant spacing of the shrub planting are both 0.5-2m, the row spacing of the herbaceous plant planting is 10-30cm, and the plant spacing of the herbaceous plant planting is 5-15cm.
[0015] In some embodiments, the tree is at least one of Metasequoia, Willow and Poplar.
[0016] In some embodiments, the shrub is at least one of Salix matsudana and Rhododendron chinense.
[0017] In some embodiments, the herbaceous plant is at least one of Bermuda grass, aquatic grass, cattail, junco and Paspalum distachyon.
[0018] In some embodiments, the vegetation coverage is at least 80%.
[0019] In some embodiments, it also includes:
[0020] S3. Timely monitor the growth of flood control vegetation on the river bank and manage and maintain it.
[0021] The method for constructing flood-control vegetation on river banks provided in the present application comprises the following steps: S1, investigating the river banks, and collecting the survey data of soil pH value, soil texture, groundwater level, water flow velocity, and flood frequency of the river banks; S2, formulating a vegetation construction plan suitable for the river banks based on the survey data, wherein the vegetation construction plan comprises: determining the vegetation coverage rate and the types of plants to be planted; wherein, in the contact area between the river banks and the river water, a vegetation buffer zone is set to mitigate the impact of the water flow on the river banks; at the same time, corresponding plants are planted on the slopes of the river banks to enhance the consolidation capacity of the soil. The present application first investigates the river banks, understands the specific conditions of the soil and river of the river banks, and then formulates a vegetation construction plan suitable for the river banks, and sets a vegetation buffer zone in the contact area between the river banks and the river water, and plants on the slopes above the vegetation buffer zone, thereby improving the flood control and slope protection effect of the flood-control vegetation on the river banks and enhancing its practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0023] Figure 1 A flow chart of a method for constructing river bank flood control vegetation provided in this application.
[0024] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "an" and "the" used in the embodiments of the present application are also intended to include plural forms, unless the context clearly indicates other meanings.
[0027] It should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0028] It should be understood that the terms "length", "width", "up", "down", "front", "back", "first", "second", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0029] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0030] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0031] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0032] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0033] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such a product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.
[0034] The technical solution of the present application and how the technical solution of the present application solves the above-mentioned technical problems are described in detail below with specific embodiments. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments. The embodiments of the present application will be described below in conjunction with the accompanying drawings.
[0035] Figure 1 The flowchart of the method for constructing river bank flood control vegetation provided for this application is as follows: Figure 1 As shown, the method for constructing river bank flood prevention vegetation provided by the present application comprises the following steps:
[0036] S1. Conduct a survey on the river bank and collect survey data on soil pH value, soil texture, groundwater level, water flow velocity, and flood frequency of the river bank;
[0037] Specifically, in the embodiment of the present application, suitable plants are selected for planting according to soil pH value, soil texture, groundwater level, water flow velocity, and flood frequency, as follows:
[0038] If the soil pH value of the river bank is less than 7, plant acid-tolerant plants; if the soil pH value is greater than 7, plant alkaline-tolerant plants;
[0039] If the soil texture is sandy, choose drought-tolerant plants; if the soil texture is clay, choose moisture-tolerant plants;
[0040] If the groundwater level is high, choose moisture-tolerant plants; if the groundwater level is low, choose drought-tolerant plants;
[0041] If the water flows fast, choose plants with well-developed root systems and strong soil-fixing ability; if the water flows slowly, you can choose a wider variety of aquatic plants;
[0042] If flooding is frequent, choose plants that are tolerant to flooding.
[0043] S2. Formulate a vegetation construction plan suitable for the river bank based on the survey data, wherein the vegetation construction plan includes: determining the vegetation coverage rate and the types of plants to be planted;
[0044] In the contact area between the river bank and the river water, a vegetation buffer zone is set up to mitigate the impact of water flow on the river bank; at the same time, corresponding plants are planted on the slope of the river bank to enhance the consolidation capacity of the soil.
[0045] In some embodiments, the plant species include at least: trees, shrubs and herbaceous plants.
[0046] In some embodiments, the root system depth of the tree is at least 1 m, and the root system depth of the shrub is at least 0.5 m.
[0047] In some embodiments, the planting ratio of trees to shrubs and herbaceous plants is 5:3:2.
[0048] In some embodiments, the row spacing and plant spacing of the tree planting are both 2-5m, the row spacing and plant spacing of the shrub planting are both 0.5-2m, the row spacing of the herbaceous plant planting is 10-30cm, and the plant spacing of the herbaceous plant planting is 5-15cm.
[0049] In some embodiments, the tree is at least one of Metasequoia, Willow and Poplar.
[0050] In some embodiments, the shrub is at least one of Salix matsudana and Rhododendron chinense.
[0051] In some embodiments, the herbaceous plant is at least one of Bermuda grass, aquatic grass, cattail, junco and Paspalum distachyon.
[0052] Specifically, in the embodiment of the present application, according to the previous survey data, the river bank can be divided into four parts: riverbed, riverbank, slope, and top. For the above four parts, the flood control vegetation in the present application is constructed as follows:
[0053] Aquatic plants such as reeds and cattails are planted in the riverbed.
[0054] Plants that are moisture-tolerant and have well-developed root systems, such as willows and poplars, are planted in the riverbank area.
[0055] Drought-resistant plants with strong soil-fixing ability, such as Bermuda grass, are planted on the slopes of river embankments.
[0056] The top of the river bank is planted with drought-tolerant plants with shallow roots, such as turf.
[0057] In some embodiments, the vegetation coverage is at least 80%.
[0058] In some embodiments, it also includes:
[0059] S3. Timely monitor the growth of flood control vegetation on the river bank and manage and maintain it.
[0060] Specifically, in the embodiment of the present application, the maintenance and management of flood control vegetation includes: regular monitoring, pruning, water management, nutrition management, pest and disease control, vegetation renewal and replanting, etc. The following is a detailed description:
[0061] Regular monitoring: Regularly check the growth of plants, including growth rate, occurrence of pests and diseases, etc.; monitor changes in soil pH, organic matter content and nutritional status; monitor changes in groundwater level, water flow rate and flood frequency.
[0062] Pruning: Prune plants regularly to remove dead branches, promote ventilation and light, maintain vegetation form, and promote plant growth while improving ornamental value. For areas with overly dense growth, thin out to maintain appropriate vegetation density.
[0063] Water management: Provide adequate irrigation during dry seasons or when the groundwater level is low; ensure that the drainage system is unobstructed to avoid waterlogging that may cause root rot in plants.
[0064] Nutrition management: replenish nutrients needed by plants in a timely manner according to soil test results; apply organic fertilizers or mulch to improve soil structure and fertility.
[0065] Pest and disease control: Use non-chemical methods such as biological control and physical control to prevent the occurrence of pests and diseases; when pests and diseases occur, take timely measures to control them and minimize the use of chemical pesticides.
[0066] Vegetation renewal and replanting: timely renewal of poorly growing or dead plants; replanting in areas with insufficient vegetation coverage to ensure the continuity and integrity of the vegetation.
[0067] Through the above maintenance and management measures, the effectiveness and long-term stability of the flood control vegetation construction plan can be ensured, while promoting the healthy development of the ecosystem.
[0068] This application first investigates the river embankment to understand the specific conditions of the soil, river, etc. of the river embankment, and then formulates a vegetation construction plan suitable for the river embankment, and sets up a vegetation buffer zone in the area where the river embankment contacts the river water, and plants are planted on the slopes above the vegetation buffer zone. This improves the flood control and slope protection effect of the flood control vegetation on the river embankment and enhances its practicality, thereby achieving the goal of both protecting the stability of the river embankment and promoting the restoration and improvement of the ecological environment.
[0069] It should be understood that, although the various steps in the flowcharts in the above-described embodiments are sequentially displayed according to the indications of the arrows, these steps are not necessarily executed sequentially in the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and they can be executed in other orders. Moreover, at least a portion of the steps in the figure may include a plurality of sub-steps or a plurality of stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and their execution order is not necessarily to be carried out sequentially, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
[0070] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the application disclosed herein. The present application is intended to cover any modification, use or adaptation of the present application, which follows the general principles of the present application and includes common knowledge or customary techniques in the art that are not disclosed in the present application. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present application are indicated by the claims.
[0071] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A method for constructing flood-control vegetation on river banks, characterized in that: The following steps are involved: S1. Conduct a survey on the river bank and collect survey data on soil pH value, soil texture, groundwater level, water flow velocity, and flood frequency of the river bank; S2. Formulate a vegetation construction plan suitable for the river bank based on the survey data, wherein the vegetation construction plan includes: determining the vegetation coverage rate and the types of plants to be planted; In the contact area between the river bank and the river water, a vegetation buffer zone is set up to mitigate the impact of water flow on the river bank; at the same time, corresponding plants are planted on the slope of the river bank to enhance the consolidation capacity of the soil.
2. The method for constructing river bank flood prevention vegetation according to claim 1, characterized in that: The plant species include at least: trees, shrubs and herbaceous plants.
3. The method for constructing river bank flood prevention vegetation according to claim 2, characterized in that: The root system depth of the tree is at least 1 m, and the root system depth of the shrub is at least 0.5 m.
4. The method for constructing river bank flood prevention vegetation according to claim 2 or 3, characterized in that: The planting ratio of trees, shrubs and herbaceous plants is 5:3:
2.
5. The method for constructing river bank flood prevention vegetation according to claim 2 or 3, characterized in that: The row spacing and plant spacing of the tree planting are both 2-5m, the row spacing and plant spacing of the shrub planting are both 0.5-2m, the row spacing of the herbaceous plant planting is 10-30cm, and the plant spacing of the herbaceous plant planting is 5-15cm.
6. The method for constructing river bank flood prevention vegetation according to claim 2, characterized in that: The tree is at least one of metasequoia, willow and poplar.
7. The method for constructing river bank flood prevention vegetation according to claim 2, characterized in that: The shrub is at least one of Salix matsudana and Rhododendron chinense.
8. The method for constructing river bank flood prevention vegetation according to claim 2, characterized in that: The herbaceous plant is at least one of Bermuda grass, aquatic grass, cattail, rush and Paspalum distachyon.
9. The method for constructing river bank flood prevention vegetation according to claim 1, characterized in that: The vegetation coverage is at least 80%.
10. The method for constructing river bank flood prevention vegetation according to claim 1, characterized in that: Also includes: S3. Timely monitor the growth of flood control vegetation on the river bank and manage and maintain it.
Citation Information
Cited By
Flood prevention automatic detection device applied to river bank
CN121346895A
A flood control automatic detection device applied to a river embankment
CN224850988U