The invention discloses a method for constructing a medium slope riparian
buffer zone in a cold region based on non-
point source pollution blocking, and belongs to the technical field of river non-
point source pollution treatment in the cold region. Submerged plants are planted in the submerged
plant unit on the lower portion of the
system by 15 cm in the river
bank direction,
pumice of 15 cm is placed close to the edge of the
vegetation, and the whole unit is alternately and sequentially arranged; the upper emergent
aquatic plant unit and the submerged
plant corresponding unit are vacant, the unit corresponding to the
pumice stone is used for placing emergent
aquatic plant planting baskets and planting emergent aquatic plants, and a biological ribbon is suspended between the two units in the
system; a living
willow pile is wedged into a middle slope bottom riverbed at the position where the slope top extends towards the water surface by 0.7-1 m, gravel-
cobble is laid at the bottom of the riverbed to the living
willow pile, the long edge of a sand retention and
turbidity reduction
system is vertically placed on the gravel-
cobble in the river
bank direction, and the space between the river
bank and the
willow pile and the gap between the river bank and the willow pile are filled with the gravel-
cobble; shrubs and arbors are planted close to the sand retention and
turbidity reduction system to serve as an arbor and
shrub interception area; herbaceous plants are planted close to the arbor and
shrub interception area to serve as a herbaceous retention area.